ROOFTRADE Living Green Roof Kit Installation Instructions Kit contents ROOFTRADE Moisture Blanket, 2m wide ROOFTRADE Sedum Blankets, 1m long x 600mm wide rolls Notes: 1. Only suitable for single, double or multiple pitch roofs 2. Do not use on flat roofs 3. Installation should be carried out by 2 people Go to www.rooftrade.co.uk/how-to-guides.html to watch the How To installation video. Tools Additional Preparation Materials Tape Measure 100mm deep x Remove existing timber fascia’s/edging and inspect the existing felt 19mm thick waterproofing. It should be without rips, tears, blisters or bald Large/Heavy Sawn Treated patches. Duty Scissors Timber for If the felt is not as new replace with ROOFTRADE High Performance Chalk Line or fascia’s/edging Cap Sheet. Straight edge 100mm x If the roof structure is in poor condition install a new 18mm exterior Hammer or 100mm x grade plywood or 18mm OSB grade 3 roof decking. electric 19mm Sawn screwdriver If the building/ structure is not solid, or you are unsure it will take 2 Treated Timber the maximum 32kg/m wet weight of the ROOFTRADE Living Green Ladder packers Roof kit brace the structure in accordance with the ROOFTRADE 65mm Shed Bracing Guide. galvanised nails Check delivery of your Living Green roof kit to ensure that all or 60mm long materials have arrived safely and in good condition. Your Living galvanised Green Roof kit should be installed on the day of delivery to avoid screws damage to the sedum blanket. If installation on the day of delivery is depending on not possible unroll the sedum blanket on the day of delivery and preferred water regular until you can carry out the installation. attachment Under no circumstance during the installation of new waterproofing method for the or the ROOFTRADE Living Green Roof do we recommend you stand packers and on the roof. fascia’s/edging General Guidelines Measure your roof in all directions and write down the dimensions as you will need them to cut the ROOFTRADE Moisture Blanket and ROOFTRADE Sedum Blanket to the appropriate sizes. After cutting to size the ROOFTRADE Moisture Blanket must be laid on top of the roof rib side down with the ribs running down the slope of the roof. When marking the ROOFTRADE Moisture Blanket for single and double pitch roofs add 140mm to the length in the direction of the ribs before cutting, this will provide a 70mm overlap for each face and will be used to attach the ROOFTRADE Moisture Blanket to the roof edge. For multiple pitched roofs cut into triangle shapes to match the roof allowing an additional 70mm for fastening. Cutting to size ROOFTRADE Moisture Blanket Open out the ROOFTRADE Moisture Blanket rib side up. Mark the length dimension on the ROOFTRADE Moisture Blanket, including the 140mm edge overlap, and cut across the ribs with a pair of large pair of scissors. Cut to width (if required) using the ribs as a cutting guide. Roll up the ROOFTRADE Moisture Blanket with the rib side down and store to one side ready to installation. Cut any other pieces of ROOFTRADE Moisture Blanket required. ROOFTRADE Sedum Blanket If you need to cut the ROOFTRADE Sedum Blanket first unroll plant side up. Measure the length or width required and cut to size using a pair of large scissors. Roll up the ROOFTRADE Sedum Blanket plant side in and store to one side ready to installation. Cut any other pieces of ROOFTRADE Sedum Blanket required. Page 1 of 2 Go to www.rooftrade.co.uk/how-to-guides.html to watch the how to installation video. If you have any queries please contact Radmat ROOFTRADE. Office hours Mon – Fri 9 a.m. to 5 p.m. Tel: 01858 450501 or e-mail: [email protected]. ROOFTRADE Living Green Roof Kit Installation Instructions Installation 1. 2. 3. 4. 5. 6. 7. Go to www.rooftrade.co.uk/how-to-guides.html to watch the How To installation video. Single (Mono) Pitch Roof Double Pitch Roof Multiple Pitch Roof Unroll ROOFTRADE Moisture Blanket 1. Unroll ROOFTRADE Moisture Blanket 1. Unroll the triangular shaped pre-cut over the roof ensuring the ribs are down. over the roof ensuring the ribs are down. ROOFTRADE Moisture Blanket over the Ensure the Moisture Blanket fits squarely Ensure the Moisture Blanket fits squarely roof ensuring the ribs are down. Ensure over the roof with 60/70mm overlapping over the roof with 60/70mm overlapping the Moisture Blanket fits squarely over the highest and lowest edges only. the lowest edges only. Temporarily the roof with 60/70mm overlapping the Temporarily weight in place if it is a weight in place if it is a windy day. When lowest edges only. Temporarily weight windy day. When installing subsequent installing subsequent pieces of Moisture in place if it is a windy day. When pieces of Moisture Blanket loosely butt Blanket loosely butt side and end joints. installing subsequent pieces of Moisture side and end joints. 2. Install the 100mm x 19mm Sawn Treated Blanket loosely butt side and end joints. Install the 100mm x 19mm Sawn Treated Timber edging to the 2 non-draining 2. Fasten the 100mm x 100mm x 19mm Timber edging to the 3 non-draining sides using screws or nails, do not trap Sawn Treated Timber Packers 19mm sides using screws or nails, trapping the the Moisture Blanket behind the edging. above the Moisture Blanket on all edges Moisture Blanket behind the edging on Position the top of the 100mm x 19mm using screws or nails, fastening through the high edge only. Position the top of Sawn Treated Timber edging 19mm the Moisture Blanket into the roof edge the 100mm x 19mm Sawn Treated above the Moisture Blanket using a piece (Figure 2). Use a piece of 100mm x Timber edging 19mm above the of 100mm x 19mm Sawn Treated Timber 19mm Sawn Treated Timber as a guide. Moisture Blanket using a piece of as a guide (Figure 1). Positioning one Packer at the end of 100mm x 19mm Sawn Treated Timber as 3. Fasten the 100mm x 100mm x 19mm each edge and one or more along the a guide (Figure 1). Sawn Treated Timber Packers using length as required. Fasten the 100mm x 100mm x 19mm screws or nails to the two low edges, 3. Fasten the 100mm x 19mm Sawn Sawn Treated Timber Packers using fastening through the Moisture Blanket Treated Timber edging to the packers on screws or nails to the one low edge, into the roof edge. Positioning one all sides using screws or nails (Figure 1). fastening through the Moisture Blanket Packer at each end and one or more 4. The ROOFTRADE Sedum Blanket must be into the roof edge. Positioning one along the length as required (Figure 2). laid along all the ridges first, with Packer at each end and one or more 4. Fasten the 100mm x 19mm Sawn 300mm on each side of the slope. Install along the length as required (Figure 2). Treated Timber edging to the Packer subsequent rolls in the optimal direction Fasten the 100mm x 19mm Sawn with screws or nails. for coverage and infill with cut pieces as Treated Timber edging to the Packer 5. The ROOFTRADE Sedum Blanket must be required butting each roll next to the with screws or nails. laid along the ridge first, with 300mm on previous one (Similar to Figure 4). The ROOFTRADE Sedum Blanket can now each side of the slope. Install 5. The Sawn Treated Timber edging can be laid in any direction. Start flush with subsequent rolls in the optimal direction now be painted/stained or left to age the roof edge and gently butt each roll for coverage and infill with cut pieces as naturally. next to the previous one. Install cut required butting each roll next to the 6. Follow Aftercare guidance. pieces to infill the roof area as required previous one (Figure 4). (Figure 3). 6. The Sawn Treated Timber edging can The Sawn Treated Timber edging can now be painted/stained or left to age now be painted/stained or left to age naturally. naturally. 7. Follow Aftercare guidance. Follow Aftercare guidance. Figure 1, attaching 100mm x 19mm Sawn Treated Timber edging. Figure 2, Timber Packers fastened through the Moisture Blanket. Figure 3, unrolling ROOFTRADE Sedum Blanket. Figure 4, example installation guide for double pitch roofs Page 2 of 2 Go to www.rooftrade.co.uk/how-to-guides.html to watch the how to installation video. If you have any queries please contact Radmat ROOFTRADE. Office hours Mon – Fri 9 a.m. to 5 p.m. Tel: 01858 450501 or e-mail: [email protected].
© Copyright 2026 Paperzz