PDF Map - Desert Renewable Energy Conservation

Renewable Energy Projects May 2014
Draft – this map is compiled from a variety of sources. The
data reflects available information at the time the research
was conducted, and is subject to change. Please consult
the appropriate data source agency for the most up to date
and accurate information. Agency contact information is
available from MWA Water Resources Department. This
map is for informational purposes only.
Legend
Quick Facts
Solar Sites
Number of Solar Projects:
Under Construction/Built
Conditionally Approved
Not Approved - On Hold
Under Review
Expired/Withdrawn
Denied
Types of Solar Project:
Hybrid Natural Gas-fired and Solar Thermal
Photovoltaic Solar
Solar Thermal Parabolic Trough
Power Tower
Number of Wind Project Applications:
Authorized Testing
Pending Testing
Pending Turbines
Pacific Wind Development, LLC
- Red Mountain
Ridgeline Power, LLC
- Searles Hills
13
14
5
8
3
1
`
^
Under Construction/Built
Conditionally Approved
Not Approved - On Hold
Under Review
Denied
Expired/Withdrawn
1
41
1
1
Wind Energy Applications (BLM)
Application Authorized - Testing
Application Pending - Testing
4
6
1
Application Pending - Turbines
Substations
*This information has been compiled from cited data sources and reflects the best known information at this time
(May 2014)
Red Mountain
Existing
Proposed
Atolia
Transmission Lines
Existing Transmission Lines
Proposed Transmission Lines
Bellevue Renewable Power
- Meridian Wind
Abengoa Mojave Solar Plant
Solar Thermal Parabolic Trough
10
`4
^
Kramer Junction
Bellevue Renewable Power
- Calico Wind
30
21
15
§
¨
¦
33
29
Hinkley
Ä
Lenwood
395
£
¤
Newberry Springs
Daggett
Barstow
Gale & Coolwater
Substations
Celtic Energy
- Lydia Wind
Helendale
Watts
` 44
^
43
El Mirage
` 31
^
14
Adelanto
Recurrent Energy/
25 ^
` 18
Victor Phelan Solar I
Victorville
` 28
Ä ^
38
35
8
`
^
`
^
2
1
Spring Valley
Lake
42
41
3
Celtic Energy
- Granite Wind Test
`
^ 27
`9
^
Baldy Mesa
Phelan
17
Hesperia
6
36
40
32
Oak
Hills
Lugo Substation
26
Nunn
23
Ä
19
Pinon Hills
37
Project IDs
CUP No. 2013-04
CUP No. 2010-011
Apple
Power, LLC
Valley Ridgeline
- Fairview
Oro Grande
40
§
¨
¦
Del Sur Wind Energy, LLC
- Lucerne II
7
Silver Mountain Wind
Energy Project, LLC
Cubit Engineering
` 34
^
Solutions for Utilities, Inc.
Phase 1&2 (Now Soitec)
39
Silverado Power
Pisgah Substation
Yermo
Lucerne Valley
11
22
Desert View Substation
E On Climate & Renewables West
- North Peak Wind
AV Substation
Avalon Solar Dev.
5
`
^
` 24
^
13
Agincourt Solar
20
Marathon Solar
Airtricity / E On - North Peak
Johnson Valley
µ
Data Sources: Bureau of Land Management,
California Energy Commission,San Bernardino
County Land Use Services, City of Hesperia,
Town of Apple Valley, City of Adelanto,
Southern California Edison, California State
Lands Commission, Desert Renewable
Energy Conservation Plan, City of Barstow
0
4.5
Miles
9
Landers
Cascade Solar
` 12
^
Pioneertown
18
Yucca Valley
Ä
Joshua Tree
16
15
Solar Sites Map ID and Status as of May 2014
Map Id
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Project Name
CUP No. 2013-04 (Reference Town of Apple Valley)
SPR No. 2013-02 (Reference Town of Apple Valley)
CUP No. 2013-05 (Reference Town of Apple Valley)
Abengoa Mojave Solar Plant
Agincourt Solar
Aikyum
Alamo Solar
Avalon Development LLC
Avalon Solar Development
Boulevard associates
Cal SPV II, LLC
Cascade Solar
Celtic Energy - Lucerne
Celtic Energy Corp.
Clean Focus (CF SBC Owner One, LLC)
Clean Focus (CF SBC Owner One, LLC)
Clean Focus (CF SBC Owner One, LLC)
Cubit Engineering
Del Oro Solar
Johnson Valley SEGS, LLC - Johnson Valley SEGS
Lightsource Renewables, LLC
Lucerne Valley Desert View Ranch, LLC
Status
Under Construction/Built
Conditionally Approved
Conditionally Approved
Under Construction/Built
Under Construction/Built
Conditionally Approved
Conditionally Approved
Under Construction/Built
Under Construction/Built
Conditionally Approved
Not Approved - On Hold
Under Construction/Built
Under Review
Under Review
Under Review
Under Review
Under Review
Under Construction/Built
Expired/Withdrawn
Not Approved - On Hold
Conditionally Approved
Under Review
MW
1.9
1
3
250
10
2
20
1.5
2
20
3
19
45
100
5
6.5
3
2
0
800
40
20
Community
Town of Apple Valley
Town of Apple Valley
Town of Apple Valley
CEC/BLM
SBCO
SBCO
SBCO
Town of Apple Valley
SBCO
SBCO
SBCO
SBCO
BLM
BLM
SBCO
SBCO
SBCO
City of Adelanto
SBCO
BLM/California State Lands Commission
SBCO
SBCO
Project Type
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Solar Thermal Parabolic Trough *
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Power Tower *
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Map Id
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Project Name
Lucerne Valley Solar 1
Marathon Solar
Native Sun Power
Nextera - Lucerne Valley
Nunn
Recurrent Energy aka Victor Phelan Solar
Riverbluff
Silver Valley
Silverado Power
Sol Focus Solar
Soltech Solar Inc. (Newberry Springs)
Solutions for Utilities, Inc. Phase 1&2(Now Soitec)
Sorrel Solar Farm Project
SunEdison - Duncan Road
SunEdison - Pinon Hills
SunEdison - White Road
Sunlight Partners
Sycamore Physicians Partners Solar
Victor Dry Farm B
Victor Dry Solar Farm
Victorville 2 Hybrid Power and Solar PV
Watts
Status
Not Approved - On Hold
Under Construction/Built
Conditionally Approved
Not Approved - On Hold
Under Construction/Built
Under Construction/Built
Expired/Withdrawn
Conditionally Approved
Under Construction/Built
Expired/Withdrawn
Conditionally Approved
Under Construction/Built
Not Approved - On Hold
Conditionally Approved
Under Review
Conditionally Approved
Conditionally Approved
Denied
Under Review
Conditionally Approved
Conditionally Approved
Under Construction/Built
MW
100
20
4
60
1
20
0
20
2
0
2
3
748
3.2
1.3
5.8
6
2.7
5
10
563
3
Community
SBCO
SBCO
City of Adelanto
SBCO
SBCO
City of Adelanto
SBCO
SBCO
City of Adelanto
City of Hesperia
SBCO
SBCO
California State Lands Commission
SBCO
SBCO
SBCO
SBCO
SBCO
SBCO
SBCO
CEC
SBCO
Project Type
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Photovoltaic Solar Facility
Hybrid Natural Gas-fired and Solar Thermal *
Photovoltaic Solar Facility
This map is produced by the Mojave Water Agency for informational use only. Please contact the MWA Water Resources
Department for questions regarding this map, Christy Huiner (760) 946-7066
Path: L:\Projects\Power Plants\2014 April Udpate\RenewableEnergyProjectsUpdate042014.mxd
Date: 5/14/2014