The Michigan Department of Transportation (MDOT) is working to enhance safety and improve mobility by modernizing the I-75 freeway. What Is Being Done? MDOT is reconstructing and realigning 3.1 miles of I-75, including ramps; building a future high occupancy vehicle (HOV) lane; and replacing bridges at Square Lake Road, Adams Road, Squirrel Road, and the I-75/Square Lake Road interchange. Where Is This Being Done?? The project is located on I-75 in Oakland County in the cities of Troy, Auburn Hills, and Bloomfield Township. Work extends from north of Coolidge Highway to north of South Boulevard, and includes the Square Lake Road and Adams Road interchanges. Auburn Hills, Bloomfield Township and Troy Oakland County For construction updates and other information, Visit the project website at: www.modernize75.com Like us on Facebook: www.facebook.com/modernize75 Oakland County Modernization Project Follow us on Twitter: www.twitter.com/modernize75 MDOT: Providing the highest quality integrated transportation services for economic benefit and improved quality of life. Construction and Motorist Information May-September 2017 2017 ROAD WORK SOUTH BOULEVARD SOUTH BOULEVARD I-75 continues this year. Work starts in May and is expected to be finished in September. I-75 Business Loop/Square Lake Road interchange bridges Southbound I-75 bridge over Adams Road Southbound I-75 bridge over Square Lake Road COOLIDGE HIGHWAY 2017 BRIDGEWORK EXIT 75 BEACH ROAD 2017 Work •The Michigan Department of Transportation’s (Maytwo-year, – September) $90.8 million project to modernize OPDYKE ROAD 2017 Work Northbound I-75 from Squirrel Road to north of South Boulevard Southbound I-75 from Coolidge Highway to north of South Blvd I-75 Business Loop (Square Lake Road) ramps to and from I-75 Adams Road ramps to and from southbound I-75 ADAMS ROAD 75 EXIT 75 ROAD CONSTRUCTION I-75 Business Road •Three I-75 BLLoop/Square (Square LakeLake Road) interchange interchange bridges. bridges (3) Southbound I-75 bridge over Adams Road •Southbound I-75 bridge over Adams Road. Southbound I-75 bridge over Square Lake Road •Southbound I-75 bridge over Square Lake Road. WESTVIEW ROAD 2017 Traffic Impact SQUARE LAKE ROAD 75 SQUIRREL ROAD BRIDGE CONSTRUCTION BRIDGE CONSTRUCTION EASTWAYS ROAD •Adams Road ramps to and from southbound I-75. EXIT 74 SQUARE LAKE ROAD ADAMS ROAD Northbound I-75 from Squirrel Road to ROAD CONSTRUCTION north of South Boulevard (1.5 miles) •Northbound I-75 from Squirrel Road to north of Southbound I-75 from Coolidge South Boulevard (1.5 miles). Highway to north of South Boulevard (3.1 I-75 miles) •Southbound from Coolidge Highway to north of South Boulevard I-75 Business Loop (Square (3.1 Lakemiles). Road) ramps to and from I-75 •I-75 Business Loop (BL) (Square Lake Road) Adams Road ramps to and from ramps to and from I-75. Southbound I-75 ARLUND WAY ROAD Coming Soon Fall 2017 & FALL 2017/SPRING 2018 WORK Spring 2018 2017 Two TRAFFIC lanes will IMPACT be open in each direction on I-75. •Two lanes will be open in each direction on I-75. Rehabilitation • Repair the of Adams Adams Road Roadcarpool carpoollot lot Motorists and area residents can expect (fall 2017/spring 2018). (Fall 2017/Spring 2018) limited nighttime andcan weekend freeway •Motorists and residents expect limited Tree•replacements, landscaping and site closures for bridge demolition and beam nighttime and weekend freeway closures for Tree replacement, landscaping and site restoration setting bridge demolition and beam setting. restoration (spring 2018).
© Copyright 2026 Paperzz