MAN Guidelines to Fitting Bodies Truck PTO Variants for ZF-Gearboxes Edition 08/2015 Engineering the Future - since 1758 MAN Truck & Bus AG Release: d 1. Fundamentals ..................................................................................................................................................................... 3 2. Operating period und Power flow dependencies ................................................................................................................ 3 3. Type of power take-off output ............................................................................................................................................. 3 4. Permissible mass moments at power take-off .................................................................................................................... 3 5. Power take-offs on HP automatic transmissions ................................................................................................................ 3 6. Power take-offs and Intarder............................................................................................................................................... 3 7. Overview of power take-offs at gearbox ............................................................................................................................. 4 8. Technical data and tables ................................................................................................................................................... 4 x-coordinates for gearbox and power take-offs ................................................................................................................... 4 y- and z-coordinates for gearbox and power take-offs ........................................................................................................ 5 AS-Lite ............................................................................................................................................................................... 10 6AS-800 (Standard) 6,58 – 0,78 .................................................................................................................................... 10 6AS-850 (Standard) 6,72 – 0,79 .................................................................................................................................... 11 6AS-1000 (Standard) 6,75 – 0,78 .................................................................................................................................. 12 AS-Mid ............................................................................................................................................................................... 13 12AS-1210 TO (Standard) 10,37 – 0,81........................................................................................................................ 13 AS-Tronic........................................................................................................................................................................... 14 12AS-1930 TD (Standard) 15,86 – 1 ............................................................................................................................. 14 12AS-2130 TD (Standard) 15,86 – 1 ............................................................................................................................. 14 12AS-2330 TD (Standard) 15,86 – 1 ............................................................................................................................. 14 12AS-1931 TD (with Intarder) 15,86 – 1........................................................................................................................ 15 12AS-2131 TD (with Intarder) 15,86 – 1........................................................................................................................ 15 12AS-2331 TD (with Intarder) 15,86 – 1........................................................................................................................ 15 12AS-2330 TO (Standard) 12,33 – 0,78........................................................................................................................ 16 12AS-2530 TO (Standard) 12,33 – 0,78........................................................................................................................ 16 12AS-2331 TO (with Intarder) 12,33 – 0,78 .................................................................................................................. 17 12AS-2531 TO (with Intarder) 12,33 – 0,78 .................................................................................................................. 17 12AS-2740 TO (Standard) 12,29 – 0,78........................................................................................................................ 18 12AS-3140 TO (Standard) 12,29 – 0,78........................................................................................................................ 18 12AS-2741 TO (with Intarder) 12,29 – 0,78 .................................................................................................................. 19 12AS-3141 TO (with Intarder) 12,29 – 0,78 .................................................................................................................. 19 d TraXon ............................................................................................................................................................................... 20 12TX-2620 TD (Standard) 16,69 – 1 ............................................................................................................................. 20 12TX-2820 TD (Standard) 16,69 – 1 ............................................................................................................................. 20 12TX-2621 TD (with Intarder) 16,69 – 1 ........................................................................................................................ 20 12TX-2821 TD (with Intarder) 16,69 – 1 ........................................................................................................................ 20 12TX-2820 TO (Standard) 12,92 – 0,77 ........................................................................................................................ 21 12TX-2821 TO (mit Intarder) 12,92 – 0,77 .................................................................................................................... 21 Ecolite ................................................................................................................................................................................ 22 S5-42 (Standard) 4,65 – 0,77 ........................................................................................................................................ 22 6S-800 TO (Standard) 6,58 – 0,78 ................................................................................................................................ 23 6S-850 (Standard) 6,72 – 0,79 ...................................................................................................................................... 24 6S-850 (Standard) 6,72 – 0,79 ...................................................................................................................................... 25 6S-1000 (Standard) 6,75 – 0,78 .................................................................................................................................... 26 Ecomid............................................................................................................................................................................... 27 9S-1110 TD (Standard) 12,73 – 1,00 ............................................................................................................................ 27 9S-1310 TO (Standard) 9,48 – 0,75 .............................................................................................................................. 27 Ecosplit .............................................................................................................................................................................. 28 16S-1820 TO (Standard) 13,8 – 0,84 ............................................................................................................................ 28 16S-1823 TO (Standard+100%Push) 13,8 – 0,84 ........................................................................................................ 28 16S-1821 TO (with Intarder) 13,8 – 0,84 ....................................................................................................................... 29 16S-1822 TO (with NMV) 13,8 – 0,84 ........................................................................................................................... 30 16S-1920 TD (Standard) 16,41 – 1 ............................................................................................................................... 31 16S-1923 TD (Standard+100%Push) 16,41 – 1............................................................................................................ 31 16S-2220 TD (Standard) 16,41 – 1 ............................................................................................................................... 31 16S-2223 TD (Standard+100%Push) 16,41 – 1............................................................................................................ 31 16S-2320 TD (Standard) 16,41 – 1 ............................................................................................................................... 31 16S-2323 TD (Standard+100%Push) 16,41 – 1............................................................................................................ 31 16S-1921 TD (with Intarder) 16,41 – 1 .......................................................................................................................... 32 16S-2221 TD (with Intarder) 16,41 – 1 .......................................................................................................................... 32 16S-2321 TD (with Intarder) 16,41 – 1 .......................................................................................................................... 32 05.08.2015 power take-offs at ZF-gearbox 1 Release: d 16S-2220 TO (Standard) 13,8 – 0,84 ............................................................................................................................ 33 16S-2223 TO (Standard+100% Push) 13,8 – 0,84 ....................................................................................................... 33 16S-2520 TO (Standard) 13,8 – 0,84 ............................................................................................................................ 33 16S-2523 TO (Standard+100% Push) 13,8 – 0,84 ....................................................................................................... 33 16S-2221 TO (with Intarder) 13,8 – 0,84 ....................................................................................................................... 34 16S-2521 TO (with Intarder) 13,8 – 0,84 ....................................................................................................................... 34 16S-2222 TO (with NMV / with NMV+100% Push) 13,8 – 0,84 .................................................................................... 35 16S-2522 TO (with NMV / with NMV+100% Push) 13,8 – 0,84 .................................................................................... 35 Ecomat .............................................................................................................................................................................. 36 6 HP 602 (Standard) 5,6 – 0,83 ..................................................................................................................................... 36 05.08.2015 power take-offs at ZF-gearbox 2 Release: d 1. Fundamentals General advice: We would like to point out that not all of the below described PTO options are available ex factory. Availability of power take-offs is defined in the sales program. 2. Operating period und Power flow dependencies Power take-offs can be distinguished according to the following factors: Operating period Power flow dependencies 3. Type of power take-off output The last letter in the power take-off designation, that is to say the letter "b" or "c", indicates the type of output. A distinction is made between: Version "b": basic version for shaft drive Version "c": direct mounting of a pump 4. Permissible mass moments at power take-off If pumps are mounted directly (version “c”), the body building firm must ensure that the maximum permissible mass moment of a direct-mounted pump with add-on elements (e.g. hoses) is not exceeded!! Permissible moment of weight, if one Output point is active: Power take off – transmission dependent d Permissible mass moment D02c, N109/10c, N36/5c, N850/10c, NS42/2c <= 30 Nm NL/1c, NH/1c, NL/4c, NH/4c, NH/6c, NL10/c, N221/10c, NAS/10c, NM AS/10c, NTX/10 <= 50 Nm Permissible moment of weight, if two Output points are active: Power take off – Permissible mass moment Permissible mass moment transmission 1. Output point 2. Output point dependent d Permissible mass moment 1. + 2. Output point NAS/10c <= 50 Nm <= 50 Nm Total max. 60 Nm NTX/10c <= 50 Nm <= 50 Nm Total max. 60 Nm N221/10c <= 50 Nm (N221/10c) <= 30 Nm (NL/1c or NL/4c) Total max. 60 Nm NM AS/10c <= 50 Nm (NM AS/10c) <= 30 Nm (NL/1c or NL/4c) Total max. 60 Nm 5. Power take-offs on HP automatic transmissions The direction of rotation depends on the installation position (at right or left of the transmission main shaft). For this reason the installed position is stated together with the power take-off designation. For example, “D02c left” is for installation to the left of the main shaft. Important: This is a reference to the installed position on the transmission, not to the direction of rotation. 6. Power take-offs and Intarder Some of the power take-offs that can be installed on gearboxes with an Intarder need an adapter kit or are specially designed power take-offs. These are identified in the tables as "-IT", e.g. N221/10-IT. In the period of April 2011 to the end of January 2012, all vehicles with ASTRONIC transmission and D20 / D26 engine had been equipped with the new Intarder (IT3). In all vehicles with ASTRONIC and V8 engine or manual transmission, the old Intarder (IT2) is still installed. The gearbox with the new Intarder (IT3) has a 12.5 mm longer measure (Vorg_x) to mounting surface of the power take-off. 05.08.2015 power take-offs at ZF-gearbox 3 Release: d 7. Overview of power take-offs at gearbox The following tables list all power take-offs available for specific gearbox types. Please note that not all combinations of chassis-gearbox-power take-offs are possible. For information on prohibited combinations for certain vehicles, please consult: the local branch or dealer. Only a written reply to a written enquiry will be considered valid. In the tables, the power take-off technical data are shown with reference to each specific gearbox. The technical data quoted in the tables are: Direction of rotation (left = anti-clockwise; right = clockwise) Speed factor f (can be multiplied by engine speed to obtain speed at power take-off), for transmissions fitted with a splitter group there are two different speed factors, depending upon the position of the splitter selector switch (switch position “L” or “I” for Low and “S” or “II” for High) Permissible torque at 1,500 rpm at the power take-off Flange diameter Operating period (K < 30 min, K < 60 min, D) Installed position Position in relation to countershaft and main shaft with x-, y- and z-coordinates By combined power take-offs (as NL/1c on N221/10), all details are corresponding to the former power take-off!! 8. Technical data and tables x-coordinates for gearbox and power take-offs Power take-off at the gearbox output end Power take-off on the N10 Power take-off on the HP transmission NMV Vorg_x: Distance from the engine mating flange surface to the installation face for the power take-off on the transmission NA_x: Distance from the installation face for the power take-off on the transmission to the rear edge of the power take-off (including the adapter ring and N10 power take-off installation face) 05.08.2015 power take-offs at ZF-gearbox 4 Release: d y- and z-coordinates for gearbox and power take-offs 05.08.2015 power take-offs at ZF-gearbox 5 Release: d d d d 05.08.2015 power take-offs at ZF-gearbox 6 Release: d 05.08.2015 power take-offs at ZF-gearbox 7 Release: d 05.08.2015 power take-offs at ZF-gearbox 8 Release: d d d Vorg_y: lateral off-set from center of main output flange to center of countershaft (+: right from main output flange; -: left) Vorg_z: height off-set from center of main output flange to center of countershaft (+: above from main output flange; -: below) NA_y: lateral off-set from center of countershaft to center of power take-off (+: right from countershaft; -: left) NA_z: height off-set from center of countershaft to center of power take-off (+: above from countershaft; -: below) 05.08.2015 power take-offs at ZF-gearbox 9 Release: d AS-Lite 6AS-800 (Standard) 6,58 – 0,78 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 621,00 Designation Vorg_y [ mm ]: 115,00 Vorg_z [ mm ]: -46,50 Direct. of rotation Speed factor f Torque NH/1b right NH/1c right NH/4b NH/4b Gearbox flange diameter [ mm ]: 120,00 Operating period [ Nm ] Flange diameter [ mm ] 0,53 800 90,00 D coaxial 0,53 800 D coaxial left 0,68 430 90,00 K<60 min left 0,68 430 90,00 K<60 min NH/4b left 0,68 430 90,00 NH/4c left 0,68 430 NH/4c left 0,68 430 NH/4c left 0,68 430 NH/6b left 1,02 400 NH/6b left 1,02 400 NH/6b left 1,02 400 NH/6c left 1,02 400 NH/6c left 1,02 NH/6c left 1,02 Position: NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 5 110,00 0,00 0,00 5 52,00 0,00 0,00 above 6 142,00 30,00 74,50 right 7 142,00 74,00 -30,00 K<60 min below 8 142,00 -30,00 -74,50 K<60 min above 6 99,00 30,00 74,50 K<60 min right 7 99,00 74,00 -30,00 K<60 min below 8 99,00 -30,00 -74,50 100,00 K<60 min above 27 154,00 30,00 75,50 100,00 K<60 min right 28 154,00 75,00 -30,50 100,00 K<60 min below 29 154,00 -30,00 -75,50 K<60 min above 27 154,00 30,00 75,50 400 K<60 min right 28 154,00 75,00 -30,50 400 K<60 min below 29 154,00 -30,00 -75,50 Vorg_y [ mm ]: 115,00 Vorg_z [ mm ]: -46,50 Direct. of rotation Speed factor f Torque NH/1b right NH/1c right NH/4b NH/4b Gearbox flange diameter [ mm ]: 150,00 Operating period [ Nm ] Flange diameter [ mm ] 0,53 800 90,00 D coaxial 0,53 800 D coaxial left 0,68 430 90,00 K<60 min left 0,68 430 90,00 K<60 min NH/4b left 0,68 430 90,00 NH/4c left 0,68 430 NH/4c left 0,68 430 NH/4c left 0,68 430 NH/6b left 1,02 400 NH/6b left 1,02 400 NH/6b left 1,02 400 NH/6c left 1,02 400 NH/6c left 1,02 400 NH/6c left 1,02 400 05.08.2015 Fig. Gearbox output end right of main output flange Vorg_x [ mm ]: 621,00 Designation Installed position Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 5 110,00 0,00 0,00 5 52,00 0,00 0,00 above 6 142,00 30,00 74,50 right 7 142,00 74,00 -30,00 K<60 min below 8 142,00 -30,00 -74,50 K<60 min above 6 99,00 30,00 74,50 K<60 min right 7 99,00 74,00 -30,00 K<60 min below 8 99,00 -30,00 -74,50 100,00 K<60 min above 27 154,00 30,00 75,50 100,00 K<60 min right 28 154,00 75,00 -30,50 100,00 K<60 min below 29 154,00 -30,00 -75,50 K<60 min above 27 154,00 30,00 75,50 K<60 min right 28 154,00 75,00 -30,50 K<60 min below 29 154,00 -30,00 -75,50 power take-offs at ZF-gearbox 10 Release: d 6AS-850 (Standard) 6,72 – 0,79 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 622,00 Designation Vorg_y [ mm ]: 120,00 Vorg_z [ mm ]: 0,00 Direct. of rotation Speed factor f Torque N36/5b above left N36/5b above N36/5b below Gearbox flange diameter [ mm ]: 120,00 Operating period [ Nm ] Flange diameter [ mm ] NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 1,47 300 90,00 K<60 min above 9 140,00 0,00 95,00 left 1,11 400 90,00 K<60 min left 1,47 300 90,00 K<60 min above 9 140,00 0,00 95,00 below 10 140,00 0,00 -95,00 N36/5b below left 1,11 400 90,00 N36/5c above left 1,47 300 K<60 min below 10 140,00 0,00 -95,00 K<60 min above 9 94,00 0,00 N36/5c above left 1,11 95,00 400 K<60 min above 9 94,00 0,00 95,00 N36/5c below left N36/5c below left 1,47 300 K<60 min below 10 94,00 0,00 -95,00 1,11 400 K<60 min below 10 94,00 0,00 -95,00 NL/1b NL/1c right 0,53 600 D coaxial 5 110,00 0,00 0,00 right 0,53 600 D coaxial 5 52,00 0,00 0,00 NL/4b left 0,68 430 90,00 K<60 min above 6 142,00 0,00 80,00 NL/4b left 0,68 430 90,00 K<60 min right 7 142,00 80,00 0,00 NL/4b left 0,68 430 90,00 K<60 min below 8 142,00 0,00 -80,00 NL/4c left 0,68 430 K<60 min above 6 99,00 0,00 80,00 NL/4c left 0,68 430 K<60 min right 7 99,00 80,00 0,00 NL/4c left 0,68 430 K<60 min below 8 99,00 0,00 -80,00 Position: Vorg_y [ mm ]: 120,00 Vorg_z [ mm ]: 0,00 Direct. of rotation Speed factor f Torque N36/5b above left N36/5b above N36/5b below Gearbox flange diameter [ mm ]: 150,00 Operating period [ Nm ] Flange diameter [ mm ] 1,47 300 90,00 K<60 min above left 1,11 400 90,00 K<60 min left 1,47 300 90,00 K<60 min N36/5b below left 1,11 400 90,00 N36/5c above left 1,47 300 N36/5c above left 1,11 N36/5c below left 1,47 N36/5c below Fig. Gearbox output end right of main output flange Vorg_x [ mm ]: 622,00 Designation 90,00 Installed position Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 9 140,00 0,00 95,00 above 9 140,00 0,00 95,00 below 10 140,00 0,00 -95,00 K<60 min below 10 140,00 0,00 -95,00 K<60 min above 9 94,00 0,00 95,00 400 K<60 min above 9 94,00 0,00 95,00 300 K<60 min below 10 94,00 0,00 -95,00 K<60 min below 10 94,00 0,00 -95,00 D coaxial 5 110,00 0,00 0,00 D coaxial 5 52,00 0,00 0,00 left 1,11 400 NL/1b right 0,53 600 NL/1c right 0,53 600 NL/4b left 0,68 430 90,00 K<60 min above 6 142,00 0,00 80,00 NL/4b left 0,68 430 90,00 K<60 min right 7 142,00 80,00 0,00 NL/4b left 0,68 430 90,00 K<60 min below 8 142,00 0,00 -80,00 NL/4c left 0,68 430 K<60 min above 6 99,00 0,00 80,00 NL/4c left 0,68 430 K<60 min right 7 99,00 80,00 0,00 NL/4c left 0,68 430 K<60 min below 8 99,00 0,00 -80,00 05.08.2015 90,00 power take-offs at ZF-gearbox 11 Release: d 6AS-1000 (Standard) 6,75 – 0,78 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 621,00 Designation Vorg_y [ mm ]: 127,80 Vorg_z [ mm ]: -46,50 Direct. of rotation Speed factor f Torque NH/1b right NH/1c NH/4b Gearbox flange diameter [ mm ]: 120,00 Operating period [ Nm ] Flange diameter [ mm ] 0,53 1000 90,00 D coaxial 5 right 0,53 1000 D coaxial 5 52,00 0,00 0,00 left 0,68 430 90,00 K<60 min above 6 142,00 30,00 74,50 NH/4b left 0,68 430 90,00 K<60 min right 7 142,00 74,00 -30,00 NH/4b left 0,68 430 90,00 K<60 min below 8 142,00 -30,00 -74,50 NH/4c left 0,68 430 K<60 min above 6 99,00 30,00 74,50 NH/4c left 0,68 430 K<60 min right 7 99,00 74,00 -30,00 NH/4c left 0,68 430 K<60 min below 8 99,00 -30,00 -74,50 NL/10b left 2,05 270 100,00 D above 15 175,60 21,00 120,00 NL/10b left 1,71 320 100,00 D above 15 175,60 21,00 120,00 NL/10b left 1,20 480 100,00 D above 15 175,60 21,00 120,00 NL/10c left 1,71 320 D above 15 136,00 21,00 120,00 NL/10c left 1,20 480 D above 15 136,00 21,00 120,00 Position: Vorg_y [ mm ]: 127,80 Vorg_z [ mm ]: -46,50 Direct. of rotation Speed factor f Torque NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 110,00 0,00 0,00 NH/1b right NH/1c right NH/4b NH/4b Getriebeflansch-Ø [ mm ]: 150,00 Operating period [ Nm ] Flange diameter [ mm ] 0,53 1000 90,00 D coaxial 0,53 1000 D coaxial left 0,68 430 90,00 K<60 min left 0,68 430 90,00 K<60 min NH/4b left 0,68 430 90,00 NH/4c left 0,68 NH/4c left 0,68 NH/4c left 0,68 430 K<60 min below NL/10b left 2,05 270 100,00 D above NL/10b left 1,71 320 100,00 D above NL/10b left 1,20 480 100,00 D above NL/10c left 1,71 320 D NL/10c left 1,20 480 D 05.08.2015 Fig. Gearbox output end right of main output flange Vorg_x [ mm ]: 621,00 Designation Installed position Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 5 110,00 0,00 0,00 5 52,00 0,00 0,00 above 6 142,00 30,00 74,50 right 7 142,00 74,00 -30,00 K<60 min below 8 142,00 -30,00 -74,50 430 K<60 min above 6 99,00 30,00 74,50 430 K<60 min right 7 99,00 74,00 -30,00 8 99,00 -30,00 -74,50 15 175,60 21,00 120,00 15 175,60 21,00 120,00 15 175,60 21,00 120,00 above 15 136,00 21,00 120,00 above 15 136,00 21,00 120,00 power take-offs at ZF-gearbox 12 Release: d AS-Mid 12AS-1210 TO (Standard) 10,37 – 0,81 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 739,00 Designation Vorg_y [ mm ]: 210,00 Vorg_z [ mm ]: 20,00 Direct. of rotation Speed factor f * K2 K1 Torque Gearbox flange diameter [ mm ]: 155,00 Operating period [ Nm ] Flange diameter [ mm ] Installed position Fig. 90,00 D coaxial 5 NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 110,00 0,00 0,00 NH/1b right 0,99 1,22 800 NH/1c right 0,99 1,22 800 D coaxial 5 52,00 0,00 0,00 NH/4b left 0,89 1,10 430 90,00 K<60 min above 6 142,00 0,00 80,00 NH/4b left 0,89 1,10 430 90,00 K<60 min right 7 142,00 80,00 0,00 NH/4b left 0,89 1,10 430 90,00 K<60 min below 8 142,00 0,00 -80,00 NH/4c left 0,89 1,10 430 K<60 min above 6 99,00 0,00 80,00 NH/4c left 0,89 1,10 430 K<60 min right 7 99,00 80,00 0,00 NH/4c left 0,89 1,10 430 K<60 min below 8 99,00 0,00 -80,00 NL/1b on NM AS/10 above right 0,99 1,22 600 90,00 D coaxial 17 264,00 0,00 0,00 NL/1b on NM AS/10 below right 0,99 1,22 600 90,00 D coaxial 21 264,00 0,00 0,00 NL/1c on NM AS/10 above right 0,99 1,22 600 D coaxial 17 206,00 0,00 0,00 NL/1c on NM AS/10 below right 0,99 1,22 600 D coaxial 21 206,00 0,00 0,00 NL/4b on NM AS/10 above left 0,89 1,10 430 90,00 K<60 min right 18 296,00 80,00 0,00 NL/4b on NM AS/10 above left 0,89 1,10 430 90,00 K<60 min below 19 296,00 0,00 -80,00 NL/4b on NM AS/10 below left 0,89 1,10 430 90,00 K<60 min above 23 296,00 0,00 80,00 NL/4b on NM AS/10 below left 0,89 1,10 430 90,00 K<60 min right 22 296,00 80,00 0,00 NL/4c on NM AS/10 above left 0,89 1,10 430 K<60 min right 18 253,00 80,00 0,00 NL/4c on NM AS/10 above left 0,89 1,10 430 K<60 min below 19 253,00 0,00 -80,00 NL/4c on NM AS/10 below left 0,89 1,10 430 K<60 min above 23 253,00 0,00 80,00 NL/4c on NM AS/10 below left 0,89 1,10 430 K<60 min right 22 253,00 80,00 0,00 NM AS/10b above left 1,89 2,33 420 100,00 K<60 min# above 16 176,00 8,00 113,00 NM AS/10b above left 1,47 1,80 510 100,00 K<60 min# above 16 176,00 8,00 113,00 NM AS/10b above left 1,22 1,50 590 100,00 K<60 min# above 16 176,00 8,00 113,00 NM AS/10b below$ left 1,89 2,33 420 100,00 K<60 min# below 20 176,00 8,00 -113,00 NM AS/10b below$ left 1,47 1,80 510 100,00 K<60 min# below 20 176,00 8,00 -113,00 NM AS/10b below$ left 1,22 1,50 590 100,00 K<60 min# below 20 176,00 8,00 -113,00 NM AS/10c above left 1,89 2,33 420 K<60 min# above 16 136,00 8,00 113,00 NM AS/10c above left 1,47 1,80 510 K<60 min# above 16 136,00 8,00 113,00 NM AS/10c above left 1,22 1,50 590 K<60 min# above 16 136,00 8,00 113,00 NM AS/10c below$ left 1,89 2,33 420 K<60 min# below 20 136,00 8,00 -113,00 NM AS/10c below$ left 1,47 1,80 510 K<60 min# below 20 136,00 8,00 -113,00 NM AS/10c below$ left 1,22 1,50 590 K<60 min# below 20 136,00 8,00 -113,00 * The constant value “K1” is installed ex-works # Continuous operation: with fan(for flange) or cooling set $ Only with frame height 270mm 05.08.2015 power take-offs at ZF-gearbox 13 Release: d AS-Tronic 12AS-1930 TD (Standard) 15,86 – 1 12AS-2130 TD (Standard) 15,86 – 1 12AS-2330 TD (Standard) 15,86 – 1 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 800,50 Designation Vorg_y [ mm ]: 140,10 Vorg_z [ mm ]: 37,50 Direct. of rotation Speed factor f Torque NAS/10b above left NAS/10b above left NAS/10b above NAS/10b below Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 1,93 400 100,00 D above 1,52 430 100,00 D above 24 254,00 -15,00 94,50 24 254,00 -15,00 94,50 left 1,29 630 100,00 D left 2,10 360 100,00 D above 24 254,00 -19,50 111,00 below 25 254,00 34,50 -90,00 NAS/10b below left 1,93 400 100,00 NAS/10b below(f=1,52) +c above(f=1,01) left 1,52 430 100,00 D below 25 254,00 34,50 -90,00 D below 26 254,00 34,50 -90,00 NAS/10b below(f=1,93) +c above(f=1,21) left 1,93 400 100,00 D below 26 254,00 34,50 -90,00 NAS/10b below(f=2,10) +c above(f=1,29) left 2,10 360 100,00 D below 26 254,00 34,50 -90,00 NAS/10c above left 1,21 NAS/10c above left 1,01 670 D above 24 196,00 -19,50 111,00 690 D above 24 196,00 -19,50 111,00 NAS/10c above(f=1,01) +b below(f=1,52) left 1,01 690 D above 26 196,00 -19,50 111,00 NAS/10c above(f=1,21) +b below(f=1,93) left 1,21 670 D above 26 196,00 -19,50 111,00 NAS/10c above(f=1,29) +b below(f=2,10) left 1,29 630 D above 26 196,00 -19,50 111,00 NAS/10c below left 1,21 670 D below 25 196,00 39,00 -107,00 NAS/10c below left 1,01 690 D below 25 196,00 39,00 -107,00 NH/1b right 0,82 1000 D coaxial 5 110,00 0,00 0,00 NH/1c right 0,82 1000 D coaxial 5 52,00 0,00 0,00 NH/4b left 1,05 430 90,00 K<60 min above 6 142,00 -21,00 77,00 NH/4b left 1,05 430 90,00 K<60 min right 7 142,00 77,00 21,00 NH/4b left 1,05 430 90,00 K<60 min below 8 142,00 21,00 -77,00 NH/4c left 1,05 430 K<60 min above 6 99,00 -21,00 77,00 NH/4c left 1,05 430 K<60 min right 7 99,00 77,00 21,00 NH/4c left 1,05 430 K<60 min below 8 99,00 21,00 -77,00 05.08.2015 90,00 Installed position Fig. power take-offs at ZF-gearbox 14 Release: d 12AS-1931 TD (with Intarder) 15,86 – 1 12AS-2131 TD (with Intarder) 15,86 – 1 12AS-2331 TD (with Intarder) 15,86 – 1 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 800,50 Vorg_y [ mm ]: 140,10 Vorg_z [ mm ]: 37,50 1 with IT3 [ mm ]: 813,00 Designation Direct. of rotation Speed factor f Torque NAS/10b above left NAS/10b above left NAS/10b above NAS/10b below Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 1,93 400 100,00 D above 1,52 430 100,00 D above 24 254,00 -15,00 94,50 24 254,00 -15,00 94,50 left 1,29 630 100,00 D left 2,10 360 100,00 D above 24 254,00 -19,50 111,00 below 25 254,00 34,50 NAS/10b below left 1,93 400 100,00 -90,00 D below 25 254,00 34,50 -90,00 NAS/10b below(f=1,52) +c above(f=1,01) left 1,52 430 100,00 D below 26 254,00 34,50 -90,00 NAS/10b below(f=1,93) +c above(f=1,21) left 1,93 400 100,00 D below 26 254,00 34,50 -90,00 NAS/10b below(f=2,10) +c above(f=1,29) left 2,10 360 100,00 D below 26 254,00 34,50 -90,00 NAS/10c above left 1,21 670 D above 24 196,00 -19,50 111,00 NAS/10c above left 1,01 690 D above 24 196,00 -19,50 111,00 NAS/10c above(f=1,01) +b below(f=1,52) left 1,01 690 D above 26 196,00 -19,50 111,00 NAS/10c above(f=1,21) +b below(f=1,93) left 1,21 670 D above 26 196,00 -19,50 111,00 NAS/10c above(f=1,29) +b below(f=2,10) left 1,29 630 D above 26 196,00 -19,50 111,00 NAS/10c below left 1,21 670 D below 25 196,00 39,00 -107,00 NAS/10c below left 1,01 690 NH/1b(AS)-IT right 0,82 1000 NH/1c(AS)-IT right 0,82 1000 NH/4b(AS)-IT left 1,05 NH/4b(AS)-IT left NH/4b(AS)-IT left NH/4c(AS)-IT NH/4c(AS)-IT NH/4c(AS)-IT 1 Installed position Fig. D below 25 196,00 39,00 -107,00 90,00 D coaxial 5 133,50 0,00 0,00 D coaxial 5 75,50 0,00 0,00 430 90,00 K<60 min above 6 165,50 -21,00 77,00 1,05 430 90,00 K<60 min right 7 165,50 77,00 21,00 1,05 430 90,00 K<60 min below 8 165,50 21,00 -77,00 left 1,05 430 K<60 min above 6 122,50 -21,00 77,00 left 1,05 430 K<60 min right 7 122,50 77,00 21,00 left 1,05 430 K<60 min below 8 122,50 21,00 -77,00 For detailed information see chapter 6 „Power take Off´s and Intarder” 05.08.2015 power take-offs at ZF-gearbox 15 Release: d 12AS-2330 TO (Standard) 12,33 – 0,78 12AS-2530 TO (Standard) 12,33 – 0,78 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 800,50 Designation Vorg_y [ mm ]: 140,10 Vorg_z [ mm ]: 37,50 Direct. of rotation Speed factor f Torque NAS/10b above left NAS/10b above left NAS/10b above NAS/10b below Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 2,15 490 100,00 D above 1,73 580 100,00 D above 24 254,00 -15,00 94,50 24 254,00 -15,00 94,50 left 1,47 710 100,00 D left 2,15 490 100,00 D above 24 254,00 -19,50 111,00 below 25 254,00 34,50 NAS/10b below left 1,73 580 100,00 -90,00 D below 25 254,00 34,50 -90,00 NAS/10b below left 1,47 710 NAS/10b below(f=1,39) +c above(f=1,03) left 1,39 600 100,00 D below 25 254,00 39,00 -107,00 100,00 D below 26 254,00 34,50 -90,00 NAS/10b below(f=1,73) +c above(f=1,23) left 1,73 580 100,00 D below 26 254,00 34,50 -90,00 NAS/10b below(f=2,15) +c above(f=1,47) left 2,15 490 100,00 D below 26 254,00 34,50 -90,00 NAS/10c above NAS/10c above left 1,23 720 D above 24 196,00 -19,50 111,00 left 1,03 730 D above 24 196,00 -19,50 111,00 NAS/10c above(f=1,03) +b below(f=1,39) left 1,03 730 D above 26 196,00 -19,50 111,00 NAS/10c above(f=1,23) +b below(f=1,73) left 1,23 720 D above 26 196,00 -19,50 111,00 NAS/10c above(f=1,47) +b below(f=2,15) left 1,47 710 D above 26 196,00 -19,50 111,00 NAS/10c below left 1,23 720 D below 25 196,00 39,00 -107,00 NAS/10c below left 1,03 730 D below 25 196,00 39,00 -107,00 NH/1b right 1,35 1000 D coaxial 5 110,00 0,00 0,00 NH/1c right 1,35 1000 D coaxial 5 52,00 0,00 0,00 NH/4b left 1,22 430 90,00 K<60 min above 6 142,00 -21,00 77,00 NH/4b left 1,22 430 90,00 K<60 min right 7 142,00 77,00 21,00 NH/4b left 1,22 430 90,00 K<60 min below 8 142,00 21,00 -77,00 NH/4c left 1,22 430 K<60 min above 6 99,00 -21,00 77,00 NH/4c left 1,22 430 K<60 min right 7 99,00 77,00 21,00 NH/4c left 1,22 430 K<60 min below 8 99,00 21,00 -77,00 05.08.2015 90,00 Installed position Fig. power take-offs at ZF-gearbox 16 Release: d 12AS-2331 TO (with Intarder) 12,33 – 0,78 12AS-2531 TO (with Intarder) 12,33 – 0,78 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 800,50 Vorg_y [ mm ]: 140,10 Vorg_z [ mm ]: 37,50 1 with IT3 [ mm ]: 813,00 Designation Direct. of rotation Speed factor f Torque NAS/10b above left NAS/10b above NAS/10b above Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 2,15 490 100,00 D above 24 254,00 -15,00 94,50 left 1,73 580 100,00 D left 1,47 710 100,00 D above 24 254,00 -15,00 94,50 above 24 254,00 -19,50 111,00 NAS/10b below left 2,15 490 100,00 D below 25 254,00 34,50 -90,00 NAS/10b below left 1,73 580 NAS/10b below left 1,47 710 100,00 D below 25 254,00 34,50 -90,00 100,00 D below 25 254,00 39,00 -107,00 NAS/10b below(f=1,39) +c above(f=1,03) left 1,39 600 100,00 D below 26 254,00 34,50 -90,00 NAS/10b below(f=1,73) +c above(f=1,23) left 1,73 580 100,00 D below 26 254,00 34,50 -90,00 NAS/10b below(f=2,15) +c above(f=1,47) left 2,15 490 100,00 D below 26 254,00 34,50 -90,00 NAS/10c above left 1,23 720 D above 24 196,00 -19,50 111,00 NAS/10c above left 1,03 730 D above 24 196,00 -19,50 111,00 NAS/10c above(f=1,03) +b below(f=1,39) left 1,03 730 D above 26 196,00 -19,50 111,00 NAS/10c above(f=1,23) +b below(f=1,73) left 1,23 720 D above 26 196,00 -19,50 111,00 NAS/10c above(f=1,47) +b below(f=2,15) left 1,47 710 D above 26 196,00 -19,50 111,00 NAS/10c below left 1,23 720 D below 25 196,00 39,00 -107,00 NAS/10c below left 1,03 730 NH/1b(AS)-IT right 1,35 1000 NH/1c(AS)-IT right 1,35 1000 NH/4b(AS)-IT left 1,22 NH/4b(AS)-IT left NH/4b(AS)-IT left NH/4c(AS)-IT NH/4c(AS)-IT NH/4c(AS)-IT 1 Installed position Fig. D below 25 196,00 39,00 -107,00 90,00 D coaxial 5 133,50 0,00 0,00 D coaxial 5 75,50 0,00 0,00 430 90,00 K<60 min above 6 165,50 -21,00 77,00 1,22 430 90,00 K<60 min right 7 165,50 77,00 21,00 1,22 430 90,00 K<60 min below 8 165,50 21,00 -77,00 left 1,22 430 K<60 min above 6 122,50 -21,00 77,00 left 1,22 430 K<60 min right 7 122,50 77,00 21,00 left 1,22 430 K<60 min below 8 122,50 21,00 -77,00 For detailed information see chapter 6 „Power take Off´s and Intarder” 05.08.2015 power take-offs at ZF-gearbox 17 Release: d 12AS-2740 TO (Standard) 12,29 – 0,78 12AS-3140 TO (Standard) 12,29 – 0,78 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 843,50 Designation Vorg_y [ mm ]: 140,10 Vorg_z [ mm ]: 37,50 Direct. of rotation Speed factor f Torque NAS/10b above left NAS/10b above left NAS/10b above NAS/10b below Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 2,15 490 100,00 D above 1,73 580 100,00 D above 24 254,00 -15,00 94,50 24 254,00 -15,00 94,50 left 1,47 710 100,00 D left 2,15 490 100,00 D above 24 254,00 -19,50 111,00 below 25 254,00 34,50 NAS/10b below left 1,73 580 100,00 -90,00 D below 25 254,00 34,50 -90,00 NAS/10b below left 1,47 710 NAS/10b below(f=1,39) +c above(f=1,03) left 1,39 600 100,00 D below 25 254,00 39,00 -107,00 100,00 D below 26 254,00 34,50 -90,00 NAS/10b below(f=1,73) +c above(f=1,23) left 1,73 580 100,00 D below 26 254,00 34,50 -90,00 NAS/10b below(f=2,15) +c above(f=1,47) left 2,15 490 100,00 D below 26 254,00 34,50 -90,00 NAS/10c above NAS/10c above left 1,23 720 D above 24 196,00 -19,50 111,00 left 1,03 730 D above 24 196,00 -19,50 111,00 NAS/10c above(f=1,03) +b below(f=1,39) left 1,03 730 D above 26 196,00 -19,50 111,00 NAS/10c above(f=1,23) +b below(f=1,73) left 1,23 720 D above 26 196,00 -19,50 111,00 NAS/10c above(f=1,47) +b below(f=2,15) left 1,47 710 D above 26 196,00 -19,50 111,00 NAS/10c below left 1,23 720 D below 25 196,00 39,00 -107,00 NAS/10c below left 1,03 730 D below 25 196,00 39,00 -107,00 NH/1b right 1,35 1000 D coaxial 5 110,00 0,00 0,00 NH/1c right 1,35 1000 D coaxial 5 52,00 0,00 0,00 NH/4b left 1,22 430 90,00 K<60 min above 6 142,00 -21,00 77,00 NH/4b left 1,22 430 90,00 K<60 min right 7 142,00 77,00 21,00 NH/4b left 1,22 430 90,00 K<60 min below 8 142,00 21,00 -77,00 NH/4c left 1,22 430 K<60 min above 6 99,00 -21,00 77,00 NH/4c left 1,22 430 K<60 min right 7 99,00 77,00 21,00 NH/4c left 1,22 430 K<60 min below 8 99,00 21,00 -77,00 05.08.2015 90,00 Installed position Fig. power take-offs at ZF-gearbox 18 Release: d 12AS-2741 TO (with Intarder) 12,29 – 0,78 12AS-3141 TO (with Intarder) 12,29 – 0,78 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 843,50 Vorg_y [ mm ]: 140,10 Vorg_z [ mm ]: 37,50 1 with IT3 [ mm ]: 856,00 Designation Direct. of rotation Speed factor f Torque NAS/10b above left NAS/10b above Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 2,15 490 100,00 D above 24 254,00 -15,00 94,50 left 1,73 580 100,00 D above 24 254,00 -15,00 94,50 NAS/10b above left 1,47 710 100,00 D above 24 254,00 -19,50 111,00 NAS/10b below left 2,15 490 100,00 D below 25 254,00 34,50 -90,00 NAS/10b below left 1,73 580 100,00 D below 25 254,00 34,50 -90,00 NAS/10b below left 1,47 710 100,00 D below 25 254,00 39,00 -107,00 NAS/10b below(f=1,39) +c above(f=1,03) left 1,39 600 100,00 D below 26 254,00 34,50 -90,00 NAS/10b below(f=1,73) +c above(f=1,23) left 1,73 580 100,00 D below 26 254,00 34,50 -90,00 NAS/10b below(f=2,15) +c above(f=1,47) left 2,15 490 100,00 D below 26 254,00 34,50 -90,00 NAS/10c above left 1,23 720 D above 24 196,00 -19,50 111,00 NAS/10c above left 1,03 730 D above 24 196,00 -19,50 111,00 NAS/10c above(f=1,03) +b below(f=1,39) left 1,03 730 D above 26 196,00 -19,50 111,00 NAS/10c above(f=1,23) +b below(f=1,73) left 1,23 720 D above 26 196,00 -19,50 111,00 NAS/10c above(f=1,47) +b below(f=2,15) left 1,47 710 D above 26 196,00 -19,50 111,00 NAS/10c below left 1,23 720 D below 25 196,00 39,00 -107,00 NAS/10c below left 1,03 730 D below 25 196,00 39,00 -107,00 NH/1b(AS)-IT right 1,35 1000 D coaxial 5 133,50 0,00 0,00 NH/1c(AS)-IT right 1,35 1000 D coaxial 5 75,50 0,00 0,00 NH/4b(AS)-IT left 1,22 430 90,00 K<60 min above 6 165,50 -21,00 77,00 NH/4b(AS)-IT left 1,22 430 90,00 K<60 min right 7 165,50 77,00 21,00 NH/4b(AS)-IT left 1,22 430 90,00 K<60 min below 8 165,50 21,00 -77,00 NH/4c(AS)-IT left 1,22 430 K<60 min above 6 122,50 -21,00 77,00 NH/4c(AS)-IT left 1,22 430 K<60 min right 7 122,50 77,00 21,00 NH/4c(AS)-IT left 1,22 430 K<60 min below 8 122,50 21,00 -77,00 1 90,00 Installed position Fig. For detailed information see chapter 6 „Power take Off´s and Intarder” 05.08.2015 power take-offs at ZF-gearbox 19 Release: d d TraXon 12TX-2620 TD (Standard) 16,69 – 1 12TX-2820 TD (Standard) 16,69 – 1 12TX-2621 TD (with Intarder) 16,69 – 1 12TX-2821 TD (with Intarder) 16,69 – 1 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 800, Designation Vorg_y [ mm ]: 140 Vorg_z [ mm ]: 38 Direct. of rotation Speed factor f Torque NTX/10b above left NTX/10b above Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] 1,78 400 100,00 D above left 1,19 630 100,00 D NTX/10b below left 1,78 400 100,00 NTX/10b below left 1,4 430 100,00 NTX/10b below (f=1,4) +c above (f=0,93) left 1,4 430 NTX/10b below (f=1,78) +c above (f=1,12) left 1,78 400 NTX/10c above left 1,12 NTX/10c above left 0,93 NTX/10c above (f=1,12) +b below (f=1,78) left NTX/10c above (f=0,93) +b below (f=1,4) NTX/10c below NTX/10c below Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 24 233,00 128,30 133,00 above 24 233,00 126,30 149,70 D below 25 233,00 169,80 -54,00 D below 25 233,00 169,80 -54,00 100,00 D below 26 233,00 169,80 -54,00 100,00 D below 26 233,00 169,80 -54,00 670 D above 24 172,00 126,30 149,70 690 D above 24 172,00 126,30 149,70 1,12 670 D above 26 172,00 126,30 149,70 left 0,93 690 D above 26 172,00 126,30 149,70 left 1,12 670 D below 25 172,00 175,00 -69,90 D below 25 172,00 175,00 -69,90 D coaxial 5 110,00 0,00 0,00 D coaxial 5 52,00 0,00 0,00 left 0,93 690 NH/1b right 0,76 1000 NH/1c right 0,76 1000 NH/4b left 0,97 430 90,00 K<60 min right 7 142,00 77,00 21,00 NH/4b left 0,97 430 90,00 K<60 min below 8 142,00 21,00 -77,00 NH/4c left 0,97 430 K<60 min right 7 99,00 77,00 21,00 NH/4c left 0,97 430 K<60 min below 8 99,00 21,00 -77,00 05.08.2015 90,00 power take-offs at ZF-gearbox 20 Release: d d 12TX-2820 TO (Standard) 12,92 – 0,77 12TX-2821 TO (mit Intarder) 12,92 – 0,77 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 800, Designation Vorg_y [ mm ]: 140 Vorg_z [ mm ]: 38 Direct. of rotation Speed factor f Torque NTX/10b above left NTX/10b above Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 2,01 490 100,00 D above 24 233,00 128,30 133,00 left 1,38 710 100,00 D above 24 233,00 126,30 149,70 NTX/10b below left 1,62 580 100,00 D below 25 233,00 169,80 -54,00 NTX/10b below left 1,38 710 NTX/10b below (f=1,31) +c above (f=0,96) left 1,31 600 100,00 D below 25 233,00 175,00 -69,90 100,00 D below 26 233,00 169,80 -54,00 NTX/10b below (f=1,62) +c above (f=1,15) left 1,62 580 100,00 D below 26 233,00 169,80 -54,00 NTX/10c above left 1,15 720 D above 24 172,00 126,30 149,70 NTX/10c above left NTX/10c above (f=1,15) +b below (f=1,62) left 0,96 730 D above 24 172,00 126,30 149,70 1,15 720 D above 26 172,00 126,30 149,70 NTX/10c above (f=0,96) +b below (f=1,31) left 0,96 730 D above 26 172,00 126,30 149,70 NTX/10c below left 1,15 720 D below 25 172,00 175,00 -69,90 NH/1b right 1,26 1000 D coaxial 5 110,00 0,00 0,00 NH/1c right 1,26 1000 D coaxial 5 52,00 0,00 0,00 NH/4b left 1,14 430 90,00 K<60 min right 7 142,00 77,00 21,00 NH/4b left 1,14 430 90,00 K<60 min below 8 142,00 21,00 -77,00 NH/4c left 1,14 / 0,88 * 430 K<60 min right 7 99,00 77,00 21,00 NH/4c left 1,14 / 0,88 * 430 K<60 min below 8 99,00 21,00 -77,00 90,00 Installed position Fig. * for tipper use only, has to be ordered separately. 05.08.2015 power take-offs at ZF-gearbox 21 Release: d Ecolite S5-42 (Standard) 4,65 – 0,77 Power take-offs for gearbox: Position: On the side of gearbox left of main output flange Vorg_x [ mm ]: 230,50 Designation Vorg_y [ mm ]: -89,00 Vorg_z [ mm ]: 141,00 Direct. of rotation Speed factor f Torque NS42/2b left right NS42/2b left NS42/2c left NS42/2c left 05.08.2015 Gearbox flange diameter [ mm ]: 120,00 Operating period [ Nm ] Flange diameter [ mm ] Installed position 1,57 190 90,00 K<30 min left right 0,95 270 90,00 K<30 min right 1,57 190 K<30 min right 0,95 270 K<30 min Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 2 133,00 -71,00 -69,00 left 2 133,00 -71,00 -69,00 left 2 120,00 -71,00 -69,00 left 2 120,00 -71,00 -69,00 power take-offs at ZF-gearbox 22 Release: d 6S-800 TO (Standard) 6,58 – 0,78 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 591,00 Designation Vorg_y [ mm ]: 115,00 Vorg_z [ mm ]: -46,50 Direct. of rotation Speed factor f Torque NH/1b right NH/1c NH/4b Gearbox flange diameter [ mm ]: 120,00 Operating period [ Nm ] Flange diameter [ mm ] 0,53 800 90,00 D coaxial 5 right 0,53 800 D coaxial 5 52,00 0,00 0,00 left 0,68 430 90,00 K<60 min above 6 142,00 30,00 74,50 NH/4b left 0,68 430 90,00 K<60 min right 7 142,00 74,00 -30,00 NH/4b left 0,68 430 90,00 K<60 min below 8 142,00 -30,00 -74,50 NH/4c left 0,68 430 K<60 min above 6 99,00 30,00 74,50 NH/4c left 0,68 430 K<60 min right 7 99,00 74,00 -30,00 NH/4c left 0,68 430 K<60 min below 8 99,00 -30,00 -74,50 NH/6b left 1,02 400 100,00 K<60 min above 27 154,00 30,00 75,50 NH/6b left 1,02 400 100,00 K<60 min right 28 154,00 75,00 -30,50 NH/6b left 1,02 400 100,00 K<60 min below 29 154,00 -30,00 -75,50 NH/6c left 1,02 400 K<60 min above 27 154,00 30,00 75,50 NH/6c left 1,02 400 K<60 min right 28 154,00 75,00 -30,50 NH/6c left 1,02 400 K<60 min below 29 154,00 -30,00 -75,50 Position: Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 110,00 0,00 0,00 Gearbox output end right of main output flange Vorg_x [ mm ]: 591,00 Designation Installed position Vorg_y [ mm ]: 115,00 Vorg_z [ mm ]: -46,50 Direct. of rotation Speed factor f Torque NH/1b right NH/1c NH/4b Gearbox flange diameter [ mm ]: 150,00 Operating period [ Nm ] Flange diameter [ mm ] 0,53 800 90,00 D coaxial 5 right 0,53 800 D coaxial 5 52,00 0,00 0,00 left 0,68 430 90,00 K<60 min above 6 142,00 30,00 74,50 NH/4b left 0,68 430 90,00 K<60 min right 7 142,00 74,00 -30,00 NH/4b left 0,68 430 90,00 K<60 min below 8 142,00 -30,00 -74,50 NH/4c left 0,68 430 K<60 min above 6 99,00 30,00 74,50 NH/4c left 0,68 430 K<60 min right 7 99,00 74,00 -30,00 NH/4c left 0,68 430 K<60 min below 8 99,00 -30,00 -74,50 NH/6b left 1,02 400 100,00 K<60 min above 27 154,00 30,00 75,50 NH/6b left 1,02 400 100,00 K<60 min right 28 154,00 75,00 -30,50 NH/6b left 1,02 400 100,00 K<60 min below 29 154,00 -30,00 -75,50 NH/6c left 1,02 400 K<60 min above 27 154,00 30,00 75,50 NH/6c left 1,02 400 K<60 min right 28 154,00 75,00 -30,50 NH/6c left 1,02 400 K<60 min below 29 154,00 -30,00 -75,50 05.08.2015 Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 110,00 0,00 0,00 power take-offs at ZF-gearbox 23 Release: d 6S-850 (Standard) 6,72 – 0,79 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 626,00 Designation Vorg_y [ mm ]: 120,00 Vorg_z [ mm ]: 0,00 Direct. of rotation Speed factor f Torque N36/5b above left N36/5b above N36/5b below Gearbox flange diameter [ mm ]: 120,00 Operating period [ Nm ] Flange diameter [ mm ] NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 1,47 300 90,00 K<60 min above 9 140,00 0,00 95,00 left 1,11 400 90,00 K<60 min left 1,47 300 90,00 K<60 min above 9 140,00 0,00 95,00 below 10 140,00 0,00 -95,00 N36/5b below left 1,11 400 90,00 N36/5c above left 1,47 300 K<60 min below 10 140,00 0,00 -95,00 K<60 min above 9 94,00 0,00 N36/5c above left 1,11 95,00 400 K<60 min above 9 94,00 0,00 95,00 N36/5c below left N36/5c below left 1,47 300 K<60 min below 10 94,00 0,00 -95,00 1,11 400 K<60 min below 10 94,00 0,00 -95,00 N850/10b above N850/10b above left 1,72 290 100,00 D above 11 165,00 -10,00 112,00 left 1,27 430 100,00 D above 11 165,00 -10,00 112,00 N850/10b above left 0,97 560 100,00 D above 11 165,00 -10,00 112,00 N850/10c above left 1,72 290 D above 11 118,00 -10,00 112,00 N850/10c above left 1,27 430 D above 11 118,00 -10,00 112,00 N850/10c above left 0,97 560 D above 11 118,00 -10,00 112,00 NL/1b right 0,53 600 90,00 D coaxial 5 110,00 0,00 0,00 NL/1b on N850/10 above right 0,53 600 90,00 D coaxial 12 246,00 0,00 0,00 NL/1c right 0,53 600 D coaxial 5 52,00 0,00 0,00 NL/1c on N850/10 above right 0,53 600 D coaxial 12 188,00 0,00 0,00 NL/4b left 0,68 430 90,00 K<60 min above 6 142,00 0,00 80,00 NL/4b left 0,68 430 90,00 K<60 min right 7 142,00 80,00 0,00 NL/4b left 0,68 430 90,00 K<60 min below 8 142,00 0,00 -80,00 NL/4b on N850/10 above left 0,68 430 90,00 K<60 min right 13 278,00 80,00 0,00 NL/4b on N850/10 above left 0,68 430 90,00 K<60 min below 14 278,00 0,00 -80,00 NL/4c left 0,68 430 K<60 min above 6 99,00 0,00 80,00 NL/4c left 0,68 430 K<60 min right 7 99,00 80,00 0,00 NL/4c left 0,68 430 K<60 min below 8 99,00 0,00 -80,00 NL/4c on N850/10 above left 0,68 430 K<60 min right 13 235,00 80,00 0,00 NL/4c on N850/10 above left 0,68 430 K<60 min below 14 235,00 0,00 -80,00 05.08.2015 Installed position Fig. power take-offs at ZF-gearbox 24 Release: d 6S-850 (Standard) 6,72 – 0,79 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 626,00 Designation Vorg_y [ mm ]: 120,00 Vorg_z [ mm ]: 0,00 Direct. of rotation Speed factor f Torque N36/5b above left N36/5b above N36/5b below Gearbox flange diameter [ mm ]: 150,00 Operating period [ Nm ] Flange diameter [ mm ] NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 1,47 300 90,00 K<60 min above 9 140,00 0,00 95,00 left 1,11 400 90,00 K<60 min left 1,47 300 90,00 K<60 min above 9 140,00 0,00 95,00 below 10 140,00 0,00 -95,00 N36/5b below left 1,11 400 90,00 N36/5c above left 1,47 300 K<60 min below 10 140,00 0,00 -95,00 K<60 min above 9 94,00 0,00 N36/5c above left 1,11 95,00 400 K<60 min above 9 94,00 0,00 95,00 N36/5c below left N36/5c below left 1,47 300 K<60 min below 10 94,00 0,00 -95,00 1,11 400 K<60 min below 10 94,00 0,00 -95,00 N850/10b above N850/10b above left 1,72 290 100,00 D above 11 165,00 -10,00 112,00 left 1,27 430 100,00 D above 11 165,00 -10,00 112,00 N850/10b above left 0,97 560 100,00 D above 11 165,00 -10,00 112,00 N850/10c above left 1,72 290 D above 11 118,00 -10,00 112,00 N850/10c above left 1,27 430 D above 11 118,00 -10,00 112,00 N850/10c above left 0,97 560 D above 11 118,00 -10,00 112,00 NL/1b right 0,53 600 D coaxial 5 110,00 0,00 0,00 NL/1c right 0,53 600 D coaxial 5 52,00 0,00 0,00 NL/4b left 0,68 430 90,00 K<60 min above 6 142,00 0,00 80,00 NL/4b left 0,68 430 90,00 K<60 min right 7 142,00 80,00 0,00 NL/4b left 0,68 430 90,00 K<60 min below 8 142,00 0,00 -80,00 NL/4c left 0,68 430 K<60 min above 6 99,00 0,00 80,00 NL/4c left 0,68 430 K<60 min right 7 99,00 80,00 0,00 NL/4c left 0,68 430 K<60 min below 8 99,00 0,00 -80,00 05.08.2015 90,00 Installed position Fig. power take-offs at ZF-gearbox 25 Release: d Power take-offs for gearbox: Position: 6S-1000 (Standard) 6,75 – 0,78 c Gearbox output end right of main output flange Vorg_x [ mm ]: 621,00 Designation Vorg_y [ mm ]: 127,80 Vorg_z [ mm ]: -46,50 Direct. of rotation Speed factor f Torque NH/1b right NH/1c NH/4b Gearbox flange diameter [ mm ]: 120,00 Operating period [ Nm ] Flange diameter [ mm ] 0,53 1000 90,00 D coaxial 5 right 0,53 1000 D coaxial 5 52,00 0,00 0,00 left 0,68 430 90,00 K<60 min above 6 142,00 30,00 74,50 NH/4b left 0,68 430 90,00 K<60 min right 7 142,00 74,00 -30,00 NH/4b left 0,68 430 90,00 K<60 min below 8 142,00 -30,00 -74,50 NH/4c left 0,68 430 K<60 min above 6 99,00 30,00 74,50 NH/4c left 0,68 430 K<60 min right 7 99,00 74,00 -30,00 NH/4c left 0,68 430 K<60 min below 8 99,00 -30,00 -74,50 NL/10b left 2,05 270 100,00 D above 15 175,60 21,00 120,00 NL/10b left 1,71 320 100,00 D above 15 175,60 21,00 120,00 NL/10b left 1,20 480 100,00 D above 15 175,60 21,00 120,00 NL/10c left 1,71 320 D above 15 136,00 21,00 120,00 NL/10c left 1,20 480 D above 15 136,00 21,00 120,00 Position: Vorg_y [ mm ]: 127,80 Vorg_z [ mm ]: -46,50 Direct. of rotation Speed factor f Torque NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 110,00 0,00 0,00 NH/1b right NH/1c right NH/4b NH/4b Getriebeflansch-Ø [ mm ]: 150,00 Operating period [ Nm ] Flange diameter [ mm ] 0,53 1000 90,00 D coaxial 0,53 1000 D coaxial left 0,68 430 90,00 K<60 min left 0,68 430 90,00 K<60 min NH/4b left 0,68 430 90,00 NH/4c left 0,68 430 NH/4c left 0,68 430 NH/4c left 0,68 430 NL/10b left 2,05 270 NL/10b left 1,71 NL/10b left 1,20 NL/10c left 1,71 NL/10c left 1,20 05.08.2015 Fig. Gearbox output end right of main output flange Vorg_x [ mm ]: 621,00 Designation Installed position Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 5 110,00 0,00 0,00 5 52,00 0,00 0,00 above 6 142,00 30,00 74,50 right 7 142,00 74,00 -30,00 K<60 min below 8 142,00 -30,00 -74,50 K<60 min above 6 99,00 30,00 74,50 K<60 min right 7 99,00 74,00 -30,00 K<60 min below 8 99,00 -30,00 -74,50 100,00 D above 15 175,60 21,00 120,00 320 100,00 D above 15 175,60 21,00 120,00 480 100,00 D above 15 175,60 21,00 120,00 320 D above 15 136,00 21,00 120,00 480 D above 15 136,00 21,00 120,00 power take-offs at ZF-gearbox 26 Release: d Ecomid 9S-1110 TD (Standard) 12,73 – 1,00 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 737,00 Designation Vorg_y [ mm ]: 208,00 Vorg_z [ mm ]: -51,00 Direct. of rotation Speed factor f Torque N109/10b above left N109/10b above left N109/10b above N109/10c above N109/10c above Gearbox flange diameter [ mm ]: 150,00 Operating period [ Nm ] Flange diameter [ mm ] 1,41 410 100 K<60 min# above 1,08 530 100 K<60 min# above left 0,88 630 100 K<60 min# left 1,08 530 K<60 min# left 0,88 630 NH/1b right 0,72 800 NH/1c right 0,72 800 NH/4b left 0,92 NH/4b left NH/4b left NH/4c NH/4c NH/4c NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 15 137,0 0,0 113,0 15 137,0 0,0 113,0 above 15 137,0 0,0 113,0 above 15 143,0 0,0 113,0 K<60 min# above 15 143,0 0,0 113,0 D coaxial 5 110,0 0,0 0,0 D coaxial 5 52,0 0,0 0,0 430 90 K<60 min above 6 142,0 0,0 80,0 0,92 430 90 K<60 min right 7 142,0 80,0 0,0 0,92 430 90 K<60 min below 8 142,0 0,0 -80,0 left 0,92 430 K<60 min above 6 99,0 0,0 80,0 left 0,92 430 K<60 min right 7 99,0 80,0 0,0 left 0,92 430 K<60 min below 8 99,0 0,0 -80,0 9S-1310 TO (Standard) 9,48 – 0,75 Gearbox output end right of main output flange Vorg_x [ mm ]: 737,00 Designation Fig. 90 Power take-offs for gearbox: Position: Installed position Vorg_y [ mm ]: 208,00 Vorg_z [ mm ]: -51,00 Direct. of rotation Speed factor f Torque N109/10b above left N109/10b above left N109/10b above Gearbox flange diameter [ mm ]: 150,00 Operating period [ Nm ] Flange diameter [ mm ] NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 1,90 410 100 K<60 min# above 1,46 530 100 K<60 min# above 15 137,0 0,0 113,0 15 137,0 0,0 left 1,18 630 100 K<60 min# 113,0 above 15 137,0 0,0 113,0 N109/10c above left 1,46 530 N109/10c above left 1,18 630 K<60 min# above 15 143,0 0,0 113,0 K<60 min# above 15 143,0 0,0 113,0 NH/1b right 0,97 800 NH/1c right 0,97 800 D coaxial 5 110,0 0,0 0,0 D coaxial 5 52,0 0,0 0,0 NH/4b left 1,24 430 NH/4b left 1,24 430 90 K<60 min above 6 142,0 0,0 80,0 90 K<60 min right 7 142,0 80,0 0,0 NH/4b left 1,24 430 NH/4c left 1,24 430 90 K<60 min below 8 142,0 0,0 -80,0 K<60 min above 6 99,0 0,0 80,0 NH/4c left 1,24 430 NH/4c left 1,24 430 K<60 min right 7 99,0 80,0 0,0 K<60 min below 8 99,0 0,0 -80,0 90 Installed position Fig. # Continuous operation: - with fan(for flange) - with use of <=80% of max permissible torque 05.08.2015 power take-offs at ZF-gearbox 27 Release: d Ecosplit 16S-1820 TO (Standard) 13,8 – 0,84 16S-1823 TO (Standard+100%Push) 13,8 – 0,84 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 832,00 Designation Vorg_y [ mm ]: 154,00 Vorg_z [ mm ]: 10,00 Direct. of rotation Speed factor f L S Torque Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] N221/10b above left 1,99 2,39 470 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,74 2,08 560 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,35 1,61 730 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,12 1,34 870 100,00 D above 16 176,00 8,00 113,00 N221/10b below left 1,99 2,39 470 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,74 2,08 560 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,35 1,61 730 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,12 1,34 870 100,00 D below 20 176,00 8,00 -113,00 N221/10c above left 1,99 2,39 470 D above 16 136,00 8,00 113,00 N221/10c above left 1,74 2,08 560 D above 16 136,00 8,00 113,00 N221/10c above left 1,35 1,61 730 D above 16 136,00 8,00 113,00 N221/10c above left 1,12 1,34 870 D above 16 136,00 8,00 113,00 N221/10c below left 1,99 2,39 470 D below 20 136,00 8,00 -113,00 N221/10c below left 1,74 2,08 560 D below 20 136,00 8,00 -113,00 N221/10c below left 1,35 1,61 730 D below 20 136,00 8,00 -113,00 N221/10c below left 1,12 1,34 870 D below 20 136,00 8,00 -113,00 NH/1b right 0,91 1,09 1000 D coaxial 5 110,00 0,00 0,00 NH/1c right 0,91 1,09 1000 D coaxial 5 52,00 0,00 0,00 NH/4b left 1,16 1,40 430 90,00 K<60 min above 6 142,00 0,00 80,00 NH/4b left 1,16 1,40 430 90,00 K<60 min right 7 142,00 80,00 0,00 NH/4b left 1,16 1,40 430 90,00 K<60 min below 8 142,00 0,00 -80,00 NH/4c left 1,16 1,40 430 K<60 min above 6 99,00 0,00 80,00 NH/4c left 1,16 1,40 430 K<60 min right 7 99,00 80,00 0,00 NH/4c left 1,16 1,40 430 K<60 min below 8 99,00 0,00 -80,00 NL/1b on N221/10 above right 0,91 1,09 600 90,00 D coaxial 17 264,00 0,00 0,00 NL/1b on N221/10 below right 0,91 1,09 600 90,00 D coaxial 21 264,00 0,00 0,00 NL/1c on N221/10 above right 0,91 1,09 600 D coaxial 17 206,00 0,00 0,00 NL/1c on N221/10 below right 0,91 1,09 600 D coaxial 21 206,00 0,00 0,00 NL/4b on N221/10 above left 1,16 1,40 430 90,00 K<60 min right 18 296,00 80,00 0,00 NL/4b on N221/10 above left 1,16 1,40 430 90,00 K<60 min below 19 296,00 0,00 -80,00 NL/4b on N221/10 below left 1,16 1,40 430 90,00 K<60 min above 23 296,00 0,00 80,00 NL/4b on N221/10 below left 1,16 1,40 430 90,00 K<60 min right 22 296,00 80,00 0,00 NL/4c on N221/10 above left 1,16 1,40 430 K<60 min right 18 253,00 80,00 0,00 NL/4c on N221/10 above left 1,16 1,40 430 K<60 min below 19 253,00 0,00 -80,00 NL/4c on N221/10 below left 1,16 1,40 430 K<60 min above 23 253,00 0,00 80,00 NL/4c on N221/10 below left 1,16 1,40 430 K<60 min right 22 253,00 80,00 0,00 05.08.2015 90,00 power take-offs at ZF-gearbox 28 Release: d 16S-1821 TO (with Intarder) 13,8 – 0,84 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 832,00 Designation Vorg_y [ mm ]: 154,00 Vorg_z [ mm ]: 10,00 Direct. of rotation Speed factor f L S Torque Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] N221/10b-IT above left 1,99 2,39 470 100,00 D above 16 176,00 8,00 113,00 N221/10b-IT above left 1,74 2,08 560 100,00 D above 16 176,00 8,00 113,00 N221/10b-IT above left 1,35 1,61 730 100,00 D above 16 176,00 8,00 113,00 N221/10b-IT above left 1,12 1,34 870 100,00 D above 16 176,00 8,00 113,00 N221/10b-IT below left 1,99 2,39 470 100,00 D below 20 176,00 8,00 -113,00 N221/10b-IT below left 1,74 2,08 560 100,00 D below 20 176,00 8,00 -113,00 N221/10b-IT below left 1,35 1,61 730 100,00 D below 20 176,00 8,00 -113,00 N221/10b-IT below left 1,12 1,34 870 100,00 D below 20 176,00 8,00 -113,00 N221/10c-IT above left 1,99 2,39 470 D above 16 136,00 8,00 113,00 N221/10c-IT above left 1,74 2,08 560 D above 16 136,00 8,00 113,00 N221/10c-IT above left 1,35 1,61 730 D above 16 136,00 8,00 113,00 N221/10c-IT above left 1,12 1,34 870 D above 16 136,00 8,00 113,00 N221/10c-IT below left 1,99 2,39 470 D below 20 136,00 8,00 -113,00 N221/10c-IT below left 1,74 2,08 560 D below 20 136,00 8,00 -113,00 N221/10c-IT below left 1,35 1,61 730 D below 20 136,00 8,00 -113,00 N221/10c-IT below left 1,12 1,34 870 D below 20 136,00 8,00 -113,00 NH/1b-IT right 0,91 1,09 1000 D coaxial 5 146,50 0,00 0,00 NH/1c-IT right 0,91 1,09 1000 D coaxial 5 88,50 0,00 0,00 NH/4b-IT left 1,16 1,40 430 90,00 K<60 min above 6 178,50 0,00 80,00 NH/4b-IT left 1,16 1,40 430 90,00 K<60 min right 7 178,50 80,00 0,00 NH/4b-IT left 1,16 1,40 430 90,00 K<60 min below 8 178,50 0,00 -80,00 NH/4c-IT left 1,16 1,40 430 K<60 min above 6 135,50 0,00 80,00 NH/4c-IT left 1,16 1,40 430 K<60 min right 7 135,50 80,00 0,00 NH/4c-IT 90,00 left 1,16 1,40 430 K<60 min below 8 135,50 0,00 -80,00 NL/1b on N221/10-IT above right 0,91 1,09 600 90,00 D coaxial 17 264,00 0,00 0,00 NL/1b on N221/10-IT below right 0,91 1,09 600 90,00 D coaxial 21 264,00 0,00 0,00 NL/1c on N221/10-IT above right 0,91 1,09 600 D coaxial 17 206,00 0,00 0,00 NL/1c on N221/10-IT below right 0,91 1,09 600 D coaxial 21 206,00 0,00 0,00 NL/4b on N221/10-IT above left 1,16 1,40 430 90,00 K<60 min right 18 296,00 80,00 0,00 NL/4b on N221/10-IT above left 1,16 1,40 430 90,00 K<60 min below 19 296,00 0,00 -80,00 NL/4b on N221/10-IT below left 1,16 1,40 430 90,00 K<60 min above 23 296,00 0,00 80,00 NL/4b on N221/10-IT below left 1,16 1,40 430 90,00 K<60 min right 22 296,00 80,00 0,00 NL/4c on N221/10-IT above left 1,16 1,40 430 K<60 min right 18 253,00 80,00 0,00 NL/4c on N221/10-IT above left 1,16 1,40 430 K<60 min below 19 253,00 0,00 -80,00 NL/4c on N221/10-IT below left 1,16 1,40 430 K<60 min above 23 253,00 0,00 80,00 NL/4c on N221/10-IT below left 1,16 1,40 430 K<60 min right 22 253,00 80,00 0,00 05.08.2015 power take-offs at ZF-gearbox 29 Release: d 16S-1822 TO (with NMV) 13,8 – 0,84 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 952,00 Designation Vorg_y [ mm ]: 154,00 Vorg_z [ mm ]: 10,00 Direct. of rotation Speed factor f L S Torque Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] N221/10b above left 1,99 2,39 470 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,74 2,08 560 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,35 1,61 730 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,12 1,34 870 100,00 D above 16 176,00 8,00 113,00 N221/10b below left 1,99 2,39 470 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,74 2,08 560 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,35 1,61 730 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,12 1,34 870 100,00 D below 20 176,00 8,00 -113,00 N221/10c above left 1,99 2,39 470 D above 16 136,00 8,00 113,00 N221/10c above left 1,74 2,08 560 D above 16 136,00 8,00 113,00 N221/10c above left 1,35 1,61 730 D above 16 136,00 8,00 113,00 N221/10c above left 1,12 1,34 870 D above 16 136,00 8,00 113,00 N221/10c below left 1,99 2,39 470 D below 20 136,00 8,00 -113,00 N221/10c below left 1,74 2,08 560 D below 20 136,00 8,00 -113,00 N221/10c below left 1,35 1,61 730 D below 20 136,00 8,00 -113,00 N221/10c below left 1,12 1,34 870 D below 20 136,00 8,00 -113,00 NH/1b right 0,91 1,09 1000 D coaxial 5 110,00 0,00 0,00 NH/1c right 0,91 1,09 1000 D coaxial 5 52,00 0,00 0,00 NH/4b left 1,16 1,40 430 90,00 K<60 min above 6 142,00 0,00 80,00 NH/4b left 1,16 1,40 430 90,00 K<60 min right 7 142,00 80,00 0,00 NH/4b left 1,16 1,40 430 90,00 K<60 min below 8 142,00 0,00 -80,00 NH/4c left 1,16 1,40 430 K<60 min above 6 99,00 0,00 80,00 NH/4c left 1,16 1,40 430 K<60 min right 7 99,00 80,00 0,00 NH/4c 90,00 left 1,16 1,40 430 K<60 min below 8 99,00 0,00 -80,00 NL/1b on N221/10 above right 0,91 1,09 600 90,00 D coaxial 17 264,00 0,00 0,00 NL/1b on N221/10 below right 0,91 1,09 600 90,00 D coaxial 21 264,00 0,00 0,00 NL/1c on N221/10 above right 0,91 1,09 600 D coaxial 17 206,00 0,00 0,00 NL/1c on N221/10 below right 0,91 1,09 600 D coaxial 21 206,00 0,00 0,00 NL/4b on N221/10 above left 1,16 1,40 430 90,00 K<60 min right 18 296,00 80,00 0,00 NL/4b on N221/10 above left 1,16 1,40 430 90,00 K<60 min below 19 296,00 0,00 -80,00 NL/4b on N221/10 below left 1,16 1,40 430 90,00 K<60 min above 23 296,00 0,00 80,00 NL/4b on N221/10 below left 1,16 1,40 430 90,00 K<60 min right 22 296,00 80,00 0,00 NL/4c on N221/10 above left 1,16 1,40 430 K<60 min right 18 253,00 80,00 0,00 NL/4c on N221/10 above left 1,16 1,40 430 K<60 min below 19 253,00 0,00 -80,00 NL/4c on N221/10 below left 1,16 1,40 430 K<60 min above 23 253,00 0,00 80,00 NL/4c on N221/10 below left 1,16 1,40 430 K<60 min right 22 253,00 80,00 0,00 Operating period Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] Position: Flywheel Vorg_x [ mm ]: 0,00 Designation Vorg_y [ mm ]: 0,00 Vorg_z [ mm ]: 0,00 Direct. of rotation Speed factor f Torque [ Nm ] Flange diameter [ mm ] NMV221 left 1,54 1300 150,00 D above 1 435,00 38,00 300,00 NMV221 left 0,98 2000 150,00 D above 1 435,00 38,00 300,00 05.08.2015 power take-offs at ZF-gearbox 30 Release: d 16S-1920 TD (Standard) 16,41 – 1 16S-1923 TD (Standard+100%Push) 16,41 – 1 16S-2220 TD (Standard) 16,41 – 1 16S-2223 TD (Standard+100%Push) 16,41 – 1 16S-2320 TD (Standard) 16,41 – 1 16S-2323 TD (Standard+100%Push) 16,41 – 1 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 917,00 Designation Vorg_y [ mm ]: 154,00 Vorg_z [ mm ]: 10,00 Direct. of rotation Speed factor f L S Torque Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] N221/10b above left 1,69 1,99 470 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,47 1,74 560 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,14 1,35 730 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 0,95 1,12 870 100,00 D above 16 176,00 8,00 113,00 N221/10b below left 1,69 1,99 470 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,47 1,74 560 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,14 1,35 730 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 0,95 1,12 870 100,00 D below 20 176,00 8,00 -113,00 N221/10c above left 1,69 1,99 470 D above 16 136,00 8,00 113,00 N221/10c above left 1,47 1,74 560 D above 16 136,00 8,00 113,00 N221/10c above left 1,14 1,35 730 D above 16 136,00 8,00 113,00 N221/10c above left 0,95 1,12 870 D above 16 136,00 8,00 113,00 N221/10c below left 1,69 1,99 470 D below 20 136,00 8,00 -113,00 N221/10c below left 1,47 1,74 560 D below 20 136,00 8,00 -113,00 N221/10c below left 1,14 1,35 730 D below 20 136,00 8,00 -113,00 N221/10c below left 0,95 1,12 870 D below 20 136,00 8,00 -113,00 NH/1b right 0,77 0,91 1000 D coaxial 5 110,00 0,00 0,00 NH/1c right 0,77 0,91 1000 D coaxial 5 52,00 0,00 0,00 NH/4b left 0,99 1,16 430 90,00 K<60 min above 6 142,00 0,00 80,00 NH/4b left 0,99 1,16 430 90,00 K<60 min right 7 142,00 80,00 0,00 NH/4b left 0,99 1,16 430 90,00 K<60 min below 8 142,00 0,00 -80,00 NH/4c left 0,99 1,16 430 K<60 min above 6 99,00 0,00 80,00 NH/4c left 0,99 1,16 430 K<60 min right 7 99,00 80,00 0,00 NH/4c left 0,99 1,16 430 K<60 min below 8 99,00 0,00 -80,00 NL/1b on N221/10 above right 0,77 0,91 600 90,00 D coaxial 17 264,00 0,00 0,00 NL/1b on N221/10 below right 0,77 0,91 600 90,00 D coaxial 21 264,00 0,00 0,00 NL/1c on N221/10 above right 0,77 0,91 600 D coaxial 17 206,00 0,00 0,00 NL/1c on N221/10 below right 0,77 0,91 600 D coaxial 21 206,00 0,00 0,00 NL/4b on N221/10 above left 0,99 1,16 430 90,00 K<60 min right 18 296,00 80,00 0,00 NL/4b on N221/10 above left 0,99 1,16 430 90,00 K<60 min below 19 296,00 0,00 -80,00 NL/4b on N221/10 below left 0,99 1,16 430 90,00 K<60 min above 23 296,00 0,00 80,00 NL/4b on N221/10 below left 0,99 1,16 430 90,00 K<60 min right 22 296,00 80,00 0,00 NL/4c on N221/10 above left 0,99 1,16 430 K<60 min right 18 253,00 80,00 0,00 NL/4c on N221/10 above left 0,99 1,16 430 K<60 min below 19 253,00 0,00 -80,00 NL/4c on N221/10 below left 0,99 1,16 430 K<60 min above 23 253,00 0,00 80,00 NL/4c on N221/10 below left 0,99 1,16 430 K<60 min right 22 253,00 80,00 0,00 05.08.2015 90,00 power take-offs at ZF-gearbox 31 Release: d 16S-1921 TD (with Intarder) 16,41 – 1 16S-2221 TD (with Intarder) 16,41 – 1 16S-2321 TD (with Intarder) 16,41 – 1 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 917,00 Designation Vorg_y [ mm ]: 154,00 Vorg_z [ mm ]: 10,00 Direct. of rotation Speed factor f L S Torque Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] N221/10b-IT above left 1,69 1,99 470 100,00 D above 16 176,00 8,00 113,00 N221/10b-IT above left 1,47 1,74 560 100,00 D above 16 176,00 8,00 113,00 N221/10b-IT above left 1,14 1,35 730 100,00 D above 16 176,00 8,00 113,00 N221/10b-IT above left 0,95 1,12 870 100,00 D above 16 176,00 8,00 113,00 N221/10b-IT below left 1,69 1,99 470 100,00 D below 20 176,00 8,00 -113,00 N221/10b-IT below left 1,47 1,74 560 100,00 D below 20 176,00 8,00 -113,00 N221/10b-IT below left 1,14 1,35 730 100,00 D below 20 176,00 8,00 -113,00 N221/10b-IT below left 0,95 1,12 870 100,00 D below 20 176,00 8,00 -113,00 N221/10c-IT above left 1,69 1,99 470 D above 16 136,00 8,00 113,00 N221/10c-IT above left 1,47 1,74 560 D above 16 136,00 8,00 113,00 N221/10c-IT above left 1,14 1,35 730 D above 16 136,00 8,00 113,00 N221/10c-IT above left 0,95 1,12 870 D above 16 136,00 8,00 113,00 N221/10c-IT below left 1,69 1,99 470 D below 20 136,00 8,00 -113,00 N221/10c-IT below left 1,47 1,74 560 D below 20 136,00 8,00 -113,00 N221/10c-IT below left 1,14 1,35 730 D below 20 136,00 8,00 -113,00 N221/10c-IT below left 0,95 1,12 870 D below 20 136,00 8,00 -113,00 NH/1b-IT right 0,77 0,91 1000 D coaxial 5 146,50 0,00 0,00 NH/1c-IT right 0,77 0,91 1000 D coaxial 5 88,50 0,00 0,00 NH/4b-IT left 0,99 1,16 430 90,00 K<60 min above 6 178,50 0,00 80,00 NH/4b-IT left 0,99 1,16 430 90,00 K<60 min right 7 178,50 80,00 0,00 NH/4b-IT left 0,99 1,16 430 90,00 K<60 min below 8 178,50 0,00 -80,00 NH/4c-IT left 0,99 1,16 430 K<60 min above 6 135,50 0,00 80,00 NH/4c-IT left 0,99 1,16 430 K<60 min right 7 135,50 80,00 0,00 NH/4c-IT 90,00 left 0,99 1,16 430 K<60 min below 8 135,50 0,00 -80,00 NL/1b on N221/10-IT above right 0,77 0,91 600 90,00 D coaxial 17 264,00 0,00 0,00 NL/1b on N221/10-IT below right 0,77 0,91 600 90,00 D coaxial 21 264,00 0,00 0,00 NL/1c on N221/10-IT above right 0,77 0,91 600 D coaxial 17 206,00 0,00 0,00 NL/1c on N221/10-IT below right 0,77 0,91 600 D coaxial 21 206,00 0,00 0,00 NL/4b on N221/10-IT above left 0,99 1,16 430 90,00 K<60 min right 18 296,00 80,00 0,00 NL/4b on N221/10-IT above left 0,99 1,16 430 90,00 K<60 min below 19 296,00 0,00 -80,00 NL/4b on N221/10-IT below left 0,99 1,16 430 90,00 K<60 min above 23 296,00 0,00 80,00 NL/4b on N221/10-IT below left 0,99 1,16 430 90,00 K<60 min right 22 296,00 80,00 0,00 NL/4c on N221/10-IT above left 0,99 1,16 430 K<60 min right 18 253,00 80,00 0,00 NL/4c on N221/10-IT above left 0,99 1,16 430 K<60 min below 19 253,00 0,00 -80,00 NL/4c on N221/10-IT below left 0,99 1,16 430 K<60 min above 23 253,00 0,00 80,00 NL/4c on N221/10-IT below left 0,99 1,16 430 K<60 min right 22 253,00 80,00 0,00 05.08.2015 power take-offs at ZF-gearbox 32 Release: d 16S-2220 TO (Standard) 13,8 – 0,84 16S-2223 TO (Standard+100% Push) 13,8 – 0,84 16S-2520 TO (Standard) 13,8 – 0,84 16S-2523 TO (Standard+100% Push) 13,8 – 0,84 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 917,00 Designation Vorg_y [ mm ]: 154,00 Vorg_z [ mm ]: 10,00 Direct. of rotation Speed factor f L S Torque Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] N221/10b above left 1,99 2,39 470 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,74 2,08 560 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,35 1,61 730 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,12 1,34 870 100,00 D above 16 176,00 8,00 113,00 N221/10b below left 1,99 2,39 470 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,74 2,08 560 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,35 1,61 730 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,12 1,34 870 100,00 D below 20 176,00 8,00 -113,00 N221/10c above left 1,99 2,39 470 D above 16 136,00 8,00 113,00 N221/10c above left 1,74 2,08 560 D above 16 136,00 8,00 113,00 N221/10c above left 1,35 1,61 730 D above 16 136,00 8,00 113,00 N221/10c above left 1,12 1,34 870 D above 16 136,00 8,00 113,00 N221/10c below left 1,99 2,39 470 D below 20 136,00 8,00 -113,00 N221/10c below left 1,74 2,08 560 D below 20 136,00 8,00 -113,00 N221/10c below left 1,35 1,61 730 D below 20 136,00 8,00 -113,00 D below 20 136,00 8,00 -113,00 D coaxial 5 110,00 0,00 0,00 D coaxial 5 52,00 0,00 0,00 N221/10c below left 1,12 1,34 870 NH/1b right 0,91 1,09 1000 NH/1c right 0,91 1,09 1000 NH/4b left 1,16 1,40 430 90,00 K<60 min above 6 142,00 0,00 80,00 NH/4b left 1,16 1,40 430 90,00 K<60 min right 7 142,00 80,00 0,00 NH/4b left 1,16 1,40 430 90,00 K<60 min below 8 142,00 0,00 -80,00 NH/4c left 1,16 1,40 430 K<60 min above 6 99,00 0,00 80,00 NH/4c left 1,16 1,40 430 K<60 min right 7 99,00 80,00 0,00 NH/4c left 1,16 1,40 430 K<60 min below 8 99,00 0,00 -80,00 NL/1b on N221/10 above right 0,91 1,09 600 90,00 D coaxial 17 264,00 0,00 0,00 NL/1b on N221/10 below right 0,91 1,09 600 90,00 D coaxial 21 264,00 0,00 0,00 NL/1c on N221/10 above right 0,91 1,09 600 D coaxial 17 206,00 0,00 0,00 NL/1c on N221/10 below right 0,91 1,09 600 D coaxial 21 206,00 0,00 0,00 NL/4b on N221/10 above left 1,16 1,40 430 90,00 K<60 min right 18 296,00 80,00 0,00 NL/4b on N221/10 above left 1,16 1,40 430 90,00 K<60 min below 19 296,00 0,00 -80,00 NL/4b on N221/10 below left 1,16 1,40 430 90,00 K<60 min above 23 296,00 0,00 80,00 NL/4b on N221/10 below left 1,16 1,40 430 90,00 K<60 min right 22 296,00 80,00 0,00 NL/4c on N221/10 above left 1,16 1,40 430 K<60 min right 18 253,00 80,00 0,00 NL/4c on N221/10 above left 1,16 1,40 430 K<60 min below 19 253,00 0,00 -80,00 NL/4c on N221/10 below left 1,16 1,40 430 K<60 min above 23 253,00 0,00 80,00 NL/4c on N221/10 below left 1,16 1,40 430 K<60 min right 22 253,00 80,00 0,00 05.08.2015 90,00 power take-offs at ZF-gearbox 33 Release: d 16S-2221 TO (with Intarder) 13,8 – 0,84 16S-2521 TO (with Intarder) 13,8 – 0,84 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 917,00 Designation Vorg_y [ mm ]: 154,00 Vorg_z [ mm ]: 10,00 Direct. of rotation Speed factor f L S Torque Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] N221/10b-IT above left 1,99 2,39 470 100,00 D above 16 176,00 8,00 113,00 N221/10b-IT above left 1,74 2,08 560 100,00 D above 16 176,00 8,00 113,00 N221/10b-IT above left 1,35 1,61 730 100,00 D above 16 176,00 8,00 113,00 N221/10b-IT above left 1,12 1,34 870 100,00 D above 16 176,00 8,00 113,00 N221/10b-IT below left 1,99 2,39 470 100,00 D below 20 176,00 8,00 -113,00 N221/10b-IT below left 1,74 2,08 560 100,00 D below 20 176,00 8,00 -113,00 N221/10b-IT below left 1,35 1,61 730 100,00 D below 20 176,00 8,00 -113,00 N221/10b-IT below left 1,12 1,34 870 100,00 D below 20 176,00 8,00 -113,00 N221/10c-IT above left 1,99 2,39 470 D above 16 136,00 8,00 113,00 N221/10c-IT above left 1,74 2,08 560 D above 16 136,00 8,00 113,00 N221/10c-IT above left 1,35 1,61 730 D above 16 136,00 8,00 113,00 N221/10c-IT above left 1,12 1,34 870 D above 16 136,00 8,00 113,00 N221/10c-IT below left 1,99 2,39 470 D below 20 136,00 8,00 -113,00 N221/10c-IT below left 1,74 2,08 560 D below 20 136,00 8,00 -113,00 N221/10c-IT below left 1,35 1,61 730 D below 20 136,00 8,00 -113,00 D below 20 136,00 8,00 -113,00 D coaxial 5 146,50 0,00 0,00 D coaxial 5 88,50 0,00 0,00 N221/10c-IT below left 1,12 1,34 870 NH/1b-IT right 0,91 1,09 1000 NH/1c-IT right 0,91 1,09 1000 NH/4b-IT left 1,16 1,40 430 90,00 K<60 min above 6 178,50 0,00 80,00 NH/4b-IT left 1,16 1,40 430 90,00 K<60 min right 7 178,50 80,00 0,00 NH/4b-IT left 1,16 1,40 430 90,00 K<60 min below 8 178,50 0,00 -80,00 NH/4c-IT left 1,16 1,40 430 K<60 min above 6 135,50 0,00 80,00 NH/4c-IT left 1,16 1,40 430 K<60 min right 7 135,50 80,00 0,00 NH/4c-IT left 1,16 1,40 430 K<60 min below 8 135,50 0,00 -80,00 NL/1b on N221/10-IT above right 0,91 1,09 600 90,00 D coaxial 17 264,00 0,00 0,00 NL/1b on N221/10-IT below right 0,91 1,09 600 90,00 D coaxial 21 264,00 0,00 0,00 NL/1c on N221/10-IT above right 0,91 1,09 600 D coaxial 17 206,00 0,00 0,00 NL/1c on N221/10-IT below right 0,91 1,09 600 D coaxial 21 206,00 0,00 0,00 NL/4b on N221/10-IT above left 1,16 1,40 430 90,00 K<60 min right 18 296,00 80,00 0,00 NL/4b on N221/10-IT above left 1,16 1,40 430 90,00 K<60 min below 19 296,00 0,00 -80,00 NL/4b on N221/10-IT below left 1,16 1,40 430 90,00 K<60 min above 23 296,00 0,00 80,00 NL/4b on N221/10-IT below left 1,16 1,40 430 90,00 K<60 min right 22 296,00 80,00 0,00 NL/4c on N221/10-IT above left 1,16 1,40 430 K<60 min right 18 253,00 80,00 0,00 NL/4c on N221/10-IT above left 1,16 1,40 430 K<60 min below 19 253,00 0,00 -80,00 NL/4c on N221/10-IT below left 1,16 1,40 430 K<60 min above 23 253,00 0,00 80,00 NL/4c on N221/10-IT below left 1,16 1,40 430 K<60 min right 22 253,00 80,00 0,00 05.08.2015 90,00 power take-offs at ZF-gearbox 34 Release: d 16S-2222 TO (with NMV / with NMV+100% Push) 13,8 – 0,84 16S-2522 TO (with NMV / with NMV+100% Push) 13,8 – 0,84 Power take-offs for gearbox: Position: Gearbox output end right of main output flange Vorg_x [ mm ]: 1037,00 Designation Vorg_y [ mm ]: 154,00 Vorg_z [ mm ]: 10,00 Direct. of rotation Speed factor f L S Torque Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] N221/10b above left 1,99 2,39 470 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,74 2,08 560 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,35 1,61 730 100,00 D above 16 176,00 8,00 113,00 N221/10b above left 1,12 1,34 870 100,00 D above 16 176,00 8,00 113,00 N221/10b below left 1,99 2,39 470 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,74 2,08 560 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,35 1,61 730 100,00 D below 20 176,00 8,00 -113,00 N221/10b below left 1,12 1,34 870 100,00 D below 20 176,00 8,00 -113,00 N221/10c above left 1,99 2,39 470 D above 16 136,00 8,00 113,00 N221/10c above left 1,74 2,08 560 D above 16 136,00 8,00 113,00 N221/10c above left 1,35 1,61 730 D above 16 136,00 8,00 113,00 N221/10c above left 1,12 1,34 870 D above 16 136,00 8,00 113,00 N221/10c below left 1,99 2,39 470 D below 20 136,00 8,00 -113,00 N221/10c below left 1,74 2,08 560 D below 20 136,00 8,00 -113,00 N221/10c below left 1,35 1,61 730 D below 20 136,00 8,00 -113,00 N221/10c below left 1,12 1,34 870 D below 20 136,00 8,00 -113,00 NH/1b right 0,91 1,09 1000 90,00 D coaxial 5 110,00 0,00 0,00 NH/1c right 0,91 1,09 1000 D coaxial 5 52,00 0,00 0,00 NH/4b left 1,16 1,40 430 90,00 K<60 min above 6 142,00 0,00 80,00 NH/4b left 1,16 1,40 430 90,00 K<60 min right 7 142,00 80,00 0,00 NH/4b left 1,16 1,40 430 90,00 K<60 min below 8 142,00 0,00 -80,00 NH/4c left 1,16 1,40 430 K<60 min above 6 99,00 0,00 80,00 NH/4c left 1,16 1,40 430 K<60 min right 7 99,00 80,00 0,00 NH/4c left 1,16 1,40 430 K<60 min below 8 99,00 0,00 -80,00 NL/1b on N221/10 above right 0,91 1,09 600 90,00 D coaxial 17 264,00 0,00 0,00 NL/1b on N221/10 below right 0,91 1,09 600 90,00 D coaxial 21 264,00 0,00 0,00 NL/1c on N221/10 above right 0,91 1,09 600 D coaxial 17 206,00 0,00 0,00 NL/1c on N221/10 below right 0,91 1,09 600 D coaxial 21 206,00 0,00 0,00 NL/4b on N221/10 above left 1,16 1,40 430 90,00 K<60 min right 18 296,00 80,00 0,00 NL/4b on N221/10 above left 1,16 1,40 430 90,00 K<60 min below 19 296,00 0,00 -80,00 NL/4b on N221/10 below left 1,16 1,40 430 90,00 K<60 min above 23 296,00 0,00 80,00 NL/4b on N221/10 below left 1,16 1,40 430 90,00 K<60 min right 22 296,00 80,00 0,00 NL/4c on N221/10 above left 1,16 1,40 430 K<60 min right 18 253,00 80,00 0,00 NL/4c on N221/10 above left 1,16 1,40 430 K<60 min below 19 253,00 0,00 -80,00 NL/4c on N221/10 below left 1,16 1,40 430 K<60 min above 23 253,00 0,00 80,00 NL/4c on N221/10 below left 1,16 1,40 430 K<60 min right 22 253,00 80,00 0,00 Operating period Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] Position: Flywheel Vorg_x [ mm ]: 0,00 Designation Vorg_y [ mm ]: 0,00 Vorg_z [ mm ]: 0,00 Direct. of rotation Speed factor f Torque [ Nm ] Flange diameter [ mm ] NMV221 left 1,54 1300 150,00 D above 1 435,00 38,00 300,00 NMV221 left 0,98 2000 150,00 D above 1 435,00 38,00 300,00 05.08.2015 power take-offs at ZF-gearbox 35 Release: d Ecomat 6 HP 602 (Standard) 5,6 – 0,83 Power take-offs for gearbox: Position: On the side of gearbox left of main output flange Vorg_x [ mm ]: 80,00 Designation Vorg_y [ mm ]: -121,00 Vorg_z [ mm ]: 210,00 Direct. of rotation Speed factor f Torque D01b left right D02c left Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] 0,97 950 100,00 D Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] left 3 229,00 -37,00 63,00 right 0,97 950 D left 3 214,00 -37,00 63,00 D05.3b left left 1,44 600 100,00 D 300° 4 325,00 76,00 63,00 D05.4b left left 2,12 400 100,00 D 300° 4 325,00 76,00 63,00 Position: On the side of gearbox right of main output flange Vorg_x [ mm ]: 80,00 Designation D01b right D02c right Vorg_y [ mm ]: 121,00 Vorg_z [ mm ]: 210,00 Direct. of rotation Speed factor f Torque left Gearbox flange diameter [ mm ]: 180,00 Operating period [ Nm ] Flange diameter [ mm ] 0,97 950 100,00 D Installed position Fig. NA_x NA_y NA_z [ mm ] [ mm ] [ mm ] 37,00 63,00 right 3 229,00 left 0,97 950 D right 3 214,00 37,00 63,00 D05.3b right right 1,44 600 100,00 D 120° 4 325,00 150,00 63,00 D05.3b right right 1,44 600 100,00 D 300° 4 325,00 -76,00 63,00 D05.4b right right 2,12 400 100,00 D 120° 4 325,00 150,00 63,00 D05.4b right right 2,12 400 100,00 D 300° 4 325,00 -76,00 63,00 05.08.2015 power take-offs at ZF-gearbox 36 MAN Truck & Bus AG Technical Sales Support Application Engineering Dachauer Str. 667 D - 80995 Munich E-Mail: [email protected] MAN Truck & Bus AG—a member of the MAN Group We reserve the right to make changes in the course of technical development.
© Copyright 2026 Paperzz