Multiform - 2/3/4/5m - ht 2,30/2,50m Lightweight structures for all small occasions Frame Portals, and intermediate frames in anodised aluminium profile Base plates and connection pieces in galvanised steel Roof and lateral bracing by diagonal bar in aluminium Tension Roof tension by steel bar and cam system Wall tension by ground rail in pre-galvanised steel Covers PVC coated polyester fabric, white translucent, flame retardant to M2 French standard Roof covers with sleeves and scalloped valance Combined gable triangle and gable walls with left hand and right hand roll-up openings, exterior sleeve Lateral walls split centrally, with tiebacks, outside lacing, exterior sleeve and mud flap Gable bay 2 3 4 5 Various type of lateral bracing 1. horizontal bar 3m 2. vertical bar 3m 3. cables 3m Tension system Gutter Roof cover Specifications Span Roof beam Valance Leg head L1 to L4 Overall width L9 External lateral height Tension bar Tension bar Cam system 400 Distance between centres Leg Juxtaposed structures Roof tension by cam system 9 4 18° 3 7 H1 Roof cover Combined gable triangle + gable wall 10 2 H2 H3 H4 0 L1 1 L1 L2 L3 L4 L9 40 250 Ø3 5 2,25 3,25 4,25 5,25 2,32 / 2,52 2,32 / 2,52 2,32 / 2,52 2,32 / 2,52 2,23 / 2,43 2,23 / 2,43 2,23 / 2,43 2,23 / 2,43 2,67 / 2,87 2,84 / 3,04 3 / 3,2 3,16 / 3,36 Internal ridge height H3 2,52 / 2,72 2,69 / 2,98 2,85 / 3,05 3,01 / 3,21 Under eave height H1 2,25 / 2,45 2,25 / 2,45 2,25 / 2,45 2,25 / 2,45 Lateral bay L10 3 3 3 3 Gable bay L1 to L4 2 3 4 5 18° 18° 18° 18° Base plate 1 250 x 250 250 x 250 250 x 250 250 x 250 Roof pitch Leg 2 100 x 65 100 x 65 100 x 65 100 x 65 Roof beam 3 100 x 65 100 x 65 100 x 65 100 x 65 Apex joint 4 Eave purlin 7 65 x 50 65 x 50 65 x 50 65 x 50 Ridge purlin 9 40 x 40 40 x 40 40 x 40 40 x 40 3 3 3 5 40 x 40 40 x 40 40 x 40 40 x 40 10 250 2/3 x 6 x 2,3 m Number of people Peg 40 Total duration of erection Base plate Pin + R clip Wall bar bracket + R clip Necessary equipment provided with frame -7 81 0 F Anchoring / Weighting 2 2 2 4,3 h 4,3 h 2 no. 3 m ladders - 1 no. 20 m measuring tape sledgehammers - hammers - adjustable spanners 400 distance between centres Anchoring Weighting Uplift force kg Coef. Number of pegs Uplift force kg Coef. 350 2 2 lg 500 290 1,65 Structure 4 and 5 m 580 2 2 lg 500 480 1,65 Load Bearing 2000 - 3000 - 4000 - 5000 15 to 20% Structure 2 and 3 m 21 -7 8 70 -6 00 50 31 8 -5 5 x 12 x 2,3 m 3h Time saved for dismantling 20 63 3- 24 4 0- 4 x 9 x 2,3 m 1 toasting fork - 1 measuring bar - 2 ropes Necessary equipment not provided 1 3000 3000 4 H2 Wall tension 0 3 H4 Erection / Dismantling Base plate 36 2 Sleeve Ground rail 0 170 250 L10 250 5m ht 2,3 / 2,5 Wall Leg 40 4m ht 2,3 / 2,5 External ridge height Number of purlins per bay L1 to L4 170 3m ht 2,3 / 2,5 Internal lateral height Diagonal bracing bar 40 2m ht 2,3 / 2,5 Height 2,3 - 2,5 m With snow F = 0 kg Without snow F = 60 kg
© Copyright 2025 Paperzz