General Information Postcard

THE EVERGREEN LINE RAPID TRANSIT PROJECT
Key Project Benefits
4 8 ,000 new direct and indirect jobs
during construction
4 S timulating existing and future
transit-oriented development
4 S horter commutes
4 D irect connection, without transfer,
onto the Millennium Line
4 F requent service (every 3 minutes during
peak periods, almost 20 hours a day)
4 B etter connections between regional
centres in Metro Vancouver
To learn more about the Evergreen Line
or to have your name added to the email
subscription list, please visit the Project Office
(2900 Barnet Highway, Coquitlam), weekdays
from 8:30 am to 4:30 pm, or contact us:
What is the Evergreen Line?
The Evergreen Line is a new rapid transit line that will connect Coquitlam to Vancouver via Port Moody and Burnaby. The Evergreen
Line will be a fast, frequent and convenient SkyTrain service, connecting Coquitlam City Centre through Port Moody to Lougheed Town
Centre in approximately 15 minutes. It will connect without transfer to the current SkyTrain network at Lougheed Town Centre Station
and will integrate with regional bus and West Coast Express networks.
Email:[email protected]
Phone:604-927-4452
Traffic Information Line: 604-927-2080
Website:www.evergreenline.gov.bc.ca
www.facebook.com/evergreenline
@TranBC
EVERGREEN LINE ROUTE ALIGNMENT
Douglas
College
Coquitlam
City Centre
SFU
G
Ga
agg
llaar
rddii
W
Waay
y
Como Lake Ave
Coquitlam
Mariner Way
Burnaby
Burquitlam
Station
MILLE
Lougheed
NNIU
Town Centre
ML
I NE
Lougheed
Town Centre
Station
Austin Ave
North Rd
ve
te A
net
Bru
Lou
ghe
ed H
wy
IT
QU
Lo
ug
he
ed
Port
Coquitlam
Hw
y
The Evergreen Line
Stations
Ground Level*
Elevated
Tunnel
N
Tunnel Portal
Westcoast Express
*Except where required to cross
existing roads and creeks
Hwy 1
P
idge
n Br
Man
ort
Fraser River
Lougheed Hwy
Inlet Centre
Coquitlam
Station
Central
Port Moody
Station
CO
Moody Centre
Station
LA
M
P
M OR
OO T
DY
Ioco Rd
rnet Hwy
Lafarge Lake
Douglas Station
Lincoln Station
Way
AM
Ba
Guildford
Fast Facts
P
CO OR
QU T
IT
L
WEST COAST EXPRESS
e Wa
Pinetre
y
Coquitlam
Burrard Inlet
Length: 11 km
Number of Stations: 7
Linking Major Population Centres:
Coquitlam, Port Moody, Burnaby
and Vancouver
Travel Time: 15 minutes
from Lougheed Town Centre to
Coquitlam City Centre
Speed: Maximum operating
speed of 80 km/h
Construction: The Evergreen Line
will be complete and in service
in early 2017.
Estimated Capital Costs:
$1.4 Billion
www.evergreenline.gov.bc.ca