Jal Power Corporation Ltd. A-102, Sector-65, Noida-201307 (U.P.), INDIA Gist of Application for investment approval for Rangit Stage-IV Hydro-electric Project (3x40 MW) at Sikkim Jal Power Corporation Limited (JPCL) is setting up 120MW Rangit Stage-IV Hydro-electric Project in the state of Sikkim in District West/South Sikkim on Build-Own-Operate and Transfer (BOOT) basis under Joint Sector with the Government of Sikkim. The project is run of the river type with diurnal pondage envisaging installation of 3 nos. Francis turbine driven generating unit of 40 MW each at a rated head of 103.67m in a surface power station. A long-term Power Purchase Agreement for 25 years has been signed by JPCL with M/s. Tata Power Trading Company Limited who have further signed an agreement with West Bengal State Electricity Distribution Company Limited for back to back sale of power. Application for in-principle clearance for the first stage investment approval for the Rangit Stage-IV Hydro-electric Project (3x40 MW) has been submitted to the West Bengal Electricity Regulatory Commission and the application has been admitted by the Commission. The gist of the application for investment approval is as follows. 1 Name of the Generating Company and address M/s. Jal Power Corporation Limited Registered Office:, Flat-B2, Road-7, Film Nagar, Jubilee Hills Hyderabad- 500033, (A.P.) Corporate Office: A-102, Sector-65, Noida-201307 (U.P.) India st 2 Investment approval for 1 Stage Investment approval for Rangit Stage-IV HE Project (3x40 MW) 3. Location of the Project In West/South District of Sikkim 4. Annual Energy 513 MUs during 90% dependable year (corresponding to 95% machine availability). 5. River Rangit 0 6. Longitude 88 18’ 10” E 0 7. Latitude 27 13’ 10” N 8. Nearest Rail Station New Jalpaiguri (BG) – 100 Km 9. Nearest Airport Bagdogra – 135 Km 10. Environment Clearance obtained from Ministry On 16.05.2007 of Environment & Forest (MOEF), GOI. 11. Techno-economic concurrence obtained from On 06.07.2007 Central Electricity Authority, GOI. 12. 13. 14 15. 16. 17. Forest Clearance from Ministry of Environment & Forest Govt. of India. Acquisition of Land. PPA signed with Tata Power Trading Co. Ltd. PPA signed on back to back basis with TPTCL based on PSA signed between TPTCL & WBSEDCL BPTA signed with PGCIL Evacuation of Power On 26.12.2007 On June, 2008 On 18.01. 2010 On 03.01.2011 On 24.02. 2010 Double Circuit 220 kV line from Power House to Pooling Station of PGCIL at New Melli (Distance about 3.2 KM) 18. Estimated Capital Cost Rs. 726.16 crore 19. Cost per MW Rs. 6.051 crore The application submitted by the Company may be inspected at the office of the Commission at FD-415A, Poura Bhawan (3rd Floor) Sector-Ill, Bidhannagar, Kolkata- 700 106, Telephone : 033-2359 2189, FAX; 2359-3397, email : [email protected] and at the Corporate office of the Company at. A-102, Sector-65, Noida- 201307 (U.P.), India and certified copies of the application and other details or part thereof may be obtained from the office of the Commission between 11.00 hrs. and 16.00 hrs. on all working days upto 07.10.2013. The application made for investment approval has been posted on the website of the applicant at www.jpcl.co.in. Objections, suggestions and comments, if any, on the above may be submitted, at the office of the Commission at rd FD-415A, Poura Bhawan (3 Floor), Sector-Ill, Bidhannagar, Kolkata- 700 106 by 09.10.2013. This notification has been issued with the approval of the Commission. Place: Noida (U.P.) M.K. SHARMA th Date: 13 September, 2013 Managing Director SALIENT FEATURES OF RANGIT STAGE-IV H.E.P. (3 X 40 MW) I. LOCATION 1 2 3 4 5 6 7 8 9 Country State District Tehsil River Name of the river basin Longitude Latitude Dam Site 10 Power House 11 12 Nearest Airport Nearest Railhead II. : : : : : : : : : India Sikkim West Sikkim Soreng Rangit The Brahmaputra 880 18’ 10” E 270 13’ 10” N 1.00 Km upstream of village Reshi in West Sikkim : Near confluence of River Rangit and right bank tributary Rothak Khola : Bagdogra - 135 Km : New Jalpaiguri (BG) - 100 Km TYPE OF PROJECT 1 2 3 4 III. Type Installed capacity Firm Power Annual energy generated during 90% dependable year : : : : Hydro Electric Project (ROR) 120 (3x40) MW 15.72 MW 513 MUs. (Corresponding to 95% availability of the Machine) : : : : : : : : : 1232.00 Sq Km 267.00 Sq Km 3473.00 M Cum 1551.394 mm 236.90 mm 9.80 mm 16.33 Cumecs 29.20 C 4.90 C HYDROLOGY & CLIMATE 1 2 3 4 5 6 7 8 9 10 IV. Catchment area upto head works Snow catchment area Average yield Average annual rainfall Maximum daily rainfall Minimum daily rainfall 90% available discharge Maximum Temperature Minimum Temperature Seismic Factors -Horizontal direction -Vertical direction : 0.250 g : 0.166 g DAM 1 Type of Dam : Concrete gravity dam 1/4 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 V. Height of Dam Top of Dam F.R.L. M.D.D.L. Dead storage level Gross storage capacity Pondage between F.R.L. and M.D.D.L. (Live storage capacity) Dead storage capacity Dimension of Spillway gate Crest elevation (Sluice) Type of gate (Sluice) Crest elevation (Ogee) Type of gate (Ogee) Length of Dam at top Width of Dam at top Length of spillway Free board Maximum tail water level River bed level Intake structure : : : : : : : 44.00 m El. 471.00 m El. 468.00 m El. 458.00 m El. 445.00 m 1.81 M Cum 1.22 M Cum : : : : : : : : : : : : : 0.59 M Cum 10.5 m ( W ) x 14 m ( H ) El. 445.00 m Radial El. 465.00 m Vertical lift 135.3 m 8.00 m 66 m 3.00 m El. 455.20 m El. 441.50 m 3 Nos with invert at El. 448.00 m of size 15.00 m width and 22.00 m height SUBMERGENCE AT F.R.L. 1 2 3 VI. Area under submergence : 13.36 Ha Number of villages affected i) Full : Nil ii) Partial : Nil Number of persons/families to be rehabilitated i) Urban : Nil ii) Rural : 37 families DESILTING CHAMBER 1 2 3 4 5 VII. Type of Desilting chamber Number of Desilting chambers Dimension of single Desilting chamber Size of silt particle to be removed Average flow velocity : : : : : Underground 3 Nos 120 m (L) x 13 m (W) x 15 m (H) 0.25 mm and above 25.30 cm/sec HEAD RACE TUNNEL 1 Type of Head race tunnel : Modified horse shoe 2/4 2 3 4 5 6 VIII. 1 2 3 IX. Dia of Head race tunnel Length Slope Design Discharge Number of Adits : : : : : 6.40 m 6488 m 1 in 478 128.00 Cumecs 2 Nos VENTILATION SHAFT Dia. Of Vertical Shaft from El. 523m to : 7m El.493.7m Dia. Of Vertical Shaft from El. 493.7m : 4m to Overt of HRT Height upto overt of the HRT : 73.5m SURGE SHAFT 1 2 3 4 5 6 7 X. Type of Surge shaft Dia of Surge shaft Dia of orifice Maximum downsurge level Top elevation of Surge shaft Bottom elevation of Surge shaft Height of Surge shaft : : : : : : : Restricted orifice, Semi-underground 18.00 m 2m El. 445.7 m El. 492.00 m El. 427.00 m 59 m : : : : Underground 5.50 m 247 m 20 mm to 36 mm : : : : Surface 75.30 m 20.20 m 41.385m : : : : : : : : : 16.50 m 18.60 m 9.60 m 9.00 m 11.20 m El. 344.0 m El. 344.835 m El. 352.835 m El. 348.835 m PRESSURE SHAFT 1 2 3 4 XI. Type of Pressure shaft Dia of Pressure shaft Length of Pressure shaft Thickness of Steel liner POWER HOUSE 1 2 3 4 5 6 7 8 9 10 11 12 13 Type of Power house Length of Power house Width of Power house Height of PH from lowest excavated level Centre to centre spacing of units Length of service bay Distance between A line to B line Distance between B line to C line Distance between C line to D line Centre line of Turbine Turbine floor level Upper generator floor level Lower generator floor level 3/4 14 15 16 17 18 19 20 21 Service bay level Top elevation of Roof truss Number of machines Type of Turbine Rated unit capacity Specific speed Synchronous speed & frequency Generator rated capacity : : : : : : : : 22 23 24 25 Power factor Generator voltage Excitation system Heaviest component to be transported : : : : 26 27 28 Power House crane Maximum gross head Maximum net head with one m/c running at rated load Minimum net head Rated net head Minimum tail water level Maximum tail water level under PLF Maximum tail water level with three m/c in operation Design Discharge Unit Penstock diameter : 1 No., 150 / 30 T : 123.50 m : 118 m 29 30 31 32 33 34 35 XII. : : : : : El. 355.00 m El. 374.00 m 3 Vertical Francis 40 MW 178.38 rpm 250 rpm, 50 Hz ± 5% 44.45 MVA with 10% continuous overload 0.9 11 KV ± 5% Static 25 T 97.00 m 103.67 m El. 344.50 m El. 354.00 m El. 347.10 m : 128.00 Cumecs : 3.2 m (after trifurcation) TAIL RACE CHANNEL Tail Race Channel shape/ length : Rectangular, Length about 42 m XIII. GENERATOR TRANSFORMERS : 16.50 MVA,11/220/ 3 KV 1-Ø -10 Nos XIV. SWITCHYARD 1 1 2 XV. Type of Switchyard/Voltage Level Number of bays in the switchyard : 220KV GIS Indoor : 6 Nos Evacuation of Power : Double Circuit 220kV line from Power House to New Melli Pooling station(About 3.2 Km). 4/4
© Copyright 2025 Paperzz