Procurement and Contracts Department Florida Gateway College 149 S. E. College Place Lake City, Florida 32025 P: 386.754.4381 F: 386.754.4881 ADDENDUM NUMBER THREE RFQ# 17-5-01 Architectural Services April 20, 2017 FGC RFQ #17-5-01 Addendum Number Three Posted on the FGC Website at www.fgc.edu is changed as follows: Q&A: Question 1 We would expect the size of the mechanical systems to be such that commissioning would be required under FL Building Code, Energy Conservation Section C408. Should commissioning be included as part of this proposal or will a separate RFQ for commissioning be issued? Answer Florida Gateway College (FGC) will comply with all governing codes, statutes, and regulations having jurisdiction on the proposed STEM building, especially with regards to Florida Model Energy Code and since energy conservation and being LEED Certifiable were stated goals. For purposes of this RFQ, please assume that an independent third party will perform the required commissioning services. An RFQ does not require a proposal based on a scope of services until after the College has ranked and negotiated with the #1 ranked firm, and subsequent firms, as appropriate, in accordance with Florida’s Consultant’s Competitive Negotiation Act (CCNA). Addendum Number 3 – ITB #17-5-01 Page 1 Question 2 Who was a part of the Architectural/Engineering Team that completed the adjacent library? When was it completed? Answer Architectural – Harvard Jolly Inc. Civil – Jones Edmunds & Associates Structural – Atlantic Engineering Services Mechanical, Electrical, Plumbing & Fire Protection – TLC Engineering for Architecture System Integrator – Professional Communications Systems, Inc. The project was completed in 2012. Question 3 We have a two-part question to submit: If a CM participates on a team as a Cost Estimator, will the CM be precluded from bidding the project during the Hard bid delivery? Also, if the delivery method were to change to CM delivery, will the CM be precluded from chasing it if one of their staff members is on the design team as a Cost Estimator? Answer A CM who participates on a team as a cost estimator will be precluded from bidding the project during the hard bid delivery. If the delivery method changes to CM, the CM will be precluded from bidding on the project. See Florida Statute 287.057(17)b. Question 4 Is FGC open to exploring other sites for this building? Answer As discussed in the Non-Mandatory Pre-Submittal Meeting, FGC is not married to the siting of the building shown at that presentation. However, President Dr. Barrett did say he wanted “This building to be a showcase” and he noted the proximity to the site and the SR 90 entrance, and to the existing Library. Ed d’Avi AIA NCARB, DirectorCollege Facilities, spoke of this building as the “Gateway to Gateway.” Those things said, the President and the Administration would carefully listen to any professional advice or recommendations given on the siting of the STEM building from the shortlisted firms and/or the selected Architectural firm. FGC recognizes your team’s expertise and experience. Question 5 Will civil engineering be part of the architect's scope of work? Answer Civil Engineering services are traditionally parts of an Architect’s basic services, and that is anticipated in this project also. Question 6 Will landscape design and/or irrigation design be part of the architect's scope of work? Answer A Planting (Landscape) Plan, Irrigation Plan, necessary sections through various hardscape portions of the work, enlarged plans, and details will be required for the project, plus appropriate specifications sections. Ed d’Avi AIA NCARB, Director-College Facilities, spoke about a building goal as “xeriscape plantings” and also that it should be LEED certifiable. Energy Addendum Number 3 – ITB #17-5-01 Page 2 conservation and water conservation through various plantings are extensions of xeriscape and LEED. Question 7 Does FGC plan to pursue sales tax savings via an Owner Direct Purchase program? Answer Owner Direct Purchase (ODP) Orders have been traditional ways of saving the Owner money for public institutions, such as Florida Gateway College. ODP will definitely be a vehicle to being good stewards of public funds. ODP will be employed for the STEM Building. The packaging and front end of the Project Manual (administrative portions of the specifications) will need to aid in this ODP effort. Question 8 Is the designated site part of a master campus drainage plan? Answer We think it is, but the selected Architectural firm will need to do its “due diligence with various governmental agencies having jurisdiction,” establishing governing codes and approvals necessary prior to or during the design process. Jones Edmunds Associates (Engineers) was the engineering firm which did the last drainage plan for the Main Campus. All data on file with Florida Gateway College will be provided to the selected firm. Question 9 What is the estimated timing for demolition of Building No. 8 & No. 9? Answer The plan is currently to have the existing Buildings 008 and 009 in existence and use until the new STEM Building is completed. It is on the “Castaldi (demolition) List” at the Florida Department of Education now, awaiting its review with many other similar buildings. The existing buildings have been placed in “unsatisfactory condition” on our survey and will continue to be carried that way. Depending upon funding there may be some consideration given to having portables, but that decision will be in the future. There is no established deadline for consideration of either portables or demolition the date at this time. Question 10 In reference to the Statement of Qualification Forms, can the forms be reformatted if all the required information is retained? Answer Yes Question 11 In reference to the Statement of Qualification Forms, can we add to or expand on certain portions of the form? For example, within the Experience/Reference section, can we add images and descriptions for some projects? Answer Yes Addendum Number 3 – ITB #17-5-01 Page 3 Misty Taylor Director of Procurement and Contracts Florida Gateway College Addendum Number 3 – ITB #17-5-01 Page 4
© Copyright 2026 Paperzz