82'-0" 19'-6" 14'-6" 17'-0" 11'-0" 20'-0" C A4 2x6 Outriggers @ 24"o.c. w/Simp. LUS26 hgrs. @ backspan 12 S5 5 1/8"x12" G.L.B. x6 3'-0" -2 3 8 S5 2'-0" 7'-3" 11 7/ 13 S6 13 S6 11 S5 6x8 24'-0" 48'-6" )2 x6 19A S6 15'-5 1/2" 6x8 5 1/8"x9" G.L.B. RIDGE Y A V 15'-0" 6 3/4"x13 1/2" G.L.B. 6x8 11A S5 C A4 7'-6 1/2" Flat bo t. chor truss es @ 24 d "o.c. 6x8 5 1/8"x9" G.L.B. (2 x6 )2 (3 6x10 22 S6 )2 x6 7 S5 11 S5 2X Overframing for cricket D A4 6x8 12 S5 1'-6" 1 1/4"x11 7/8" Versa-Rim Outriggers @ 24"o.c. w/Simp. LUS210 hgrs. notch to 5 1/2" @ eave 7'-3" x6 )2 x6 -2 x6 3 3 -2 x6 5'-0" 21 S6 (2 5'-6" -2 3 1.9 @ I/450 8" BC (3 ) o 2x m 6 ab o ve fr 5 1/8"x21" G.L.B. 5 1/4"x11 7/8" Versa-Lam 10 S5 2x6 Outriggers @ 24"o.c. w/Simp. LUS26 hgrs. @ backspan SECOND FLOOR/LOWER ROOF FRAMING NOTES: B A4 12'-0" (2)-1 3/4"x11 7/8" M=L w/Simp. HUC410 hgr. @ backspan 6x10 6x10 6x8 See note #8 10A S5 Flat bot. chord trusses @ 24"o.c. x6 )2 (2 )2 x6 19 S6 x6 6x8 e x6 ov b )2 (2 m a o fr )2 5 1/8"x12" G.L.B. Simp. HHUS410 hgr. typ. @ EA. end (2 5'-0" Y 1 3/4"x11 7/8" M=L (2 14 S6 1.9 c. @ 16"o. E LL 6x8 1 1/4"x11 7/8" Versa-Rim Outriggers @ 24"o.c. w/Simp. LUS210 hgrs. notch to 5 1/2" @ eave 2X Overframing for cricket x6 -2 1 3/4"x11 7/8" M=L I/450 rs Rafte 6x10 3 D A4 15 S6 8" BC 11 7/ 22A S6 A 9'-0" 13 S6 V 11 7/ 8" BC I/4 w/Sim p. LSSU 50 1.9 Ra fters I25 hgr @ 24 s w/we b stiffe "o.c. ners Strap EA. side of beam to dbl. top plt. w/ Simp. MTS30 strap ties 23 S6 11 7/ 8" BC I/4 w/Sim p. LSSU 50 1.9 Ra fters I25 hgr @ 24 s w/we b stiffe "o.c. ners 6x10 A A4 Continuous beam (upset) 5 1/8"x22 1/2" G.L.B. Ridge 9 S5 T T S w ub 5x C /S e 5 no ol. im ste x3 te ca p. C el /1 #5 p - C co 6 se O6 l. e 5 1/4"x24" Versa-Lam See note #8 LL E 6x8 7 S5 50 1.9 " BCI/4 11 7/8 . @ 16"o.c 5 1/8"x12" G.L.B. . 16"o.c x6 (2 )2 x8 p 6 im 8 /S 4- ap / 1 l. c 5 co w 11 C Simp. HGLTV5.511 hgr. x6 48'-6" C -2 3 x6 )2 5 1/8"x9" G.L.B. See note #8 Continuous dbl. top plt. 9'-0" E (2 Ref Simp. HHUS5.50/10 hgr. 5 1/4"x11 7/8" Versa-Lam "o.c. @ 16 1.9 50 . 16"o.c BCI/4 1.9 @ 7/8" 15'-0" I/450 8" BC NOTE: see architectural detail sheet D1 for pergola framing details 1'-6" (3)-1 3/4"x11 7/8" M=L 6 3/4""x21" G.L.B. BEAM 6 l. /1l co 4 x3ee 1/ #5 " x5 st 5 e 8 5 e T t = S b O no 2 T Tu C e ; H C e 8 p. - S / im p 6 7 /S a = w l. c 3 o W C 6x8 16"o.c. (2 450 1.9 @ 11 7/ 11 S5 19A S6 (2)-1 3/4"x11 7/8" M=L 6x10 5 1/8"x12" G.L.B. (24F-V8) Continuous 6x8 11 7/8" BCI/ 8 S5 RIDGE 2X Overframing for cricket 20 S6 F tr lat b us se ot. s @ ch 24 ord "o .c. 7 S5 6'-0" 6x10 7 S5 Fla tru t bo sse t. c s @ hord 24 "o.c . 2'-0" 6x8 B A4 om (2)2 ab x6 ov e e x6 v )2 bo (2 m a o fr 7 S5 8 S5 NOTE: see architectural detail sheet D1 for pergola framing details fr 4'-0" 5 1/8"x9" G.L.B. A A4 17'-0" 82'-0" 20'-0" 11'-0" 1. See structural notes for additional information. 2. Provide solid blocking in floor joist depth @ all posts, multi-studs and holdowns. 3. Floor joists to be continuous @ all locations. 4. See roof framing notes 2-6, page #S3. 5. Weld Col. Cap to T.S. Col. w/3/16" fillet weld all around. 6. All floor joists to use Simp. IUT11 hgrs. 7. -8. Edge nail these walls w/8d@4"o.c. SCALE: 1/4"=1'-0"
© Copyright 2026 Paperzz