NO. Project Name Project CAPEX (MJD) 1 Improvement of existing Sewer Network of Wadisseer Service Area 4.5 2 Improvement of the existing system of West Zarqa Pumping Station Service Area: Phase 2 3 3 Improvement of Ain Ghazal existing Sewer Network: Phase 2 14 4 Annual Expansion Program for wastewater collection and house connections expansion for the existing systems in Fuhais and Mahes: phase 2 7.5 Contract Name Improvement of existing Sewer Network of Wadisseer Service Area Improvement of the existing system of West Zarqa Pumping Station Service Area: Phase 2 Improvement of Ain Ghazal existing Sewer Network: Phase 2 Construction of wastewater collection system and house connections in Balqa Governorate Contract Years of CAPEX Governorate Implementation (MJD) 4.5 Amman 2016 - 2018 3 Amman 2016 - 2018 14 Amman 2016 - 2017 Balqa 2016 - 2017 15 5 Annual Expansion Program for wastewater collection and house connections expansion for the existing systems in Fuhais and Mahes: phase 3 7.5 Balqa 2020 - 2021 6 Madaba System Extension (Trunk, Collection sewer, House Connection): Phase 1 30.2 Madaba 2016 - 2019 7 Madaba Annual Expansion Program for collection sewers and house connections: Phase 2 Madaba 2020 - 2022 8 Eastern Zarqa Pumping Station SystemReplacement of forcemain of the EZPS by 700mm diameter pipeline 9 10 11 12 13 Annual Expansion Program for wastewater collection and house connections expansion for the existing systems for Ajloun Qasabeh and Kufranja Districts Annual Expansion Program in Irbid for wastewater collection and house connections: Phase 1 Annual Expansion Program in Irbid for wastewater collection and house connections: Phase 2 Annual Expansion Program for collection sewers and house connections in Ma'an Service System: Phase 1 Annual Expansion Program for collection sewers and house connections in Ma'an Service System: Phase 2 Miscellaneous Wastewater system Projects in Madaba 33.2 15 Construction of Transmission pipeline 900 mm from east zarqa ( hashmyeh) lifting station to Kherbet Samra WWTP , 10 Km length 15 Zarqa 2016 - 2017 10 Rehabilitation of Wastewater Network for South Ajloun 10 Ajloun 2016 - 2020 Irbid 2016 - 2020 Irbid 2020 - 2021 Ma’an 2016 - 2018 Ma’an 2022 - 2025 3 2.5 Miscellaneous Wastewater system Project in Irbid 5 2.5 12.5 Wastewater Collection System in Ma'an ( Engineering Services and Implementation) 12.5 25 NO. Project Name Annual Expansion Program for collection Sewers 14 and House Connections for Jafer Area Tafila System Extension (Trunk, Collection Sewer, House Connection) Annual Expansion Program for collection sewers 16 and house connection in Tafila, Ies and Ruwaym areas: Phase 1 Annual Expansion Program for collection sewers 17 and house connection in Tafila, Ies and Ruwaym areas: Phase 2 15 18 19 Annual Expansion Program for collection sewers and house connection expansion for Mouta'a City Karak System (Trunk, PS, Collection sewer, House Connection) Annual Expansion Program for collection sewers 20 and house connection expansion for Karak City: Phase 1 Annual Expansion Program for collection sewers 21 and house connection expansion for Karak City: Phase 2 Expansion of Collection Networks within the 22 existing system of Aqaba City Phase 1 Expansion of Collection Networks within the 23 existing system of Aqaba City Phase 2 Improvement of Wastewater Network in 24 Hashimia District, Beren, Hiteen Camp Construction Sewer Network and House 25 Connections in the unsewered localities of Um Qsair and Moqabaleen Project CAPEX (MJD) 0.6 20.5 Contract Name Annual Expansion Program for collection Sewers and House Connections for Jafer Area Tafila System Extension (Trunk, Collection Sewer, House Connection) Contract Years of CAPEX Governorate Implementation (MJD) 0.6 Ma’an 2017 - 2018 20.5 Tafila 2016 - 2017 Tafila 2016 - 2017 Tafila 2020 - 2022 Karak 2016 - 2018 Karak 2016 - 2018 Karak 2016 - 2018 Karak 2016 - 2018 Karak 2016 - 2018 Karak 2020 - 2023 Aqaba 2016 - 2018 Aqaba 2017 - 2020 2.5 Construction of Wastewater collection system in Tafilah 5 2.5 3 19 Annual Expansion Program for collection sewers and house connection expansion for 3 Mouta'a City wastewater system network in karaka Phase 4700000 one wastewater system network in karak Phase 9500000 r\two wastewater system network in karak Phase 4800000 three 2.5 Miscellaneous Wastewater system Project in Karak Governorate 4.5 2 9.33 Construction of wastewater network and replacement of the existing network 17.33 1.2 Improvement of Wastewater Network in Hashimia District, Beren, Hiteen Camp 1.2 Zarqa 2017 - 2018 22.6 South Amman Sewer Network Project / Phase Three 90 Amman 2016 - 2018 12 Amman 2016 - 2018 20 Amman 2016 - 2018 8 Construction of Wastewater Collection and House 26 Connection of the Unsewered Area of Abu Nseir 12 Construction of Wastewater Collection and House Connection of the Unsewered Area of Abu Nseir Construction of sewer network and house 27 connections in the localities of Marka and Nasr in West Zarqa Pumping Station Service Area 20 Construction of Miscellaneous Wastewater Project in Amman ( East Amman, Nasir) NO. 28 29 30 31 32 33 34 35 36 37 38 39 40 Project Name Construction of sewer network and house connections for the unsewered localities of Abu Alanda & Queisma in Ain Ghazal service area: Phase2 Annual Improvement Program of Amman existing sewer Network: Phase 1 Annual Improvement Program of Amman existing sewer Network: Phase 2 Construction of Sewer Network and House Connections in the locality of Majr Al Hamam within Wadisseer District Construction of Wastewater Collection and House Connection for the locality of Wadisseer in Wadisseer District Construction of Sewer Network and House Connections in Khraibet Essooq, Jawa and Yadoodeh Localities within Quaismeh District Construction of Sewer Network and House Connections in the locality of Binayat within Na'oor District Construction of Sewer Network and House Connection for the unsewered locality of Um El Summaq within Na'oor District Construction of Sewer Network and House Connection for the unsewered locality of Badr Jadeda within Wadisseer Construction of wastewater collection system and house connections in Ira &Yargha area, Botna, Shona, and Treatment Costs needed Ma'mounieh Collection System & WWTP Maieen Collection System & WWTP Faisalieh Collection System & WWTP Construction of wastewater collection system and 41 house connection in Sukhneh, and transmission system from Sukhneh PS to EZPS Construction of wastewater collection system and 42 house connections in unsewered areas in the East Zarqa System Project CAPEX (MJD) 6.4 18.3 18.3 Contract Name Contract Years of CAPEX Governorate Implementation (MJD) South Amman Sewer Network Project / Phase three 90 Replacement of Wastewater Transmission Line 36.6 Amman 2016 - 2018 Amman 2016 - 2017 Amman 2020 - 2021 19 Wastewater Network System Projects in Na'or ( 5 Phases) 55 Amman 2016 - 2018 76 Construction of Wastewater Collection and House Connection for the locality of Wadisseer in Wadisseer District 76 Amman 2016 - 2018 53 South Amman Sewer Network Project / Phase three 90 Amman 2016 - 2018 6 Wastewater Network System Projects in Na'or ( 5 Phases) 55 Amman 2016 - 2018 4.8 Wastewater Network System Projects in Na'or ( 5 Phases) 55 Amman 2016 - 2018 8.8 Amman 2016 - 2018 30 Balqa 2017 - 2020 7.1 7.3 6.7 13.5 Madaba Madaba Madaba 2016 - 2017 2016 - 2017 2016 - 2017 Zarqa 2016 - 2017 2.802 Zarqa 2016 - 2017 5.29 Zarqa 2016 - 2017 8.8 30 7.1 7.3 6.7 15 14 Construction of Sewer Network and House Connection for the unsewered locality of Badr Jadeda within Wadisseer Preparation of Studies and Construction of Wastewater System in Ira,Maghareeb,Botna and Shona Ma'mounieh Collection System & WWTP Maieen Collection System & WWTP Faisalieh Collection System & WWTP Sukhneh Wastewater Project Construction of 400 mm transmission pipeline from Sukhneh lifting station to East Zarqa lifting station, 10 Km length Wastewater Collection System Project in Azraq / Package One/ Northern Azraq Wastewater Collection System Project in Azraq / Package Two/ Northern Azraq 1.5 NO. Project Name Zarqa System Construction of the wastewater collection and 43 house connection and treatment for the unsewered localities of Ajloun Construction of Wastewater Collection System 44 and House Connections for Kofor Khal & Baliela areas in Jerash District 45 Construction of Wastewater Collection System and House Connections for Bal'ama Project CAPEX (MJD) 30 14 20 Construction of Wastewater Collection System 46 and House Connections for Badiah Shamaliyyeh Al Gharbiyyeh 14.2 Construction of Wastewater Collection System 47 and House Connections including Pumping Station for Manshiyyet Bani Hasan 5.2 48 Construction of wastewater collection system and house connections for the rest of Mafraq City Construction of Wastewater Collection System in 49 addition to WWTP for the unsewered localities in Koorah District- Birgish Project 16.6 41.5 Contract Name Contract Years of CAPEX Governorate Implementation (MJD) Wastewater Collection System Project in Azraq / Package Three/ WWTP 5.923 Zarqa 2016 - 2017 Construction of Wastewater Collection System Project in Junaid Area -Ajloun 30 Ajloun 2020 - 2022 4 Jarash 2016 - 2017 3.5 Jarash 2016 - 2017 3 Jarash 2016 - 2017 3.5 Jarash 2016 - 2017 20 Mafraq 2016 - 2017 14.2 Mafraq 2016 - 2017 5.2 Mafraq 2016 – 2017 16.6 Mafraq 2016 - 2017 18.5 Irbid 2017 - 2020 5.9 Irbid 2017 - 2020 4.3 Irbid 2017 - 2020 8.7 Irbid 2017 - 2020 Construction of Wastewater Collection System Project in Jbarat , Manara ( Bab Amman Jarash) Area /Phase one Construction of Wastewater Collection System Project in ( Bab Amman Jarash)/Part of Dahr El Siro/ Phase Two Construction of Wastewater Collection System Project in ( Bab Amman Jarash)/Part of Dahr El Siro & Nabi Hood Area/ Phase Three Construction of Wastewater Collection System Project in ( Bab Amman Jarash)/Sakib Area / Phase Four Construction of Wastewater Network in Rhaba, Bal'ama, Eiddon bani hasan / Mafraq Construction of Wastewater Collection System and House Connections for Badiah Shamaliyyeh Al Gharbiyyeh Construction of Wastewater Collection System and House Connections including Pumping Station for Manshiyyet Bani Hasan Construction of wastewater collection system and house connections for the rest of Mafraq City (Birgish Sewer Network – Phase oneWWPT, Design capacity 7500 m3/day – Reuse line for irrigation, lifting station) (Construction of wastewater System in Jdetah – Birgish Phase Two) ( Construction of Wastewater System in Kufr Abel – Birgish Phase Three) (Construction of Wastewater System in kufor Awan – Birgish Phase Four) NO. 50 51 52 53 54 55 56 57 58 Project Name Construction of wastewater collection system and house connections in the unsewered localities in Ramtha District- Sahel Horan Construction of Wastewater Collection and house connections and the Treatment Cost needed in Qasabah Irbid District Construction of sewer network system for Jafer Locality in addition to the wastewater treatment cost Mouta'a System (Trunk, Collection Sewer, House Connection) Construction of a new sewer network system for Western Villages of Irbid (Kufr Yoba, Bait Yafa, Jumha) Studying & Construction of a new sewer network system for Mekhaba Area Construction of a new sewer network system for North Salt, Ein AL Basha, and Baq’a (North & North East) Construction of a new sewer network system for Salt including WWTP Construction of a new sewer network system for Dair Alla, Almashareh, Shona North & South Construction of a new sewer network system for Jarash Construction of a new sewer network system for 60 Delal Halabat Al Khaldieh Construction of a new sewer network system for 61 Shava Badran (Three Packages) 59 Construction of a new sewer network system for 62 Qaser District, part of Qasaba District, Alrawda, Samakieh, Alrabah including WWTP Construction of a new sewer network system for 63 Prince Hashim Rouda, Petra District, Eil District Project CAPEX (MJD) 37 40 5.3 16.6 60 50 90 10 200 5 38 24 50 9 Contract Name Contract Years of CAPEX Governorate Implementation (MJD) (Construction of Wastewater System in Kufor Rakib and Beit Edes – Birgish- Phase five) 4.1 Irbid 2017 - 2020 Wastewater Collection System Project in Sahel Horan 37 Irbid 2017 - 2019 40 Irbid 2017 - 2019 5.3 Ma’an 2017 - 2020 16.6 Karak 2016 - 2018 60 Irbid 2018 - 2020 50 Irbid 2023 - 2025 90 Balqa 2018 - 2020 10 Balqa 2016 - 2017 200 Balqa 2018 - 2020 5 Jarash 2016 38 Zarqa 2023 – 2024 24 Amman 2016 - 2018 50 Karak 2023 - 2025 4 Ma’an 2016 - 2018 ( Construction of Water and waste water system within Irbid area ( Hakama, Mghaier, Wastyeh)) Construction of sewer network system for Jafer Locality in addition to the wastewater treatment cost Mouta'a System (Trunk, Collection Sewer, House Connection) Construction of a new sewer network system for Western Villages of Irbid (Kufr Yoba, Bait Yafa, Jumha) Studying & Construction of a new sewer network system for Mekhaba Area Construction of a new sewer network system for North Salt, Ein AL Basha, and Baq’a (North & North East) Construction of a new sewer network system for Salt including WWTP Construction of a new sewer network system for Dair Alla, Almashareh, Shona North & South Construction of a new sewer network system for Jarash Construction of a new sewer network system for Delal Halabat Al Khaldieh Construction of a new sewer network system for Shava Badran (Three Packages) Construction of a new sewer network system for Qaser District, part of Qasaba District, Alrawda, Samakieh, Alrabah including WWTP Construction of Wastewater Pipeline and house connections and lifting stations for Prince Hashim Rouda, Petra District, Eil District NO. Project Name Project CAPEX (MJD) including lifting stations Construction of a new sewer network system for 64 Athroh, Prince Haya, and Hay Alzera’a 65 Jordan Valley Wastewater Project Grinatha, Alaresh and German University 66 Collection System & WWTP. 5.7 42 7 Contract Name Construction of Wastewater Network and house connections and lifting station / Petra District Construction of Wastewater Network for Athroh / Package one Construction of Wastewater Network for Prince Haya, and Hay Alzera’a / Package Two Jordan Valley Wastewater Project Grinatha, Alaresh and German University Collection System & WWTP. Contract Years of CAPEX Governorate Implementation (MJD) 5 Ma’an 2016 - 2018 3.209 Ma’an 2016 - 2017 2.516 Ma’an 2016 - 2017 42 Jordan Valley 2017 - 2019 7 Madaba 2022 - 2025 67 Construction Sewer Network and house connections in the unsewered Areas Phase 1 20 Construction Sewer Network and house connections in the unsewered Areas Phase 1 20 Amman 2016 - 2018 68 Construction Sewer Network and house connections in the unsewered Areas Phase 2 14 Construction Sewer Network and house connections in the unsewered Areas Phase 2 14 Amman 2019 - 2025 1.4 3 1 Expansion of Fuhais and Mahes WWTP Rehabilitation of As Salt WWTP Expansion of East Jarash WWTP 1.4 3 1 Balqa Balqa Jarash 2022 - 2023 2022 - 2024 2016 - 2017 10 Expansion of Madaba WWTP 10 Madaba 2016 - 2018 4.8 2.2 2.45 1.1 4 Irbid Irbid Irbid Irbid Ma’an 2017 - 20219 2022 - 2025 2022 - 2024 2019 - 2021 2022 - 2024 30.75 Aqaba 2017 - 2020 69 Expansion of Fuhais and Mahes WWTP 70 Expansion of As Salt WWTP 71 Expansion of East Jarash WWTP Expansion of Madaba WWTP & Establishment of 72 Wastewater Network 73 Expansion of Wadi Al Arab WWTP 74 Expansion of Central Irbid WWTP 75 Expansion of Ramtha WWTP: Phase 2 76 Expansion of Wadi Hassan WWTP 77 Expansion of Wadi Mousa WWTP 4.8 2.2 2.45 1.1 4 78 Expansion of Aqaba WWTP 30.75 Disposal of the Dry Sludge in the Northern Governorates 80 Expansion of Ramtha WWTP Phase 1 79 81 Establishment of Parallel conveyance line for the Treated Wastewater from Ain Ghazal WWTP 82 Contribution in the Expansion of Kharbit As Samra for Handling Extra Amount of WW 40 14.7 2 230 Expansion of Wadi Al Arab WWTP Expansion of Central Irbid WWTP Expansion of Ramtha WWTP: Phase 2 Expansion of Wadi Hassan WWTP Expansion of Wadi Mousa WWTP Expansion of Mechanical wastewater treatment and upgrade the required system Disposal of the Dry Sludge in the Northern Governorates Expansion of Ramtha WWTP Phase 1 Establishment of Parallel conveyance line for the Treated Wastewater from Ain Ghazal WWTP Contribution in the Expansion of Kharbit As Samra for Handling Extra Amount of WW 14.7 Northern Governorates Ramtha 2 Balqa 2016 230 Zarqa 2020 - 2024 40 2016 - 2017 2019 - 2021 NO. Project Name Establishment of Parallel conveyance line for the 83 Treated Wastewater from Madaba WWTP to South Amman WWTP Project CAPEX (MJD) 20 84 Establishment of Wastewater Treatment Plant Transported by Trunk to Ghor Safi Landfill 58 85 Establishment of conveyance reuse line for the Treated Wastewater from Wadisseer to Kafreen 7 86 Establishment of Parallel conveyance line trunk A 2 87 Establishment of Parallel conveyance line trunk B 2 88 Construction of New Tanker station (Sewage dumping) replacement of the existing Ain Ghazal 60 Contract Name Establishment of Parallel conveyance line for the Treated Wastewater from Madaba WWTP to South Amman WWTP Establishment of Wastewater Treatment Plant Transported by Trunk to Ghor Safi Landfill Establishment of conveyance reuse line for the Treated Wastewater from Wadisseer to Kafreen Establishment of Parallel conveyance line trunk A Establishment of Parallel conveyance line trunk B Construction of New Tanker station (Sewage dumping) replacement of the existing Ain Ghazal Contract Years of CAPEX Governorate Implementation (MJD) 20 Amman 2016 - 2017 58 Karak 2023 - 2025 7 Amman 2017 - 2018 2 Madaba 2016 - 2017 2 Madaba 2018 - 2019 60 Amman 2016 -2018
© Copyright 2026 Paperzz