Akhalkalaki HPP www.energy.gov.ge Akhalkalaki HPP is located in Samtskhe-Javakheti region, Akhalkalaki district, village Korkhi. www.energy.gov.ge Installed Capacity - 15 MW Average Annual Generation – 85 GW/h Regulation Type – Reservoir Capacity Usage Ratio – 66.7% www.energy.gov.ge Construction Cost – 25.5 million USD Construction Period – 2.5 years Domestic Tariff – 4.8 USc/kWh Export Tariff – 8 USc/kWh Estimated carbon credit generation – 29.9 thousand tones Note: All the calculations are based on preliminary assumptions. Therefore any clarifications will cause appropriate changes in the final results. www.energy.gov.ge Site Location: - - Samtskhe-Javakheti region, Akhalkalaki district, village Korkhi Name of the River: Paravani GPS Coordinates: X=372214 Y=4590639 HPP Type: - Diversion, Reservoir Site Description: Head unit, diversion channel and free flow tunnel, pressure tank, turbine conduit, power house, tailrace channel. Head unit on the river Paravani conveys concrete dam, height - 28.0m, which ensures maximum water discharge, reinforced concrete water intake. Diversion is represented by free flow tunnel, diameter - 3.5m, length - 3.7km. Head unit on the river Janjgajuri conveys concrete dam, height - 5.0m, which ensures maximum water discharge, reinforced concrete water intake and silt basin. Diversion is represented by channel and free flow tunnel, diameter - 2.5m, length - 2.4km. At the end of the diversion there is a reinforced concrete pressure tank, dimensions - 5.0x25.0m. Turbine conduit is represented by 2.0m diameter bifilar metal pipe. Power house dimensions - 17.0x30.0m , height 15.0m. Tailrace covered channel is reinforced concrete rectangular construction, dimensions - 4.0x4.0m, length - 450.0m. www.energy.gov.ge Technical Parameters Installed Capacity Average Annual output Autumn-winter (Oct-March) generation Capacity usage ratio/Efficiency Type of regulation Scheme of energetic usage potential Hydrology Hydrological Data (number of years) Year of the average multi annual discharge Catchment area High water flow Average water flow Low water flow PMF (1%) Rated water discharge Maximum gross head Minimum gross head Reservoir Full supply level (FSL) Minimum Operation level (MOL) Total volume at FSL Active reservoir level Dam Type Crest Elevation MW GWh GWh % 14.6 85.35 38.3 66.7 Reservoir Full Year Year km2 m3/sec m3/sec m3/sec m3/sec m3/sec m m 58 1971 2020.0 25.11 22.1 17.2 120.0 25.0 70.4 67.0 masl masl mln. m3 mln. m3 1638.0 1623.0 3.3 2.3 masl Low crest weir 1638.1 www.energy.gov.ge Spillway Type Crest Elevation Length of spillway crest Reservoir elevation during PMF Spillway capacity at reservoir level PMF Water intake Sill elevation Stop log type and number Quantity Sluice or bottom spillway Type and number Quantity Dimensions (w x h) or (d) Diversion Type of diversion Dimensions (w; l) or (d; l) Stilling basin or shaft Dimensions (w x l) or (d ) Powerhouse Type Dimensions (w x h x l) Elevation of tailrace outlet sill Tailrace Type Dimensions (w x h) Elevation of outlet sill masl m masl m3/sec Surface 1368.1 25.0 1639.1 50.0 unit 1619.0 Butterfly valve 1 unit m Bottom 1 3.0 m Tunnel 3.5; 3700 m 5x25 m masl Above-ground 17x15x30 1570.6 m masl Channel 4x4 1565.5 masl www.energy.gov.ge Turbines/Generators Turbine Type and number Rated discharge Rated output Maximum output Generator Type Generator nominal output Generator nominal output Transformers Type Number Nominal power Transformer dimensions (l x w x h) Seismic background of the construction site Richter scale MW rpm F. HLA 194-LJ-140; 2 12.5 7.56 8.41 SF 8000-14/2860 7.3 428.6/792 unit MVA m Three-phase 2 8.1 4.5x3.15x4.8 m3/sec MW MW Magnitude Economic - Financial Parameters Costing mln. USD Duration of the construction Year Investment per 1 kV Thousand USD Investment per 1 kV/h USD Revenue per USD spent (Average price new HPP - 4,8 cents) USD Estimated carbon credit generation T. Social and Environmental Parameters Special environmental requirements Social Impact 6.8 25.50 2.5 1.75 0.3 0.19 29.9 Additional workplace; Development of infrastructure Ecological risks Medium Transmission lines Parameters Distance to inter connection point Infrastructure Existing roads Roads to be constructed kV km 35 4.5 km Paved 0.50 www.energy.gov.ge Number of observed years – 58 Chosen Year - 1971 www.energy.gov.ge www.energy.gov.ge www.energy.gov.ge www.energy.gov.ge www.energy.gov.ge www.energy.gov.ge
© Copyright 2025 Paperzz