Bell Park Sports Club facilities and function room upgrade

DESIGN INSPIRATION
MASTERPLAN
STAGE A - FUNCTIONS SPACES
new
MASTERPLAN
AIR LOCK
up-graded
RAMP
FEMALE
TOILETS
new
skylight
up-graded
upgraded
MALE
TOILETS
MAIN
FUNCTION
ROOM
NEW
LANDSCAPING
OUTDOOR
DECK
NEW
LANDSCAPING
upgraded
FOYER
space division
(multiple functions)
up-graded
up-graded
CONFERENCE
SECURE
ROOM
ANTEROOM
re-located
RAMP
STAGE
NEW
LANDSCAPING
NEW
LANDSCAPING
RAMP
FUNCTION
DROP- OFF
EXIT RAMP
SCOPE OF WORKS
•
•
•
•
•
•
•
•
Remove plasterboard wall between entry foyer
and function room, and replace with full height
glass wall.
Replace existing doors to function room with
large full height timber doors.
Replace carpet to function room & lobby.
Replace existing curtains with new including
curtains to glass wall.
Replace existing ceiling with new acoustic
plasterboard ceiling.
Replace existing windows to North façade with
operable doors onto deck
Install new outdoor timber deck and handrail
and pergola structure.
Relocate existing stage and all associated
services to suit new layout.
AMENITIES
•
•
•
•
•
•
•
•
•
Upgrade existing general lighting and install 5
new large scale feature drop pendant lights.
Allow to repaint and make good as required to
plasterboard walls.
Clad over existing internal brick arch ways.
Square up and install new timber sliding door.
Minor upgrade to bar area as required.
New dining chairs to function area.
Remove passageway wall outside toilets and
extend lobby.
New glazed entry/airlock doors and side lights.
Upgrade finishes and lights to existing
conference room and convert office to bridal/
powder room.
General upgrade of lobby finishes including
installation of large feature skylight.
•
•
•
•
•
•
•
Paint all exiting brickwork white.
Retain existing toilet partitions, allow to
polished and replace existing doors with
new laminate doors.
Replace all existing sanitaryware
including toilet suites, urinals, hand
basins, taps and soap dispensers with
new.
Provide new decorative mirrors to suit
new layout.
Install new floors tiles.
Allow to tile long wall full height with new
decorative feature wall tiles.
Upgrade lighting.
Images depict potential design intent, they are not the design.
NEW
LANDSCAPING
DESIGN INSPIRATION
MASTERPLAN
STAGE B - MEMBERS’ FACILITIES
MASTERPLAN
SOCCER PITCH
GLAZED
WIND
BREAK
CAFE
DECK
EXISTING
GRANDSTAND
CHILDREN’S
PLAY
EXTENDED
SEATING
new
AIR LOCK
upgraded
NEW
LOADING
AREA
KITCHEN &
STORE
FACILITIES
RESTAURANT
new
MAIN
BAR
MEMBERS
BAR/
LOUNGE/
CAFE
SCOPE OF WORKS
•
•
•
•
•
All new furniture to suit the new restaurant and
bar layout.
New floor finishes including carpet and tiles
around the bar area and rubber floor behind the
bar area.
New glazed airlock and new glazed openings
to East façade to connect with the grandstand.
Upgrade to existing kitchen to allow for
a functional space to cater for seating
requirements.
Demolish extended service area and extend
grandstand seating.
•
•
•
•
•
•
Extend and upgrade existing bar to improve
service to functions area.
New central bar area between restaurant and
members’ bar.
General upgrade of finishes and lighting to
existing dining area to convert to a modern
restaurant facility.
General upgrade of finishes and lighting to
members’ bar area.
Construction new external cafe deck area
including glazed wind break.
New outdoor children’s play area.
Images depict potential design intent, they are not the design.
upgraded
BAR/ SERVICE
MASTERPLAN
SERVICE
RM
4m2
NEW
CHANGE ROOMS
225m2
TO PITCH
MENS
HOME
WOMENS
HOME
change room 25m2
total 37m2
DESIGN INSPIRATION
MASTERPLAN
STAGE C - NEW CHANGE ROOMS
STORE
5m2
OFFICIALS
ROOM
21m2
change room 25m2
total 37m2
MENS
VISITOR
WOMENS
VISITOR
FIRST AID
7m2
MASSAGE
STORE
E
15m2
SCOPE OF WORKS
•
•
•
•
•
Provide complete new change room building with facilities to comply with FFV Class A standard.
Players change rooms 25m2 each minimum.
Massage table provided in each players dressing room.
Official Room 20m2 minimum.
First Aid 10m2 minimum.
Images depict potential design intent, they are not the design.
change room 21m2
total 33m2
MASTERPLAN
STAGE C - NEW CHANGE ROOMS
EXTERIOR VIEWS
MASTERPLAN
STAGE D - SITE ENHANCEMENTS
EXISTING
LIGHTING
SEPTIC TANK
DISCHARGE AREA
SCOPE OF WORKS
EXISTING
LIGHTING
EXISTING
LIGHTING
•
•
•
JUNIOR
SOCCER
PITCH
MAIN SOCCER
PITCH
•
•
•
•
•
Y
UNDAR
•
EXISTING
LIGHTING
GRANDSTAND
1
LOADING
3
CONVERT OLD
CHAGEROOMS
TO STORAGE
44
18
FUTURE CARPARK
EXPANSION
NEW
CHANGEROOMS
LOCATION
45
156
173
279
NEW
E NETBALL
L
COURTS
4
174
188
FUTURE CARPARK
EXPANSION
8
189
203
204
218
233
247
9
126
155
267
266
66
CLUB BUILDING
SITE
ENTRANCE
ONLY
REMOTE CONTROL
RACING CAR AREA
248
LYNNBURN RD
SITE
EXIT
ONLY
EXISTING
HOUSE
MIDLAND
EXISTING
PUBLIC
TOLIETS
GRANDSTAND EXPANSION- VENUE CLASS
A (500+)
EXISTING
LIGHTING
EXISTING
LIGHTING
NEW
LIGHTING
NEW
LIGHTING
HWY
SITE BO
SITE BO
POTENTIAL
ADDITIONAL
SOCCER
PITCHES
UNDAR
Y
•
New lighting to main soccer pitch.
Relocate existing lighting to practice
pitch.
Building entry changes, including new
entry portico, improved access and
drop-off zone and disabled entry.
Site entry changes to separate entry
and exit points.
New netball area.
Extended grandstand.
Future carpark expansion to old Bocce
area.
Additional soccer pitches (dependent
on land acquisition).
Convert existing change rooms to
storage.
Revision to car parking arrangement to
suit new layout.