DESIGN INSPIRATION MASTERPLAN STAGE A - FUNCTIONS SPACES new MASTERPLAN AIR LOCK up-graded RAMP FEMALE TOILETS new skylight up-graded upgraded MALE TOILETS MAIN FUNCTION ROOM NEW LANDSCAPING OUTDOOR DECK NEW LANDSCAPING upgraded FOYER space division (multiple functions) up-graded up-graded CONFERENCE SECURE ROOM ANTEROOM re-located RAMP STAGE NEW LANDSCAPING NEW LANDSCAPING RAMP FUNCTION DROP- OFF EXIT RAMP SCOPE OF WORKS • • • • • • • • Remove plasterboard wall between entry foyer and function room, and replace with full height glass wall. Replace existing doors to function room with large full height timber doors. Replace carpet to function room & lobby. Replace existing curtains with new including curtains to glass wall. Replace existing ceiling with new acoustic plasterboard ceiling. Replace existing windows to North façade with operable doors onto deck Install new outdoor timber deck and handrail and pergola structure. Relocate existing stage and all associated services to suit new layout. AMENITIES • • • • • • • • • Upgrade existing general lighting and install 5 new large scale feature drop pendant lights. Allow to repaint and make good as required to plasterboard walls. Clad over existing internal brick arch ways. Square up and install new timber sliding door. Minor upgrade to bar area as required. New dining chairs to function area. Remove passageway wall outside toilets and extend lobby. New glazed entry/airlock doors and side lights. Upgrade finishes and lights to existing conference room and convert office to bridal/ powder room. General upgrade of lobby finishes including installation of large feature skylight. • • • • • • • Paint all exiting brickwork white. Retain existing toilet partitions, allow to polished and replace existing doors with new laminate doors. Replace all existing sanitaryware including toilet suites, urinals, hand basins, taps and soap dispensers with new. Provide new decorative mirrors to suit new layout. Install new floors tiles. Allow to tile long wall full height with new decorative feature wall tiles. Upgrade lighting. Images depict potential design intent, they are not the design. NEW LANDSCAPING DESIGN INSPIRATION MASTERPLAN STAGE B - MEMBERS’ FACILITIES MASTERPLAN SOCCER PITCH GLAZED WIND BREAK CAFE DECK EXISTING GRANDSTAND CHILDREN’S PLAY EXTENDED SEATING new AIR LOCK upgraded NEW LOADING AREA KITCHEN & STORE FACILITIES RESTAURANT new MAIN BAR MEMBERS BAR/ LOUNGE/ CAFE SCOPE OF WORKS • • • • • All new furniture to suit the new restaurant and bar layout. New floor finishes including carpet and tiles around the bar area and rubber floor behind the bar area. New glazed airlock and new glazed openings to East façade to connect with the grandstand. Upgrade to existing kitchen to allow for a functional space to cater for seating requirements. Demolish extended service area and extend grandstand seating. • • • • • • Extend and upgrade existing bar to improve service to functions area. New central bar area between restaurant and members’ bar. General upgrade of finishes and lighting to existing dining area to convert to a modern restaurant facility. General upgrade of finishes and lighting to members’ bar area. Construction new external cafe deck area including glazed wind break. New outdoor children’s play area. Images depict potential design intent, they are not the design. upgraded BAR/ SERVICE MASTERPLAN SERVICE RM 4m2 NEW CHANGE ROOMS 225m2 TO PITCH MENS HOME WOMENS HOME change room 25m2 total 37m2 DESIGN INSPIRATION MASTERPLAN STAGE C - NEW CHANGE ROOMS STORE 5m2 OFFICIALS ROOM 21m2 change room 25m2 total 37m2 MENS VISITOR WOMENS VISITOR FIRST AID 7m2 MASSAGE STORE E 15m2 SCOPE OF WORKS • • • • • Provide complete new change room building with facilities to comply with FFV Class A standard. Players change rooms 25m2 each minimum. Massage table provided in each players dressing room. Official Room 20m2 minimum. First Aid 10m2 minimum. Images depict potential design intent, they are not the design. change room 21m2 total 33m2 MASTERPLAN STAGE C - NEW CHANGE ROOMS EXTERIOR VIEWS MASTERPLAN STAGE D - SITE ENHANCEMENTS EXISTING LIGHTING SEPTIC TANK DISCHARGE AREA SCOPE OF WORKS EXISTING LIGHTING EXISTING LIGHTING • • • JUNIOR SOCCER PITCH MAIN SOCCER PITCH • • • • • Y UNDAR • EXISTING LIGHTING GRANDSTAND 1 LOADING 3 CONVERT OLD CHAGEROOMS TO STORAGE 44 18 FUTURE CARPARK EXPANSION NEW CHANGEROOMS LOCATION 45 156 173 279 NEW E NETBALL L COURTS 4 174 188 FUTURE CARPARK EXPANSION 8 189 203 204 218 233 247 9 126 155 267 266 66 CLUB BUILDING SITE ENTRANCE ONLY REMOTE CONTROL RACING CAR AREA 248 LYNNBURN RD SITE EXIT ONLY EXISTING HOUSE MIDLAND EXISTING PUBLIC TOLIETS GRANDSTAND EXPANSION- VENUE CLASS A (500+) EXISTING LIGHTING EXISTING LIGHTING NEW LIGHTING NEW LIGHTING HWY SITE BO SITE BO POTENTIAL ADDITIONAL SOCCER PITCHES UNDAR Y • New lighting to main soccer pitch. Relocate existing lighting to practice pitch. Building entry changes, including new entry portico, improved access and drop-off zone and disabled entry. Site entry changes to separate entry and exit points. New netball area. Extended grandstand. Future carpark expansion to old Bocce area. Additional soccer pitches (dependent on land acquisition). Convert existing change rooms to storage. Revision to car parking arrangement to suit new layout.
© Copyright 2026 Paperzz