LNG COLD BOX MOVE

PROJECT:
LNG COLD BOX MOVE
INDUSTRY:
Petrochemicals
PROJECT TYPE:
Specialized Heavy Rigging
and Transportation
PROJECT OVERVIEW:
Transportation from Port
of Vancouver to LNG facility
in Hillsboro, OR. Engineered
and supervised the two-crane
pick from the vessel to
Omega Morgan equipment.
EQUIPMENT USED:
Low profile hydraulic dollies.
PROJECT SPECS:
Cold Box weighed
302,000 lbs. It’s dimensions
were 127'L x 11'7"W x 11'7"H.
OMEGAMORGAN.COM
PORTLAND (503) 647-7474
SEATTLE (253) 852-7500
PHOENIX (602) 789-4143
CALGARY (403) 474-6460