Ministry of Water Resources, River Development and Ganga

Ministry of Water Resources, River Development and Ganga Rejuvenation
Themes
Good Governance challenges
and
opportunities
GoS Recommendations
Electronic Service Delivery
Action Plan for Implementation
Operationalisation of Digital Locker, Electronic Payment System
Timeline
December, 2016
e-Procurement
i)
Implementation of e-Procurement under Central public
procurement platform for procurement of goods, services
and work contracts
ii) End to End procurement of goods
iii) Training/capacity building of the officials involved in eprocurement
iv) Preparation of list of equipments/services which can be hired
instead of procurement
Adoption of GIS based decision support system for the projects
Start of Mobile Apps services for
i) Rain Water Harvesting
ii) Water studies in formation
iii) Legal and other provision on water regulation
Re-engineering of the process for the sanction and approval of
PMKSY, ID scheme, approval of the State Govts.
Third Party Evaluation of Schemes/Projects under
i) NMCG
ii) AIBP
iii) CAD
i) Setting up of Regional Centre on Traditional Water
Management at CWPRS, Pune
ii) Adoption of Best Practices of Karnataka/Gujarat in Water
conservation/management
iii) Expansion of Data Bank under DWRIS (NWIC)
Identification/Development of Water Bodies sites as tourist
spots.
December, 2016
14 WALMIs will be strengthened for the training of WUAs by
September, 2016
Tracking of processes
Mobile Apps
Re-engineering of the
processes
Third Party Evaluation of
the scheme
Dissemination
information
on
Practices
Employment
Generation
Strategies
Tourism
identification
of
Best
potential
Strengthening of WALMIs
295 | P a g e
March, 2017
December, 2016
August, 2016
December, 2017
June, 2017
Oct, 2016
December, 2016
Remarks
Themes
GoS Recommendations
Employment generation in
the schemes of Ministry
Integration of Rain Water
Harvesting with MNREGA
Identification of new skills
Farmers
Centric
Issues in Agriculture
and allied Sector
MoUs with the foreign
countries
To make all schemes
farmer-centric
Training to WUAs/Farmers
PIM to be operationalized
Water Management
Ground
Measurement
Jal KrantiAbhiyan
Education & Health;
Universal
access
Clean Ground water
Water
Action Plan for Implementation
giving finance al support for infrastructure/faculty strengthening
Details of Employment Generation to be included in the
Proposal/Cabinet Notes of the schemes of the Ministry
Water Harvesting structure, field ponds and other structures will
be integrated with MNREGA for better employment generation
i)
Identification of new skills in water conservation, water
governance, rain water harvesting like plumbing, repairing
etc.
ii) Certification through CGWA/SGWA
To provide training for new techniques to WUAs in the MoUs
signed countries
Mapping up of Accelerated Irrigation Benefits Programme (AIBP),
Repair Renovation and Restoration (RRR) of Water Bodies,
Command Area Development and Water Management
(CAD&WM) Programme, Flood Management Programme,
Development of Water Resources Information System (DWRIS)
etc. for the maximum benefits of the farmers.
Training of water user associations in new techniques of water
conservation
To provide incentives to states/farmers for using PIM/sprinkle
irrigation
Requesting M/o-HRD for Inclusion of water management subject
in the selected Universities /Engineering Colleges
i) Mapping of ground water level
ii) Training to local youths for ground water conservation
iii) Application based collection of ground water Data by local
youths
i) Water Management/Water Conservation Awareness
programme in selected blocks/villages throughout the country.
ii) Implementation of ground water minor irrigation scheme with
financial support from PMKSY
To educate people through selected schools/localities on
clean/pollution free ground water
296 | P a g e
Timeline
Continuous process
Continuous process
March, 2016
Continuous process
December, 2016
Throughout
the
year, 2016-17
December, 2016
December, 2016
2016-19
2016-18
Continuous Process
Remarks
Themes
and quality
Innovative
Budgeting
Accelerated Growth
with inclusion and
equity
GoS Recommendations
Timeline
Minimum use of Plastic i) To discourage serving of water bottles in the meetings
Water Bottles
ii) Innovative schemes like collecting of left over water in water
bottles in schools/hotels etc. for gardening and other uses.
Public Participation
Involvement of general public for water conservation/not
polluting water bodies
e-learning
e-learning modules to be developed by 3 research institutes
under the Ministry
Education in Water Sector
To consult HRD Ministry to include Ganga Rejuvenation, River
Conservation subjects in the school curriculum
Exploring
innovative To prepare and approve the scheme for funding the MMI and MI
Funding to MMI and MI irrigation projects through NABARD/other Financial Institutions
irrigation projects
Provision for posts along- Making provision of posts in the all new schemes itself
with schemes
Making
provision
for All schemes will have prevision for administrative expenditure of
administrative expenditure 3% of budget allocation
Agricultural Growth
Make investment in irrigation through Solar Pump, Sprinkler,
Drip, recycled water and Command Area Development
Immediate
River Basin Management
December, 2017
Social Audit
Awareness
Generation
/Media campaign
Swachh Bharat and
Ganga Rejuvenation
Action Plan for Implementation
Incentivization for research
in Water Sector
Swachh Bharat Campaign
i).IWRM study of 10 identified river basins for complete water
scenario of these river basins.
ii) Setting up of River Basin Authority
Implementation of Social Audit in CAD,RRR scheme
i)
Involvement of Gram Panchayats in water conservation
ii) Regular media campaign through DTH, Radio and print
media
To incentivize the researcher/students for innovative research in
water sector
i)
Action Plan for the Swachh Bharat Mission in the
Ministry
ii) Cleanliness drive to be conducted on quarterly basis
iii) Awareness among the employees by conducting
297 | P a g e
Immediate
September, 2016
December, 2016
July,2016
2016-17
2016-17
December,2016
March,2017
Continuous process
2016-17
Completed
Continuous Process
Continuous Process
Remarks
Themes
GoS Recommendations
Ground
Management
River Cleaning
Water
Ganga Cleaning
Energy
Efficiency
and conservation
Energy saving
Awareness
saving
Govt. Vehicle
Solar Energy
for
energy
Action Plan for Implementation
workshops/training
Involving Gram Panchayat & NGOs for the management and
conservation of ground water
i)
Maintaining e-flow of the rivers for pollution abatement
ii) To make permanent anti-erosion structure along the river
bank
iii) De-silting of rivers
i) To ensure that no untreated industrial effluents is drained in
the river Ganga.
ii) To ensure that no untreated water will flow in to the River
Ganga
iii) To ensure that Sewage Treatment Plant will be installed at
every meeting point
iv) Identification of Ganga Grams for complete sanitation
campaign
v) Involvement of local bodies/Panchayats/ NGOs in Ganga
Cleaning
vi) Involved corporate sector under CSR programme
Upgrade office equipments to energy saving/star rating models.
Timeline
To create awareness among officers and staff to turn off their
electrical appliances when he is not on their seats.
Immediate
i)
Minimizing use of govt. vehicles.
ii)
To promote CNG vehicles.
iii)
Procure fuel efficient new vehicles.
To promote use of solar pumps for irrigation
Immediate
298 | P a g e
March, 2017
March, 2019
Continuous Process.
To be completed by
March, 2020
March, 2017
December, 2018
Remarks