2 to 36, 9, 31 2 to 36, 9, 31 - Central Bedfordshire Council

580
13
CUT LINE
Notes:
AD
CUT LINE
46
Junction Visibility Splay
RO
Key:
GE
RA
25
Plane out 50mm of existing carriageway
(repairs to binder course to be carried out as
required)
50mm HRA 35/14 with 20mm chipping to be
laid prior to the application of the red anti-skid
material. Minimum PSV of 70.
Limit of Works Boundary (To existing features. Agreed in
meeting with CBC Highways 29.03.2016)
Proposed Tactile Paving (Buff coloured unless noted
otherwise)
1.
Do not scale from this drawing.
2.
All dimensions are in metres unless stated otherwise.
3.
This drawing is to be read in conjunction with all relevant Engineers and Architects Drawings,
Specifications, Reports and Engineering Details.
4.
All Highway works are to be constructed in accordance with Central Bedfordshire's (CBC) Design Guide
and with Manual for Streets (latest addition). Approval is to be sought by Highways (CBC) prior to
construction if works deviate away from the standards outlined within these documents.
5.
This drawing to be read in conjunction with drawing T7598/PH - 220 - Section 278 Construction Notes
Proposed 15mm imprint surface. PSV 68. Colour: Prismo Red.
RS06
68m
6.3
Proposed Traffic Sign with a 60m (min) clear visibility splay for a
30mph approach and a 75m (min) clear visibility splay for a 40mph
approach
CBC Horticulture and Arboriculture officer to
confirm tree strategy
600
RS07
2m
19
Proposed Anti Skid. PSV 70.
Existing lighting column to be relocated to back
of proposed footway.
6
3
2
20
1
Proposed retaining wall. Type to be agreed with highways. (Height
will vary along extents). Specification to be agreed with CBC.
Highfield Bungalow
109
Highfield House
101
97
Highfield Barn
132
91
83
130
8m Mallatite tubular galvanised column with thermoplast coating
with post top Philips Luma 60-120 DS-NW 1 10000 NW LED lantern,
RAL 9007 and switch regime at 35:18 lux. Install double pole
isolator at base of the column
1
81
73
79
Existing column and lantern to remain
71
65
AD
LD
IE
Brethrens
57
6
Meeting
Fields
63
View
RO
F
CH
UR
CH
88
House
The Corner House
55
Bankside
76
2
49
7
4
18
Proposed 0.5m verge (150mm (min) topsoil
and seed) to face of retaining structures
Proposed 3m Simmonsign Modupost with 3m extension and install
Libra Retro 28LED left handed black lantern with 70lux photocell
34
10
8
SE
12
CLO
8
DE
KSI
BAN
22
2
Existing column and lantern to be disconnected and removed to tip.
Private / DNO feed to be disconnected
620
BIDW
ELL H
ILL
5
64
240
8
(PH)
1
F:4.5m x D:25m
008
Red Lion
38
2m
Contractor to seek approval from all
appropriate bodies prior to construction
commencing on the existing tress that are to
remain
1
016
2
The Old
CBC Horticulture and Arboriculture
officer to confirm tree strategy
007
Supply cables 3 core 6mm² XLPE / PVC / SWA / PVC laid in
50mm Ø orange duct for private network, laid at minimum
cover depth of 450mm in footpath and 750mm in carraigeway
Forward Visibility Splays
Existing Bus Stop
Chainage marker
Post
HOUGHTON REGIS
Proposed highway drainage
Car Park
2m
Existing footway to be widened
30
El Sub Sta
640
30
LOCATION MAP
(1:5000)
Existing lighting column to be relocated to back
of proposed footway.
Top of raised tables to be smooth underneath
thermplastic markings and white lining.
36
CBC Horticulture and Arboriculture
officer to confirm tree strategy
Road Safety Audit Stage 1-2
Problem 3.2.3
007
Solution:
Agreed. Consistent surface
material to be provided over
extent of raised table and
parking bays
2m
2m
Non location references items:
Problem 3.1.1
Solution:
Agreed. Crossing relocated. Vegetation to be cut back and cleared within extents of visibility splays.
29
Proposed raised table
50mm thick HRA surface course
Type F 30/14, PSV 68
15mm thick "Imprint" surface
Colour "Prismo Red"
Amey Road Safety Audit Stage 1-2
Ref. 904251/RSA2/DR/442
660
Tie into existing footway
Problem 3.1.3
28
Solution:
Agreed. Buff HFS removed. Skid resistant road markings, street lighting and raised thermoplastic markings to be
provided to increase conspicuity.
Problem 3.2.1
Existing Bus Stop
Problem 3.2.2
Road Safety Audit Stage 1-2
Problem 3.1.2
Vicarage
Solution:
Agreed. Raised table extended to
incorporate bus stop and accesses
27
GG
Solution:
Agreed. Existing kerbs to be raised or replaced to appropriate levels along raised features.
Problem 3.4.1
Solution:
Agreed. Tactile crossing layouts have been amended.
0
W
D
I
B
Solution:
Agreed. Bullnosed kerb with upstand to be provided along raised features.
68
L
EL
L
L
I
H
006
Problem 3.4.2
Vehicular access
Solution:
Agreed. All existing street furniture to be relocated to back of proposed footways.
Road Safety Audit Stage 1-2
Problem 3.4.3
Provide temporary "New Road Layout Ahead" road sign.
Diagram no. 7014 (variant) with 60m (min) clear visibility
splay. Exact position to be agreed with CBC representative
on site. Sign to be removed after three months.
Problem 3.5.6
Solution:
Agreed. Uncontrolled crossing
facility to be removed.
Tactile crossing provided on
raised table on Bedford Road.
Solution:
Agreed. No proposed steps on the adoptable highway. Hand rails to be provided on site where height of steps
exceed 600mm.
Problem 3.5.7
22
Solution:
Agreed. Street lighting design provided.
0
70
o3
2t
6,
9,
31
Be
on
ac
Mam-Tor
72
0
0m
:6
vis
2
Existing tactile crossing
Street lighting design to be
updated to suit relocated crossing
Indicative Belisha beacon.
Position to be confirmed following
updated street lighting design
5m
20
MP4
1.
Proposed 15mm imprint
surface. Colour: Prismo Red
MP3
Top of raised tables to be smooth underneath
thermplastic markings and white lining.
Street lighting design to be
updated to suit relocated crossing
1
Ivydene House
004
HOUGHTON REGIS
Vehicular access
Dropped crossing
76
0
Vehicular access
Existing full height kerb
Existing double yellow lines
Bea
Indicative Belisha beacon.
Position to be confirmed following
updated street lighting design
con
vis:
60m
780
n
Sig
BE
5m
:4
vis
Watling Court
003
Existing bus stop
1t
800
6
1
o
RS06
RS07
RS6
RS06
RS07
RS6
DF
OR
DR
9
Rev C
Drawings updated to suit CBC comments received (13.05.2016).
By CM
Checked TH
Date 26.05.2016
Rev B
Drawings updated following CBC meeting (29.03.2016).
By CM
Checked TH
Date 05.04.2016
Rev A
Drawings updated to suit CBC comments received (22.01.2016).
By CM
Checked TH
Date 24.03.2016
OA
Client
D
TAYLOR WIMPEY
82
0
Sig
nv
Existing bus stop
is:4
Project HOUSING DEVELOPMENT
5m
BEDFORD ROAD
Existing crossover
HOUGHTON REGIS
6
0
(SHEET 3 OF 3)
4a
Scale at A0
Existing crossover
1:250
Drawn by
Status
4
Provide temporary "New Road Layout Ahead" road sign.
Diagram no. 7014 (variant) with 60m (min) clear visibility
splay. Exact position to be agreed with CBC representative
on site. Sign to be removed after three months.
SECTION 278 WORKS
GENERAL ARRANGEMENT
84
Existing crossover
Title
5
S
H
C
I
TM
LS
E
A
E
V
A
E
U
N
0
74
8
Provide temporary "New Road Layout Ahead" road sign.
Diagram no. 7014 (variant) with 60m (min) clear visibility
splay. Exact position to be agreed with CBC representative
on site. Sign to be removed after three months.
Bedford Court
005
Vehicular access
FOR TECHNICAL APPROVAL
CM
Checked by
Project ref
T7598/PH
TH
Date
Drawing no.
211(3)
MARCH 2015
Revision
C