Why Complete with the Leader... Halliburton sets industry records. With wells reaching depths of 29,000 feet, the Jack/St. Malo Project in the Gulf of Mexico relied on state-of-the-art technology from Halliburton to save time and money. The Enhanced Single-Trip Multizone (ESTMZ™) completion system saved 25 days of rig time and improved time to production. And our Stim Star vessel delivered 30,000 bbls of DeepQuest® stimulation fluid to the project, that’s 15 million pounds of weighted fluid reducing surface pressures and enhancing safety. EMPIRE STATE BUILDING - 1483 FEET TALL 1500 ft tool string To help save rig time, Halliburton fractured up to 6 zones in a single trip, placing more than 2 million pounds of proppant. To accomplish this, the tool string had to be 1500 ft (450 m) long. That’s equivalent to the height of the Empire State Building. What can our ESTMZ, Stim Star and DeepQuest technologies do for you? SAVINGS 25 FLUID WEIGHT= 1500 AFRICAN ELEPHANTS DAYS Fewer trips = big savings Single-trip completions saved 25 days of rig time. Immense fluid weight The Stim Star vessel delivered 30,000 bbls of DeepQuest stimulation fluid. That’s 15 million pounds of weighted fluid, the equivalent of 1500 African elephants. CAPABILITY AND EXPERIENCE MAKE HALLIBURTON THE CHOICE FOR DEEPWATER COMPLETIONS Halliburton’s ESTMZ system capabilities greatly exceed those of previous single-trip completion systems. It can deliver the proppant and pressures associated with stacked operations, but in a fraction of the time. PRESSURE DIFFERENTIAL RATING: PUMP RATE: PROPPANT VOLUME: up to 10,000 psi up to 45 barrels per minute up to 3,750,000 lbs per well INVOLVED IN 9O% OF DEEPWATER WELLS H011551 06/15 © 2015 Halliburton. All Rights Reserved. Halliburton has worked on more than 90% of deepwater operations worldwide, including every project in the Lower Tertiary.
© Copyright 2026 Paperzz