dpa Design and Planning Associates Limited DESIGN AND ACCESS STATEMENT Proposed Warehouse Extension, Shotton CHP Zone 4 – Deeside Industrial Estate Weighbridge Road Deeside Flintshire CH5 2LF For GDF SUEZ ENERGY October 2010 Design & Planning Associates Limited Belgrave House 15 Salop Road Oswestry SY11 2NR Tel: 01691 659595 Fax: 01691 670263 Site location/description of existing site use. Shotton Combined Heat and Power Station is a 210MWe gas-fired CHP power station in Flintshire, Wales.It is located on Weighbridge Road in Deeside, near the A548 in Shotton, Flintshire.CHP Shotton power plant is accessed off Weighbridge Road and situated within Zone 4 – Deeside Industrial Estate. The power station opened in 2001 as Shotton CHP Ltd, when owned by TXU Europe. The plant is near the site of UPM's Shotton paper mill. It is near steelworks owned by Corus Group. In December 2002, TXU had financial problems when the price of electricity plummeted. The plant went into administration. In January 2003, the administrators, Pricewaterhousecoopers, successfully restarted the power plant. It was the first time a power station had been commercially running whilst in receivership. In October 2003, the plant was bought by Gaz de France (GdF), being their only power station in the UK until the company bought the Teesside power station in February 2008. Late 2008 Gaz de France merged with Suez (a major global utility company) to form GDF Suez. The trading company is [1]. The site is next door to the Deeside Power Station, north of the River Dee. The site is 276sqm approximately in area and is situated within the Shotton CHP power plant. An aerial View of the power station and the red arrow indicating the site of the warehouse extension. The site is level and presently it is used as an external storage yard. 2 Position of the proposed warehouse. Photo shows existing site useage. Close up view of the site as existing. 3 Proposal The proposal is for a 247sqm warehouse extension allowing the operators at the power station to store equipment under cover, away from the weather elements. Image showing the artist view of the warehouse extension. Access There is no change to the access onto the power station site. Access into the warehouse extension is off the main internal circulatory road which runs around the power station. Layout The layout of the warehouse is governed by the existing faceted shape of the concrete retaining wall on the West Elevation and the road on the East Elevation. The warehouse is positioned in line with existing warehouse along the the East Elevation and 1200mm away from the retaining wall structure on the West Elevation. 4 Scale/design The scale of the extension is smaller in height than the existing building, however the materials and colour of the building fabric matches that of the existing. The proposed wall cladding starts above ground level as the omission of a facing brick wall like the existing building would be cost effective. Car parking No car parking facilities are required as outlined in the clients brief. Energy efficiency/carbon reduction strategy The new extension will comply with Part L.2B of the Building Regulations “Conservation of Fuel and Power” using the latest insulated wall and roof panels. The ground floor will be insulated. The warehouse will not be heated at this stage however the extension proposed will be future proofed should heating be required. Sustainable materials Doors will be constructed of steel and aluminium. The steel structure will be galvanised thus less maintenance required. The new cladding panels are long-life, with zero ozone depletion potential and with the thickness ensuring optimum u-values (energy savings and less carbon emissions). Drainage Surface water drainage will be discharged to the main drainage system via the existing on-site surface water drainage system. 5 ACCESS STATEMENT Statement of Intent The design complies with current regulations and good practice to provide reasonable access for all: elderly, young and disabled persons. Building Regulations & DDA The works are subject to approval under the Building Regulations 2000 as a new build work. The works should therefore comply with Requirement M1. Compliance with Requirement M1 can be shown by following guidance contained in Approved Document M (2004). Sources of Guidance Approved Document M (2004 Edition) BS8300:2001 DRC Guidance Note ‘Access Statements’ Consultations Consultation with the Local Authority Building Control Department will be undertaken as part of any Building Regulations application. 6 SPECIFIC ACCESS ISSUES Car Parking No car parking is required. Approach to Building The approach to the building is basically level and will be suitably furnished with a non-slip surface. Accessible Entrance The ground floor level to the extension is elevated from the external level by approximately 150mm and the main or principal entrance is accessed via 1/20 level access of paved material or limited steps to accommodate site levels. Entrance doors give a clear unobstructed width of 800mm with level threshold in compliance with current Building Regulations. Internal layout and facilities No internal layout is required. 7
© Copyright 2026 Paperzz