Planning Committee “INSERT DATE”

Planning Committee: 22 September 2010
Briefing Notes
ITEM 01: 376 Uxbridge Road, Ealing W5 – PP/2010/2234
Amended Recommendation
Further Written Representations
Notes
1 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 02: 2A Queen Anne’s Gardens, Chiswick W4 1TU - P/2010/2355
Amended Recommendation
Condition 3 shall be amended to the following:
All windows in the northern elevation and the proposed window to the landing on the eastern elevation
of the approved scheme shall be fixed shut and be fitted with obscure glazing and permanently
maintained as such. The first floor rear window to the bedroom/ study area in the eastern elevation
shall be obscure glazed, and permanently maintained as such.
Reason: To prevent overlooking and loss of privacy in the interests of the amenities of the
neighbouring properties, in accordance with policies 4.1, 5.5 and 5.9 of the adopted Ealing Unitary
Development Plan: 'Plan for the Environment' (2004).
Further Written Representations
A further objection letter was received from a previous objector stating:
In the first application this was an obscure window; this has not been shown in the revised application
and no reference has been made in the report although the half landing staircase window is shown
obscure.
The first floor window directly overlooks our garden and is only 2.1m away horizontally from it.
Therefore the window should also be obscure and non-opening. Without this there will be a
fundamental and gross intrusion on the privacy and enjoyment of the private space of 9 Woodstock
Road. It will definitely be provocative to intrusion and aggravated feeling.
As it is we will be staring directly into the ground floor windows and vice versa and these should be
partially obscure with perhaps an obscure central section and clear surround.
Officer’s response: This has been addressed in the amended condition. It is now recommended that
the first floor rear window will be obscure glazed.
Notes
2 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 03: 68 Perryn Road, Acton, London W3 7LX - P/2010/2585
Amended Recommendation
Page 10
Condition 3 to be replaced with the following wording in response to the applicant’s request to allow
natural ventilation and avoid condensation in the relevant rooms:
3.
The first floor bathroom window in the northern elevation and the first floor ensuite windows
shall be fixed shut to the bottom sash with the top sash having a restricted opening to a position
above eye level, fitted and permanently maintained with obscure glass. The stairwell windows
shall also be fixed shut, fitted and permanently maintained with stained, obscure glass.
Reason: To prevent overlooking and loss of privacy in the interests of the amenities of the
neighbouring properties, in accordance with policies 4.1, 5.5 and 5.9 of the adopted Ealing
Unitary Development Plan: 'Plan for the Environment' (2004)
Condition 5 to be replaced with the following wording in response to further advice from the Council’s
Landscape and Tree Officer:
5.
The authorised tree works shall be carried in full compliance with all aspects covered within the
Aboricultural report compiled by Mark Clews of Arborhelp received via email 7 September 2010.
A final written report by the consulting Arboricultural consultant should be submitted to the Local
Authority, with regard to the implementation of all recommendations contained within the
arboricultural report.
Reason: To prevent damage to the protected trees in the interest of the visual character and
appearance of the area in accordance with adopted UDP policies 4.1 and 5.5 and
Supplementary Planning Guidance 9: 'Trees and Development Guidelines'
Page 11
Condition 6 to be replaced with the following wording in response to further advice from the Council’s
Landscape and Tree Officer:
6.
No development shall take place until full details of both hard and soft landscape works for the
development have been submitted to and approved in writing by the Local Planning Authority,
including detail shpwing the no dig surface to the front driveway ensuring porus surface and sub
base is provided. These works shall be carried out as approved prior to first occupation of
dwelling hereby approved, or in accordance with a programme agreed by the Local Planning
Authority. Any trees or other plants which die or are removed within the first five years following
the implementation of the landscaping scheme shall be replaced during the next planting
season.
Reason: To ensure that the development is landscaped in the interests of the character and
appearance of the locality, in accordance with policies 4.5 of the Council's adopted Unitary
Development Plan 'Plan for the Environment' (2004).
3 of 24
Planning Committee: 22 September 2010
Briefing Notes
Page 12
Condition 9 would be imposed restricting permitted development rights.
9.
Notwithstanding the provisions of Classes A, B, C, D, E and F of Schedule 2, Part 1, Class A
Town and Country Planning (General Permitted Development) Order 1995, as amended by the
Town and Country Planning (General Permitted Development) (Amendment) (No. 2) (England)
Order 2008, no extensions, alterations or other works shall be carried out without the prior
permission of the Local Planning Authority, obtained through the submission of a planning
application.
Reason: To prevent the overdevelopment of the site and to safeguard the living conditions of
adjoining properties and the appearance of the surrounding area, in accordance with policies
4.1, and 5.5 of the adopted Ealing Unitary Development Plan 'Plan for the Environment' (2004).
Further Written Representations
Comments by Landscape Officer on Additional Information received 07/09/2010:
There is no objection in principal to the development, however you shall need to provide a condition to
specify that the recommendations and tree protection measures as detailed and specified in the
Arboricultural report by Arborhelp (dated etc) shall be fully implemented. This shall also require a final
written report by the consulting Arboricultural consultant with regard to the implementation of all
recommendations contained within the arboricultural report as well as those aspects pertaining to other
conditions relevant within the approved application.
Also a condition shall be required for the full details of the construction and implementation of the no
dig surface of the front drive as outlined within the Arboricultural report by Arborhelp.
Also condition method of construction and installation of the foundations for the rear development in
line with the recommendation of the Arboricultural report...part 2 implementation of approved
construction methods of foundation type.
It is noted that the applicant has provided a statement regarding the 2 issues above and the intention is
to protect the trees integrity through out development. Conditions for detail shall still be required in
order to make sure the contractors are fully aware of the issues and Arboricultural supervision has
been detailed into the works.
Hard and soft landscaping detail to include no dig surface to the front driveway ensuring porous
surface and sub base is provided. Soft landscaping to the front and rear.
Comments in Report for Amendment.
The third line of the officer’s response to Transport Services comments on page 5 of the report should
read as follows:
“It is not considered that a refusal of the application is justified on this aspect”
Notes
Two additional responses received raising no additional issues.
4 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 04: Hanwell Locks, St Margaret’s Road, Hanwell W7 2NF - P/2010/2539
Amended Recommendation
Since the publication of the officer’s report negotiations have taken place with the developer
resulting in an overall small increase in the level of s.106 contributions to £272,000 (£270,000).
1. Additional head of term for the legal agreement:

No development to commence until details of an apprentice scheme are submitted and
agreed by the Council, including the following provisions:
-Arrangements setting out how the developer will procure its contractors to work with
local employment and training agencies, voluntary and private sector providers and local
schools, colleges and universities.
-The establishments of targets for local labour and measures to be undertaken to meet
those targets.
-Provision of training opportunities in respect of new jobs created by the development.
-Employment and training opportunities in relation to the demolition and construction
phases of the development, and to the security, maintenance and environmental
improvement and management of the development.
-Employment and training opportunities in relation to housing management and estate
maintenance.
-Local people should be employed wherever possible throughout the life of the
development in accordance with the terms of the apprentice scheme.
-The developer will implement and promote the objectives of the agreed apprentice
scheme.
2. Additional heads of terms for the legal agreement:



A financial contribution of £10,000 towards maintenance and management work at the
Charity of William Hobbayne Allotments, St Margaret’s Road, Hanwell.
A financial contribution of £2,000 towards the provision of refuse bins, chemical dog loos,
and oak benches along the towpath near the development.
A financial contribution of £2,000 towards the provision of tree planting at the end of
Belvedere Road to block the industrial units from view.
3. Revised head of term in the legal agreement:

Reduction in the financial contribution towards highways works from £54,000 to £42,000
because the clear and surface towpath access on north side of Trumpers Way would no
longer be provided, as this access has recently been upgraded. Therefore the £12,000
originally allocated for the upgrade of this access has been reallocated (see 2 above).
4. Revised planning conditions:
Revisions to conditions 6, 7, 9 & 19 to take account of the phasing of this development.
Condition 6. Phased Parking Details –
5 of 24
Planning Committee: 22 September 2010
Briefing Notes
Details of the phased introduction of the residential car parking including the underground/undercroft
car park, disabled spaces, ramps, associated access and manoeuvring space as indicated on the
approved drawings shall be submitted to and approved in writing by the local planning authority prior to
the commencement of the development. The development shall be implemented only in accordance
with the approved details and in accordance with the approved phasing of development, and thereafter
these car parking facilities and the associated access and manoeuvring areas shall not be obstructed
or used for any other purpose except with the prior written permission of the local planning authority.
Reason: To ensure that there is adequate provision and retention of car parking within the site for each
phase of the development in the interests of the free flow of traffic and conditions of general highway
safety on the neighbouring highways and in the interests of the residential character of the
neighbouring area, in accordance with policies 4.1 and 9.1 of the adopted Ealing Unitary Development
Plan 'Plan for the Environment' (2004).
Condition 7. Phased Details of Access Roads and Surface parking
Details of the phased construction of surface access roads, turning areas and parking spaces within
the residential element of the development and associated works, all as indicated on the approved
drawings shall be submitted to and approved in writing by the local planning authority prior to the
commencement of the development. The development shall be implemented only in accordance with
the approved details and in accordance with the approved phasing of development, and thereafter
these facilities shall not be obstructed or used for any other purpose except with the prior written
permission of the local planning authority.
Reason: To ensure that the access road, turning area and parking spaces are provided for each phase
of the development in accordance with policies 4.1 and 9.1 of the Unitary Development Plan (UDP)
'Plan for the Environment' (2004).
Condition 9. Cycle Parking Available prior to Occupation
Details of the phased introduction of cycle parking facilities for the residential units and light industrial
units as indicated on the submitted drawings shall be submitted to and approved in writing by the local
planning authority prior to the commencement of the development. The development shall be
implemented only in accordance with the approved details and in accordance with the approved
phasing of development, and thereafter these facilities shall be provided and available for use, not be
obstructed or used for any other purpose except with the prior written permission of the local planning
authority.
Reason: To ensure that there is adequate provision for cycle parking for each phase of the
development, in accordance with policies 9.1 and 9.6 of the adopted Ealing Unitary Development Plan
'Plan for the Environment' (2004).
Condition 19. Refuse and Recycling
Details of the phased introduction of refuse and recycling facilities as indicated on the submitted
drawings shall be submitted to and approved in writing by the local planning authority prior to the
commencement of the development. The development shall be implemented only in accordance with
the approved details and in accordance with the approved phasing of development, and thereafter
these facilities shall be provided and available for use, not be obstructed or used for any other purpose
except with the prior written permission of the local planning authority.
Reason: To ensure that adequate provision for refuse storage is made for each phase of the
development, in accordance with policies 2.10 and 4.1, of the adopted Unitary Development Plan (Plan
for the Environment 2004) and Supplementary Planning Guidance 4: Refuse & Recycling Facilities.
6 of 24
Planning Committee: 22 September 2010
Briefing Notes
Revision to condition 42 to request a management plan for the manoeuvring of commercial
vehicles within the commercial aspect of the development.
Condition 42. B1 (c) Turning Space for Service, Emergency and Delivery Vehicles
Details to include a management plan for the turning and manoeuvring of service, emergency and
delivery vehicles within the commercial aspect of the development shall be submitted to and approved
in writing by the local planning authority prior to the first use of the B1 (c) element of the development.
The development shall be implemented and operated only in accordance with the approved details
unless otherwise agreed in writing by the local planning authority.
Reason: To ensure adequate manoeuvring space for service, emergency and delivery vehicles within
the commercial aspect of the development in accordance with policies 9.1 & 9.9 of the Unitary
Development Plan ‘New Plan for the Environment’.
Revision to condition 27 to take account of structures within the buffer zone shown on the
approved drawings:
Condition 27. Canal Bank Buffer Zone
A buffer zone of 8 metres width measured from bank top must be provided for the whole extent of the
site. In this zone there shall be no hard standing, or structures, including overhanging development
such as balconies, domestic gardens or formal landscaping (other than those shown on the approved
drawings or agreed in writing with the Local Planning Authority). The buffer zone shall be planted with
locally native shrubs and grasses of UK genetic provenance / left to colonise and regenerate naturally /
left as a natural area for wildlife.
Reason: In the interests of ecological protection and the visual amenity of the area in accordance with
policies 3.1, 3.2, 3.8, 4.1 and 5.5 of the adopted Unitary Development Plan (Plan for the Environment
2004) and Supplementary Planning Guidance 10: Noise and Vibration.
Revision to condition 21 to take account of the fact that the developer has now agreed to meet a
higher standard of sustainable design, construction and energy efficiency in this development:
Condition 21 Code for Sustainable Homes
Details of the means to provide the Code for Sustainable Homes as a minimum Level 4 standard for
the proposed dwellings shall be submitted to and approved by the local planning authority prior to the
commencement of the development and the approved details shall be incorporated into the design of
the buildings.
Reason: To ensure the development’s commitments to sustainability through the implementation of
high energy efficiency measures and sustainable technologies in accordance with policies 4A.3
Sustainable Design and Construction, 4A.7 Renewable Energy of the London Plan (2008).
Additional Planning Condition to request details of the overall phasing of the development.
Condition 49. Phasing (Details)
Details of the phasing of the development shall be submitted to and approved in writing by the local
planning authority prior to the commencement of the development. The development shall be
implemented only in accordance with the approved details, unless otherwise agreed in writing by the
local planning authority.
Reason: In the interests of highway safety, residential amenity and to ensure that the development is
implemented in accordance with a programme agreed in writing by the Local Planning Authority, in
7 of 24
Planning Committee: 22 September 2010
Briefing Notes
accordance with policies 2.1, 4.1, 5.5, 9.1 and 9.9 of the adopted Unitary Development Plan (Plan for
the Environment 2004) and Supplementary Planning Guidance 10: Noise and Vibration.
Further Written Representations
External
-1 additional letter of objection was received from a local residential property. The points of objection
made in this letter are the same as those listed at page 7 of the planning officer’s report.
-1 additional letter was received from a local resident with the following additional points:

Requests additional s.106 contributions for the benefit of the local community:
(i) £10,000 towards maintenance and management work at the local allotments adjacent to the
Piggeries site.
(ii). Financial contribution towards the provision of refuse bins, chemical dog loos, and oak
benches along the towpath near the development.
(iii) Financial contribution towards the provision of tree planting at the end of Belvedere Road to
block the industrial units from view.
(iv). Introduction of a 20 mph speed limit in Olde Hanwell especially Humes Avenue/St
Margaret’s Road and introduction of traffic calming or a speed camera on Trumpers Way.
Case Officer’s Response: The developer agrees to the principle of (i) a £10,000 financial
contribution towards maintenance and management work at the local allotments adjacent to the
Piggeries site, but only provided the requirement for the existing financial contribution of
£12,000 for a clear and surface towpath access on north side of Trumpers Way is removed.
The developer states that the existing stepped access between the north side of Trumpers Way
and the towpath is adequate. This access has recently been upgraded. The Council’s Transport
department have no objection to this.
The developer agrees to a financial contribution of £4,000 towards (ii) the provision of refuse
bins, chemical dog loos, and oak benches along the towpath near the development, and (iii) the
provision of tree planting at the end of Belvedere Road to block the industrial units from view.
The developer’s Transport Consultants and the Council’s Transport departments have
considered the provision of a 20mph speed limit on local roads, assessed the need in respect of
highway safety and concluded this is unnecessary.
The Transport department have checked the accident records of the area and there have been
no reported personal injury accidents on the local roads in last three years.
Transport have also noted the Planning Inspector’s comments on the previous appeal for a 120
dwelling development, which concluded that the road network would be able to accommodate
the additional traffic generated by the development. The current proposal at 73 dwellings is
significantly less intensive than that previous scheme.
-A letter was received from BAA Airports on behalf of Heathrow Airport stating that they have no
objection to this development.
Internal
Parks & Countryside
8 of 24
Planning Committee: 22 September 2010
Briefing Notes
1. Details of the surface treatment for car parking spaces within tree root protection
zones is required.
2. Landscaping is required between the mansion block and the canal.
3. A green roof is recommended for the mansion block building.
Case Officer’s Response: Planning conditions have been added regarding hard and soft landscaping,
the canal buffer zone and landscaping management to satisfy the points 1 & 2 made by Parks and
Countryside. It is not possible to provide a green roof on the mansion block building as the roof of this
building would contain solar water heating panels. However the industrial building would be provided
with a green roof.
Energy Officer:
1. The residential aspect of this development should meet the higher standard of
sustainable design and construction, renewable energy and energy efficiency known
as Code for Sustainable Homes Level 4.
Case Officer’s Response: The developer has agreed to meet this higher standard and planning
condition 21 has been revised accordingly (see above).
Notes
9 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 05: Land to the rear of 339, 341 and 343 Uxbridge Road, Acton W3 9RH P/2010/2658
Amended Recommendation
Further Written Representations
Notes
10 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 06: 41-159 Bromyard Avenue, Acton London W3 7JS - P/2010/2551
Withdrawn from the agenda.
Amended Recommendation
Further Written Representations
Notes
11 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 07: 41-159 Bromyard Avenue, Acton London W3 7JS - P/2010/2623
Withdrawn from the agenda.
Amended Recommendation
Further Written Representations
Notes
12 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 08: 227 Tentelow Lane, Southall UB2 4LP - P/2010/2381
Amended Recommendation
Further Written Representations
Notes
13 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 09: Selborne Primary School, Conway Crescent, Perivale Greenford UB6 8JD PP/2010/1272
Amended Recommendation
Recommendation (DEEMED CONSENT):
That Deemed Consent be granted, subject to appropriate arrangements being in place (whether by
means of a planning obligation or otherwise) to secure a contribution towards Transport Facilities (of
amount £67,500), subject to conditions
Additional drawings:
AP02A, AP03A and AP04A received date 10/09/2010 replacing AP02, AP03 and AP04.
Additional planning conditions:
Additional conditions
29 Sedum Roof
Notwithstanding the information contained within the application, full details of a 'Sedum' roof to be
provided (in place of conventional flat roof proposed) shall be submitted and approved in writing by the
Local Planning Authority before the development commences and the details so approved shall be
implemented before first occupation of the development and shall thereafter be retained, unless
otherwise agreed in writing by the Local Planning Authority.
Reason: In the interests of character of the area and biodiversity, in accordance with policies 3.8, 4.1
and 4.5 in the adopted Ealing Unitary Development Plan 2004 'Plan for the Environment'.
Further Written Representations
External
- One additional letter was received from a local resident whose father lives next to the new main
entrance (no address provided) raising the following points:
- Queried how busy the new main entrance would be, whether any replacement of gates, brickwork
and pavement would be required to make a road surface for vehicles. Trees on the site are overgrown
into their property
Case Officer’s Response: An email was sent to the consultee advising the new entrance would be
replacing the current main entrance to the school from Conway Crescent. Therefore it is expected that
the amount of vehicular and pedestrian traffic at the new entrance to Thames Avenue would be similar
to that currently experienced at the existing Conway Crescent entrance. The proposal would involve
removing the pavement and installing a 'road surface' for vehicular access at this entrance. It is also
proposed to re-landscape the entrance and other areas; full details of the landscaping would be
requested via a condition attached to the planning permission. Such details would have to be submitted
before the development commences
Sport England
Development has been considered in light of its playing fields policy. Sport England does not wish to
raise an objection to the application.
14 of 24
Planning Committee: 22 September 2010
Briefing Notes
Case Officer’s Response: Response acknowledged
Crime Prevention Officer
- In general this is a better layout than the existing arrangement.
- Access into the School should only be possible through the official reception area once the school
day has started. Visitors entering the site via the new main entrance should be channelled to the
reception. Access to the car park should also be restricted. I recommend a fence (and gate) restricting
access to the car park to channel visitors to the reception.
- If the main corridor by the entrance is to be used as a route for pupils I recommend that additional
access controlled doors are fitted to create an enclosed lobby (leaving the corridor clear) - thus
preventing access into the main building. If pupils are excluded from using the doors shown on the plan
then these could instead be fitted with access control operated from reception.
- The new design of the main entrance removes a 'planted buffer zone'. This may leave homes more at
risk of burglary as the fencing can be more easily scaled or broken. The fencing should be topped with
an anti-climb deterrent such as wooden trellis and planting encouraged to grow through it. Space
should be left for some planting both to fill the trellis and cover the fencing to help prevent it being a
graffiti target.
- The new parts of the building should be included within the burglar and fire alarm.
- New external doors should meet level 2 of the Loss Prevention Standard 1175 for burglary resistance.
- Windows should be certificated to BS 7950 and have one pane of glass at least 6.4mm laminated
glass.
Case Officer’s Response: Condition already added ensuring compliance of development with
requirements of the ‘Secured By Design’ award
Internal
Landscape and Tree Officer
- Detailed hard and soft landscaping along the access route into the site as well as any additional soft
landscaping is required. Removal of all trees would not be acceptable
- The provision of a sedum roof shall be required on the educational principle as well as biodiversity
aspect of the site this can be conditioned.
Case Officer’s Response: Planning conditions have already been added regarding hard and soft
landscaping & trees aspect. Additional condition is recommended in relation to provision of sedum roof.
Access Officer
- There should be 1 disabled parking space.
- The lift and accessible toilet facilities satisfy access requirements
Case Officer’s Response: 3 No disabled parking spaces have been provided as part of the proposal
15 of 24
Planning Committee: 22 September 2010
Briefing Notes
Transportation
-
A breakdown of the financial contributions requested was provided, detailed as follows:
Selborne Primary School
Item
Proposals
Reasons /Justification
1.
Flashing school signs and advance
warning signs on Conway Crescent
and Thames Avenue Road
Raised zebra crossing on Thames
Avenue.
To raise driver awareness
and improve road safety on
the approaches to the school
To provide a safe crossing
facility for pedestrians and
pupils and enhance road
safety
2.
3
4
5
6
Estimated cost
£5,000
(Flashing signs -£3,000 and
warning signs - £2,000)
£30,000
(Raised zebra)
Raised table at or in the immediate
Improve pedestrian safety
vicinity of the school entrance on
and reduce traffic speeds
Conway Crescent
School Keep Clear Markings and
To deter obstructive and
parking restrictions in Thames Avenue indiscriminate parking in the
vicinity of the school
(Raised table)
Guard railing outside both school
entrances
Traffic Calming measures on Conway
Crescent and Thames Avenue and
Tees Avenue
Cycle training for additional 14
children each year for 3yrs due to
increase in pupil numbers.
Feasibility study
Guard railing schemes (£2000)
Total
£5,000
(School keep clear and traffic
order - £3,000)
To reduce traffic speeds and £10,500
improve pupils of the school 7 No. Sinusoidal humps at £1500
per hump
£2000
To promote cycling and
sustainable transport and
(Cycle training 14 students/year
@£1000 over 2yrs)
£5,000
To identify congestion relief
measures along Teignmouth
Gardens.
£57,500
Case Officer’s Response: The amount detailed in the breakdown of figures is £2,500 greater than that
as originally stated/agreed. The revised figure is a marginal increase and has been agreed by all
parties concerned. The financial contribution to be paid from the Council’s Education Department to the
Transport Department would therefore be £57,500. This has been reflected in the revised
recommendation above.
Notes
These revised drawings submitted showed the following minor changes to the proposal:
The proposed parking area has been moved adjacent to the eastern boundary to provide a more
efficient layout with greater ease of access for disabled users. The area occupied by the hard standing
would be significantly reduced in relation to that originally proposed with no loss of parking spaces.
5 No additional cycle parking spaces have been provided just inside the entrance area, again providing
convenient access for users of the main school entrance.
Revised details of the entrance from Thames Avenue were received showing further general details.
The pedestrian gate would be further set back towards the street to reduce the possibility of anti-social
behaviour.
16 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 10 : 48A,B,C Woodville Gardens, Ealing, London W5 2LQ - P/2010/2898
Amended Recommendation
Further Written Representations
Notes
Councillor Pagan verbal objection:
1. The building is not small scale, and is out of scale and character with this and surrounding
properties, and is not what would be expected within a Conservation Area.
Officer’s response: The buildings footprint has been reduced by 29% in comparison to the previous
application (P/2010/0895). The buildings footprint of 44m² represents 9% coverage of the entire rear
garden area (481m²) and 16% of the garden area for the flats (268m²). Although the roof is 3.75m in
height, it has a low pitch of 25 degrees, which reduces its visibility. Amended drawings have been
received removing velux rooflights, which reduces the roofs visual impact in terms of light. The
building’s roof would be constructed of western Cedar shingles, helping it to blend in visually with the
trees within the rear garden of 75 Madelely Road. The building is considered of suitable size and
design within this Conservation Area.
2. Has identified a discrepancy within the report within the section on Impact on Residential Amenity
where it is stated
"The proposed outbuilding is located 34m from the nearest residential windows at ground floor of
no.48"
Officer’s response: Scaling from the drawing, this measures at 28m and the report should be amended
accordingly.
3. Pointed out discrepancies within the drawing. There are a mixture of proposed planting and trees
indicated on the site plan. There are also on site trees within the garden, and off site trees at 75
Madelely Road.
Officer’s response: The applicant has submitted a site plan indicating proposed planting. Whilst
welcome in principle, the level of detail is considered inadequate and further details would be required
by condition. In addition no existing on site trees (near to the boundary with the garden at no. 48
Woodside Gardens) nor the presence of existing off site trees at 75 Madeley Road and 46 Woodside
Gardens have been indicated. Whilst it is considered the submitted drawing is misleading, a tree
survey and landscaping schedule are required by condition and would address this matter.
4. Pointed out that the building would impact upon the setting of Locally Listed Building at 75 Madeley
Road.
17 of 24
Planning Committee: 22 September 2010
Briefing Notes
Officer’s response: The building would be located close of the locally Listed Building at no 75 Madeley
Road. The building would be located 32m (at its nearest point) from the rear of 75 Madeley Road. there
is substantial tree cover on the common boundary and it is considered the building would have a
minimal visual impact upon this property.
A further objection was received from the occupant of 50 Woodville Gardens;

There is an unequivocal threat within the Design and Access Statement that the garden will not
be maintained should the application be refused.
Officer’s response: If the garden were ever in serious neglect, Planning Enforcement action could
be taken.

The works to the garden so far are in anticipation of the garden building being erected
Officer’s response: The application to undertake work to the rear garden was approved by the
Council, on its own merits (App Ref P/2010/0265).

The application should be considered in light of the previous application for the use of the
building as an office.
Officer’s response: The application must be considered on its merits (as submitted) if the building
were in use as anything other than ancillary to its residential use, enforcement action could be
taken.

The application contravenes Conservation policy in that it is not a single modest size room
Officer’s response: The building is considered a modest building in terms of the size of the
garden at this property. It covers 9% of the total garden area of the rear garden.

The tenants do not have access to the rear garden
Officer’s response: There is no evidence to prove or disprove this claim, and the application
should be considered on its merits as submitted.
Late objection from occupiers (tenants) of no 48A Woodville Gardens

We have not been consulted by the freeholder about the use of the garden, we fail to
understand this

Presently we do not have access to the garden, we decided to opt out of this in the tenancy
agreement
Response from freeholder of 48 Woodville Gardens summerised as follows:

There was not an intention to consult tenants until after planning permission was secured

Accordingly, the statement within the Design and Access regarding the potential use of the
structure by tenants was dependant upon planning permission being granted

Although my original desire was to use the building for other purposes, the present proposal is
for users of the property and should be considered on that basis
18 of 24
Planning Committee: 22 September 2010
Briefing Notes

Like many applications, details regarding screening the site will be forthcoming should planning
permission be granted

There is already light and power running to the small shed, so the infrastructure for power to the
new building is straightforward

Disruption regarding building work would be minimal as the structure would be constructed off
site
19 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 11: John Lewis Dist Centre, 41- 44 Kendal Avenue, Acton W3 0RP - P/2010/2778
Amended Recommendation
Further Written Representations
Notes
The report indicates the site is within the Hanger Hill ward and this should be amended to read
East Acton ward.
20 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 12: 11 Templewood, West Ealing, London W13 8BA - P/2010/1914
Amended Recommendation
Further Written Representations
Notes
21 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 13: 53 Fowlers Walk, Ealing, London W5 1BQ - P/2010/2631
Amended Recommendation
Further Written Representations
An email from the Conservation Panel was received on 17/09/2010 stating that they have seen
the amended drawings in which the proposed extension has a reduced depth of 2.30m. The
panel mentions the reduction in depth makes the proposal suitable and will withdraw their
original objection to it.
Notes
22 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 14: West London Shooting Ground, West End Road, Northolt UB5 6RE P/2010/2515
Amended Recommendation
It is suggested that the following condition is added to the recommendation: 13. The applicant shall undertake to conduct periodic maintenance of the existing overflow ditch on the
southern boundary of the site to ensure that the ditch does not become overly clogged with vegetation
or other material originating from the West London Shooting Grounds site. The applicant shall also
undertake to carry out regular inspections of the ditch and report any build up of fly tipping material to
the Council. Details of how this periodic maintenance will be undertaken shall be submitted in writing to
the LPA within three months of the commencement of the development.
REASON: In the interests of the visual amenity of the area and to enable the ditch to function to its full
potential to assist in the prevention of flooding, in accordance with policies 2.5, 3.4, 3.8, 4.1 and 4.5 of
the adopted Ealing Unitary Development Plan, Plan for the Environment (2004).
Further Written Representations
Notes
The applicant has agreed to accept the additional recommended condition (as above) and has
indicated that they are happy to accept joint responsibility with the Council for its on-going
maintenance.
23 of 24
Planning Committee: 22 September 2010
Briefing Notes
ITEM 015: 12 Bayham Road W4 – COM/2009/0708
Notes
Page 1
The subject Ward should read Southfield and not Greenford
24 of 24