Planning Committee: 22 September 2010 Briefing Notes ITEM 01: 376 Uxbridge Road, Ealing W5 – PP/2010/2234 Amended Recommendation Further Written Representations Notes 1 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 02: 2A Queen Anne’s Gardens, Chiswick W4 1TU - P/2010/2355 Amended Recommendation Condition 3 shall be amended to the following: All windows in the northern elevation and the proposed window to the landing on the eastern elevation of the approved scheme shall be fixed shut and be fitted with obscure glazing and permanently maintained as such. The first floor rear window to the bedroom/ study area in the eastern elevation shall be obscure glazed, and permanently maintained as such. Reason: To prevent overlooking and loss of privacy in the interests of the amenities of the neighbouring properties, in accordance with policies 4.1, 5.5 and 5.9 of the adopted Ealing Unitary Development Plan: 'Plan for the Environment' (2004). Further Written Representations A further objection letter was received from a previous objector stating: In the first application this was an obscure window; this has not been shown in the revised application and no reference has been made in the report although the half landing staircase window is shown obscure. The first floor window directly overlooks our garden and is only 2.1m away horizontally from it. Therefore the window should also be obscure and non-opening. Without this there will be a fundamental and gross intrusion on the privacy and enjoyment of the private space of 9 Woodstock Road. It will definitely be provocative to intrusion and aggravated feeling. As it is we will be staring directly into the ground floor windows and vice versa and these should be partially obscure with perhaps an obscure central section and clear surround. Officer’s response: This has been addressed in the amended condition. It is now recommended that the first floor rear window will be obscure glazed. Notes 2 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 03: 68 Perryn Road, Acton, London W3 7LX - P/2010/2585 Amended Recommendation Page 10 Condition 3 to be replaced with the following wording in response to the applicant’s request to allow natural ventilation and avoid condensation in the relevant rooms: 3. The first floor bathroom window in the northern elevation and the first floor ensuite windows shall be fixed shut to the bottom sash with the top sash having a restricted opening to a position above eye level, fitted and permanently maintained with obscure glass. The stairwell windows shall also be fixed shut, fitted and permanently maintained with stained, obscure glass. Reason: To prevent overlooking and loss of privacy in the interests of the amenities of the neighbouring properties, in accordance with policies 4.1, 5.5 and 5.9 of the adopted Ealing Unitary Development Plan: 'Plan for the Environment' (2004) Condition 5 to be replaced with the following wording in response to further advice from the Council’s Landscape and Tree Officer: 5. The authorised tree works shall be carried in full compliance with all aspects covered within the Aboricultural report compiled by Mark Clews of Arborhelp received via email 7 September 2010. A final written report by the consulting Arboricultural consultant should be submitted to the Local Authority, with regard to the implementation of all recommendations contained within the arboricultural report. Reason: To prevent damage to the protected trees in the interest of the visual character and appearance of the area in accordance with adopted UDP policies 4.1 and 5.5 and Supplementary Planning Guidance 9: 'Trees and Development Guidelines' Page 11 Condition 6 to be replaced with the following wording in response to further advice from the Council’s Landscape and Tree Officer: 6. No development shall take place until full details of both hard and soft landscape works for the development have been submitted to and approved in writing by the Local Planning Authority, including detail shpwing the no dig surface to the front driveway ensuring porus surface and sub base is provided. These works shall be carried out as approved prior to first occupation of dwelling hereby approved, or in accordance with a programme agreed by the Local Planning Authority. Any trees or other plants which die or are removed within the first five years following the implementation of the landscaping scheme shall be replaced during the next planting season. Reason: To ensure that the development is landscaped in the interests of the character and appearance of the locality, in accordance with policies 4.5 of the Council's adopted Unitary Development Plan 'Plan for the Environment' (2004). 3 of 24 Planning Committee: 22 September 2010 Briefing Notes Page 12 Condition 9 would be imposed restricting permitted development rights. 9. Notwithstanding the provisions of Classes A, B, C, D, E and F of Schedule 2, Part 1, Class A Town and Country Planning (General Permitted Development) Order 1995, as amended by the Town and Country Planning (General Permitted Development) (Amendment) (No. 2) (England) Order 2008, no extensions, alterations or other works shall be carried out without the prior permission of the Local Planning Authority, obtained through the submission of a planning application. Reason: To prevent the overdevelopment of the site and to safeguard the living conditions of adjoining properties and the appearance of the surrounding area, in accordance with policies 4.1, and 5.5 of the adopted Ealing Unitary Development Plan 'Plan for the Environment' (2004). Further Written Representations Comments by Landscape Officer on Additional Information received 07/09/2010: There is no objection in principal to the development, however you shall need to provide a condition to specify that the recommendations and tree protection measures as detailed and specified in the Arboricultural report by Arborhelp (dated etc) shall be fully implemented. This shall also require a final written report by the consulting Arboricultural consultant with regard to the implementation of all recommendations contained within the arboricultural report as well as those aspects pertaining to other conditions relevant within the approved application. Also a condition shall be required for the full details of the construction and implementation of the no dig surface of the front drive as outlined within the Arboricultural report by Arborhelp. Also condition method of construction and installation of the foundations for the rear development in line with the recommendation of the Arboricultural report...part 2 implementation of approved construction methods of foundation type. It is noted that the applicant has provided a statement regarding the 2 issues above and the intention is to protect the trees integrity through out development. Conditions for detail shall still be required in order to make sure the contractors are fully aware of the issues and Arboricultural supervision has been detailed into the works. Hard and soft landscaping detail to include no dig surface to the front driveway ensuring porous surface and sub base is provided. Soft landscaping to the front and rear. Comments in Report for Amendment. The third line of the officer’s response to Transport Services comments on page 5 of the report should read as follows: “It is not considered that a refusal of the application is justified on this aspect” Notes Two additional responses received raising no additional issues. 4 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 04: Hanwell Locks, St Margaret’s Road, Hanwell W7 2NF - P/2010/2539 Amended Recommendation Since the publication of the officer’s report negotiations have taken place with the developer resulting in an overall small increase in the level of s.106 contributions to £272,000 (£270,000). 1. Additional head of term for the legal agreement: No development to commence until details of an apprentice scheme are submitted and agreed by the Council, including the following provisions: -Arrangements setting out how the developer will procure its contractors to work with local employment and training agencies, voluntary and private sector providers and local schools, colleges and universities. -The establishments of targets for local labour and measures to be undertaken to meet those targets. -Provision of training opportunities in respect of new jobs created by the development. -Employment and training opportunities in relation to the demolition and construction phases of the development, and to the security, maintenance and environmental improvement and management of the development. -Employment and training opportunities in relation to housing management and estate maintenance. -Local people should be employed wherever possible throughout the life of the development in accordance with the terms of the apprentice scheme. -The developer will implement and promote the objectives of the agreed apprentice scheme. 2. Additional heads of terms for the legal agreement: A financial contribution of £10,000 towards maintenance and management work at the Charity of William Hobbayne Allotments, St Margaret’s Road, Hanwell. A financial contribution of £2,000 towards the provision of refuse bins, chemical dog loos, and oak benches along the towpath near the development. A financial contribution of £2,000 towards the provision of tree planting at the end of Belvedere Road to block the industrial units from view. 3. Revised head of term in the legal agreement: Reduction in the financial contribution towards highways works from £54,000 to £42,000 because the clear and surface towpath access on north side of Trumpers Way would no longer be provided, as this access has recently been upgraded. Therefore the £12,000 originally allocated for the upgrade of this access has been reallocated (see 2 above). 4. Revised planning conditions: Revisions to conditions 6, 7, 9 & 19 to take account of the phasing of this development. Condition 6. Phased Parking Details – 5 of 24 Planning Committee: 22 September 2010 Briefing Notes Details of the phased introduction of the residential car parking including the underground/undercroft car park, disabled spaces, ramps, associated access and manoeuvring space as indicated on the approved drawings shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. The development shall be implemented only in accordance with the approved details and in accordance with the approved phasing of development, and thereafter these car parking facilities and the associated access and manoeuvring areas shall not be obstructed or used for any other purpose except with the prior written permission of the local planning authority. Reason: To ensure that there is adequate provision and retention of car parking within the site for each phase of the development in the interests of the free flow of traffic and conditions of general highway safety on the neighbouring highways and in the interests of the residential character of the neighbouring area, in accordance with policies 4.1 and 9.1 of the adopted Ealing Unitary Development Plan 'Plan for the Environment' (2004). Condition 7. Phased Details of Access Roads and Surface parking Details of the phased construction of surface access roads, turning areas and parking spaces within the residential element of the development and associated works, all as indicated on the approved drawings shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. The development shall be implemented only in accordance with the approved details and in accordance with the approved phasing of development, and thereafter these facilities shall not be obstructed or used for any other purpose except with the prior written permission of the local planning authority. Reason: To ensure that the access road, turning area and parking spaces are provided for each phase of the development in accordance with policies 4.1 and 9.1 of the Unitary Development Plan (UDP) 'Plan for the Environment' (2004). Condition 9. Cycle Parking Available prior to Occupation Details of the phased introduction of cycle parking facilities for the residential units and light industrial units as indicated on the submitted drawings shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. The development shall be implemented only in accordance with the approved details and in accordance with the approved phasing of development, and thereafter these facilities shall be provided and available for use, not be obstructed or used for any other purpose except with the prior written permission of the local planning authority. Reason: To ensure that there is adequate provision for cycle parking for each phase of the development, in accordance with policies 9.1 and 9.6 of the adopted Ealing Unitary Development Plan 'Plan for the Environment' (2004). Condition 19. Refuse and Recycling Details of the phased introduction of refuse and recycling facilities as indicated on the submitted drawings shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. The development shall be implemented only in accordance with the approved details and in accordance with the approved phasing of development, and thereafter these facilities shall be provided and available for use, not be obstructed or used for any other purpose except with the prior written permission of the local planning authority. Reason: To ensure that adequate provision for refuse storage is made for each phase of the development, in accordance with policies 2.10 and 4.1, of the adopted Unitary Development Plan (Plan for the Environment 2004) and Supplementary Planning Guidance 4: Refuse & Recycling Facilities. 6 of 24 Planning Committee: 22 September 2010 Briefing Notes Revision to condition 42 to request a management plan for the manoeuvring of commercial vehicles within the commercial aspect of the development. Condition 42. B1 (c) Turning Space for Service, Emergency and Delivery Vehicles Details to include a management plan for the turning and manoeuvring of service, emergency and delivery vehicles within the commercial aspect of the development shall be submitted to and approved in writing by the local planning authority prior to the first use of the B1 (c) element of the development. The development shall be implemented and operated only in accordance with the approved details unless otherwise agreed in writing by the local planning authority. Reason: To ensure adequate manoeuvring space for service, emergency and delivery vehicles within the commercial aspect of the development in accordance with policies 9.1 & 9.9 of the Unitary Development Plan ‘New Plan for the Environment’. Revision to condition 27 to take account of structures within the buffer zone shown on the approved drawings: Condition 27. Canal Bank Buffer Zone A buffer zone of 8 metres width measured from bank top must be provided for the whole extent of the site. In this zone there shall be no hard standing, or structures, including overhanging development such as balconies, domestic gardens or formal landscaping (other than those shown on the approved drawings or agreed in writing with the Local Planning Authority). The buffer zone shall be planted with locally native shrubs and grasses of UK genetic provenance / left to colonise and regenerate naturally / left as a natural area for wildlife. Reason: In the interests of ecological protection and the visual amenity of the area in accordance with policies 3.1, 3.2, 3.8, 4.1 and 5.5 of the adopted Unitary Development Plan (Plan for the Environment 2004) and Supplementary Planning Guidance 10: Noise and Vibration. Revision to condition 21 to take account of the fact that the developer has now agreed to meet a higher standard of sustainable design, construction and energy efficiency in this development: Condition 21 Code for Sustainable Homes Details of the means to provide the Code for Sustainable Homes as a minimum Level 4 standard for the proposed dwellings shall be submitted to and approved by the local planning authority prior to the commencement of the development and the approved details shall be incorporated into the design of the buildings. Reason: To ensure the development’s commitments to sustainability through the implementation of high energy efficiency measures and sustainable technologies in accordance with policies 4A.3 Sustainable Design and Construction, 4A.7 Renewable Energy of the London Plan (2008). Additional Planning Condition to request details of the overall phasing of the development. Condition 49. Phasing (Details) Details of the phasing of the development shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. The development shall be implemented only in accordance with the approved details, unless otherwise agreed in writing by the local planning authority. Reason: In the interests of highway safety, residential amenity and to ensure that the development is implemented in accordance with a programme agreed in writing by the Local Planning Authority, in 7 of 24 Planning Committee: 22 September 2010 Briefing Notes accordance with policies 2.1, 4.1, 5.5, 9.1 and 9.9 of the adopted Unitary Development Plan (Plan for the Environment 2004) and Supplementary Planning Guidance 10: Noise and Vibration. Further Written Representations External -1 additional letter of objection was received from a local residential property. The points of objection made in this letter are the same as those listed at page 7 of the planning officer’s report. -1 additional letter was received from a local resident with the following additional points: Requests additional s.106 contributions for the benefit of the local community: (i) £10,000 towards maintenance and management work at the local allotments adjacent to the Piggeries site. (ii). Financial contribution towards the provision of refuse bins, chemical dog loos, and oak benches along the towpath near the development. (iii) Financial contribution towards the provision of tree planting at the end of Belvedere Road to block the industrial units from view. (iv). Introduction of a 20 mph speed limit in Olde Hanwell especially Humes Avenue/St Margaret’s Road and introduction of traffic calming or a speed camera on Trumpers Way. Case Officer’s Response: The developer agrees to the principle of (i) a £10,000 financial contribution towards maintenance and management work at the local allotments adjacent to the Piggeries site, but only provided the requirement for the existing financial contribution of £12,000 for a clear and surface towpath access on north side of Trumpers Way is removed. The developer states that the existing stepped access between the north side of Trumpers Way and the towpath is adequate. This access has recently been upgraded. The Council’s Transport department have no objection to this. The developer agrees to a financial contribution of £4,000 towards (ii) the provision of refuse bins, chemical dog loos, and oak benches along the towpath near the development, and (iii) the provision of tree planting at the end of Belvedere Road to block the industrial units from view. The developer’s Transport Consultants and the Council’s Transport departments have considered the provision of a 20mph speed limit on local roads, assessed the need in respect of highway safety and concluded this is unnecessary. The Transport department have checked the accident records of the area and there have been no reported personal injury accidents on the local roads in last three years. Transport have also noted the Planning Inspector’s comments on the previous appeal for a 120 dwelling development, which concluded that the road network would be able to accommodate the additional traffic generated by the development. The current proposal at 73 dwellings is significantly less intensive than that previous scheme. -A letter was received from BAA Airports on behalf of Heathrow Airport stating that they have no objection to this development. Internal Parks & Countryside 8 of 24 Planning Committee: 22 September 2010 Briefing Notes 1. Details of the surface treatment for car parking spaces within tree root protection zones is required. 2. Landscaping is required between the mansion block and the canal. 3. A green roof is recommended for the mansion block building. Case Officer’s Response: Planning conditions have been added regarding hard and soft landscaping, the canal buffer zone and landscaping management to satisfy the points 1 & 2 made by Parks and Countryside. It is not possible to provide a green roof on the mansion block building as the roof of this building would contain solar water heating panels. However the industrial building would be provided with a green roof. Energy Officer: 1. The residential aspect of this development should meet the higher standard of sustainable design and construction, renewable energy and energy efficiency known as Code for Sustainable Homes Level 4. Case Officer’s Response: The developer has agreed to meet this higher standard and planning condition 21 has been revised accordingly (see above). Notes 9 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 05: Land to the rear of 339, 341 and 343 Uxbridge Road, Acton W3 9RH P/2010/2658 Amended Recommendation Further Written Representations Notes 10 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 06: 41-159 Bromyard Avenue, Acton London W3 7JS - P/2010/2551 Withdrawn from the agenda. Amended Recommendation Further Written Representations Notes 11 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 07: 41-159 Bromyard Avenue, Acton London W3 7JS - P/2010/2623 Withdrawn from the agenda. Amended Recommendation Further Written Representations Notes 12 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 08: 227 Tentelow Lane, Southall UB2 4LP - P/2010/2381 Amended Recommendation Further Written Representations Notes 13 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 09: Selborne Primary School, Conway Crescent, Perivale Greenford UB6 8JD PP/2010/1272 Amended Recommendation Recommendation (DEEMED CONSENT): That Deemed Consent be granted, subject to appropriate arrangements being in place (whether by means of a planning obligation or otherwise) to secure a contribution towards Transport Facilities (of amount £67,500), subject to conditions Additional drawings: AP02A, AP03A and AP04A received date 10/09/2010 replacing AP02, AP03 and AP04. Additional planning conditions: Additional conditions 29 Sedum Roof Notwithstanding the information contained within the application, full details of a 'Sedum' roof to be provided (in place of conventional flat roof proposed) shall be submitted and approved in writing by the Local Planning Authority before the development commences and the details so approved shall be implemented before first occupation of the development and shall thereafter be retained, unless otherwise agreed in writing by the Local Planning Authority. Reason: In the interests of character of the area and biodiversity, in accordance with policies 3.8, 4.1 and 4.5 in the adopted Ealing Unitary Development Plan 2004 'Plan for the Environment'. Further Written Representations External - One additional letter was received from a local resident whose father lives next to the new main entrance (no address provided) raising the following points: - Queried how busy the new main entrance would be, whether any replacement of gates, brickwork and pavement would be required to make a road surface for vehicles. Trees on the site are overgrown into their property Case Officer’s Response: An email was sent to the consultee advising the new entrance would be replacing the current main entrance to the school from Conway Crescent. Therefore it is expected that the amount of vehicular and pedestrian traffic at the new entrance to Thames Avenue would be similar to that currently experienced at the existing Conway Crescent entrance. The proposal would involve removing the pavement and installing a 'road surface' for vehicular access at this entrance. It is also proposed to re-landscape the entrance and other areas; full details of the landscaping would be requested via a condition attached to the planning permission. Such details would have to be submitted before the development commences Sport England Development has been considered in light of its playing fields policy. Sport England does not wish to raise an objection to the application. 14 of 24 Planning Committee: 22 September 2010 Briefing Notes Case Officer’s Response: Response acknowledged Crime Prevention Officer - In general this is a better layout than the existing arrangement. - Access into the School should only be possible through the official reception area once the school day has started. Visitors entering the site via the new main entrance should be channelled to the reception. Access to the car park should also be restricted. I recommend a fence (and gate) restricting access to the car park to channel visitors to the reception. - If the main corridor by the entrance is to be used as a route for pupils I recommend that additional access controlled doors are fitted to create an enclosed lobby (leaving the corridor clear) - thus preventing access into the main building. If pupils are excluded from using the doors shown on the plan then these could instead be fitted with access control operated from reception. - The new design of the main entrance removes a 'planted buffer zone'. This may leave homes more at risk of burglary as the fencing can be more easily scaled or broken. The fencing should be topped with an anti-climb deterrent such as wooden trellis and planting encouraged to grow through it. Space should be left for some planting both to fill the trellis and cover the fencing to help prevent it being a graffiti target. - The new parts of the building should be included within the burglar and fire alarm. - New external doors should meet level 2 of the Loss Prevention Standard 1175 for burglary resistance. - Windows should be certificated to BS 7950 and have one pane of glass at least 6.4mm laminated glass. Case Officer’s Response: Condition already added ensuring compliance of development with requirements of the ‘Secured By Design’ award Internal Landscape and Tree Officer - Detailed hard and soft landscaping along the access route into the site as well as any additional soft landscaping is required. Removal of all trees would not be acceptable - The provision of a sedum roof shall be required on the educational principle as well as biodiversity aspect of the site this can be conditioned. Case Officer’s Response: Planning conditions have already been added regarding hard and soft landscaping & trees aspect. Additional condition is recommended in relation to provision of sedum roof. Access Officer - There should be 1 disabled parking space. - The lift and accessible toilet facilities satisfy access requirements Case Officer’s Response: 3 No disabled parking spaces have been provided as part of the proposal 15 of 24 Planning Committee: 22 September 2010 Briefing Notes Transportation - A breakdown of the financial contributions requested was provided, detailed as follows: Selborne Primary School Item Proposals Reasons /Justification 1. Flashing school signs and advance warning signs on Conway Crescent and Thames Avenue Road Raised zebra crossing on Thames Avenue. To raise driver awareness and improve road safety on the approaches to the school To provide a safe crossing facility for pedestrians and pupils and enhance road safety 2. 3 4 5 6 Estimated cost £5,000 (Flashing signs -£3,000 and warning signs - £2,000) £30,000 (Raised zebra) Raised table at or in the immediate Improve pedestrian safety vicinity of the school entrance on and reduce traffic speeds Conway Crescent School Keep Clear Markings and To deter obstructive and parking restrictions in Thames Avenue indiscriminate parking in the vicinity of the school (Raised table) Guard railing outside both school entrances Traffic Calming measures on Conway Crescent and Thames Avenue and Tees Avenue Cycle training for additional 14 children each year for 3yrs due to increase in pupil numbers. Feasibility study Guard railing schemes (£2000) Total £5,000 (School keep clear and traffic order - £3,000) To reduce traffic speeds and £10,500 improve pupils of the school 7 No. Sinusoidal humps at £1500 per hump £2000 To promote cycling and sustainable transport and (Cycle training 14 students/year @£1000 over 2yrs) £5,000 To identify congestion relief measures along Teignmouth Gardens. £57,500 Case Officer’s Response: The amount detailed in the breakdown of figures is £2,500 greater than that as originally stated/agreed. The revised figure is a marginal increase and has been agreed by all parties concerned. The financial contribution to be paid from the Council’s Education Department to the Transport Department would therefore be £57,500. This has been reflected in the revised recommendation above. Notes These revised drawings submitted showed the following minor changes to the proposal: The proposed parking area has been moved adjacent to the eastern boundary to provide a more efficient layout with greater ease of access for disabled users. The area occupied by the hard standing would be significantly reduced in relation to that originally proposed with no loss of parking spaces. 5 No additional cycle parking spaces have been provided just inside the entrance area, again providing convenient access for users of the main school entrance. Revised details of the entrance from Thames Avenue were received showing further general details. The pedestrian gate would be further set back towards the street to reduce the possibility of anti-social behaviour. 16 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 10 : 48A,B,C Woodville Gardens, Ealing, London W5 2LQ - P/2010/2898 Amended Recommendation Further Written Representations Notes Councillor Pagan verbal objection: 1. The building is not small scale, and is out of scale and character with this and surrounding properties, and is not what would be expected within a Conservation Area. Officer’s response: The buildings footprint has been reduced by 29% in comparison to the previous application (P/2010/0895). The buildings footprint of 44m² represents 9% coverage of the entire rear garden area (481m²) and 16% of the garden area for the flats (268m²). Although the roof is 3.75m in height, it has a low pitch of 25 degrees, which reduces its visibility. Amended drawings have been received removing velux rooflights, which reduces the roofs visual impact in terms of light. The building’s roof would be constructed of western Cedar shingles, helping it to blend in visually with the trees within the rear garden of 75 Madelely Road. The building is considered of suitable size and design within this Conservation Area. 2. Has identified a discrepancy within the report within the section on Impact on Residential Amenity where it is stated "The proposed outbuilding is located 34m from the nearest residential windows at ground floor of no.48" Officer’s response: Scaling from the drawing, this measures at 28m and the report should be amended accordingly. 3. Pointed out discrepancies within the drawing. There are a mixture of proposed planting and trees indicated on the site plan. There are also on site trees within the garden, and off site trees at 75 Madelely Road. Officer’s response: The applicant has submitted a site plan indicating proposed planting. Whilst welcome in principle, the level of detail is considered inadequate and further details would be required by condition. In addition no existing on site trees (near to the boundary with the garden at no. 48 Woodside Gardens) nor the presence of existing off site trees at 75 Madeley Road and 46 Woodside Gardens have been indicated. Whilst it is considered the submitted drawing is misleading, a tree survey and landscaping schedule are required by condition and would address this matter. 4. Pointed out that the building would impact upon the setting of Locally Listed Building at 75 Madeley Road. 17 of 24 Planning Committee: 22 September 2010 Briefing Notes Officer’s response: The building would be located close of the locally Listed Building at no 75 Madeley Road. The building would be located 32m (at its nearest point) from the rear of 75 Madeley Road. there is substantial tree cover on the common boundary and it is considered the building would have a minimal visual impact upon this property. A further objection was received from the occupant of 50 Woodville Gardens; There is an unequivocal threat within the Design and Access Statement that the garden will not be maintained should the application be refused. Officer’s response: If the garden were ever in serious neglect, Planning Enforcement action could be taken. The works to the garden so far are in anticipation of the garden building being erected Officer’s response: The application to undertake work to the rear garden was approved by the Council, on its own merits (App Ref P/2010/0265). The application should be considered in light of the previous application for the use of the building as an office. Officer’s response: The application must be considered on its merits (as submitted) if the building were in use as anything other than ancillary to its residential use, enforcement action could be taken. The application contravenes Conservation policy in that it is not a single modest size room Officer’s response: The building is considered a modest building in terms of the size of the garden at this property. It covers 9% of the total garden area of the rear garden. The tenants do not have access to the rear garden Officer’s response: There is no evidence to prove or disprove this claim, and the application should be considered on its merits as submitted. Late objection from occupiers (tenants) of no 48A Woodville Gardens We have not been consulted by the freeholder about the use of the garden, we fail to understand this Presently we do not have access to the garden, we decided to opt out of this in the tenancy agreement Response from freeholder of 48 Woodville Gardens summerised as follows: There was not an intention to consult tenants until after planning permission was secured Accordingly, the statement within the Design and Access regarding the potential use of the structure by tenants was dependant upon planning permission being granted Although my original desire was to use the building for other purposes, the present proposal is for users of the property and should be considered on that basis 18 of 24 Planning Committee: 22 September 2010 Briefing Notes Like many applications, details regarding screening the site will be forthcoming should planning permission be granted There is already light and power running to the small shed, so the infrastructure for power to the new building is straightforward Disruption regarding building work would be minimal as the structure would be constructed off site 19 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 11: John Lewis Dist Centre, 41- 44 Kendal Avenue, Acton W3 0RP - P/2010/2778 Amended Recommendation Further Written Representations Notes The report indicates the site is within the Hanger Hill ward and this should be amended to read East Acton ward. 20 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 12: 11 Templewood, West Ealing, London W13 8BA - P/2010/1914 Amended Recommendation Further Written Representations Notes 21 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 13: 53 Fowlers Walk, Ealing, London W5 1BQ - P/2010/2631 Amended Recommendation Further Written Representations An email from the Conservation Panel was received on 17/09/2010 stating that they have seen the amended drawings in which the proposed extension has a reduced depth of 2.30m. The panel mentions the reduction in depth makes the proposal suitable and will withdraw their original objection to it. Notes 22 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 14: West London Shooting Ground, West End Road, Northolt UB5 6RE P/2010/2515 Amended Recommendation It is suggested that the following condition is added to the recommendation: 13. The applicant shall undertake to conduct periodic maintenance of the existing overflow ditch on the southern boundary of the site to ensure that the ditch does not become overly clogged with vegetation or other material originating from the West London Shooting Grounds site. The applicant shall also undertake to carry out regular inspections of the ditch and report any build up of fly tipping material to the Council. Details of how this periodic maintenance will be undertaken shall be submitted in writing to the LPA within three months of the commencement of the development. REASON: In the interests of the visual amenity of the area and to enable the ditch to function to its full potential to assist in the prevention of flooding, in accordance with policies 2.5, 3.4, 3.8, 4.1 and 4.5 of the adopted Ealing Unitary Development Plan, Plan for the Environment (2004). Further Written Representations Notes The applicant has agreed to accept the additional recommended condition (as above) and has indicated that they are happy to accept joint responsibility with the Council for its on-going maintenance. 23 of 24 Planning Committee: 22 September 2010 Briefing Notes ITEM 015: 12 Bayham Road W4 – COM/2009/0708 Notes Page 1 The subject Ward should read Southfield and not Greenford 24 of 24
© Copyright 2025 Paperzz