Combine Underframe Conversions CONVERT-A

CONVERT-A-DRILL
Combine Underframe Conversions
PRODUCT
INFORMATION
BULLETIN
CAD/PCT
Fitting Guide.......Primary Coil Tines to Underframes
Typical parts: * Tines......... Part no. PCT D-LH Diamond mount left-hand coil
Part no. PCT D-RH Diamond mount right-hand coil
Part no. PCT V-LH Vertical mount left-hand coil
Part no. PCT V-RH Vertical mount right-hand coil
Mounting Gear........ Part no. PCT UB3A/4A splayed U bolts
Part no. PCT CP3A/4A tine clamp plate
Part no. PCT L75A/100A tine locker
Part no. PCT HA 1/2 tine height setting plate
* A balance of LH & RH tines are usually ordered to optimise tine placement and prevent crabbing.
Method:
Height
1. Set frame up at a comfortable working
adjuster
Clamp plate
height........Should be at least 600mm above
U-Bolts
ground & well-supported (e.g. 200 lt. drums)
2. Mark required tine positions on the top
TINE
rear face of the RHS, noting that the marks
MOUNTING
correspond to the centres of the tine shanks.
DETAIL
3. Locate the tine locker plates, U bolts and
Tine
Clamp plates loosely on the bar in their
Locker
required positions, so that tines rest against
the front face of the bar (as a general rule).
4. Slide the top end of the tines up into each
10. Fit coil tine height adjuster plates to hole
mounting assembly with the coil of the tine
on top of tine, selecting the hole most suitable
just clear of the frame at it’s closest point.
to limit slippage through the mounting
5. Armed with a rattle-gun or ratchet with
assembly,
should it ever occur.
3/4” tube socket, clamp down ‘snug’ but not
11. Fit points and other parts to tine as
fully tight.
detailed in PIBCAD/PCT 3/03
6. When all tines are in place in this manner
and while wearing safety glasses, use a large 12. Replace cups and delivery hoses, blanking
off any unused outlets at the box.
hammer to tap down the top of the end tines
13. With fully-assembled underframe on the
of each row, through their clamp assemblies
ground and the old float removed, reverse the
so that the distance between point mounting
combine over it and using the straps and bolts
hole and underside of the frame is 515mm.
supplied,
bolt it into place.
7. Fully tighten these end tines, torqueing the
U bolt nuts to 82Nm or 65ft.lb.
PLEASE READ THIS IN CONJUNCTION
8. Now run a stringline from one end to the
WITH THE OTHER PAGES SUPPLIED.
opposite side, across the point-mounting
CALL YOUR DEALER , OR PRIMARY SALES
bolthole centres on each row.
AUSTRALIA IF YOU REQUIRE FURTHER
ASSISTANCE.
Adjust middle tine heights to match, while
ensuring that the frame is not sagging in the
middle from lack of support.
9. When all tines are in place and adjusted,
firm the clamp plates down with a hammer
SALES AUSTRALIA
and fully tighten nyloc nuts (see #7 above)
PRODUCT
CONVERT-A-DRILL INFORMATION
BULLETIN
Combine Underframe Conversions CAD/PCT
Inter 511 Combines fitted with smaller than 18.4 x 26 tyres and a 203mm (8”) ram
cylinder may require adjustments / alterations to compensate for increased lift.
ENSURE MACHINE IS SAFELY PARKED AND SUPPORTED
PRIOR TO MAKING THESE ALTERATIONS
set tractor hydraulic control lever to the “float” position
to remove all residual hydraulic pressure
Wear appropriate protective equipment at all times.
“A”
1. Remove ram cylinder from rockshaft arm.
6. Remove existing floats and fit
2. Remove leveling screws (Turnbuckles)
Convert-A-Drill frame following the
from lifting arms.
same procedures as in the original Owners
3. Remove lifting arms from axle arms
Manual. (Use new rear hanging brackets
(position”A”), turn and reposition on axle
supplied with frame)
arms (position “B”).
7. Raise and lower machine while checking
4. Refit leveling screw arms (Turnbuckles)
clearance on ram cylinder and leveling screw
to lifting arms and adjust pin centres to
(Turnbuckle) arm movements.
800mm (”L”) in drawing above.
(The rockshaft arms may be scalloped out
5. Refit ram cylinder to rockshaft arm in
with an angle grinder to provide extra
lowest locating position. (Ram piston
clearance for ram if required.)
position may need to be changed to relocate)
PLEASE READ THIS IN CONJUNCTION
WITH THE OTHER PAGES SUPPLIED. CALL
YOUR DEALER OR PRIMARY
SALES AUSTRALIA IF YOU REQUIRE
FURTHER ASSISTANCE
SALES AUSTRALIA
PRIMARY COIL TINES
Fitting Guide for
Points, Residue Deflectors,
Boots
onto Primary Coil Tines
PRODUCT
INFORMATION
BULLETIN
CAD/PCT
Seed/ Single shoot tube:
Your seed or seed/fert. boot may now be
bolted to the back of the bracket with two 1”
Points:
1. Single bolt-hole points such as PR 2DB, x 5/16” bolts & nylocs at a height to suit your
seeding program and soil conditions. If using
3T, 4T, 7T, 8T, 9T, 9DB, 10T, 23T, 91,
a steel delivery boot (Part no. ST-ADJ-135 or
94TW, and 94 DB-TW can be fitted.
similar), a pair of connecting links (Part no.
See catalogue for bolt size and torque
ST-CL-50) will angle boot backwards if
specs.
desired.
2. Ensure that bolt is firmly held down
into bolt-head recess, and that the point is
pushed well onto the tine foot before
tightening, to avoid it coming loose in
service.
Single / double shoot bracket:
(no residue deflectors)
Holding the bracket (Part no. PCT-SBB-2)
with it’s front lip around the shank and the
chamfered corner adjacent to the tine foot,
pass the 3/8” bolts (with spring washers
fitted) through the tine leg from front and
secure with nyloc nut provided.
Residue deflectors:
(Part no. PCT-TT-3)
1.The threaded block fits into the back of
the deflector plate and is held in place in
front of the tine, by the two 3/8” bolts
(and spring washers), which in this case
are pushed through the tine from the back
and threaded into the block.
2.Ensure that the residue deflector is fully
down on the head of the point to reduce
wear and presents a smooth, continous
trash-flow surface.
3.Check your assembly-the residue
deflector must be flush against the seed
tube mounting bracket, in front of the
tine.
Double shoot conversion:
You may convert to double shoot use by
adding two clips (Part no. PCT-FT-HC) to
two holes in the body of the single shoot
bracket which will hold Barflo or other
dual shoot delivery hose at various depths
for fertiliser placement.
Dual Shoot with PCT-FT-235 steel
fertiliser boot:
This boot bolts directly behind the tine shank,
with the bolts being fed through from the
front of the tine. Seed boots are secured to it
through a mounting plate welded behind the
steel tube.
A separate, new residue deflector
(# PCT-TT4) can be fitted, which features two
clamps above and below the mounting area.
Mudshield:
This option (PCT Mud-1) is fitted to the
point mounting bolt to eliminate blockage
of fertiliser delivery tubes especially in
accretive soils.
Primary Coil Tines represent the most
efficient way to upgrade existing conventional
implements to direct drill/no-till capacity!
PLEASE READ THIS IN CONJUNCTION
WITH THE OTHER PAGES SUPPLIED.
CALL YOUR DEALER OR PRIMARY
SALES AUSTRALIA IF YOU REQUIRE
FURTHER ASSISTANCE
SALES AUSTRALIA