LPD 17 Class Amphibious Transport Dock Ship Program \(PMS 317\)

PBL Strategy
1
Candidate PBL ISE/CF Systems
ISE/CF Systems:
• A total of ten major ISE CF systems are found in three of the eight Product Data categories in the LPD 17 Combat System
• These ten major ISE CF systems contain 24 CF and 4 GFE ancillary sub-systems.
• Hardware (H/W) and Software (S/W) vendors include the Government, Raytheon, Sperry, Avondale and CAE.
Combat System
Product Data
System Structure
ISE CF
System
Included Ancillary
Sub-System
GFE CFE
SURVEILLANCE
SPS-73
X
Combat System
Product Data
System Structure
ISE CF
System
INTERIOR COMMS
ICS
NAVIGATION
NAVSYS
NAVSSI
NDDS
WSN-7
WQN-2
Fathometer
Flux Gate Compass
Wind System
X
X
X
X
X
X
X
Ship IPDE
Section 490 Equip
X
X
CIDS
X
EXTERIOR COMMS
X
CRYPTOLOGIC
MISSION CONTROL
WEAPONS CONTROL
IVDS
27TV
SITE 400
HOSS
X
X
X
X
MCS
DCS
ICAS
X
X
X
X
ADS
X
23TV
Command System
Steer & Prop Control
ECS
Support Equip
TSTS
X
X
X
X
X
X
X
SCS
SWAN
X
X
X
IVCS
WPCS
SPT
A&I
Announcing System
Intercom
Switchboards
SHIP CONTROL
SUPPORT
SWAN Electronics
FOCP
SSMS
Included Ancillary
Sub-System
GFE CFE
MSCS
Coils
X
X
SAT-2A
X
Turn-Key RCS
None
None
None
2
ISE CFE PBL Development
Today
System definition &
boundaries
LCESMP
ISE CFE
Support
Concept
Identify key
performance
metrics/objectives
Identify functional
processes
to achieve performance
Determine BV Support
Source
System
Support
Plan
ISE CFE PBL
Approach
(Draft SOO)
Well-defined,
justifiable and
executable!
3
System Support Goal
Develop a viable and best value
Performance Based Logistics (PBL)
approach for the ten LPD 17 Class
Contractor Furnished Electronic
(CFE) systems
4
PBL Range, Scope and Depth of
Support Determination
Complete below table for all CF ISE Systems
PBL
Category
Support
Scope
Navy
Cog
Traditional
PBL
Material Only
NAVICP
Material &
Maintenance
NAVICP,
PARM
Expanded
PBL
Prime
Vendor
Support
(Logistics Only)
Material,
Maintenance and
Engineering
NAVICP,
PARM, ISEA
Systems
System X
System Y
System Z
!
!
!
5
Integrated Shipboard Electronic (ISE) Systems and
Total Ship Support Development Timeline
ISE PBL Support
Approach Development
LCE&S Contract Approach
– Organic, Commercial or Hybrid Support?
– ISS Contract?
– PBL Contract by CFE system?
– Engineering& Logistics? Logistics only?
– PBL Contract for all CFE systems?
– ISE LCE&S Bundled with Total Ship PY Contract?
COTS Technology Evolution
Planning
Class Planning Yard Approach
SOW Development
RFP Negotiations
Stand-up Class Planning Yard
Unique System Support
PBL
Contract(s)
Award
Oct-Dec
2001
Jan-Mar
2002
Apr-Jun
2002
Jul-Sep
2002
Oct- Dec
2002
Jan-Mar
2003
Apr-Jun
2003
Jul-Sep
2003
Oct-Dec
2003
Today
6
Contracting Challenges
" Scope yet to be defined for system support
– Organic versus Commercial Role
• Political challenges associated with source of system support
• Obtaining Objective Cost and Performance Data for BVA
" Alignment of Funding Streams
– Supply Support is NWCF funded
– ISEA is PM funded
– Increased visibility of total costs
" Timing of award
– Interim Support
– Alpha Contracting
– Feathered approach
7