KPL/OP/CT/IE/2014 KAMARAJARPORT LIMITED REPLIES TO THE PRE-PROPOSAL QUERIES RAISED IN RESPECT OF THE TENDER FOR APPOINTMENT OF INDEPENDENT ENGINEER FOR THE PROJECT “DEVELOPMENT OF CONTAINER TERMINAL AT KAMARAJAR PORT ON DBFOT BASIS” S. No 1. Clause No./ Page No. Clause No.2.2.2 Pg.No.21 (Conditions of Eligibility of Applicants) Clause Descriptionin the Queries / Clarifications sought Clarification by KPL document B.E. (Civil) or equivalent with Kindly modify educational Refer amendment specialization in Structural qualification for Team Leader to:- attached. Engineering. B.E. (Civil) or equivalent with specialization in Structural Engineering / Port Planning. 2. Clause No 3.1.4, Pg.No.41(Eligible Assignments) Development of Port Infrastructure having an estimated capital cost (excluding land) of at least Rs. 289.60 crore (Rupees Two Hundred Eighty Nine Crore and Sixty lakhs only) in case of a project in India, and US $ 144.80 million (US Dollar One Hundred Forty Four point eighty million) for projects elsewhere; For the purpose of this RFP, Port Infrastructure would be deemed to include, on-shore and off-shore terminals, REPLY TO QUERIES We understand that Capital Yes. Confirmed. dredging projects at major ports with offshore marine piling works for navigational towers will also be considered within the scope of port infrastructure projects. Kindly confirm. 1 KPL/OP/CT/IE/2014 S. No Clause No./ Page No. 3. Clause No.7.5, Pg.No.52 (Time and Payment Schedule) 4. General 5. Clause No 3.1.4, Pg.No.41(Eligible Assignments) REPLY TO QUERIES Clause Descriptionin the document berths, jetties, quays, cargo / container handling system, port based terminal facilities, CFS/ICDs, Queries / Clarifications sought Clarification by KPL The total duration of Service of the Independent Engineer shall be until completion of 6 months from the date of Commercial Operation of the Project. The Consultant shall deploy its Key Personnel as per the Deployment schedule proposed. We understand that the commercial operations referred here pertain to Phase I. The total duration for IE assignment will be 33 (i.e. 27 + 6) months from signing of Concession Agreement. Kindly confirm. Yes. The commercial operation referred here pertains to Phase I only. The total duration of IE assignment will be 33 months (i.e. 27 + 6) from the Date of Award of Concession to the Concessionaire. For the purposes of determining Conditions of Eligibility and for evaluating the Proposals under this RFP, engineering consultancy assignments in respect of monitoring and supervision of construction, for the following projects shall be deemed as eligible assignments (the “Eligible Assignments”): i. Development of Port Infrastructure having an Kindly extend the submission of Bid submission due bid by 3 weeks date extended to 07th July 2014. Requesting to relax the eligibility Refer amendment criteria for the cost of project only attached for fulfilling the Design and/or PMC parameters. 2 KPL/OP/CT/IE/2014 S. No Clause No./ Page No. REPLY TO QUERIES Clause Descriptionin the document estimated capital cost (excluding land) of at least Rs. 289.60 crore (Rupees Two Hundred Eighty Nine Crore and Sixty lakhs only) in case of a project in India, and US $ 144.80 million (US Dollar One Hundred Forty Four point eighty million) for projects elsewhere; For the purpose of this RFP, Port Infrastructure would be deemed to include, on-shore and off-shore terminals, berths, jetties, quays, cargo / container handling system, port based terminal facilities, CFS/ICDs, OR ii. Any project involving construction or supply and erection of Mechanical Handling Equipments and having an estimated capital cost (excluding land) of at least Rs. 724.00 crore (Rupees Seven Hundred Twenty Four crore only) in case of a project in India, and US $ 362.00 million (US Dollar Three Hundred and Sixty two million) for projects Queries / Clarifications sought Clarification by KPL 3 KPL/OP/CT/IE/2014 S. No Clause No./ Page No. Clause Descriptionin the document elsewhere. Queries / Clarifications sought Clarification by KPL Provided that the Applicant firm claiming credit for an Eligible Assignment shall have, prior to Proposal Due Date, received professional fees of at least Rs. 72.40 Lakh (Rupees Seventy Two Lakhs and Forty thousand only) for such assignment, and where credit is being claimed by a Key Personnel, she/he should have completed the relevant assignment prior to Proposal Due Date. Provided further that if the Applicant firm is taking credit for an Eligible Assignment which was undertaken for a private sector entity, such assignment shall have been completed prior to Proposal Due Date and the Applicant shall have received professional fees of at least Rs. 1.45 crore (Rupees One Crore and Forty Five Lakhs only). REPLY TO QUERIES 4 KPL/OP/CT/IE/2014 S. No Clause No./ Page No. Clause Descriptionin the document Queries / Clarifications sought Clarification by KPL 6. Clause 7.4. xiii. Pg.No.51 (Review of Designs, Drawings and documents) The Independent Engineer Is charges for testing shall be No. shall carry out, or cause to included in our offer? be carried out, all the Tests specified hereto and issue a Completion Certificate or Provisional Certificate, as the case may be, in accordance with the provisions of the Agreement. Checking the Design details and the execution of work as per the standard codes of practices. Relevant tests on construction materials like cement, steel, metal and sand as per the standard codes of practices. 7. Clause 7.7, Pg.No.53 (Consultancy Team) 8. Clause 7.7 a, Pg.No.53 and Clause 4.6, Pg.No.103 Port Engineer cum Team leader/ Project Manager Minimum Time required on site – Total duration of the services Resident Team Leader and Project Manager The person designated as the Team Leader of the Consultant‟s Personnel shall REPLY TO QUERIES Does the total duration means Refer Clause 7.5.1. the entire project duration of 27 months? In Clause 4.6, it is stated that in Refer amendment with addition, the Consultant shall respect to Clauses2.1.4 designate a suitable person as and 7.7.1. Project Manager (the “Project Manager”) who shall be 5 KPL/OP/CT/IE/2014 S. No 9. Clause No./ Page No. Clause 4.4, Pg.No.102 (Substitution of Key Personnel) REPLY TO QUERIES Clause Descriptionin the document be responsible for the coordinated, timely and efficient functioning of the Personnel. In addition, the Consultant shall designate a suitable person as Project Manager (the “Project Manager”) who shall be responsible for day to day performance of the Services. The Authority expects all the Key Personnel specified in the Proposal to be available during implementation of the Agreement. The Authority will not consider any substitution of Key Personnel except under compelling circumstances beyond the control of the Consultant and the concerned Key Personnel. Such substitution shall be limited to not more than two Key Personnel subject to equally or better qualified and experienced personnel being provided to the satisfaction of the Authority. Without prejudice to the Queries / Clarifications sought responsible for day to performance of the Services. Clarification by KPL day Does the personnel refereed in both clauses are same or different? Kindly clarify. Kindly relax the substitution from RFP Clause prevails. 2 persons to 4 persons. 6 KPL/OP/CT/IE/2014 S. No 10. Clause No./ Page No. Annex-6 Payment Schedule, Pg.No.115 REPLY TO QUERIES Clause Descriptionin the document foregoing, substitution of one Key Personnel shall be permitted subject to reduction of remuneration equal to 20% (twenty per cent) of the total remuneration specified for the Key Personnel who is proposed to be substituted. In case of a second substitution, such reduction shall be equal to 50% (fifty per cent) of the total remuneration specified for the Key Personnel who is proposed to be substituted. A) Review and approval of DPR for the entire Project – 5% B) Phase – I Development work : 1. Review of Designs and Drawings, construction methodology, quality assurance procedures, procurement, engineering and construction time schedule submitted by the concessionaire-5% Queries / Clarifications sought Clarification by KPL This payment schedule shows Refer Annexure – III to that 80% is divided into 8 stages amendment attached and linked with progress of the for payment schedule. construction. We request you to make the payment in man month basis based on the actual staff deployed for this assignment. 7 KPL/OP/CT/IE/2014 S. No Clause No./ Page No. Clause Descriptionin the document Queries / Clarifications sought Clarification by KPL 2. Review and recommendation of the Operation and Maintenance plan prepared by the Concessionaire – 2% 3. Verification of the Documents on Manufacture and delivery of the Container Handling Equipments as submitted by the Concessionaire – 2% 4. Pro-rata percentage payment for the services of Inspection of the Construction as per TOR based on physical progress of work during construction (subject to the stages indicated below) – 80% (divided into stage payment as under) Completion of Physicalprogress: of 30% - 10% of 40% - 10% of 50% - 10% of 60% - 10% of 70% - 10% of 80% - 10% of 90% - 10% 100% - 10% 5. Issue of provisional / completion certificate for the Phase – I of the project– 4% REPLY TO QUERIES 8 KPL/OP/CT/IE/2014 S. No Clause No./ Page No. Clause Descriptionin the document Queries / Clarifications sought Clarification by KPL 6. Vetting of as-built drawings by the Independent Engineer, Completion of work and issue of completion certificate by the Kamarajar Port Limited to the IE for the Phase - I development work.- 2% 11. Bid Submission Date Last date for submission of Requesting you to kindly extend Bid submission due bid as per RFP is 30th June the last date for submission of date extended to 07th bids to 10th July 2014 July 2014. 2014 12. Clause 2.2.2 B (Conditions of Eligibility of Applicants – Financial Capacity) The Applicant shall have received a minimum income of Rs 14.48 crore (Rupees Fourteen Crore and Forty Eight Lakhs only) or US $ 7.24 million per annum from professional fees during each of the 3 (three) financial years preceding thePDD. For the avoidance of doubt, Professional fees hereunder refer to fees received by the Applicant for providing advisory or consultancy services to its clients excluding Service tax. REPLY TO QUERIES With regards to the clause 2.2.2 RFP Clause prevails. (B) on Conditions of Eligibility based on the financial capacity, we request that this clause may be revised to reduce the figure of Rs. 14.48 crores to Rs. 6crores. This will help in receiving more competitive bids from the specialized firms who mainly deal in port sector only. 9 KPL/OP/CT/IE/2014 S. No Clause No./ Page No. Clause Descriptionin the document Queries / Clarifications sought Clarification by KPL 13. Bid Submission Date Last date for submission of We request you to extend the bid Bid submission due bid as per RFP is 30th June submission date by another 10 date extended to 07th days. July 2014. 2014 14. Clause 5.3, Pg.No.104, Change in Applicable law If, after the date of this Agreement, there is any change in the Applicable Laws with respect to taxes and duties which increases or decreases the cost or reimbursable expenses incurred by the Consultant in performing the Services, by an amount exceeding 2% (two per cent) of the Agreement Value specified in Clause 6.1.2, then the remuneration and reimbursable expenses otherwise payable to the Consultant under this Agreement shall be increased or decreased accordingly by agreement between the Parties hereto, and corresponding adjustments shall be made to the aforesaid Agreement REPLY TO QUERIES Bidder requests to delete the RFP Clause Prevails following words from the clause „by an amount exceeding 2% (two per cent) of the Agreement Value specified in Clause 6.1.2‟ 10 KPL/OP/CT/IE/2014 S. No Clause No./ Page No. Clause Descriptionin the document Value. Queries / Clarifications sought Clarification by KPL 15. Clause 2.26, Pg.No.38, Indemnity The Consultant shall, subject to the provisions of the Agreement, indemnify the Authority for an amount not exceeding 3 (three) times the value of the Agreement for any direct loss or damage that is caused due to any deficiency in services. Bidder Requests to reduce the RFP Clause Prevails liability for loss or damage due to deficiency in to50% of agreement value instead of 3 times of the agreement value as mentioned in the subject clause. 16. Clause 6.4, Pg.No.47, Miscellaneous It shall be deemed that by submitting the Proposal, the Applicant agrees and releases the Authority, its employees, agents and advisers, irrevocably, unconditionally, fully and finally from any and all liability for claims, losses, damages, costs, expenses or liabilities in any way related to or arising from the exercise of any rights and/or performance of any obligations hereunder, pursuant hereto and/or in Bidder request subject clause. REPLY TO QUERIES to delete the RFP Clause Prevails As the clause imposes an embargo on the Consultant from raising any sorts of claims (in respect of the Agreement) against the Authority/Client. 11 KPL/OP/CT/IE/2014 S. No Clause No./ Page No. Clause Descriptionin the document connection herewith and waives any and all rights and/or claims it may have in this respect, whether actual or contingent, whether present or future. Queries / Clarifications sought Clarification by KPL 17. Clause 2.4, Pg.No.89, Expiration of Agreement Unless terminated earlier pursuant to Clauses 2.3 or 2.9 hereof, this Agreement shall, unless extended by the Parties by mutual consent, expire upon the expiry of 6 (six) months from the date of commercial operations of the Project by the Concessionaire. Upon Termination, the Authority shall make payments of all amounts due to the Consultant hereunder. Please confirm bidder‟s Both the Clauses mean understanding: the same. “As per Clause 2.4 the Agreement would expire „after 6 months from the date of commercial operations‟; whereas, as per clause 6.3 (d), the services shall be deemed completed and accepted only „after completion of operation phase of 6 months after issue of completion certificate‟. Bidder understands that both the clauses mean the same thing. 18. Clause 3.12, Pg.No.101, Accuracy of Documents The Consultant shall be responsible for accuracy of the data collected by it directly or procured from other agencies/authorities, the designs, drawings, Bidder requests to delete the RFP Clause Prevails second sentence from the subject clause “ Subject to the provisions of Clause 3.4 ….conform to good industry practice” should be REPLY TO QUERIES 12 KPL/OP/CT/IE/2014 S. No 19. Clause No./ Page No. Clause 7.2.1, Pg.No.106, Liquidity Damages for error/variation REPLY TO QUERIES Clause Descriptionin the Queries / Clarifications sought document estimates and all other deleted details prepared by it as part of these services. Subject to the provisions of Clause 3.4, it shall indemnify the Authority against any inaccuracy in its work which might surface during implementation of the Project, if such inaccuracy is the result of any negligence or inadequate due diligence on part of the Consultant or arises out of its failure to conform to good industry practice. The Consultant shall also be responsible for promptly correcting, at its own cost and risk, the drawings including any resurvey / investigations. In case any error or variation is detected in the reports submitted by the Consultant and such error or variation is the result of negligence or lack of due diligence on the part of the Consultant, the Clarification by KPL Bidder requests to replace the RFP Clause Prevails word “consequential” with “direct” in the third line of the subject clause. 13 KPL/OP/CT/IE/2014 S. No Clause No./ Page No. 20. Appendix-II, Form 1 & 2, Financial Proposal 21. Appendix-II, Form 1 & 2, Financial Proposal REPLY TO QUERIES Clause Descriptionin the document consequential damages thereof shall be quantified by the Authority in a reasonable manner and recovered from the Consultant by way of deemed liquidated damages, subject to a maximum of 50% (fifty per cent) of the Agreement Value. Queries / Clarifications sought As per Form -1 the Fee quoted is LS and payment terms are related to this LS fee i.e, the Contract Price. In view of this Bidder requests to clarify the purpose of Form-2 and Form-3 where-in bidder has to provide the break-up of costs and per-diem rate for the Personnel. Bidder understands that the LS fee quoted in form-1 should match with the fee quoted at Item no. G (TOTAL) in the Form-2. Clarification by KPL Refer amendment attached Refer amendment attached 14
© Copyright 2026 Paperzz