2 Sep ptember 2013 3 CONSTRUCTIO ON UPDATE – WEEK STARTING G 9 SEPTEM MBER TO W WEEK END DING 22 SE EPTEMBER R 2013 Below w is an overviiew of upcom ming works over o the fortn night starting 9 Septembe er 2013 for thhe Mains+Ke essels upgrad de. Prope erties directlyy impacted byy the works will w be contaccted by the Community C Engagement E t Team. Works s will occur M Monday to Sa aturday betw ween 6.30am m and 6.30pm m. For safety and traffic m management reasons som me works s will occur be etween 8.00pm and 5.00 0am on Sund day to Thursd day nights. day 4 Septe Refer overleaf forr important information i about the s cheduled tra affic switch on Wednesd ember 2013 to t realig gn Kessels R Road westbo ound traffic to t the north between Be enaud Street and Grout Street and temporary t pedes strian divers sion on soutth side of Ke essels Road d between Sp pringfield Sttreet and Grrout Street. Locattion Scheduuled constructtion activities 1 Kessels Roa ad west of th he intersectio on (including niight works) Draina ge works forr the western n section of K Kessels Road d underpass. Ongoin ng excavations and concreting works for the westtern half of th he Mains Road bridge e deck. Finish hing and landdscaping works for the Kessels K Road n noise barrier. 2 Mains Road d north of the e intersection n (including niight works) Continu uing survey, kerb and foo otpath workss. Ongoing works w to insta all underg ground draina age and perm manent signaage. Works to t install stre eet lighting g. Asphalting g works. 3 Mains Road d south of the e intersection n (including niight works) Ongoin ng kerb and footpath f worrks. Works too install unde erground stormw water drainag ge. 4 Kessels Roa ad east of the intersection (including niight works) Works to prepare fo or and then start s excavattions for the eastern secttion of the Kesssels Road underpass u 5 Kessels Roa ad north side e businesses s Continu uing landsca aping works along a the no rth side of Kessels Road d. 6 Kessels Roa ad south side e businesses s (including niight works) Earthw works and services investtigation. Instaallation of tem mporary foottpaths and lig hting along south s side off Kessels Rooad. Construc ction of underg ground storm m water drainage, new ke rbing, and as sphalting wo orks. 7 Mimosa Cre eek, Grout, Benaud B and Springfield S Streets and Kessels K Road Park ‘n’ Ride e (including night n works) w compou unds. Workss to demolish the old Mim mosa Establiishment of works Creek Bridge. Earth hworks and the t installatioon of new un nderground service es. 2 1 44 3 5 6 7 Traffic switch to temporarily realign Kessels Road westbound traffic to the north To accommodate further upgrade works on the southern side of Kessels Road, the project will implement a traffic switch to temporarily realign Kessels Road westbound traffic to the north between Benaud Street and Grout Street. The traffic switch will see westbound traffic on Kessels Road between Springfield Street and Grout Street temporarily moved onto the new northern half of the Mimosa Creek Bridge. Following the implementation of the switch, both east and westbound traffic lanes on Kessels Road will be on the new northern half of the Mimosa Creek Bridge. The old Mimosa Creek Bridge will then be demolished to facilitate construction of the new southern half of the bridge. Lane closures and traffic control will be in place on Kessels Road between MacGregor Street and Mains Road from 8pm Wednesday 4 September 2013 to 5am Thursday 5 September 2013 to facilitate these changes (weather and construction conditions permitting). During these lane closures, Grout Street and Springfield Street will be accessible via left in/left out only, with u-turn facilities provided at the MacGregor Street and Mains Road intersections. Traffic control and signage will be in place during these works to guide road users along the newly aligned works. Every reasonable effort will be made to minimise disruptions to residents and businesses, however, there will be some traffic delays, noise, dust, flashing lights and lighting towers associated with the construction activities. Motorists are advised to drive carefully, follow the road signage in place and allow extra time to complete your journey. Temporary pedestrian diversion on Kessels Road south side To facilitate the bridge construction works, pedestrian access on the southern side of Kessels Road between Grout Street and Springfield Street will be temporarily diverted to the northern side of Kessels Road from Thursday 5 September 2013. The diversion will be in place for the next few months while the second half of the Mimosa Creek Bridge is constructed. Safety is a project priority and pedestrians are asked to follow the signage in place.
© Copyright 2026 Paperzz