2017 Construction Brochure

The Michigan Department of
Transportation (MDOT) is
working to enhance safety
and improve mobility by
modernizing the I-75 freeway.
What Is Being Done?
MDOT is reconstructing and realigning
3.1 miles of I-75, including ramps;
building a future high occupancy
vehicle (HOV) lane; and replacing
bridges at Square Lake Road,
Adams Road, Squirrel Road, and the
I-75/Square Lake Road interchange.
Where Is This Being Done??
The project is located on I-75 in
Oakland County in the cities of Troy,
Auburn Hills, and Bloomfield Township.
Work extends from north of Coolidge
Highway to north of South Boulevard,
and includes the Square Lake Road
and Adams Road interchanges.
Auburn Hills,
Bloomfield Township
and Troy
Oakland
County
For construction updates
and other information,
Visit the project website at:
www.modernize75.com
Like us on Facebook:
www.facebook.com/modernize75
Oakland County
Modernization
Project
Follow us on Twitter:
www.twitter.com/modernize75
MDOT: Providing the highest quality integrated
transportation services for economic benefit and
improved quality of life.
Construction and Motorist
Information
May-September 2017
2017 ROAD WORK



SOUTH BOULEVARD
SOUTH BOULEVARD
I-75 continues this year. Work starts in May and
is expected to be finished in September.



I-75 Business Loop/Square Lake Road interchange bridges
Southbound I-75 bridge over Adams Road
Southbound I-75 bridge over Square Lake Road
COOLIDGE HIGHWAY
2017 BRIDGEWORK
EXIT 75
BEACH ROAD
2017 Work
•The Michigan Department of Transportation’s
(Maytwo-year,
– September)
$90.8 million project to modernize
OPDYKE ROAD
2017 Work

Northbound I-75 from Squirrel Road to north of South Boulevard
Southbound I-75 from Coolidge Highway to north of South Blvd
I-75 Business Loop (Square Lake Road) ramps to and from I-75
Adams Road ramps to and from southbound I-75
ADAMS ROAD
75
EXIT 75
ROAD CONSTRUCTION
 I-75
Business
Road
•Three
I-75 BLLoop/Square
(Square LakeLake
Road)
interchange
interchange
bridges. bridges (3)
 Southbound I-75 bridge over Adams Road
•Southbound I-75 bridge over Adams Road.
 Southbound I-75 bridge over Square Lake
Road
•Southbound I-75 bridge over Square Lake Road.
WESTVIEW ROAD
2017 Traffic Impact
SQUARE LAKE
ROAD
75
SQUIRREL ROAD
BRIDGE
CONSTRUCTION
BRIDGE
CONSTRUCTION
EASTWAYS ROAD
•Adams Road ramps to and from southbound I-75.
EXIT 74
SQUARE LAKE ROAD
ADAMS ROAD
 Northbound
I-75 from Squirrel Road to
ROAD CONSTRUCTION
north of South Boulevard (1.5 miles)
•Northbound I-75 from Squirrel Road to north of
 Southbound
I-75 from
Coolidge
South Boulevard
(1.5 miles).
Highway to north of South
Boulevard
(3.1 I-75
miles)
•Southbound
from Coolidge Highway to
north
of South
Boulevard
 I-75
Business
Loop
(Square (3.1
Lakemiles).
Road) ramps to and from I-75
•I-75 Business Loop (BL) (Square Lake Road)
 Adams Road ramps to and from
ramps to and
from I-75.
Southbound
I-75
ARLUND WAY
ROAD
Coming Soon
Fall 2017 &
FALL
2017/SPRING 2018 WORK
Spring
2018
2017
Two TRAFFIC
lanes will IMPACT
be open in each direction
on I-75.
•Two lanes will be open in each direction on I-75.  Rehabilitation
• Repair the
of Adams
Adams Road
Roadcarpool
carpoollot
lot
 Motorists and area residents can expect
(fall
2017/spring
2018).
(Fall
2017/Spring
2018)
limited nighttime
andcan
weekend
freeway
•Motorists
and residents
expect limited
 Tree•replacements,
landscaping
and site
closures
for
bridge
demolition
and
beam
nighttime and weekend freeway closures
for
Tree replacement,
landscaping
and site
restoration
setting
bridge demolition and beam setting.
restoration (spring 2018).