Toshiba Albania ReportonBenchmarking andDraftCapacity Assessment SponsoredbytheUNDPonbehalfofthe InternationalDonorCommunity Casals&Associates/Claro&Associates 2010 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment PREFACE This report presents the findings and recommendations of an assessment of Albania’s public procurement system. A team of international consultants (“the Assessment Team”) from Casals & Associatesanditsstrategically,Claro&AssociatesaidedbythreelocalconsultantscontractedbyUNDP, workingincoordinationwiththeinternationaldonorcommunityinAlbania,carriedoutthefieldͲwork phase from March 17 through April 23, 2010. Subsequently, the Team Leader carriedͲout a followͲup visittovalidateallfindingsandtheresultingrecommendationswiththeGOA,representedMs.Valbona Kuko, director of the DSDC, and by Ms. Kokdiana Cankja, director of the PPA. Their comments and suggestionswhereincorporatedintothefinalversionofthisassessmentreportasdeemedappropriate. SubsequentlytothevalidationofthepreliminaryreportwiththeGOA,adraftwasprovidedforreview and comments to the members of the “Advisory Group for the Procurement Assessment” (“Advisory Group” or “AG”). The AG consists of representatives of the GOA (Director of the DSDC, Council of Ministers and the Director of the Public Procurement Agency); UNDP; the World Bank; USͲAID; EU Commission,andtheAustrianDevelopmentAgency(seecompletedetailsinAnnex3). All comments and suggestions were reviewed and reflected in the appropriate sections of the accompanying assessment report to the extent that the consulting team deemed appropriate. Furthermore,majorchangesoccurringfromthedateoffinalizationofthefieldͲworkphaseandthedate ofthefollowͲupmissionperformedbytheconsultingteamleaderfromJune3throughJune14,2010 werealsoreflectedinthefinalreport. This document includes facts, observations, findings, and commentary believed to be accurate as of today,withthecaveatthatthescopeofthereportislimitedtoasampleofinstitutionsagreeduponin advance with UNDPͲAlbania, and that the assessment is based on interviews with and data made available by officials working in these institutions, interviews with and data made available by local stakeholders,otherdatamadeavailablebytheGovernmentofAlbania,aswellasdataavailableinthe publicdomain. The Assessment Team wishes to acknowledge the following representatives of the government of Albania (GOA) and members of the international donor community for their kind support and collaborationduringtheperformanceoftheassessment:Mrs.ValbonaKuko,Director(DSDC)Councilof Ministers;Mrs.AlpinaQiriazi,DSDCCoordinator,CouncilofMinisters;Mrs.KlodianaCankja;Directorof the Public Procurement Agency (PPA); Mrs. Gülden TürközͲCosslett, UNDP Resident Representative; Messrs:NorimasaShimomura,UNDPCountryDirectorandArbenRama,UNDPDemocraticGovernance Cluster Manager; and Jakob Schemel, UNDP Management Support Officer; Ms. Xhesi Mane; UNDP DemocraticGovernanceProgramAssociate;FrancescaAcquaro,EUCommission’sDelegationtoAlbania; Mr.SeanHuff,USAIDProgramOfficer;Mrs.IlirianaDana,USAIDDeputyProgramOfficer;AstridWein, Head of Austrian Development Agency Office; Mr. Knut Leipold, World Bank Procurement Specialist; Page1of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Mrs.GretaMinxhozi,WorldBankSeniorOperationsManager,andNevilaComo,ProgramOfficer,Donor TechnicalSecretariat. Page2of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment TableofContents INTRODUCTION Background,Objectives,MethodologyandScope ObjectivesfortheAssessment MethodologyandScope OpportunityPresentedbyThisReview OVERVIEWOFTHEEXISTINGSYSTEM InstitutionalOrganization InstitutionalCapacity eͲGPPlatform SupervisionandControl MarketDevelopment LegalFramework MAINFINDINGSANDRECOMMENDATIONS RESULTSFROMTHEASSESSMENTBASEDONTHEOECD/DACMETHODOLOGYFOR PUBLICPROCUREMENTSYSTEMS(VERSION4) DETAILEDBENCHMARKINGANALYSIS PILLARI.–LEGISLATIVEANDREGULATORYFRAMEWORK PILLARII–INSTITUTIONALFRAMEWORKANDMANAGEMENTCAPACITY PILLARIII–PROCUREMENTOPERATIONSANDMARKETPRACTICES PILLARIV–INTEGRITYANDTRANSPARENCYOFTHEPUBLICPROCUREMENTSYSTEM PROGRESSSINCE2006ASSESSMENT Annex1–MatrixCapacityActionPlan Annex2–ListofProcurementEntitiesReviewed Annex3–MeetingswiththeAdvisoryGroup Annex4–RawstatisticaldataobtainedtoanalyzeCPIs Annex5–ListofAlbanianLegislationReviewedfortheAssessment Annex6ͲDispositionofcommentsreceivedfromtheAdvisoryGroup Page 4 4 4 5 8 9 10 10 10 13 15 16 19 21 23 23 41 48 52 62 69 92 95 123 155 156 Page3of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment I. INTRODUCTION 1. Background,Objectives,MethodologyandScope 1.1. In 2009, the Government of Albania (GOA), represented by the DSDC, requested the United Nations Development Programme (UNDP), to support their continued efforts to improve their public procurement system, through the conduct of an independent assessment of it public procurement system following an internationally recognized methodology, taking stock of the significant improvements undertaken by the GOA since the issuance, in 2006, of the World Bank’sCountryFiduciaryAssessmentReport(CFA). 1.2. This request reaffirmed the GOA’s commitment to deepen its procurement reform and its efforts to modernize its public procurement system, reflecting a longͲterm commitment to promote transparency and accountability in its public financial management administration; createanefficientmarketeconomy,increasethepublictrustintheprofessionalismofitscivil service.ThesegoalsarealsofirmlyanchoredinitslargerEuropeanUnion(EU)accessionagenda. 1.3. Asacountrywithclearpoliticalandlegalcommitmentstoundertakeaseriesofstepstowards admissionintotheEU,Albaniaisawareoftheneedtofurtherharmonizeitslegislationwiththe EU procurement directives. This harmonization process is aimed at bringing its public procurementsysteminlinewiththestandardsoftheEUMemberStatesbeforeaccession. 2. ObjectivesfortheAssessment 2.1. ThekeyobjectivesbasedonwhichtheassessmentoftheGOA’spublicprocurementsystemwas conductedwereto: x BenchmarkthepublicprocurementsysteminAlbaniaagainstinternationallyrecognized bestpractices; x Measureprogresssinceearlierdiagnosticexercises; x Prepare a detailed capacity development plan that can further elaborate implementationoftheCorporatePlan,andprovideabasisformobilizingresourcesfor necessaryreformsandcapacitydevelopment;and, x Developacasestudyonthisexerciseforpublicationby UNDPontheassessmentand developmentofacapacitydevelopmentplan. Page4of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment 3. MethodologyandScope 3.1. The assessment was conducted utilizing the OECD/DAC Methodology for Assessment of the National Procurement Systems (Version 4, July 17, 2006). Accordingly, Base Line Indicators (BLIs)werescorednotonlyintermsoftheadequacyoftheformalelementsthatcharacterize the four pillars of a public procurement system, but also contemplating the actual level of performance and compliance of the relevant elements that conform the system, through the applicationofComplianceandPerformanceIndicators(CPIs),wheneverapplicable. 3.2. The combination of BLIs and CPIs, along with the involvement of the broad array of stakeholders in the private and public sector, along with the members of the international donor community represented in Albania, provide a solid analytical foundation to support a comprehensivediagnosisoftheGOA’sprocurementsystem. 3.3. Annex 4 contains a list of raw data directly obtained from the eͲGP platform, from January throughDecember2009,plussomelimitedstatisticalinformationthatwasmanuallycaptured bythePPAfortheyears2007and2008.ItshouldbenotedthattheeͲGPplatformdoesnot currently have the capability of capturing all of the relevant information required by the suggestedCPIindicators,andlacksofthecapabilitytorunadͲhocqueriesorproducestatistical reports. However, the information available, which was downloaded into spreadsheets for purposes of grouping and analysis, provided sufficient basis for assessing the overall performance of the public procurement system, when considered together with the BLI indicators.PleaserefertoAnnex1,Recommendation13forfurtherdetails. 3.4. Accordingly,theassessmentencompassed,butwasnotlimitedto,areviewofallrelevantlaws andregulations,previousassessmentsandreportsfromtheWorldBank,SIGMA1andUSͲAID; as well as interviews and case reviews of a sample of contracting authorities (CAs) at the national and municipal levels. The sample, which included 8 institutions at the national level and2municipalitiesatthelocallevel(seeAnnex2fordetails),wasselectedbythe“Advisory Group for the Procurement Assessment” (“Advisory Group” or “AG”). The AG consists of representativesoftheGOA(DirectoroftheDSDC,CouncilofMinistersandtheDirectorofthe PublicProcurementAgency);UNDP;theWorldBank;USͲAID;EUCommission,andtheAustrian DevelopmentAgency(seecompletedetailsinAnnex3). 3.5. The assessment was performed by Casals & Associates, Inc. (“Casals”), in association with its strategicallyClaro&Associates,Inc.(“Claro”),referredtojointlyasthe“AssessmentTeam.” 3.6. The Assessment Team consisted of Fernando A. Fernandez, Senior Associate of Claro (Team Leader)andAleksanderDardeli,DirectorofRuleofLawandJusticeReformProgramsofCasals, with the expert assistance of three national consultants: Mrs. Silvana Rusi; Mrs. Zana 1 SupportforImprovementinGovernanceandManagement–AjointinitiativeoftheOECDandtheEuropean Union,principallyfinancedbytheEU. Page5of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Zvokopola; and Mr. Deni Guga. In addition, Mrs. Nevila Como participated in her capacity of expertliaisonwiththeGOAandthedonorcommunity. 3.7. The assessment consisted of three phases: i) field and home based work for information gathering,interviewsandbenchmarking;ii)diagnosticanalysisandfindings;and,3)validation, formulation of recommendations and development of the action plan, formulation of a case studyandreportwriting.ThefieldworktookplacefromMarch17throughApril23,2010,and wasfollowedbyawrapͲupmissionfromJune3throughJune14,2010. 3.8. DuringthefieldworktheAssessmentTeamconductedinterviewswithmajorstakeholdersfrom the public and private sectors; civil society and international donors; field reviews of tender processes, including the review of relevant documentation of a tender sample and their subsequent contract administration process. Annex 3 contains all notes resulting from the reviewsoftenderprocessesandtheirrelatedcontractmanagement. 3.9. Upon conclusion of the field work and based on the information resulting from its review of previousrelevantassessmentreports;analysisofthelegalframeworkandapplicablerulesand regulations for public procurement, along with the results of interviews and the analysis of a limited number of procurement statistics, the Assessment Team proceeded to analyze the systemintermsoftheOECD/DACmethodology.Acompletedetailfortheratingofeachpillar, indicatorandsubͲindicatorisincludedinthisreport. 3.10. Thethirdphaseofthework,consistingoftheformulationofagapanalysisandofacapacity development plan, and a facilitation exercise with the major GOA’s stakeholders and the internationaldonorcommunity,tookplacefromJune3throughJune14,2010.Shortlyafter completionofthisthirdphase,anduponreceivingthecommentsfromthemembersoftheAG, the Assessment Team finalized the assessment report, which incorporates all relevant comments or changes as deemed appropriate by the consulting team. Annex 6 contains the finaldispositionofcommentstothepreliminarydraftreportreceivedfromthemembersofthe AdvisoryGroup. 3.11. Althoughthecurrentpublicprocurementsystemhasbenefitedgreatlyfromtheimprovements ofthelegalandregulatoryframework throughthe passageoftheamendmentstothe public procurementlaw(PPL),andtheGOA’sdecision,sinceJanuary1,2009,tomandatetheuseof theelectronicprocurementplatform,thereviewfoundroomforimprovementsinanumberof areas as detailed under “Main Findings and Recommendations” below. These improvements areneededtomakethesystemmoreagile;tofurtheralignitwithinternationallyrecognized best practices and EUͲDirectives; to help develop the national procurement market through thecreationandnurturingofastrongpartnershipwiththeprivatesector;andtomakeitmore open,predictable,efficientandtransparent,therebyenhancingpublictrustinthesystem.The proposed reforms wouldalso generate significant savings to the government by reducing the Page6of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment system’stransactionandoperatingcostsand,moreimportant,bydrivinglowermarketprices forgovernmentpurchases. 3.12. These reforms for the most part should focus on some improvements to the legal and regulatory framework (i.e. the PPL; Rules and Regulations; and, Procurement Manual). The mostsignificantaspectsofthereform,however,entailamoreprofoundchangemanagement processinherentto: x Integratingthepublicprocurementsystemwiththepublicfinancialmanagementsystem by linking the eͲGP platform and the procurement plans with the budgetary system (as partoftheongoingdevelopmentoftheIntegratedFinancialSystem); x viewing and formally treating the public procurement process as encompassing from planning what, when, how, and how much to purchase to effectively implement public strategy; through contract administration and execution; completing the public expenditurecycle; x enhancingtheinstitutionalcapacityandorganizationoftheprocurementfunction; x strengthening the dayͲtoͲday operations of the system to achieve consistency and predictability across the spectrum of Contracting Authorities (CAs); developing a strong partnership with the private sector and civil society; and implementing a common and integratedinternalcontrolframework; x continuing the modernization and strengthening of the internal and external audit functions; x enhancing,aspartofabroadereͲGovernmentstrategy,theeͲGPplatformbothintermsof hardwareandsoftware,includingthedevelopmentofextendedsmartquerycapabilities; x simplifyingandstreamliningthecurrentorganizationalsetupoftheprocurementfunction, whichtodayentails1,700procurementunitsinvolving5,100civilservants.Thesuggested streamlining is meant to significantly reduce the size and functions currently assigned to the procurement units embedded within the structure of each line ministry and public institution,andnottoaffecttheorganizationalstructureofthelineministriesandpublic institutionsthemselves; x reassessingtheworkͲloadofthePPAensuringtheadequacyofitsstructure,staffleveland budget, to enable it to properly discharge its various responsibilities as required by the PPL;and; x adopting the 2010 diagnostic and the capacity development plan, as a common tool for prioritizingandcoordinatingthesupportofalldonors.Thelatterentailsnotonlyvetting the report with the international donor community and major stakeholders, but also Page7of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment defineadetailedactionplanwithappropriategoalsandperformanceindicatorsforeach majortask,andagovernancestructuretocoordinateitsfinancingandimplementation. 3.13. Moreover,mostofthereformsproposedaredesignedtoenhancetransparency,predictability andpublictrustinthesystem,andreflectanewtrendinpublicprocurement,wherebygreater emphasisisplacedonperformancethanonconformanceandcompliancewithformalities.This performancefocusisespeciallyprevalentintheEUcommunity. 3.14. This review identifies a number of relevant issues along with possible actions that, if implemented,couldhelpimprovetheoverallperformanceofthepublicprocurementsystemof Albania.Tofacilitatetheirconsiderationandsubsequentprioritization,allissuesidentifiedhave been categorized according to their degree of impact in the fulfillment of the four strategic objectivesofpublicprocurementsystems:efficiency;transparency;increasedcompetition;and conformance with international best practices. Likewise, the possible actions identified in connectionwitheachissue,havebeenclassifiedintermsoftheestimateddegreeofdifficulty; cost;andtimeinvolvedintheirimplementation.Thepurposeofthismatrix,whichisincluded as Annex 1, is to provide the GOA with a tool to assist it in deciding how to formulate a successful strategic action plan for the next phase of the reform of the public procurement system. 4. OpportunityPresentedbyThisReview 4.1. Asamediumtermgoal,theGOAiscommittedtoachievingsuccessfulaccessiontotheEU,and tomodernizingitspublicfinancialmanagementandprocurementsystems.Thisreviewprovides the GOA as well as all major stakeholders with an insightful understanding of the issues affectingthecurrentsystemandthepossiblewaystoconsolidatingtheimprovementsalready achieved,whilecontinuouslyclosingthegapwithinternationallyrecognizedbestpracticesand EUDirectives.ThisapproachisaimedatallowingtheGOAtoplotadefinedimprovementplan sequencing the actions in terms of their expected degree of impact towards continuously fosteringtheoverallbettermentofthesystem. 4.2. Sincethe2006CFAperformedbytheWorldBank,theGOA,supportedbyandworkinginclose coordination with UNDP; the EU Commission; the World Bank; USͲAID; and other relevant members of the international donor community, has been improving the public financial management and procurement systems. Currently, the World Bank is financing a fullͲscope system audit of the eͲGP platform, to take stock of recent updates to implement the recommendations resulting from a previous audit performed with the support of USͲAID, in 20082.Likewise,theEUthroughtheTwinningProgram,hasbeensupportingthestrengthening and modernization of the internal and external audit functions, and is currently finalizing its 2 SystemsauditperformedbyKPMG. Page8of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment planstocontinuesupportingtheimprovementofthepublicprocurementsystemthroughthe IPA2008. 4.3. Through this assessment, conducted under the oversight of the AG, assembled by UNDP, all major stakeholders have the opportunity to choose which actions they may wish to support through endorsing a common diagnostic and action plan, thus further optimizing the overall effectivenessofinternationalcooperationinAlbania. 4.4. Endorsementbytheinternationaldonorcommunityoftherecommendedactionscontainedin the“MatrixCapacityActionPlan”depictedinAnnex3,alongwiththeestablishmentofarobust governance structure, similar to that established through the AG for the oversight of the performance of this assessment, should further strengthen the ability of the GOA to successfullyplanandundertakeacredibledetailedimplementationplan. 4.5. Lastbutnotleast,establishmentofagovernancestructureastheonedescribedabove,should be accompanied by a strong commitment from all international donors to pull their available resources through a “swap” financing instrument such as to ease the financial reporting and administrativeburdenfortheGOA. Page9of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment II. OVERVIEWOFTHEEXISTINGSYSTEM ThefollowingbrieflydescribesthemainfeaturesoftheAlbanianprocurementsystem. 5. InstitutionalOrganization 5.1. ThePPLanditsimplementinglegislationsetsupaprocurementorganizationthatconsistsofa centralPublicProcurementAgency(PPA), whichislegallyresponsibleforregulation and oversight functions, and ThePPAislegallyestablishedasa“centralbody”reporting directlytothePrimeMinister,andfinancedbythestate approximately 1,700 functionally budget.ThePPAisresponsiblefor: independentcontractingauthorities(CAs) a) Draftinglegislationandregulationsforthe at central and local government levels. approvaloftheCouncilofMinisters(CoM); Complementing this structure, the 2007 b) Monitoringprocurementactivities; amendment of the PPL created a Directorate for concentrated c) Producingthe“PublicProcurementBulletin”; procurement at the Ministry of Interior d) Promotingandorganizingthetrainingofcentral on behalf of the Executive Branch; a andlocalgovernmentofficialsinvolvedin Public Procurement Commission (PPC), procurement; which was established by law No. 10270 e) Preparesstandardtenderdocumentstobe and became operational in April 2010; usedinawardingprocedures; and a Public Procurement Advocate f) Assistingcontractingauthoritiesbyproviding (PPAV), a nonͲbinding ombudsman who advicetoensureadequateandconsistent providesadviceandguidance3. applicationofthePPL; 5.2. While no official information could be obtained to ascertain the work force currently assigned to working in the public procurement organization, as describedabove,aconservativeestimate, based on the PPL4, which calls for, as a minimum, 3 professional staff per CA, is of 5,100 civil servants assigned to public procurement. 5.3. A particular feature of the Albanian system is that amendments to the PPL and to the Rules and Regulations are g) Decidesonpenaltiesincaseofmisconductor advisedtheheadoftheCAonpenaltiesor punishmentofCA’sofficialswhoinfringedthe PPL;and, h) Cooperateswithinternationalinstitutionsin mattersrelatedtopublicprocurement,and encouragesandsupportstheuseof internationaltechnicalstandards. AlthoughnotspecificallystatedinthePPL,ChapterII, Article13,paragraph2,thePPAisalsoresponsible forestablishingandmaintaininginoperationstheeͲ GP platform. 3 ThePPAVdirectlyconductsinvestigationsonallegationsreceivedaboutpotentialviolationsofthePPL,including potentialcasesoffraudandcorruption. 4 PPLChapterV,Article1(b). Page10of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment passed by the Council of Ministers (CoM) through “Decisions,” and formally approved by the Parliament. 5.4. ThePPLconstitutestheprimarylegislationonpublicprocurement,complementedbytheRules andRegulationsapprovedbytheCoM,whichareaimedatprovidingfurtherguidanceonthe application of the Law. While a procurement manual5 exists, it is not in use since it was developedpriortotheenactmentofthe2009amendmentstothePPL. 6. InstitutionalCapacity 6.1. Throughthe2009amendmentsthePPLwassignificantlyoverhauled,closingthegapwiththe EUDirectives.Thesemanychangestothelaw,coupledwiththeCoM’sdecisiontomandateall procurement tenders to be processed electronically through the eͲGP platform exacerbated even further a deficient capacity of the human resources responsible for the dayͲtoͲday operationsofthesystemthroughoutthe1,700CAs. 6.2. While the PPA, working in coordination with the Training Institute for Public Administration (TIPA), which controls the budget resources for the training of all civil servants in Albania, providedtrainingintheuseoftheeͲGPplatform,thecoverageofsuchtrainingatcentraland locallevelonlyencompassed1,600ofthe5,100procurementofficials.Itshouldbenotedthat TIPA’sannualbudgetamountsto$90,000ayear;andthattofulfillitsmandate,TIPAisrequired totrain6,000governmentcivilservantsperyear.Additionally, DuringOctoberͲNovember 2009, the PPA organized trainings founded through its own resources for contracting authorities. The total number of trained staff from contracting authorities reached 1,053 people. For 2010, the PPA has planned a repeat of the 2009 training in the use of the eͲGP platform.However,notraininghadbeenconductedatthetimethisassessmenttookplace. 6.3. The Department of Public Administration (DOPA), which is responsible for defining the job descriptions and the career stream of all government civil servants does not provide for a separatejobdescriptionandcareerpathforpublicprocurementofficials.Accordingly,thetype of expertise and professional formation of procurement officials varies widely across the system, and the lack of incentives coupled with budgetary constraints, hinder the ability to attractqualifiedprofessionals. 5 FinancedthroughaUSͲAIDgrantin2007. Page11of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment 7. eͲGPPlatform 7.1. IntroductionoftheeͲGPplatformundoubtedlyhadaverypositiveeffectinreducingcorruption and overall opacity of the public procurement system, while increasing transparency. As an example indicative of this positive trend, the average number of offers per bidding process increasedfrom2in2008,tomorethan6in2009;whilethenumberofcomplaintswasreduced from1every21offersto1every33offers. 7.2. TheeͲGPplatformwasdevelopedandimplemented(softwareandhardware)withthesupport oftheMillenniumChallengeCorporation(MCC)andUSͲAID,in2007.AccordingtoUSͲAID,the eͲGP platform was not designed to accommodate the volume of transactions currently being processed. Although the eͲGP platform was upgraded during 2009 in terms of number of servers and software, lack of a suitable archive solution coupled with the sheer number of transactions is significantly affecting the processing capacity of the system. Unless an archive solution is implemented soon, the ability of the eͲGP platform to keep live transactions for morethana yearbecomesquestionable.Lackofanarchivesolutionalsoprecludesusing the systemforauditandcontrolpurposesandaffectstherunningofqueries,giventhatmostofthe processing capacity is absorbed by the relatively high volume of information that has to be processedbythesystemeverytimeaqueryisrun. 7.3. The procurement information in the tables below corresponds to manually processed transactionsfor2007and2008,andelectronicallyfor2009. Table1–BiddingProcessesfrom2007through2009 2007 CivilWorks Goods Services Total BelowThreshold 971 1,150 674 2,795 49.1% OpenTenders 1,170 1,101 505 2,776 48.8% NumberofTendersProcessed Restricted Other Procedures Procedures 8 16 11 26 3 56 22 98 0.4% 1.7% International OpenTenders 1 0 0 1 0.0% Total 2,166 2,288 1,238 5,692 100% 2008 CivilWorks Goods Services Total BelowThreshold 689 1,701 1,039 3,429 42.2% OpenTenders 738 1,839 1,852 4,429 54.5% NumberofTendersProcessed Restricted Other Procedures Procedures 2 197 9 16 2 2 13 215 0.2% 2.6% International OpenTenders 7 22 5 34 0.4% Total 1,633 3,587 2,900 8,120 100% Page12of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment 6 2009 BelowThreshold CivilWorks Goods Services Total NumberofTendersProcessed Restricted Other Procedures Procedures 4 217 7 5 3 11 225 0.2% 3.1% OpenTenders 725 1,853 1,252 3,830 52.6% 447 1,154 1,599 3,200 44.0% International OpenTenders 3 5 3 11 0.2% Total 1,396 3,024 2,857 7,277 100% 7.4. The scope of the public procurement market in Albania for the years 2005 through 2009 (actual)and2010(estimate)inbillionsofAlbanianlekisasfollows: INDICATORS 2005 2006 2007 2008 2009 2010 (a) 2010 (b) 1.Operation&Maintenance 24.5 22.8 25.3 28.8 31.8 32.3 37.3 2.Capitalexpenditure,ofwhich: 38.4 51.1 57.0 93.8 105.1 67.4 86.1 2.1Domesticfinanced 24.3 35.4 48.2 82.5 50.2 38.6 59.5 2.2Foreignfinanced 14.1 15.7 22.6 8.8 43.6 28.8 26.6 3.TotalO&M+Capitalexpenditure 62.9 73.9 82.3 122.6 136.9 99.7 123.3 814.8 882.2 966.7 1,087.9 1,143.4 1,242.8 1,242.8 4. GDP 5.O&M/GDP 3.0 2.6 2.6 2.6 2.8 2.6 3.0 6.Capitalexpenditure/GDP 4.7 5.8 5.9 8.6 9.2 5.4 6.9 Source: Ministry of Finance, INSTAT (a)2010Budget(afterdeductingfrozenfunds) (b)MacroFramework2010(Decision7January2010) 7.5. ConsistentwiththePPA’sviewthatitsprocurementresponsibilitiesendwiththeawardofthe procurement contract, the eͲGP platform does not capture any information pertaining to contract management. Consequently, vital information such as changing orders; actual quantitiesofgoodsdelivered;actualamountspaid;andotherrelevantinformationoncontract performance and completion falls out of the scope of the PPA, and rests solely within the purviewofeachgovernmententity.Furthermore,theeͲGPplatformisnotlinkedtothebudget system,forwhichautomaticverificationoftheavailabilityoffundscannotbeeffectedthrough the eͲGP platform as a preͲcondition for initiating a tender process. Although the primary responsibilityforensuringproperavailabilityoffundspriortoinitiatingapurchaseorderrests withtheappropriatelineministryorpublicinstitution,theeͲGPplatformoughttobecomethe primarycontrolforensuringthesufficiencyofbudgetfunds7. 6 Opentendersrepresentedapproximatelyfrom90%Ͳ93%ofthetotalprocurementvalueduringtheyears2007– 2009,whilesmallvaluepurchasesrepresentedapproximately6%Ͳ7%duringthesameperiod. 7 Oneoftheobservationsresultingfromthereviewofprocurementtransactionsreviewedrevealedserious deficienciesinthemanagementandcontrolofbudgetaryappropriationswhicharesubsequentlychanged followingtheapprovalofthepurchaseorder. Page13of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment 7.6. FollowinganindependentauditoftheeͲGPplatformconductedbyKPMGin2008,withaUSͲ AID grant, the PPA commissioned an overhaul of the eͲGP platform in 2009 to implement severalcriticaldeficienciesaffectingdataaccessandsecurity.AhighͲlevelassessmentoftheeͲ GPprocessesandsystemswillbeconductedearlyin2010byanindependentconsultingfirm contractedunderthefinancingoftheWorldBank. 7.7. BasedoncurrentPPA’sestimate,thesheervolumeoftransactionalinformationresultingfrom 2009 procurement processes has almost fully utilized the storage capacity (i.e. archiving capacity).Furthermore,theexistingplatformhasverylimitedquerycapabilitiesanddoesnot take advantage of its ability to store live data to produce information to support decision making. Consequently, along with further improvements to the software to modernize its platformandmakeitmoreuserfriendlyandabletofeedthestrategic planninganddecision makingprocess,itisvitaltoseekamediumͲtermsolutionforthearchivingofdata.Thisinturn, wouldallow forappropriatequantities ofdatatobestored,permitting dataͲminingtooccur, and relieving computer processing resources that are currently absorbed in the processing of transactioninformation. 7.8. Inthisregard,theupcomingauditoftheeͲGPplatformmentionedabove,shouldprovideGOA with the required information to guide the decision making process with regards to future upgradesormodificationsofthecurrentsoftwareandhardwareplatforms. 7.9. Connectivity,whilerelativelygoodatthecentrallevel,itisnotyetconsistentintheinteriorof Albania,whichhinderstheuseofthesystem.Thisisanissuethatshouldbeconsideredaspart of a broader eͲGovernment strategy. However, the consulting team did not find evidence indicating that connectivity in the interior of Albania –while spotty at best – resulted into potentialbiddersbeingexcludedfromparticipatinginpublicprocurementbiddings. 7.10. When the eͲGP platform was designed, its security setup contemplated two profiles only, contracting agency, and PPA. Although according to PPA the eͲprocurement platform has a profileforinternalandexternalauditors,suchprofile–whichhasbeenmodeledaftertheaudit law–canonlybeaccessedoncetheauditorshavecommunicatedandobtainedauthorization fromtheheadoftheinstitution.Consequently,theSSAauditorshavetorequestspecificaccess tothetendersselectedfromtheheadofeachinstitutiontheywishtoaudit.Thisconstitutesan overly cumbersome process and contradicts the practice that both internal and external auditors should have unrestricted access to all transactions (except for the information maintainedinthelockboxcorrespondingtoongoingtenders,duetoconfidentialityreasons)8. 8 AdoptionofanunrestrictedaccessprofileforSAAauditorswouldnecessitateamodificationoftheexistinglaw creatingtheSSA,whichrequirestheSSAtoobtainpermissionfromeachlineministryandpublicinstitutionit wantstoaudit,toaccesstheirsystemsandtransactions.Revisionofthelawishighlyrecommendedtoeliminate aninherentlimitationinthescopeoftheSSAaudits,andshouldspecifythatthePPAshouldguarantee unrestrictedaccesstoSSAauditorsforthemtoproperlydischargetheirprofessionalresponsibility. Page14of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment 8. SupervisionandControl 8.1. As part of its commitment to modernizing its public financial management and procurement systems, on November 6, 2009, the CoM approved the “Policy Paper and Action Plan for the PublicInternalFinancialControlfor2009–2014”(PIFIC). 8.2. ThePIFCrecognizestheneedtoapprove,amongothers,specificlawsinexternalandinternal audit, and the adoption of an internal control framework based on internationally accepted standards,likeC.O.S.O.9intheUS. 8.3. Albaniahasembarkedonanambitiousandchallengingpathtomodernizingitspublicfinancial managementsystem.Whileinitialstepstowardsadoptionofanintegratedcontrolframework and modernization of the internal and external audit functions are beginning to take place, implementation of these changes will necessitate several years to come to fruition, and a considerable effort and resources to support a highly challenging and significant change management process that should not be underestimated since it’s one of the most relevant elementsinensuringthesuccessofthereforms. 8.4. DirectcontrolofthepublicprocurementsystemfallswiththePPA,throughitsmonitoringand oversightfunctions,andwiththeinternalauditfunctionexertedbyeachinstitution,whilethe externalcontrolfunctionistheresponsibilityoftheSSA. 8.5. ThroughanEUfinancedTwinningProgram,thecapacityoftheSSAhasbeenstrengthenedand modernized. This project also supported the strengthening and formal creation in all governmentinstitutionsofaninternalauditfunction.AreviewofreportsissuedbytheSSAand theinstitution’sinternalauditorsintheinstitutionsreviewedbytheAssessmentTeamshowed aratherformalisticapproachfocusedsolelyoncompliance. 9. MarketDevelopment 9.1. Whilethemajorityofcontractorsandrepresentativesfromtheprivatesectorandcivilsociety interviewedduringtheassessmentexpressedafavorableopinionoftheeͲGPplatformandits ability to increase competition, most of them are concerned about the confidentiality of the process and fear that government procurement officials may have access to the contents of bidspriortobidopening,evenifkeptinthelockbox.Whilenoproofofsuchcomplaintswas 9 InternalcontrolframeworkdevelopedbytheTreadwayCommissionoftheCommitteeofSponsoring Organizations,establishedbytheU.S.Congress. Page15of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment offered,oneofthechiefelementscontributingtothisconcerncouldbeexplainedbythelackof acommunicationsstrategyandproactiveengagementwiththeprivatesectorbythePPA10. 9.2. ThefunctionsandresponsibilitieslistedinthePPLforthePPAdonotincludetheengagement of the private sector. Consequently, the PPA does not have funding in its budget to provide trainingtotheprivatesectororstrategytoproactivelyengagetheprivatesectoranddevelopa strongpartnershiptohelpbuildthelocalprocurementmarket. 9.3. Although the Albanian private sector and the civil society have experienced a considerable development,particularlyfrom2006through2009,theirleveloforganizationandengagement with the government sector is characterized by some distrust and perceptions of lack of transparency and corruption. Nonetheless, the 2009 corruption survey published by Transparency International shows a relative improvement for Albania, which moved from position111in2006,to95in2009. 10. LegalFramework 10.1. 10.2. 10.3. Enacted in 2006, Albania’s Public Procurement Law (PPL) provides a comprehensive legal frameworkforpublicprocurement.Ithasbeenfrequentlyamendedinthepastthreeyearsto reflect the provisions of Directive 2004/18/EC of the European Parliament and Council concerning the coordination of procedures for the award of public works contracts, public supplycontractsandpublicservicecontracts.Itsinitialversionwasmodeledonothersources, particularly the UNCITRAL Model Law on the Procurement of Goods, Works, and Services (1994). Its internal organization is still reminiscent of the UNCITRAL11 Model Law, but its substantiveprovisionshavebeensignificantlyamendedtoensuregreatercompliancewiththe AcquisCommunautaire12. ThePPLwasamendedinlate2009tobebroughtintogreatercompliancewiththeprovisionsof EC Directive 2004/17 (Utilities Directive) covering entities that operate the water, energy, transportandpostalservices.ThePPLhasnowbroughtutilitieswithinitsscopeofapplication andincludesimportantprovisionsforsectoralcontracts(Article58).ThePPLalsoprovidesnow forframeworkagreements(Article35).Therationalebehindintroducingthesenewmodalities wastoenhanceefficiencyintheexpenditureofpublicmoneysforgoods,services,andworks. Moreover, review procedures have been brought into greater compliance with the requirements of the EC Remedies Directives (89/665/EEC, 92/13/EEC and 2007/66/EC), establishingaPPCthatwilltakeoverreviewfunctionsofthePPAandbyformallyempowering thePPCtoconducttimelyandeffectivereviewofprocurementcomplaints. 10 PPAisnotlegallyrequiredtoengagewiththeprivatesector. Theinternalstructureofthelawincludingdefinitions,principlesandinstitutionalsetͲupresemblesthe UNCITRALmodellaw http://www.uncitral.org/uncitral/en/uncitral_texts/procurement_infrastructure/1994Model.html 12 ThebodyofCommunitylegislationbywhichallEUMemberStatesarebound.CountriesjoiningtheEUmust haveimplementedtheexistingAcquisCommunautairebythetimeofaccession. 11 Page16of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment 10.4. 10.5. 10.6. 10.7. However, further improvement is advisable. The PPL amendments have not addressed concerns that its provisions on the scope of its application leave room for evasion by stating vaguelythat“othercontractsmayberegulatedbyotherlegislation.”BecausethePPLdoesnot apply to concessions, there is a lingering risk of overlapping between the legal concepts of “concession” and “procurement contract.” A recent amendment based on the directives, whichallowsauthoritiesthediscretionofshorteninguptoamaximumof7daysthetimelimit forrespondingtotendersthatareannouncedelectronicallyrunscountertobestpracticeand theveryconceptoffairopportunityprovidedtobidders13. ThePPLisseenbygovernmentofficialsandusersoftheprocurementsystemashighlycomplex andratherrigid,whichinturnaffectstheoperationalefficiencywithincontractingauthorities. The PPL establishes a highly complex procurement “machine”, the very existence of which makes it difficult to create institutional capacity in the PPA to carry out its regulatory and advisory functions effectively. The inherent complexity of the PPL stems from comments received throughout our fieldͲwork from both contracting authorities and bidders; consideration of the existing organizational structure consisting of 1,700 procurement units; andacomparisontoothercountriesbasedonourcumulativeexperienceinthefield.Further, because of a significant number of amendments and the rather recent shift to adopt almost exclusivelyelectronicprocedures,thePPLinitsentiretycreatestheimpressionthatithasbeen stretchedtoitslimitstoaccommodatevariouspolicyprioritiesandthat,insteadofacoherent whole;itresemblesachangingpatchworkofinitiatives. The PPL is an overarching regulatory umbrella for the operations of about 1,700 contracting authorities. While the PPL in itself simply borrows this structure from the Law on Budget (its appendix lists all the budgetary units of the Government which are in turn considered under the PPL procurement units), the sheer number of contracting authorities in a relatively small country such as Albania with modest human and financial resources makes uniform and effective application of the PPL difficult. Further, while fragmentation and decentralization of authorityregardingprocurementisindicativeofgreaterresponsivenesstogovernmentand/or public needs, it also risks shifting responsibility for decisionͲmaking to low tier government officialswithoutproperaccountabilitylodgedinhighertiersofgovernment. The secondary (or subsidiary) legislation implementing the PLL has also evolved in the right direction.TheAssessmentTeamtakesnoteofseveralCouncilofMinistersDecisionsincluding those establishing the Directorate for Concentrated Procurement, and amending the procurement rules to provide, among others, binding rules for effective eͲprocurement. The subsidiarylegislationincludesmodeltenderdocumentsforgoods,services,andworks.Italso includesgeneralconditionsofcontractsforpublicsectorcontracts. 13 AccordingtothePPA,shorteningoftimeͲlimitsforreceiptofrequeststoparticipateandforreceiptoftenders stipulated in article 43 of the PPL, paragraphs 1, through 7, was implemented based on the directives of the European Community which provide that whenever an eͲprocurement system is used, the contracting authority mayconsideritappropriatetoreducetimeͲlimitsuptoamaximumof7days.TheConsultingTeamisoftheview that such reduction is illͲadvised considering that the use of an eͲprocurement system does not necessarily contribute to reduce the amount of time required by bidders to prepare and submit their offer. In turn, such reductionmayhavetheundesiredeffectofhinderingtheabilityoftheGOAtoobtaingoodvalueͲforͲmoney. Page17of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment 10.8. However,furtherstepsneedtobetakentomakethesecondarytieroflegislationmorehelpful for the implementation of the PPL and more responsive to the very concept of effective and transparent procurement. Despite important amendments to the PPL in 2009, little thought seemstohavebeengiventotheurgentneedtoreflecttheseamendmentsintheprocurement rules.Noamendmentshavebeenissuedasyet.ThePPAhasyettoadoptafullyfunctionaland widely embraced procurement manual which will effectively help contracting authorities and users.Someimportantconceptsusedinthesubsidiarylegislationdonotseemtobeconducive to transparent and effective procurement. To mention one example, the introduction and actual widespread use of the concept of the estimated value of a contract and the so called “ceilingonfunds”(“fondilimit”)inmanyprocurementproceduressetsthestageforpotential forerrorsorabuses. Page18of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment III. MAINFINDINGSANDRECOMMENDATIONS 11. Below there is a summary of the main findings and recommendations. These findings and recommendations are aimed at ensuring that the system fosters better fiscal management and supports the GOA’s objectives. This assessment does not present a traditional action plan, but insteadincludesamatrixofmainfindingsandproposedareasforimprovementandpossibleactions thattheGOAisencouragedtoconsider(seeAnnex1).Thematrixisintendedtoserveasatoolfor the GOA to use in deciding on the actions to be taken, its priorities, and the timing of implementation,therebyleadingtotheformulationofanactionplanforimprovements. 12. All findings and recommendations summarized below, as well as the more detailed version contained in the “Matrix Capacity Action Plan,” Annex 1, have been thoroughly discussed and agreedwiththeGOA,representedbytheDirectoroftheDSDC,whichprovidedoverallcoordination for the assessment, the Director of the PPA, and the Chairman of the PPC. Furthermore, the preliminary draft report, which contents are substantially the same as those of this report, were reviewedandagreedwiththeAdvisoryGroup14. 13. As in many other countries, decision makers in Albania have traditionally viewed public procurementasanadministrative,almostclericalfunction(aseriesofpurchasingevents).However, procurementisnowviewedinternationallyasastrategicgovernmentfunctionthatshouldbeused to promote better fiscal management and to support the government’s development policies. As such, its key objective is not control, but the system’s ability to deliver works, goods and services efficientlyandeconomically,withinarobustframeworkoftransparency,ethics,andaccountability principles. 14. While the Albanian legal framework for public procurement system has undergone significant improvements;thecapacityofitsinstitutions;levelofoperations;marketdevelopment;theinternal controlframework,andtheinternalandexternal controlfunctions,havenotevolvedat thesame pace. Consequently, while certain minor adjustments to the PPL are in order, the Albanian public procurementsystemhastheopportunitytobenefitthemostfromaseriesofactionstowards: x implementingframeworkcontractsforsmallpurchasesandpurchasesofenergy; x discontinuingthepracticeofpublishingthe“limitfund”; x discontinuing the use of a formula to identify abnormally low offers, replacing it with appropriatemechanismstodealwith“lowballing” x simplifyingprocurementprocesses; 14 Advisory Group: group assembled by the UNDP for the purpose of overseeing the performance of the assessment of the public procurement system of Albania. The Advisory Group is formed by the Director of the DSDC,DirectorofthePPA,UNDP,theWorldBank,USAID,EuropeanCooperation,andAustrianCooperation. Page19of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment x modernizingandupgradingtheeͲGPplatform; x enhancing the capacity of the PPA and CAs while significantly simplifying and reducing the currentstructureof1,700CAsthroughimplementingasolidchangemanagementstrategy; x developing a specific job description and career stream for public procurement officials and a trainingstrategytosupportit; x developingandimplementingastrategytoproactivelyengagetheprivatesectorasapartnerin thedevelopmentofamoreefficient,competitive,transparentandethicalprocurementmarket; x fullyintegratingtheprocurementsystemwiththepublicfinancialmanagementsystem; x RevisePPA’srolepertaininginvestigationsoncomplaintsbroughttotheattentionofthePPAV (PPLArticle66); x enhancing the planning function; adopting a common integrated internal control framework; andmodernizingtheinternalandexternalcontrolfunction; x reassesstheworkͲloadofthePPAensuringtheadequacyofitsstructure,stafflevelandbudget, toenableittoproperlydischargeitsvariousresponsibilitiesasrequiredbythePPL;and; x makeofthe2010diagnosticandthecapacitydevelopmentplanacommontoolforprioritizing andcoordinatingthesupportofalldonors.Thisrecommendationentailsdefiningadetailed actionplanwithappropriategoalsandperformanceindicatorsforeachmajortaskandvettingit withthemembersoftheinternationaldonorcommunityandmajorstakeholdersinAlbania,as wellasputtinginplacearobustgovernancestructuretocoordinateandoverseeitsfinancing undera“SWAP”modalityanditsimplementation. Page20of166 AlbaniiaǦReporrtonBencchmarkin ngandDra aftCapaccity 2010 0 A Assessme ent IV. RESULTSFR ROMTHEASSSESSMENTBA ASEDONTHEOECD/DACM METHODOLO OGYFORPUBLIC PROCUREM MENTSYSTEM MS(VERSION4) dicators, supplemented by b the 15. Overaall, the assessment of thee 12 BLI indiicators and itts 56 subͲind assesssment of the e applicable CPIs, C is consisstent with th he various im mprovements introduced to t the PPL and a with the introduction of the eͲGP platform as the sole con nduit of public procuremeent in Alban niasinceJanuary2009. 16. Thetw wographicsb belowdepict theassessed dlevelofthe publicprocu urementsysteemforeacho ofthe fourp pillarsrepresentativeofth heexpected idealcapacittyofapubliccprocuremen ntsystem(Grraphic 1), an nd for each of o the 12 BLLIs (Graphic 2), 2 as of March 2010, ass well as the opportunitiees for impro ovements with respect to the benchmark. Fu urthermore, the graph also showss the impro ovementssincetheprevio ousassessmeentconducted dbytheWorrldBankinJu une2006.Taable2 alsoshowstheasssessedlevelo ofcapacityforreachpillarin ncomparativeformfor20 010and2006. Graphic1–AssesssmentofthePublicProcu urementSyste emofAlbania PillarI 3 2.5 2 1.5 1 0.5 PillarIV Benchm mark PillarII 0 2010 2006 PillarIII Page21o of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Graphic2–AssessmentofthePublicProcurementSystemofAlbania 1 3 12 2 2.5 2 11 3 1.5 1 0.5 10 Benchmark 2010 4 0 2006 9 5 8 6 7 Table2–AssessedLevelofCapacityoftheAlbanianPublicProcurementSystem2006–2009 Pillar 2010 AssessedCapacity 2006 NetChange I. LegalFmwrk. 2.42 Satisfactory 2.25 8% II. Inst.Capacity 1.58 RelativelyLow 0.83 81% III. MarketDvlpt. 1.61 RelativelyLow 1.2 25% IV. Int.&Trpcy. 1.77 RelativelyLow 0.94 79% Page22of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment V. DETAILEDBENCHMARKINGANALYSIS 17. Thissectionprovidesadetailedanalysisoftheassessedlevelofcapacityforeachofthe12BLIsand their 56 subͲindicators, classified under each of the four Pillars that are deemed –by the internationalcommunityͲrepresentativeofthecapacityofapublicprocurementsystem. 18. EachsubͲindicatorisbasedoninternationallyrecognizedbestpracticesinpublicprocurement.The scoringsystemrangesfrom3to0foreachBLIsubͲindicator,with3representingtheideallevelof complianceandperformancewiththestatedstandard.Ascoreof2isforcaseswherethesystem exhibits less than full compliance and performance and consequently necessitates some improvementsintheassessedarea.Ascoreof1indicatesanareawheresubstantiveworkisneeded toattainareasonablelevelofcomplianceandperformance.Aratingof0istheresidual,indicatinga failure to comply with the proposed standard. No decimals are admitted in the scoring of subͲ indicators, while the scoring at the BLI and Pillar level correspond the arithmetical average of the individual scores for each subͲindicator. There is no aggregate scoring for the system as a whole sinceeachPillarreferstoadifferentdimensionofthesystem. 19. Tofacilitatetherelationbetweentheassessmentanalysisbelowandeachoftherelevantfindings statedunderSectionIII.–“MainFindingsandRecommendations”,thematrixcontainedinAnnex1 classifiesallfindingsunderthecorrespondingPillar. PILLARI.–LEGISLATIVEANDREGULATORYFRAMEWORK 20. Alegislativeandregulatoryframeworkisthestartingpointforasoundgovernancesystemandas suchiscoveredthroughPillarIoftheOECD/DACMethodology.PillarIencompassestwoindicators and14subͲindicators,whichhavebeenscoredfollowingascalefrom0to3,asexplainedabove. BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework 1–Publicprocurement legislativeandregulatory frameworkachievesthe agreedstandardsand complieswithapplicable obligations 1(a)–Scopeofapplication ofthelegislativeand regulatoryframework Sinceemergingin1991fromfourdecadesofCommunistrule, and 10 years after devolution into lawlessness, Albania has undergone a remarkable transformation. Aggressive market reforms, government modernization, and active engagement with the international community have brought about NATO membership, a Stabilization and Association Agreement with the European Union (EU), greater freedoms, and better living standards. Expanding at an average rate of 6% per annum, 2 Page23of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework Albania’seconomyisoneofthefastestgrowingintheBalkans. Albania is politically organized as a parliamentary democracy. ThePresidentistheheadofstateandiselectedtoservefora 5Ͳyear term by the Assembly of the Republic of Albania (hereinafter referred to as the Parliament). The President appoints a Prime Minister from the ruling Party. The Prime MinisternominatestheappointeestotheCouncilofMinisters for ratification in the parliament, and thereafter becomes the chairman of, the Council of Ministers. Executive power rests withtheCouncilofMinisters. AlbaniaisaCivilLawcountry.Itslegalsystemincludesits constitution,codes(legislationtheadoptionofwhichrequiresa qualifiedmajorityvoteintheparliament),laws(legislation whichcanbeadoptedbyasimplemajorityvoteinthe parliament),subsidiarylegislationsuchasdecisions,orders, regulations,rules,andinstructionsissuedbytheCouncilof MinistersoraMinistry,decreesissuedbythePresidentof Albania,andcourtdecisionsissuedbytheConstitutionalCourt ortheSupremeCourtwhentheSupremeCourtissues“unifying decisions.” TheConstitutionprovidesforthehierarchy,statusandeffectof legalnorms.Inparticular,Article4declarestheConstitutionis supremewithintheAlbanianlegalsystem.Article122provides thatinternationalagreements,ratifiedbylaw,prevailover incompatiblelawsofAlbania.Article116oftheConstitution providesthat:“normativeactsthatareeffectiveintheentire territoryoftheRepublicofAlbaniaare:a.Constitution;b. ratifiedinternationalagreements;c.laws;d.normativeactsof theCouncilofMinisters.” Article118providesthatalawmayspecifythatanorganhas thecompetencetomakedelegatedlegislationonspecified mattersaccordingtospecifiedprinciples,butthatorgancannot furtherdelegatesuchcompetence.Otherwise,rulesissuedby theCouncilofMinisters,ministriesandcentralstate institutions,andordersofthePrimeMinister,areonlybinding onsubordinateadministrativeentitiesandmaynotserveasthe Page24of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework basisfortakingdecisionsthataffectindividualsandother subjects(Article119). AstheConstitutiondeterminesthehierarchyofnormsitisnot necessarytoindicatespecificallyinalawthatitisincompliance withtheConstitution,asthiswillnormallybetreatedasselfͲ evident.However,thetextofdelegatedlegislationshould specifythelegalauthorityunderwhichitismade. Alaw,afterapprovalintheParliament,ispromulgatedbythe PresidentoftheRepublic,andentersintoforce15daysafterits publicationintheOfficialGazette. ThefoundationofAlbania’slegalframeworkintheareaof publicprocurementisLawno.9643onPublicProcurement (PPL),whichwasadoptedon20November2006andentered intoforceon1January2007,replacingthePublicProcurement Lawno.7971whichhadbeeninforcesince1995.ThePPLwas furtheramendedinOctoberof2009.ThePPLisbasedmainly ontheprovisionsofDirective2004/18/EC,butitalsoreflects influencesfromothersources,suchastheUNCITRALModel Lawonpublicprocurement,theWorldBankguidelinesandthe WTOGovernmentProcurementAgreement(GPA). OnthebasisofthePPL,theCouncilofMinistersadopted implementingregulationsintheformofDecisionno.1dated 10January2007OntheRulesofPublicProcurement,amended mostrecentlyon25May2010.Theseregulationsamplify, clarify,andimplementthelegalframeworksetoutinthePPL. In essence, the PPL and its implementing legislation sets up a procurement system that consists of a central Public Procurement Agency (PPA) with a regulatory/oversight function, approximately 1,700 functionally independent procurementunitsatcentralandlocallevelsofgovernment,a directorate for concentrated procurement on behalf of the Executive Branch, a Public Procurement Commission (PPC) (a bodythatreviewsandmakesdeterminationsonadministrative complaints);andaPublicProcurementAdvocate(PPAD),anonͲ bindingombudsmanwhoprovidesadviceandguidance. Page25of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework ThePPLwas amendedinlate2009to bebroughtintogreater compliance with the provisions of EC Directive 2004/17 (Utilities Directive) covering entities that operate the water, energy,transportandpostalservices.ThePPLhasnowbrought utilities within its scope of application and includes important provisions for sectoral contracts (Article 58). The PPL also provides now for framework agreements (Article 35). The rationale behind introducing these new modalities was to enhance efficiency in the expenditure of public moneys for goods,services,andworks. Moreover, review procedures have been brought into greater compliance with the requirements of the EC Remedies Directives (89/665/EEC, 92/13/EEC and 2007/66/EC), establishing a PPC that will take over review functions of the PPA and by formally empowering the PPC to conduct timely andeffectivereviewofprocurementcomplaints. In order to place recent changes in proper context, our assessmentfollowedupontherecommendationsoftheWorld Bank Country Fiduciary Assessment of August 2006 (page 19). While great effort has been placed to bring the PPL into compliancewiththedirectives,theAssessmentTeamnotesa few recommendations that have not been formally incorporatedintothePPL,suchas: x definingemergencyandforcemajeure; x definingnonͲdiscrimination; x providing for selection of consultants for service contractsonthebasisoftechnicalqualificationsalone; and, x providinganopportunitytodebarredpartiestoprotest thedebarment. The Assessment Team recognizes that the above recommendations were made in the context of an older and significantly different legal framework. It also recognizes that definitionsmayhavebeenprovidedinotherlaws.However,for purposes of ensuring responsiveness and continuity, it encourages thePPAto addaspecific referenceto suchother lawsonthePPA’swebͲsite. ThePPL’sscopeisextensive.AsstatedinitsArticle1,thePPL Page26of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework setsouttherulesapplyingtotheprocurementofgoods,works, and services. Some public contracts are exempted: defense contracts; secret contracts or contracts requiring special security measures; contracts regarding financial services, arbitration services, or broadcasting services; as well as contractswhicharegovernedbyagreementswithotherstates orinternationalorganizations(Articles5,6,7,and8ofthePPL). Albanian authorities have yet to address earlier concerns, raisedbytheWorldBankandSigma(ajointinitiativeoftheEU and the OECD), that PPL’s provisions and the scope of its application,allowsevasionandloopholes.Forexample,thePPL in its Article 4, states vaguely that “other contracts may be regulatedbyotherlegislation.”Althoughthislanguageisbased ontheDirective,theDirectiveisconsideredasastartingpoint, and not necessarily indicative of international best practice. GiventhefactthatthePPLdoesnotapplytoconcessions,there isalingeringriskofoverlappingbetweenthelegalconceptsof “concession”and“procurementcontract.” WetakenotethatamendmentstotheLawonConcessionsare in the process of being developed and adopted and that they would purportedly resolve this concern. However, as of now thegoverninglegalframeworkislackinginthisregard. TheAssessmentTeam,throughitsconsultations,foundthatthe PPL is considered by officials and users of the procurement system as highly complex and rigid, which in turn affects the operational efficiency within contracting authorities. Indeed, the PPL establishes a highly complex procurement system, which makes the creation of institutional capacity in the PPA difficult and impacts its ability to carry out its regulatory and advisoryfunctionseffectively.Further, becauseofasignificant number of amendments and the recent shift to adopt almost exclusivelyelectronicprocedures,thePPLattimescreatesthe impression that it has been stretched to its limits to accommodate various policy priorities and that, instead of a coherentwhole,itresemblesapatchworkofinitiatives(though theymaybecommendable). As noted above, the PPL provides a framework that regulates the day to day activities of 1,700 contracting authorities defined in the Budget Law (its appendix lists all the budgetary units of the Government which are in turn considered under Page27of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework 1(b)–Procurement the PPL procurement units). The sheer number of contracting authoritiesdoesnotseemcommensuratewiththeconstraints of a relatively small country with limited human and financial resources. Such overly heavy organizational structure makes uniform application of the PPL extremely difficult and unnecessarily costly. To underscore the significance of this point, if the average number of employees per procurement unitis3(asrequiredbyCouncilofMinisters’DecisionNo1of January 10, 2007, On the Rules of Public Procurement, amended most recently on 25 May 2010, Chapter V, Article 1(b)),thenthePPLrequiresapproximately5,100employeesfor its effective operation, a staggering number and cost given Albania’ssizeandresources. Whilethisisapolicyconcernthatdoesnotnecessarilyrelateto the formal soundness of the procurement legislation, it is emphasized because it has ramifications for the effective implementationofthePPL,andbecauseitdoesaffectthelongͲ termviabilityofthesystemandthecoreprincipleofeconomy intheuseofpublicresources. Further, fragmentation and decentralization of authority regardingprocurementisindicativeofapolicydecisiontowards greater responsiveness to government or public needs. Legislators should be aware that this decentralization of authoritycouldalsoshiftresponsibilitytogovernmentofficials at lower tiers, without proper accountability lodged in higher tiers of the bureaucracy. It is unclear whether policy options were analyzed or whether regulatory impact analyses were conducted that would clearly present arguments and counterargumentsinfavororretainingthiscomplexsystemor streamlining it. This is another policy concern that does not necessarily relate to the formal soundness of the PPL but that could have a negative impact on the integrity and accountabilityofthepublicprocurementsystem. Access to legislation is reasonably good. Applicable legislation may be accessed for free though the PPA’s website (https://www.app.gov.al/), as well as though the online database of the Office of Official Publications (http://www.qpz.gov.al/). The PPL sets forth 5 different procurement methods: open, 3 Page28of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework methods restricted,negotiatedwithorwithoutpublication,requestsfor proposals, and design contests (Article 29). Although not yet operational,thePPLalsoprovidesforelectronicreverseauction andthedynamicpurchasingsystem(Article37). The PPL explicitly provides that the open procedure is the defaultprocedure.(Article30).Restrictedproceduresaretobe used when necessary to distinguish between a phase dealing with qualifications and a phase dealing with the actual responsiveness of the offer (Articles 29, 30). The use of a negotiated procedure with or without prior publication is intended to be exceptional. However, even under the application of the negotiated procedure without prior publication,thelawcallsforobtainingquotationsfromatleast 5 economic operators. This in turn entails a competitive process15. The requirement for publication depends on how the value of the contract relates to the high or the low value thresholds (Article31).Thehighvaluethresholds(Article27)arecurrently set by secondary legislation at 1,200,000,000 ALL for public works and 200,000,000 ALL for goods and services (Council of Ministers’ Decision No 1 of January 10, 2007, On the Rules of PublicProcurement,amendedmostrecentlyon25May2010). Thelowvaluethresholdsarecurrentlysetat12,000,000ALLfor publicworks,and8,000,000forgoodsandservices(Councilof Ministers’ Decision No 1 of January 10, 2007, On the Rules of PublicProcurement,amendedmostrecentlyon25May2010). Article 29.5 of the PPL and Chapter VI 2) provides for small value purchase, as a simplified procedure, such simplification still requires appointment of a special commission of 3 membersandtoobtainatleast“ …threeindicationsofpricesof goods or services.” Consequently, neither the PPL nor its subsidiary legislation provide for the purchase of low value 15 A review of tenders performed at the government electricity producing corporation KESH, for purchasesofenergyfromneighboringcountries,showedthatuseofthenegotiatedprocedureentailed a competitive process and also yielded lower prices than those obtained through open international tenders. Page29of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework items or small purchased through direct contracting under petty cash accounts. This omission appears unwarranted and may lead to situations in which authorities have to incur needless administrative costs for purposes of implementing cumbersome procurement procedures for minor purchases. Additional subsidiary legislation for purposes of fully implementing the PPL provisions on framework contracts (see below)mayprovideasolutionfortheneedtoefficientlyhandle smallpurchasesbyspecifyingthatframeworkcontractsmaybe used,among,otherforpurposesforsmallpurchases. ChapterIVofCouncilofMinisters’DecisionNo1ofJanuary10, 2007, On the Rules of Public Procurement, amended most recently on 25 May 2010) is unambiguous in assigning responsibility at an appropriate level for the use of a specific procedure (the head of the Contracting Authority or his/her assignee). Article 28 of the PPL specifically prohibits the fractioning of contractsasameansofbypassingcompetition. Article 58 provides comprehensive umbrella rules and procedures for procuring sectoral or framework contracts. However,Article58/3–whichwouldseemtoexcludefromthe application of the PPL sectoral contracts for the resale and lease to third parties of, inter alia, energy, water, transportation and postal services – is vague and likely to generate problems in implementation. Also, Article 58/6 provides for an unnecessary exclusion from the scope of applicationofthePPLforpurchasesofenergy,fuelsandwater if such goods are used for the production of energy. It should be noted that while the definition adopted by the PPL is the sameasthatincludedintheDirective,inclusionofthiswording in the Directive assumes there is a separate legislation regulating public utilities and their procurement, which is not thecaseinAlbania. Broadlyspeaking,publicprocurementunderthePPLisopento foreign companies. The law is based on the principles of nonͲ discrimination and national treatment for any economic operator. 1(c)–Advertisingrulesand The legislative framework (both the PPL and the secondary 2 Page30of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework timelimits legislation) provide clear rules and criteria related to, and indeedrequire,thepublicadvertisingoftendersinaccordance withspecifiedtimelimitsofasequenceofsteps. Article38ofthePPLprovidesthatnoticesforcontractsvalued above the highͲvalue thresholds must be published in the Public Procurement bulletin as well as a newspaper of wide circulationinEurope.Italsoprovidesthatnoticesforcontracts valued below than the high value thresholds but higher than the low value thresholds must be published in the Public Procurement Bulletin. The Public Procurement Bulletin produced in Albanian only and is accessible for free at: https://www.app.gov.al. In the case of open procedures above the high value thresholds,theminimumtimelimitforsubmittingtendersis52 daysfromthedateofpublicationofthecontractnotice(Article 43ofthePPL). Article43ofthePPLalsospecifies,amongother,thefollowing timelimits: a. for requests to participate, 20 days from the date of publication of the contract notice for restricted or negotiated procedures with publication valued above thehighthreshold; b. forreceiptoftenders,20fromthedateofsendingthe invitationforrestrictedprocedures; c. for receipt of tenders, 30 days from the date of publicationforopenproceduresbetweenthehighand lowvaluethresholds; d. for requests to participate, 15 days from the date of publication of the contract notice for restricted or negotiated procedures with publication valued betweenthehighandlowthresholds; e. forreceiptoftenders,15daysfromthesendingofthe invitationforrestrictedproceduresvaluedbetweenthe highandthelowthresholds. Article43alsoprovidesforareductionby7daysinthecaseof the52daytimelimitorthe30daytimelimit(describedabove) if electronic means are used. Although such reduction was implemented based on the directives, it should be mentioned Page31of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework 1(d)–Ruleson participation that the directives do not “mandate” an across the board reductionoftimeͲlimitsby7days,butrecognizetheabilityfor the contracting authority to reduce timeͲlimits up to a maximumof7days.TheAssessmentTeamviewsthisprovision as illͲadvised. The purpose of the time limits is to ensure that biddershaveadequatetimetorespondtoatender.Whilethe introductionofeͲprocurementmayarguablymakeiteasierfor authoritiestoevaluatetenders,itdoesnotnecessarilymakeit easierforbidderstorespondtoatender. As a consequence, bidders may not have appropriate time to preparetheirbidsandthiscouldresultintotheGOAnotbeing abletogetrealvalueͲforͲmoneythroughpublicprocurement. Also, the 52 day minimum specified in Article 43 of the PPL is impracticalandincompatiblewithproceduresusedforsectoral contractsunderArticle58ofthePPLandparticularlythosefor the purchase of energy. The PPL needs to be amended to provideformorerealisticminimumperiodsthatareapplicable toproceduresforsectoralcontracts. Article 39 of the PPL provides the main criteria regarding contract notices. Chapter III, Article 2(a) of the Council of Ministers’ Decision No 1 of January 10, 2007, On the Rules of Public Procurement, amended most recently on 25 May 2010 specifies comprehensive requirements for notices of contract awards. Article45ofthePPLprovidesreasonableexclusioncriteriafor prospective bidders. These include: criminal convictions, professional misconduct, insolvency, and failure to pay taxes. Article 46 of the PPL provides rules about the qualification of bidders.ExceptforParagraph1(b)ofArticle46whichprovides for qualification on the basis of technical ability, which may createanopeningforarbitrariness,therulesareintendedtobe nonͲdiscriminatoryandtoencourageparticipationbysmalland medium enterprises. They also, to the extent, possible favor pass/fail type criteria. The Consulting Team recommends GOA tofurtherrefineapplicablecriteriainthesecondarylegislation. The rules are also intended to be proportionate to the nature and size a contract to be awarded. Article 47 of the PPL 2 Page32of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework 1(e)–Tender documentationand technicalspecifications providesthedisqualificationcriteria.Ourreviewhasnotfound any provision or legal instrument that would seem to favor participation by government owned or controlled economic operators. Onepointofconcernisthatwhilegroundsfordebarmentseem by and large clear, neither the PPL, nor the subsidiary legislation provide the applicable administrative rules or procedures as to how debarred parties can appeal the debarment. Debarment procedures are contained in the Administrative Code. However, for sake of transparency and completenessofinformation,theConsultingTeamencourages PPAtoincludeaspecificreferencetotheAdministrativeCode inthePPA’swebͲsite. Also, the Consulting Team underscores the fact that while the overarchingrulesonparticipationandqualitativeselectionare generally adequate and nonͲdiscriminatory from a normative pointofview,thesupportingsecondarytieroflegislationis,in certain instances, vague and creates room for potential errors orabuse. Article 41 of the PPL provides that each CA will use standard bidding documents (SBDs), as provided by the public procurement rules. SBDs are available for download from the PPA’swebͲsiteandtheiruseismandatorybyallCAs. Article42ofthePPLprovidestheframeworkforclarifyingand modifying tenders. Article 13 of the PLL states that the PPA should favor the use the international standards in the preparationoftechnicalspecifications. CouncilofMinisters’DecisionNo1ofJanuary10,2007,Onthe Rules of Public Procurement, amended most recently on 25 May 2010 establishes in Chapter III the minimum tender documentsbyenumeratingelementsofageneralandspecific nature. ChapterV,Article2oftheCouncilofMinisters’DecisionNo1of January 10, 2007, On the Rules of Public Procurement, amended most recently on 25 May 2010 specifies the rules governingthepreparationoftechnicalspecifications.According to it, each Procurement Unit is responsible for drafting the 3 Page33of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework 1(f)–Tenderevaluation andawardcriteria technicalspecificationsexceptincaseswhereitlacksexpertise. Inthesecases,thetechnicalspecificationsaredraftedonbehalf oftheContractingAuthoritybyspecialistswithinorwithoutthe ContractingAuthority. Article 23(3) specifically states that the use of international standardsand,intheirabsence,otherstandards,isencouraged when preparing tender specifications. While this general principleiscommendable,theConsultingTeam’sreviewshows that these provisions necessitate of further guidance and clarificationinthePublicProcurementRules. Articles53and54ofthePPLprovidethegeneralrulesforthe evaluation of tenders. These rules make possible, in principle, the submission of alternatives if a Contracting Authority does notreceiveeconomicallysoundtenders.ChapterV,Article4of theCouncilofMinisters’DecisionNo1ofJanuary10,2007,On theRulesofPublicProcurement,amendedmostrecentlyon25 May 2010 provides more detailed rules that must be made publicinadvanceofthetenderevaluation.Thesedetailedrules are largely sound. Although technical criteria for tender evaluation are of the pass/fail nature, the low level of institutionalcapacityandtheoverallcomplexityofprocedures warrant greater specificity. This could be achieved through a revisionoftheProcurementRegulations. Article 58 of the PPL specifies the procedures for awarding sectoral contracts. These procedures are compatible with the AcquisCommunautaireandgenerallysound. ChapterVI,Article3oftheCouncilofMinisters’DecisionNo1 of January 10, 2007, On the Rules of Public Procurement, amendedmostrecentlyon25May2010providesstepͲbyͲstep rules for contracts for services. These rules sufficiently distinguishbetweenthetechnicalandmonetaryaspectsofthe evaluation process by providing for a pointsͲbased, twoͲtier evaluation process, the first tier of which focuses on the technicalproposalandthesecondtierofwhichfocusesonthe costproposal. Article 56 of the PPL provides the framework for dealing with abnormally low tenders. Chapter V, Article 4(ë) of the Council 2 Page34of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework 1(g)–Submission,receipt andopeningoftenders ofMinisters’DecisionNo1ofJanuary10,2007,OntheRulesof Public Procurement, amended most recently on 25 May 2010 provides the rule for assessing whether an offer is abnormally low. According to this provision, an offer is abnormally low when it is greater than the arithmetical median of all the discounts (difference from the ceiling price) of all remaining offersplusonefifthofthatdifference16. This rule is inappropriate since it artificially produces an abnormally high number of abnormally low offers even in situations where the supposedly abnormally low price would appearnormalonitsfaceandineffect. Although not included in the PPL, Chapter 3, 2Ͳa) of the subsidiarylegislationrequirespublicationoftheestimatedfund foraparticularprocurementinthe“contractnotice.”Areview of a sample of tender processes at 10 contracting authorities, encompassing approximately 40 tenders, shows that the maximum fund available is always provided in the tender documents made available to bidders. This practice should be discontinued because not only it encourages bidders to bid artificially low amounts and therefore decrease the quality of the goods, services, or works they provide but also when combinedwiththetechnicalspecifications,itcanbeeffectively usedtofavoraspecificsupplier.Thepracticeofpublishingthe maximum limit funds deprives the public authorities from obtainingbestvalueinprocurementandmayleadtoadditional administrative costs. Such change would be best effectuated throughanamendmentoftheCouncilofMinisters’DecisionNo 1 of January 10, 2007, On the Rules of Public Procurement, amendedmostrecentlyon25May2010. Articles 48 through 52 of the PPL provides the general criteria forsubmittingtenders,verifyingreceipt,preservingthesecurity oftenders,modifyingandwithdrawingtenders,andopeningof tenders. 3 16 Forexample,ifthefundlimitis750,000lek,andfiveoffersarereceivedasfollows:749,950;749,000;749,400; 748,900;and,745,000;theformulawouldcalculateandcomparethefollowingfactors:Averagepriceoffered (749,950+749,000+749,400+748,900+745,000)/5=748,450lek;Differencewithfundlimit=(750,000–748,450)= 1,550lek;factor=(1,550+1/5*1,550)=1,860;differencebetweenlowestpriceandfundlimit=(750,000Ͳ745,000) =5,000;thenif5,000isgreaterthan1,860,offerof745,000lekisofabnormallylowprice.However,therelative differencewithrespecttothelimitfundisonly0.6%. Page35of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework 1(h)ͲComplaints ThesegeneralcriteriaareamplifiedinChapterVoftheCouncil ofMinisters’DecisionNo1ofJanuary10,2007,OntheRulesof Public Procurement, amended most recently on 25 May 2010. This Chapter provides stepͲbyͲstep rules for submitting and opening tenders. They outline a defined and regulated proceeding for opening tenders and require that the modality ofsubmissionbespecifiedclearlyinadvanceofthesubmission. (In the overwhelming majority of cases, this is a rather moot point, as tenders are conducted by using the eͲprocurement platform).Therulesarealsoclearanddetailedonthedutyto maintainadequaterecordsoftheproceedings. One point of some concern is that while the subsidiary legislation provides that members of an evaluating committee must sign statements to the effect that no conflict of interest would arise by their participation in the evaluation process, there is no explicit language which would require that during theevaluationperiod,informationrelatingtotheexamination, clarificationandevaluationoftendersmustnotbedisclosedto the participants or to others not involved officially in the evaluation process. While the provisions of Article 21.1 of the PPL might make this point seem redundant, the Consulting Team’s view is that it needs to be clearly stated in applicable legislation17. The PPL unambiguously establishes a right of review of decisions made by Contracting Authorities or the PPA. The 2009 amendments to the PPL have established a twoͲtier complaintsreviewsystem. The first tier is intraͲsystemic. An aggrieved party may file a complaint with a Contracting Authority within 7 days of becoming aware of the alleged irregularity (Article 63 of the PPL).ACAmustreviewthecompliantandmakeadecisionon its validity within 7 days of receipt of the compliant, a period during which the award of the contract is suspended. If the complainantisnotsatisfiedwiththedecisionoftheContracting 3 17 PPLArticle21.1“TherelevantinformationrecordedbytheCAaccordingtoArticle12ofthePPLshall,on request,bemadeavailabletoanyinterestedpersonafteratenderhasbeenawarded,orafterawarding procedureshavebeenterminatedwithoutresultinginaprocurementcontract.Suchrequestmaybesubmitted anytimeandtheCAisobligedtomaketheinformationavailablewithin5daysfollowingthereceiptofarequest.” Page36of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework authority,s/heoritsauthorizedagentmayfileacomplaintwith thePPCwithin7daysofthedecisionmadebytheContracting Authority. Complaints with the PPC follow the extraͲsystemic tier in that the PPC is an independent agency tasked with administrative review authority over procurement decisions. It decisions are finalontheadministrativelevel,butsubjecttojudicialreview. Its decisions can be appealed in the District Court of Tirana (a first level court) which, in such a case, would have original subject matter jurisdiction over the dispute. Article 64 of the PPLdescribesPPC’sscopeofauthorityandthemattersthatare subjecttoreviewbythePPC. Additionally, thePPLgivesthePPAtheauthoritytoinitiatean administrative investigation in all cases where it determines thattherehasbeenaviolationofthePPL(Article66). The latter generates an inconsistency and a potential conflict withtheintentofthePPLthatallcomplaintsbedecidedbythe PPC.TotheextentthatthePPAretainstheauthoritytodecide ontheperformanceofanadministrativeinvestigationandsince onlythosecomplaintsthatareexpresslyfiledtothePPCbyan economicoperatorwouldbereviewedbythePPC,thePPAmay receiveacomplaint directlyfromthe CAorfromaneconomic operatorwhodoesnotliketodeposittherequired10%ofthe amountofthecontractvalue. At the time of finalizing the wrapͲup mission for this assessment,RulesofProcedureofthePPCwerebeingdrafted, andassuchtheiranalysishavenotbeenincludedaspartofthis assessment. To understand the significance of the 2009 amendments, it is necessary to summarize the essence of the EC Remedies Directives (89/665/EEC, 92/13/EEC and 2007/66/EC). The original remedies directives date from 1989 as to supply contracts (89/665/EEC), and 1992 as to utilities (92/13/EEC). Thecurrentversions(the“RemediesDirectives”)resultedfrom updates adopted in 2004: Directive 2004/18/EC, applicable to contractsforpublicworks,supplies,andservices,andDirective 2004/17/EC, applicable to contracts in the water, energy, transport, and postal sectors. Those directives provide means Page37of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework bywhichparticipantsinpublictenders(“economicoperators”) couldseektoenforceEuropeanlawonpublicprocurementby challengingtheactionsofpublicauthorities.Theircornerstone is the requirement that each EU Member State establish a meansoflegalredressbeforeacourtoradministrativetribunal. On December 20, 2007, the European Parliament and Council of Ministers published a longͲawaited directive to enhance remedies available to disappointed bidders in public tenders conducted by any of the 27 members of the European Union (2007/66/EC)(the“NewDirective”).Thisdirectivewasdesigned to make existing remedies for violations of competitive procurement procedures more viable. The New Directive supplemented and amended preͲexisting directives on procurement remedies by requiring a “standstill” period of 10 calendar days after bidders are given notice of the award decision, including a summary of reasons. This will enable a disappointedvendortoinitiateachallengeintimeforthecourt or administrative tribunal to preserve the status quo by forbidding execution of a contract pending legal review. In cases of “urgency,” a Member State may limit the initial standstill to seven calendar days; however, this period is extendedbyanadditionalthreedaysifacompanynotifiesthe procuringauthoritywithintheinitialsevendaysofitsintentto protest.Toensurethatpotentialchallengerscanconsidertheir optionsduringthestandstillperiod,thedeadlineforrequesting legalreviewcannotbelessthan10daysafternoticeofaward. In cases of “extreme urgency,” as defined by the Remedies Directives,nostandstillperiodapplies.Inordertopermitaction within these tight timeframes, contracting and review authorities are required to accept notice of review by fax or electronic medium (eͲmail). Member State procedures may require companies to bring their complaints first to the procuringauthority,beforeseekingreviewbytheindependent tribunal required by the Remedies Directives. In the event the procuring authority rejects the protest, however, there is an additional standstill period of five working days after the authority issues its decision. During that period, the aggrieved companymayinitiatereviewbytheindependenttribunal. TheConsultingTeam’sreviewofthe2009amendmentsshows that the PPL has been brought into greater (albeit not full) compliance with the Acquis Communautaire. It should be pointed out that – despite a Stabilization and Association Page38of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework 2–Existenceof ImplementingRegulations andDocumentation 2(a)–Implementing regulationthatprovide definedprocessesand proceduresnotincludedin higherͲlevellegislation 2(b)–Modeltender documentsforgoods, works,andservices 2(c)–ProceduresforpreͲ Agreement with the European Union – Albania is at present under no obligation to ensure full compliance. The 2009 amendments are decidedly a noted improvement in Albania’s legislativeframeworkforpublicprocurement. Regulations implementing the PLL (Council of Ministers’ Decisionsarelargelycomprehensive.Theoverwhelmingbulkof them (albeit not everything – a notable exception being the very Council of Ministers’ Decision that establishes the DirectorateforConcentratedProcurement)areconsolidatedin theCouncilofMinisters’DecisionNo1ofJanuary10,2007,On theRulesofPublicProcurement,amendedmostrecentlyon25 May 2010. A set is available on the website of the Public ProcurementAgency. Such regulations have been updated regularly. However, because of frequent amendments and the fact that they were not completely consistent with one another, and considering the number of tertiary legal instruments that are required to make them fully functional, regulations are neither optimally organized hierarchically, nor wellͲstructured formally. Further steps are advisable to make such regulations more helpful for theimplementationofthePPLandmoreresponsivetothevery conceptofeffectiveandtransparentprocurement. Modelinvitationandtenderdocumentsforanextensiverange ofgoods,works,andservicesprocuredbygovernmentagencies have been adopted. They are available at: https://app.gov.al/ep/BiddingDocuments.aspx. The PPA has adopted a set of standard, obligatory set of templatesthatareconsistentwithapplicablelegislation.These templates are to be used when preparing documents used in competitivetenderprocesses. Responsibility for drafting and regularly updating such model documents has been assigned to the PPA (Article 13.2 of the PPL). The subsidiary legislation (consolidated in the Council of 2 3 2 Page39of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework qualification Ministers’ Decision No 1 of January 10, 2007, On the Rules of PublicProcurement,amendedmostrecentlyon25 May2010) provides rules on designing and implementing procedures for preͲqualification. Chapter III, Article 3 provides limitations on the content of the procedures for preͲqualifications in works, goods,andservicescontracts. While not explicit about the use of pass/fail type qualification criteria, this legal instrument is aimed at supporting and favoringtheuseofsuchcriteria. The subsidiary legislation also provides guidance on the applicationofpreͲqualificationcriteria(SeeChapterIII,Article3 andChapterV,Article2). However, while the Consulting Team’s assessment of the procedures for preͲqualification in subsidiary legislation shows that these procedures are largely sound, it should be pointed out that greater definition and specificity on the nature and circumstances of use of such procedures is warranted. What would otherwise be deemed reasonable legislative principles areattimes improperlyappliedtoproducescenariosinwhich seemingly qualified bidders end up being unfairly disqualified fromcertainprocurementactions18. ChapterVIoftheCouncilofMinisters’DecisionNo1ofJanuary 10, 2007, On the Rules of Public Procurement, amended most recently on 25 May 2010 provides rules for procedures governing the procurement of consulting services (Article 3) and design contests (Article 4). These rules pay adequate attention to how technical capacity is to be evaluated. These rulesallowforascoredevaluationoftechnicalcapacity,aswell asforacombinationofpriceandtechnicalcapacity. Our assessment shows that these rules do not allow for selection on the basis of technical qualifications alone. SubͲ 2(d)–Proceduressuitable forcontractingforservices orotherrequirementsin whichtechnicalcapacityis akeycriterion 2 18 In one instance, the Consulting Team observed that a CA had placed a turnover requirement as a pre-qualification criterion for a bidder that was equal to the value of the contract. The procurement involved purchasing automobiles. The explanation provided was that the CA had applied the principle of proportionality per Article 46 of the PPL. Given the nature of the procurement and the relatively low risk on the part of the government, this rule on qualitative selection was applied in a discriminatory manner. Page40of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework 2(e)–User’sguideor manualforcontracting entities 2(f)–GeneralConditionsof Contracts(GCC)forpublic sectorcontractscovering goods,worksandservices consistentwithnational requirementsand,when applicable,international requirements indicator 2 d) states that the legal framework should provide for conditions under which selection based exclusively in technical capacity is appropriate. While the law specify conditionswherethedecisionwillsolelybebasedontechnical considerations,thisinpracticedefaultsintheuseofaweighted evaluationcriteriathatassignsatleast30%toprice. Ourassessmentalsoshowsthattheserulesarenotadequately clearontheproceduresandmethodologiesforcombiningprice andtechnicalcapacityunderdifferentcircumstances. ChapterXIoftheCouncilofMinisters’DecisionNo1ofJanuary 10, 2007, On the Rules of Public Procurement, amended most recently on 25 May 2010provides that the PPA is tasked with producing user’s guide and manuals, as well as organizing capacity building activities for purposes of the effective implementationofthePPL. A Guide on Procedures for Public Procurement was produced byaUSAIDͲfundedprojectin2007andadoptedbythePPA.Itis available for consult on the PPA’s website at: https://app.gov.al/ep/ProcurementManuals.aspx. It seems, at thetimeofproductionandadoption,thisGuidewasadynamic document that produced tangible information for users of the publicprocurementsystem. However, this Guide has not been update to reflect the important legislative and regulatory changes that have been adoptedsince2007anditthereforeoflittleornousetousers. Our assessment did not identify any specific evidence of ongoingeffortstoproduceanupdatedmanualorguide. ThereareGeneralConditionsofContractthatincludethemain provisions to be included in contracts for goods, works and services with the Government of Albania. These General Conditionsareavailableat: https://app.gov.al/ep/BiddingDocuments.aspx. While the legal partoftheConsultingTeam’sanalysisshowsthattheseGeneral Conditionsmaybearticulatedmoreclearlyandthewordingof contracts, in general, may be more clear, these General Conditions of Contracts are generally in keeping with reasonably sound applicable legislation and reflect key provisions of the law that have a bearing on the contractual 2 3 Page41of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarI–LegislativeandRegulatoryFramework performanceoftheparties. To briefly illustrate, the General Conditions of Contract for Works procured in an open procedure include clauses on corrupt practices and conflict of interest confidential or proprietary information, intellectual property, origin of goods, obligations of each party, communications, insurance, reporting, curing defects, warranties, payment, force majeure, amendments, conflict resolution, etc. Other types of contracts include similar General Conditions. We find these General Conditions to be comprehensive and compatible with internationalbestpractice. TheGeneralConditionsarecomprehensiveand–byandlarge– consistent with international best practices such as the use of clausesonavoidingconflictsofinterest,protectingintellectual property rights, and amending the agreement. One point of concern,however,isthattheseGeneralConditionsofContracts contain no provisions on alternative dispute resolution mechanisms as a method of avoiding costly litigation and promotingefficiency. PillarII–INSTITUTIONALFRAMEWORKANDMANAGEMENTCAPACITY 21. PillarIIfocusesonhowtheprocurementsystem,asdefinedbythelegalandregulatoryframework, isactuallyoperatinginpractice. 22. PillarIIencompasses3indicatorsand12subͲindicatorstoassesstheinstitutionsandmanagement systemsthatareintegralpartoftheoverallpublicsectorgovernanceofthecountry.Thefollowing table summarizes the result of the assessment of the 12 subͲindicators which have been scored followingascalefrom0to3,asexplainedabove. BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarII–InstitutionalFrameworkandManagementCapacity 3ͲThepublicprocurement systemismainstreamed andwellintegratedinto thepublicsector governancesystem 3(a)–Procurement planningandassociated Currently,procurementplanningisnotfullyintegratedintothe budget formulation process, and budget availability continues 2 Page42of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarII–InstitutionalFrameworkandManagementCapacity to be the main focus of procurement plans instead of the prioritization of institutional needs aligned with strategic governmentobjectives. Overall,timingforbudgetformulationhasnoticeablyimproved with regards to the 2010 budget, but links between procurement plans and strategic objectives are lacking, and links between multiyear estimates and subsequent setting of budgetceilingscontinuetobeunclear. A review of a sample of contracts shows that payments are 3(b)–Budgetlawand processed with significant delays due to a lack of available financialprocedures supporttimelyprocurement funds.Thissituation,whichdirectlyaffectsdevelopmentofthe local procurement market and puts local firms at peril, is contractexecution,and payment compounded by the lack of integration of the public procurement system with the public financial management system. According to law, no procurement action may start without 3(c)–Noinitiationof proper budget authorization (Directive No. 1, of January 1, procurementactions 1996). However, there is no electronic link between the withoutexistingbudget authorization of funding in the budget and the eͲGP system. appropriations Furthermore, responsibility for budget appropriations rests witheachlineministry,andthePPLdoesnotincludeasoneof the PPA responsibilities to ensure there are available funds prior to initiating the procurement action through the system. Lack of a proper control at the level of the eͲGP platform is madeevidentbythesignificantvolumeofoverduepaymentsto government vendors. Such a tardiness is simply explained by the subsequent change effected to budgetary commitments, whichcreatesanunrealisticcashposition,resultingintheover commitment of funds. Consequently, enforcement of budgetary authorizations prior to commencing a procurement processthroughtheeͲGPplatformshouldcontributetoreduce thispractice. The eͲGP system is not electronically linked with the public 3(d)–Systematic financial management system. Additionally, the available completionreportsare preparedforcertificationof informationonprojectedcashflowavailabletobudgetentities only covers a twoͲmonth ceiling set by the MOF for each budgetexecutionandfor reconciliationofdelivery institution.ThescopeoftheeͲGPsystemdoesnotencompass withbudgetprogramming informationpertainingtocontractexecutionandmanagement, for which no information is available on contract completion. expendituresarepartofthe budgetformulationprocess andcontributetomultiyear planning 1 2 1 Page43of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarII–InstitutionalFrameworkandManagementCapacity 4–Thecountryhasa functional normative/regulatorybody 4(a)–Thestatusandbasis forthe normative/regulatorybody iscoveredinthelegislative andregulatoryframework 4(b)–Thebodyhasa definedsetof responsibilitiesthatinclude butarenotlimitedtothe following:providingadvice tocontractingentities; draftingamendmentsto thelegislativeand regulatoryframeworkand Eachinstitutionkeepsrecordsofcontractcompletion.Controls over contract management are kept by the corresponding technical or operational units that requested the goods, services or works procured. PPA and its units do not contemplate contract management as part of their responsibility,forwhichtheeͲGPsystemwasdesigned toend atcontractaward. The degree of independence of the PPA is considered to be similar to that of a cabinet minister, since both, cabinet ministers and the head of the PPA are appointed and report directlytothePrimeMinister.Furthermore,thePPAisobliged topresentanannualreporttotheCouncilofMinisters.While independence is always relative, considering the line of dependency,thePPAisconsideredtobeestablishedatalevel affording it a reasonably adequate degree of authority and independence. The PPL established the PPA as a “central body” reporting directlytothePrimeMinister,financedbytheStatebudget. PPA is responsible for drafting legislation and regulations for theapprovaloftheCouncilofMinisters;monitorsprocurement activities19; produces the Public Procurement Bulletin; promotes and organizes the training of central and local government official involved in procurement; and assists CAs with advice to ensure adequate and consistent application of thePPL.UponestablishmentofthePPCinApril2010,thePPA has ceased from performing administrative review of complaints(seePillarIV,indicator10(b)forfurtherreference). 3 3 19 Article2ofthePPLdefinesthemonitoringfunctionofthePPAasencompassingtheprocurementprocess throughthecontractaward,hencelimitingitsoversightcapacityoncontractexecution.Thisinturn,posesan internalcontrolriskandlimitstheabilityoftimelypreventingordetectingpaymentsinexcessorforitems, quantitiesorqualitydifferentthanthatcontracted.Currently,contractadministrationresponsibilitiesrestsolely withtherequestingunitofeachbudgetaryunit(i.e.:lineministries;municipalities;autonomousinstitutions,etc.). Page44of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarII–InstitutionalFrameworkandManagementCapacity As stated in the PPL, PPC’s decisions and instructions, in the areaofpublicprocurement,areadministrativelyfinal20. AlthoughthePPL(Article19/1)definesthecreationofaPublic Procurement Committee as the highest body in the field of procurement, responsible for examining complaints and for takingdecisionsthatareadministrativelyfinal,thePPChasnot formally established. Subsequent to the performance of this assessment, in April 2010, the members of the PPC were formallyappointed;itsorganizationalstructureconsistingof18 positions was approved; and its budget was also approved; effectivelybecomingoperationalinMayof2010. EstablishmentofthePPCeliminatedtheconflictofinterestthat existed priortoApril2010,duetothe factthatthe PPAacted notonlyinacapacityofapolicymaking,oversightandadvisory body,butalsoasreviewerofappeals.Thisinturnundermined the perception of fairness and transparency over the appeal processofcomplaints. At the time of this assessment, March 2010, the roster of the 4(c)–Thebody’s PPA consisted of 36 positions, and was considered reasonably organization,funding, staffed. However, following the decision of establishing the staffing,andlevelof independenceand PPC, in April 2010, the government transferred to the PPC 18 authority(formalpower)to positionsoriginallyassignedtothePPA.Furthermore,ofthe18 exerciseitsdutiesshouldbe remaining positions, approximately 9 correspond to IT staff sufficientandconsistent positions, leaving only 9 positions, including the Director, to withtheresponsibilities perform all of the core functions of the PPA. Such level of staffingraisesseriousconcernsaboutthecapacityofthePPAto adequatelydischargeitslegalresponsibilities,andmuchlessto be able to undertake the implementation of the recommendations resulting from this assessment. Consequently, the level of staffing and resources of the PPA andthoseofthePPC,willhavetobereassessed. ThelastreformofthePPLconferredthestatusofcivilservants toallmembersofthePPA,includingtothePPA’sDirector. implementingregulations; monitoringpublic procurement;providing procurementinformation; managingstatistical databases;reportingon procurementtootherparts ofthegovernment; developingandsupporting implementationof initiativesforimprovements ofthepublicprocurement system;andproviding implementationtoolsand documentstosupport trainingandcapacity developmentof implementingstaff. 2 20 DecisionsofthePPCcanbeappealedatthecourts.However,intheopinionoftradeassociations,chambersof commerceandentrepreneursinterviewedaspartofthisassessment,publicconfidenceintheeffectivenessofthe courtsisverylow,andtheprocessisregardedasveryonerousandtimeconsuming.Thisinitselfconstitutesa majorsystemicbarrier. Page45of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarII–InstitutionalFrameworkandManagementCapacity 4(d)–Theresponsibilities shouldalsoprovidefor separationandclaritysoas toavoidconflictofinterest anddirectinvolvementin theexecutionof procurementtransactions 5–Existenceof InstitutionalDevelopment Capacity 5(a)–Thecountryhasa systemforcollectingand disseminatingprocurement information,including tenderinvitations,requests forproposals,andcontract awardinformation EstablishmentofthePPC,asstatedunderindicator4(b)above, eliminated the perceived conflict of interest that existed throughApril2010,asaconsequenceofthePPAtoperforming incompatiblefunctions. 2 The eͲGP platform, which is structured as a partially transactionalsystem21,isthenatural“tool”tocapturerelevant procurement information needed to retroͲfeed the decision making process regarding public expenditures and procurement.InformationtobeproducedbytheeͲGPplatform should help assess the overall performance and quality of the procurement system; review the adequacy of the strategic direction for developing the market; plan and exploit opportunities for further aggregation of procurement; and for the overall optimization and integration of the public procurement system into the public financial management system. However, the ability for gathering and reporting on relevantprocurementinformationisstilllackingduetolackof advanced query capabilities22, software and hardware limitationspendingimplementationofasuitablesolutiontothe 2 21 TheeͲGPplatformwasdesignedtohandleaprocurementtransactionfromtheinitiationoftheprocurement processuponformalapprovalofthepurchaseorderbytheheadofabudgetunit,totheawardofthecontract. Furthermore,theeͲGPplatform–consistentwiththePPA’sviewthattheprocurementprocessendswiththe contractawardͲdoesnotcontainanyinformationregardingcontractexecution,limitingtheabilityoffullytracking overallperformanceoftheprocurementprocess. 22 USͲAID,whoaspartofitsdevelopingeffortstohelpstrengtheningthepublicprocurementsystemofAlbania, financedthedesign,programmingandimplementationoftheeͲGPplatform,statedthattheoriginalsystemand itshardwarehadnotbeendesignedtohandlealargevolumeoftransactionsasitisnowthecase.Similarconcerns wereraisedbyKPMGconsulting,whichperformedanauditoftheeͲGPplatformin2008.ThePPAhasechoed thoseconcernsandwiththeassistanceofthesameconsultingfirmthathadoriginallydesignedtheeͲGPplatform, performedseveralchangestoaddressthebulkoftheauditors’recommendations,includingthepurchaseof severaladditionalservers.However,thesolutionsimplementeddidnotencompassimplementationofasolution tothelackofasuitablearchiveprocedure.AnewauditoftheeͲGPplatform–financedbytheWorldBankͲis expectedtotakeplaceinthenearfuture.However,thechangesintroducedtothesystemdidnotencompass upgrades/changestothehardware,forwhichconcernsaffectingtheperformanceandstoragecapacityofthe systemhaveyettobeaddressed. Page46of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarII–InstitutionalFrameworkandManagementCapacity archiving of effected procurement transactions, which are currently absorbing an inordinate amount of the processing capacity. Asmentionedunder5(a),whiletheeͲGPshould,bydefinition, 5(b)–Thecountryhas systemsandproceduresfor playtheprimaryroleincapturingrelevantinformationtofeed the analytical process required to ensure adequate decision collectingandmonitoring making in terms of implementing public policy through nationalprocurement statistics effective and efficient procurement, the current system does not currently capture or produce information such as the one suggested under Compliance and Performance indicators by the OECD/DAC methodology. Furthermore, onͲline query capabilitiesoftheexistingsystemareverylimitedandpreclude runningbasicqueries,suchashowmanytenderswereawarded inagivenyeartothesamevendor. ThePPAisformallytaskedwiththeresponsibilityfordesigning 5(c)–Asustainable a strategy for training of public procurement officials both at strategyandtraining central and local government levels. In so doing, the PPA capacityexiststoprovide partners with the Training Institute for Public Administration training,adviceand (TIPA),whichhasabudgetofapproximately$90,000ayearfor assistancetodevelopthe capacityofgovernmentand training6,000governmentemployees.Thelatterisconsidered largely inadequate to satisfy the training needs of privatesectorparticipants tounderstandtherulesand approximately 5,100 civil servants assigned to the 1,700 CAs, regulationsandhowthey without including private sector organizations, which are the shouldbeimplemented naturalpartnersofthegovernmentinthepublicprocurement process.In2009,thePPAinpartnershipwiththeTIPA,trained approximately 700 employees at the local government level and 900 at the central government level. These trainings focusedontheuseoftheeͲGPplatformonly. PPA does not have a training strategy. Plans are drafted on a yearlybasis,basedonwhatisconsideredapriorityareaatthat time. Training for 2010, is expected to focus on the use of the eͲGP platform. Trainingdoesnotincludetheprivatesector,sincethePPLdoes notformallyrecognizeasamandateforittoprovidetrainingto theprivatesectorororganizedcivilsociety,andassuchhasno budgetallotmentforthatpurpose.However,asinprioryears, PPA is willing to facilitate training to the private sector if the 1 1 Page47of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarII–InstitutionalFrameworkandManagementCapacity privatesectorcoversthecostofdevelopingandrenderingthe training. AlthoughPPAhasdraftedsomepreliminaryplans,itlacksofa 5(d)–Qualitycontrol standardsaredisseminated formal strategy for developing a career path and an accreditationprogramforprocurementspecialists. andusedtoevaluatestaff performanceandaddress While there is a performance evaluation system, lack of a developmentissues specific terms of reference and of a career path for procurementofficials,rendertheperformanceassessmentasa perfunctory exercise that is not designed to actually measure and address performance gaps and build capacity through recruitmentofqualifiedprofessionalsandtraining. 1 Page48of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment PillarIII–PROCUREMENTOPERATIONSANDMARKETPRACTICES 23. Pillar III focuses on the operational efficiency and effectiveness of the procurement system at the level of those institutions responsible for issuing individual procurement actions. It looks at the marketasonemeanofjudgingthequalityandeffectivenessofthesystem. 24. Pillar III encompasses 3 indicators and 10 subͲindicators to assess whether the country’s procurement operations and practices are efficient; the functionality of the public procurement market;andtheexistenceofcontractadministrationanddisputeresolutionprovisions. 25. The following table summarizes the result of the assessment of the 10 subͲindicators which have beenscoredfollowingascalefrom0to3,asexplainedabove. BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIII–ProcurementOperationsandMarketPractices 6–Thecountry’s procurementoperations andpracticesareefficient 6(a)–Thelevelof procurementcompetence amonggovernmentofficials withintheentityis consistentwiththeir procurement responsibilities Capacityofprocurementofficialsvarieswidelyamongdifferent lineministries.Toillustratethispoint,ourreviewofarandom sample of procurement processes at 10 CAs, showed inconsistent application of the law and other errors that are indicative of capacity shortcomings throughout the system. Thesefindingsarecorroboratedbythe2008AnnualReportof the SSA, which quotes having found errors and inconsistent application of the PPL in connection with 60% of the procurementprocessesselectedforreview. Representatives of private sector associations that were interviewed as part of our assessment consistently pointed to lackofcapacityandunderstandingofgovernmentprocurement officials. In addition to the Annual Report of the SSA, the PPA’s Annual Report provides useful data to ascertain the existing gap betweencapacityandrequirements. The low capacity levels are perpetuated through a lack of budget allocations to support training and of a strategy to enhancetheprofessionalprofileofpublicprocurementofficials throughaspecificcareerpath. 1 Page49of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIII–ProcurementOperationsandMarketPractices As indicated under 5(c ) and 6(a) there are procurement training programs, but their overall scope and effectiveness is undermined due to the lack of a strategy and appropriate budgetresourcestoimplementit. In our interview with the Administrator of TIPA, we gathered information about the trainings provided in 2007 and 2008 to form trainers of trainers, in government procurement. However,noinformationcouldbeobtainedabouthowmanyof thosetrainedstillremaininthesystem.Statisticalinformation ongovernmentstaffrotationcouldnotbeobtainedduringthe fieldworkphaseoftheassessment. 6(c)–Thereareestablished Whilethereareformalrequirementsastothenumberofyears that public records are to be kept, lack of a formal internal normsforthesafekeeping controlframeworkcreatesasomewhaterraticandinconsistent ofrecordsanddocuments relatedtotransactionsand level of compliance. Furthermore, following mandatory use of contractmanagement theeͲGPsystemforconductingallpublicprocurementatlocal and central government levels, coupled with inherent electronicarchiveconstraints,questiontheabilityofthePPAto ensure full archiving of electronic records on public procurement transactions after one year. This in turn poses a seriousriskofsecuringanappropriateaudittrail.Inaccordance tocommerciallaw,proposalsandothertenderdocumentation providedinhardͲcopyaretobekeptfor10years. 6(d)–Thereareprovisions PPA is responsible for the oversight of procurement processes fordelegatingauthorityto performedbyCAs. Following the establishment of the PPC in April 2010, all otherswhohavethe complaints, which were being processed by the PPA, are now capacitytoexercise directlyaddressedbythePPC. responsibilities 7–Functionalityofthe publicprocurementmarket AlthoughPPAhasofferedsomelimitedtrainingandassistance 7(a)–Thereareeffective totheprivatesector,asstatedin5(c),thePPAdoesnothave mechanismsfor asoneofitsfunctionstoprovidetrainingtotheprivatesector partnershipsbetweenthe or to work with it to help develop the market in Albania. publicandprivatesector Accordingly, PPA’s limited budget does not provide for resourcestoundertaketrainingactivitiesfortheprivatesector, unless the private sector pays for it. As a result, there is no strategyonhowtoworkwiththeprivatesectortohelpdevelop themarket.Thereisbeenlittleprivatesectorconsultationand 6(b)–Theprocurement trainingandinformation programsforgovernment officialsandforprivate sectorparticipantsare consistentwithdemand 1 2 2 1 Page50of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIII–ProcurementOperationsandMarketPractices 7(b)–Privatesector institutionsarewell organizedandableto facilitateaccesstothe market 7(c)–Therearenomajor systemicconstraints(e.g. inadequateaccesstocredit, contractingpractices,etc.) inhibitingtheprivate sector’scapacitytoaccess theprocurementmarket although the private sector welcomed the introduction of the eͲGP platform, it remains suspicious of the level of security affordedbythesystem,aswellasofthegovernment’sabilityto manipulatetheprocess. With the exception of the association of constructors, the American Chamber of Commerce, and the Chamber of CommerceofTirana,theprivatesectorandcivilsocietyarenot wellorganized. The private sector in Albania shows growth over the past 3 years. In particular, construction and commercial enterprises havedevelopedatasteadypace.However,theglobalfinancial crisis has had an impact on the accelerated pace of growth showedbytheAlbanianeconomyoverthepastfewyears.Asa result, access to credit, while unrestricted, has become more difficult.Furthermore,duetotheincreasingfinancialcostsand theunpredictabilityofthegovernment’sfunding,whichresults in significant delays in paying obligations, private sector firms, especially small and medium size companies, are hesitant to participateinpublicprocurement. There are no constraints for foreign firms to participate in public procurement tenders, other than the fact that only international bids are advertised in English. While virtually, all tenders are open to both local and foreign firms local tenders are all published in Albanian language only. This in turn may restrict the GOA’s ability to obtain good valueͲforͲmoney in procurement of items that are not produced in Albania. Nonetheless, it should be noted that the PPL does not afford any margin of preference or preferential treatment to local bidders over international bidders. Furthermore, definition as to when a tender should be local or international is done through the establishment of procurement thresholds, which areapprovedbytheCouncilofMinistersandrevisedeverytwo years,orwhentheconditionssowarrant.TheConsultingTeam likes to encourage the PPA – as part of a clear strategy to develop the local procurement market – to consider the possibilityofestablishingcriteriainthesecondaryprocurement legislation of when the procurement of specific items, regardless of the thresholds, should require that the RFP be publishedbothinAlbanianandinEnglish. 1 2 Page51of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIII–ProcurementOperationsandMarketPractices 8–Existenceofcontract administrationanddispute resolutionprovisions 8(a)–Proceduresare clearlydefinedfor understandingcontract administration responsibilitiesthatinclude inspectionandacceptance procedures,qualitycontrol procedures,andmethodsto reviewandissuecontract amendmentsinatimely manner 8(b)–Contractsinclude disputeresolution proceduresthatprovidefor anefficientandfairprocess toresolvedisputesarising duringtheperformanceof acontract 8(c)–Proceduresexistto enforcetheoutcomeofthe disputeresolutionprocess Contract administration responsibilities, including inspection and tests prior to acceptance and payment for works, goods and services, are clearly defined. However, one of the consequences of advertising the fund limit is the potential acceptanceoflowerqualityofworks,goodsandservices. 2 AlbaniaacceptseitherUNCITRALortheInternationalChamber of Commerce (Paris) arbitration rules for resolving contract disputes whenever the government is a party. Conflicts and disputesarisingfromprocurementcontractsareresolvedbased on the Civil Code of Albania. SBDs do not contain information onADRmechanism,butreferonlytocourts. 2 Albania is a member of the New York Convention on Enforcement of International Arbitration Awards. The evaluation team was not able to find records of enforcement thatmightbeindicativeoftheeffectivenessofthecourtsinthis regard. 1 Page52of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment PillarIV–INTEGRITYANDTRANSPARENCYOFTHEPUBLICPROCUREMENTSYSTEM 26. PillarIVfocusesontheadequacyandperformanceoftheintegrityandinternalcontrolmechanisms andsystems,aswellasontheinternalandexternalauditfunction,thatareconsiderednecessaryto support adequate implementation and performance of the legal and regulatory framework. Consequently,thisPillartakesaspectsoftheprocurementsystemandgovernanceenvironmentand seekstoensurethattheyaredefinedandstructuredtocontributetointegrityandtransparency. 27. Pillar IV encompasses 4 indicators and 18 subͲindicators to assess the adequacy of the country’s control and audit systems; the efficiency of the appeals mechanism; the degree of access to information;andtheadequacyofethicsandanticorruptionmeasuresinplace. 28. The following table summarizes the result of the assessment of the 18 subͲindicators which have beenscoredfollowingascalefrom0to3,asexplainedabove. BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIV–IntegrityandTransparencyofthePublicProcurementSystem 9–Thecountryhas effectivecontrolandaudit systems 9(a)–Alegalframework, organization,policy,and proceduresforinternaland externalcontrolandaudit ofpublicprocurement operationsareinplaceto provideafunctioning controlframework On November 6, 2009, by Decision No. 640, the Council of Ministers approved the “Policy Paper and Action Plan for the PublicInternalFinancialControlfor2009Ͳ2014.” The PIFC recognizes the need to improve the managerial accountability,internalcontrols,riskmanagement, accounting service, and monitoring. Decision No. 640, concludes recognizing that “ …This will require the preparation of the FMC Law, …” as well as the approval of specific laws in ExternalandInternalAudit,andtheadoptionofanintegrated internal control framework based on international accepted standards,likeC.O.S.O.intheU.S. Albaniahasembarkedonanambitiousandchallengingpathto modernizing its public financial management system. While initial steps towards adoption of an integrated control framework and modernization of the external and internal audit function are beginning to take place, implementation of thesechangeswouldrequireseveralyears,andaconsiderable amount of resources to support a highly challenging and significantchangemanagementprocess. 1 Page53of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIV–IntegrityandTransparencyofthePublicProcurementSystem 9(b)–Enforcementand followͲuponfindingsand recommendationsofthe controlframeworkprovide anenvironmentthatfoster compliance 9(c)–Theinternalcontrol systemprovidestimely informationoncompliance toenablemanagement Atthetimeofthisassessment,duetotheabsenceofadefined internal control framework, each institution is responsible for establishing their own set of regulations for authorizing and processingoffinancialtransactionsandcontracts.Furthermore, whencombinedwiththeabsenceofdetailedjob descriptions, the internal control varies from institution to institution and poses significant risks when it comes to ensuring adequate segregation of duties between the authorization, registration, processingandsafekeepingfunctions. Through the EU funded Twinning project, the capacity of the State Supreme Audit has been modernized. This project also supported the strengthening and formal creation in all budget entities of an internal audit function. Our review of procurement transactions revealed a fair amount of focus on thepartofboththeSSAandtheinternalauditorsinthereview of procurement transactions. However, the aim of those reviews–basedonthefindingsandrecommendationsͲappears tobetooformalisticandfocusedsolelyoncompliance. Reportsfor2009performanceoftheSSAwerenotavailableat thetimeofthisassessment.The2008AnnualReportoftheSSA shows a broad coverage of procurement processes at the centralgovernmentlevelofapproximately87%ofprocurement processes tendered. The number of processes found in nonͲ compliance represented approximately 60% of the processes audited, with a total amount of assessed economic loss of 779,815,000lek. According to the 2008 Annual Report of the SSA, compliance with outstanding recommendations has significantly improved from previous years. The current compliance rate is of approximately 80%. Typically, institutions have 20 days upon final issuance of the audit report to comment on recommendations and to provide a plan for their implementation. According to the SSA, enforcement of administrative and disciplinary measures as well as damage recoveryimprovedin2008. Compliancewithoutstandingauditrecommendationsissuedby both, internal auditors and the SSA, are tracked in each institution in a centralized manner, typically by the General Counsel. However, timeliness in compliance and reporting 2 1 Page54of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIV–IntegrityandTransparencyofthePublicProcurementSystem action 9(d)–Theinternalcontrol systemsaresufficiently definedtoallow performanceauditstobe conducted 9(e)–Auditorsare sufficientlyinformedabout procurementrequirements andcontrolsystemsto conductqualityauditsthat contributetocompliance 10–Efficiencyofappeals mechanism 10(a)–Decisionsare deliberatedonthebasisof availableinformation,and thefinaldecisioncanbe reviewedandruleduponby abody(orauthority)with enforcementcapacityunder thelaw varies significantly from institution to institution, due to the lack of standard procedures. Nonetheless, the SSA noted a significant improvement in the overall rate of reporting and compliancecomparedtopreviousyears. As stated in 9(a), lack of an integrated internal control framework along with a relatively incipient internal audit function, hampers the conduct of performance audits. Most audits on projects financed by international donors consist of financialaudits,whicharedifferentinscopeandconsequently different in the level of assurance on the internal control systemoveroperations. WhileauditorsaregenerallyconversantwiththePPL,theyhave notyethadaccesstotheeͲGPplatform.Theinitialsetupofthe eͲGP platform requires auditors to obtain authorization to accesstheeͲGPplatformfromtheheadofeachinstitutionthey want to audit. Although this process mirrors the Audit Law, t whenconsideredtogetherwithaverylimitedtrainingtakenby SSA auditors has effectively constrained the SSA’s ability to auditprocurementprocessesthroughtheeͲGPsystemin2009. Starting on January 1, 2009, by decision of the Council of Ministers all public procurement transactions are to be conductedthroughtheelectronicplatform.Thisdecision,along with the standͲstill created by the cumbersome process for auditors to access transactions due to the lack of an unrestricted “Auditor” profile in the eͲGP, hampers the effectiveness of the external and internal audits of procurement. Additional training for auditors is planned for 2010. ThePPLestablishesthePPAasthehighestbodyintheareaof publicprocurement.Animportantconcernhighlightedin4(b), is that currently, and until formal establishment of the PPC (based on law No. 10170 of October 22, 2009), through the appointmentofitsmembers,thePPAwillcontinuetodraftall procurement legislation for approval of the Council of Ministers; and advice CAs on application of the PPL and on specific procurement transactions, while complaints are reviewedbythePPC,anindependentbodydefinedinthePPL 0 1 2 Page55of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIV–IntegrityandTransparencyofthePublicProcurementSystem andformallyinplacesinceApril2010.EstablishmentofthePPC has effectively eliminated the conflict of interest that existed beforebyhavingthecomplaintreviewfunctionunderthePPA. Throughthedateofcompletionofthefieldworkrelatedtothis 10(b)–Thecomplaint assessment, PPA was still responsible for the review of reviewsystemhasthe complaints. capacitytohandle complaintsefficientlyanda Asmentionedabove,startingApril2010,theGOAhasformally meanstoenforcethe remedyimposed established and put in place the PPC, which has an organizational structure consisting of 5 members and 18 staff positionswithadedicatedbudget.Thisstructure,alongwithits functional dependency from the Prime Minister, affords the PPCwiththerequiredlevelofindependenceandstafftoensure adequatehandlingofcomplaints.However,duetothefactthat the PPC was not in operations at the performance of this assessment,thecurrentgradingassignedtothisindicatordoes not reflect its actual performance, which will have to be assessedafteritsfirstyearofoperations. The number of complaints have almost doubled in 2009 (1,100),withrespectto2008(564),and2007(645).Amongthe reasonsforsuchincrease(thiscanbeconsideredasameasure ofsuccessoftheintroductionoftheeͲGPplatform),isthefact that theaveragenumber ofbidspertender processincreased from 2 to almost 8. Consequently, the actual frequency of complaints when measured on the total number of bids receivedhasdecreasedfrom1complaintevery21bidsin2007Ͳ 2008, to 1 complaint every 33 bids in 2009. However, the relativenumberofcomplaintsresultingineithercancellationof the procurement process or modification of the bidding documentscontinuestobeapproximately30%overtheperiod 2007Ͳ2009; while the number of complaints dismissed either becauseofbeingfiledaftertheexpirationofthe5daysallotted orduetolackofsufficientinformationorfailuretocomplywith requirementsstillisat70%. Oneofthechiefcomplaintsexpressedbythosecontractorsand suppliersinterviewedthroughoutthisassessmentisthelackof consistencyandcapacityofprocurementauthoritiestohandle complaints. This, in turn, impinges upon the required level of fairness,andtransparencythatistobeexpectedbytheprivate sector. In particular, we observed a transaction pertaining to 1 Page56of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIV–IntegrityandTransparencyofthePublicProcurementSystem the procurement of vehicles where two bidders complained abouttheinclusionofafinancialrequirementforthemtoshow alevelofannualsalesduringthethreeyearsprecedingthecall fortender,ofatleastthemaximumamountofthecontract,for 300vehicles.Suchrequirementwhichappearsunjustifiedgiven theinherentriskassociatedinthistypeofprocurement(i.e.the governmentwouldonlypayupondeliveryofthevehicles),was reviewed and dismissed by the PPA23, which sided with the opinionoftheprocurementselectioncommitteeestablishedby the CA in connection with that tender. This example raises concernsabouttheindependence,objectivityandtransparency ofthecomplaintandappealmechanisms. The review of procurement transactions and contract 10(c)–Thesystem administration at 10 entities shows inconsistencies in the operatesinafairmanner, withoutcomesofdecisions repliestocomplaints,indicativeoflackofdedicatedresources aswellaslackofcapacity. balancedandjustifiedon thebasisofavailable information ComplaintsarenotpublishedinthePPA’swebsite.Repliesto 10(d)–Decisionsare requests for clarification during the course of an RFP are publishedandmade processed through eͲmail, using the accounts defined by the availabletoallinterested bidders in a dedicated mail box assigned to each bidder. partiesandtothepublic Appeals are registered in the courts’ docket. In 2009, of approximately 1,100 complaints received in connection with 7,277advertisedtenders,or15.1%.Ofthesecomplaints,23.4% (257)resultedincancellationoftheprocurementprocess;3.5% (38)resultedinmodificationstothetechnicalspecificationsor bidding documents; while 73.2% (805) were dismissed due to lack of compliance with formal requirements or missing information. 10(e)–Thesystemensures DecisionsofthePPAcanonlybeappealedthroughthecourts. The amendment creating the PPC does not change the thatthecomplaintreview bodyhasfullauthorityand appellateprocedures,whicharestatedinthePPL.Theprivate independenceforresolution sectorpointstosignificantdelaysandcostlyproceedingsasthe ofcomplaints majordeterrentstopursueappealsondecisionsofthePPA. 1 3 3 23 Therequirementofrequestingbidderstoshowalevelofsalesequalingthetotalamountofthecontractfor eachofthethreeyearsendedpriortotheyearoftheRFP,isallowedbyadecreeoftheCouncilofMinisters,for whichthePPAconsideredthatuseofsuchmaximumrequirementbytherespectiveCAhadnotcontravenedthe law. Page57of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIV–IntegrityandTransparencyofthePublicProcurementSystem 11–Degreeofaccessto information 11(a)–Informationis publishedanddistributed throughavailablemedia withsupportfrom informationtechnology whenfeasible Information is published in the “Public Procurement Bulletin”, weekly and posted on the PPA’s website. Information posted for contract awards corresponds to calls for tenders; award notices;andcancellations.Thewebsitehaslinkstothe“Public Procurement Bulletin;” the PPL; amendments; SBDs; a procurement manual (which is largely outdated since it does not incorporate any of the amendments introduced in 2009); anddecisionsoftheCouncilofMinisters. 12–Thecountryhasethics andanticorruption measuresinplace Albania has ratified several international treaties and 12(a)–Thelegaland regulatoryframeworkfor conventions related to corruption and is member to some of procurement,including the major international organizations and programs dealing tenderandcontract with corruption and/or organized crime. The Civil Law documents,includes Convention on Corruption (Council of Europe) was ratified by provisionsaddressing on7June2000bytheAlbanianparliamentwiththepassingof corruption,fraud,conflict Law No. 8635. The duties and liabilities of this convention are ofinterest,andunethical partially adopted in the internal legislation. However, some behaviorandsetsout amendments are still pending, including some involving the (eitherdirectlyorby Civil Code, the Code of Administrative Procedures, and the referencetootherlaws)the Status of Civil Servants, because they have not yet been actionsthatcanbetaken approved by Parliament. All these laws require a voting withregardtosuch majorityofthreeͲfifthofallmembersofparliament,sopassing behavior them demands crossͲparty consensus, which hardly seems likelyinthecurrentpoliticalenvironment. TheCriminalLawConventiononCorruption(CouncilofEurope) wasratifiedbytheParliamentwiththepassingofLawNo.8778 on 26 April 2001. This has been changed with Law No. 9369 from 14 April 2005, which has removed all reserves. The definitions included in this convention have already been adopted as amendments in the Penal Code and the Penal Procedural Code. The Additional Protocol to Criminal Law Convention on Corruption (Council of Europe) was ratified by theAlbanianParliamentwithLawNo.9245from24June2004, but it has still not been fully implemented in the national legislation. The United Nations Convention Against Corruption (UNCAC) 2 2 Page58of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIV–IntegrityandTransparencyofthePublicProcurementSystem wasratifiedbytheAlbanianParliamentwithLawNo.9492on 13March2006.Mostoftheprovisionsofthisconventionhave now been adopted in the national legislation. However, a few provisionsstillremaintobeincorporated. Albania has also ratified a number of key conventions in the broader field of economic crime, including the Convention on Laundering, Search, Seizure and Confiscation of the Proceeds fromCrime(since2001), theConventiononCybercrime(since 2002). Albania has been a member of the Group of States Against Corruption (GRECO) since the ratification of the Criminal Law Convention on Corruption in 2001, and is also membertotheStabilityPactAntiͲCorruptionNetwork(SPAI). Albanian legislation relevant for antiͲcorruption has improved substantially in recent years. The Criminal Code criminalizes both active and passive bribery and undue influence of public officials (articles 244, 245, 245/1, 259 and 260). The Criminal ProceduralCodewasamendedin2004toincludeenhanced regulation of financing of political parties, conflict of interest, rules of ethics in the public administration, criminalization of active and passive corruption, and the use of special investigation means and further improvements are in the pipeline.TheLawonthePreventionandCombatingOrganized Crime adopted in September 2004 provides the legal basis for combating economic crimes performed by organized criminal groups. AlbaniatookasignificantstepforwardwhenitadoptedtheLaw ondeclarationofPropertiesbyOfficialsin2002andtheLawon prevention of Conflict of Interest in 2005. Both laws provide comprehensive regulations, clear rules and duties, strict limitationsofpersonalinterestofpoliticiansaswellasmidͲand highͲlevel officials in relations their duties, severe administrativepenaltiesandlinkagewiththecriminallaws.Asa result of the two laws, the High Inspectorate for Declaration and Auditing of Assets (HIDAA) is currently in a quite strong positiontofulfillitsmandate.Furthermore,anumberofrecent lawshavefocusedonsimplifyingtheadministrativeprocedures for businesses, such as the PPL, the Law on Registration of Businesses as well as numerous amendments to various laws which has abolished some licenses and simplified remaining procedurestoobtainthenecessaryones. Page59of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIV–IntegrityandTransparencyofthePublicProcurementSystem 12(b)–Thelegalsystem definesresponsibilities, accountabilities,and penaltiesforindividuals andfirmsfoundtohave engagedinfraudulentor corruptpractices 12(c)–Evidenceof enforcementofrulingsand penaltiesexists The government’s current draft antiͲcorruption strategy (“the CrossͲcutting Strategy for Prevention, Fight on Corruption and Transparent Governance 2007Ͳ2013” described further below) includesapipelineoffurthersuggestedlegislativechanges.This includes a Law on Limiting the Immunity of Members of Parliament and Ministers as well as amendments to the Civil ServiceLaw,CivilCodeandCivilProceduralCode. The PPL confers to the PPA with the authority to exclude an economic operator from participation in awarding procedures foraperiodof1to3yearsincasesoffraud,corruptionornonͲ fulfillment of contractual obligations (PPL Article 3). The PPL also makes specific reference to corruption and conflicts of interest(Article26);andtoexclusioncriteriaofcandidatesand bidders convicted by final judgment due to: participation in a criminal organization; corruption; fraud; money laundering; and,forgery. However, “fraud” and “corruption” are not defined or characterized in the PPL. Specific reference to fraud and corruption and conflict of interest, applying to economic operationsandcivilservantsiscontainedinthePPL(Article26). The PPA is empowered to exclude economic operators (i.e. individuals and firms) from participating in awarding procedures for up to 3 years (see 12(a) above). Furthermore, underarticles45through47,thePPLestablishesconditionsfor exclusion of bidders under certain conditions involving fraud and corruption. The PPA also has the capacity to impose penalties and recommend sanctions (ranging from monetary penalties to debarment for firms and individuals, as well as to CAs and civil servants) to those involved in procurement for inappropriate conduct and fraud and corrupt practices. However, the penalties and sanctions are not well defined eitherinthePPLorintheProcurementRules. Enforcement of penalties and sanctions against economic operators are published in the Public Procurement Bulletin posted in the PPA’s website, and also reported in the PPA’s AnnualReport. 2 2 Page60of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIV–IntegrityandTransparencyofthePublicProcurementSystem Albania,withtheassistanceoftheinternationaldonorshasan ongoing anticorruption program. However, the Assessment Team could not obtain sufficient information on the coordination of that program among the government entities involved. ThecreationofthePPADin2007,affordsanadditionallevelof assurance in connection with the overall transparency and fairnessoverprocurementoperations.InitsAnnualReportfor 2008, the PPAD indicates that of the allegations received, 354 had enough merit to warrant a full investigation. In 210, the PPA has initiated an administrative action, whereas 144 were resolved without the need to resorting to an administrative investigation. Of the recommendations issued by the PPAD, 129 supported theclaimsraisedbythebidders;30involvedrecommendations tothereevaluationofthebidsreceived;and102calledforthe invalidation of the tender. Of the 354 cases investigated, the PPAsupportedtheconclusionsofthePPADinallbut64cases. TheAssessmentTeamalsotooknoteofthecommentincluded in the 2008 Annual Report of the SSA, which quotes that encountered nonͲcompliance with procurement processes in approximately 60% of the cases reviewed. Typically, the nonͲ compliance findings refer to issues such as: delays in the initiation of tendering procedures; delays in payments; shortcoming and infringements on freelance consultancy payments; application of inconsistent legal provisions; lack of observance of proper contract resolution provisions by implementation units; and inadequate calculation of the fund limit. By and large, confidence in the public procurement system 12(e)–Stakeholders (privatesector,civilsociety, among civil society and economic operators is generally low. VeryfewprivateassociationsandNGOsareactivelyinvolvedin andultimatebeneficiaries ofprocurement/endͲusers) the public procurement process. Furthermore, the PPA does supportthecreationofa not have a strategy or any mechanism to proactively engage procurementmarketknown theprivatesectorandcivilsocietyinadialoguetoimprovethe foritsintegrityandethical publicprocurementmarket. behaviors ThePPAD,createdbythePPLtosafeguardthelegalrightsand interests of suppliers against irregular actions or omissions of 12(d)–Specialmeasures existtopreventanddetect fraudandcorruptionin publicprocurement 2 1 Page61of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment BaseLineIndicator/SubͲ Indicator SummaryAssessment Score PillarIV–IntegrityandTransparencyofthePublicProcurementSystem contracting authorities. The PPAD is appointed for 5 years by parliament, following a recommendation of the Council of Ministers. ThePPADhasnopowerenforcementofhisownandtoalarge extentitsfunctionsduplicatethemonitoringtasks ofthePPA. However, considering the inherent conflict of interest in the performanceofthereviewfunctionthatexisteduntilApril2010 that the PPC was formally put in place, the work being performedbythePPADplaysasupportiveandeffectiveroleto the reviews or investigations conducted either by the PPA or othercompetentauthorities. ThePPAfeaturesinaboxlocatedintheupperleftcornerofits 12(f)–Thecountryshould main webͲpage under the title “Telephone”, two telephone haveinplaceasecure numbers.Althoughthesenumberscorrespondtothenumbers mechanismforreporting of the hotline, no explicit reference is made to them as fraudulent,corrupt,or unethicalbehavior belonging to the hotline. to report allegations of fraud and corruption. The PPAD has also had meetings with trade associations and chambers of commerce and civil society to entice their cooperation and make them aware of the functions, structure, and proceedings of the PPAD. The PPAD hasadedicatedresourcetomaintainingthehotline. During themeetingstheassessmentTeamhadwitheconomic operators, they commended the work of the PPAD and feel confident about the confidentiality afforded by the PPAD to casesreported. Relevant legislation is included in Law No. 9131 (September 12(g)–ExistenceofCodes ofConduct/CodesofEthics 2003)onRulesofEthicsforPublicAdministration,andLawNo. forparticipantsthatare 8549(November11,1999)onStatusofCivilServants.Financial involvedinaspectsofthe disclosure of personal assets for those who deal with public publicfinancial financialmanagementisrequiredbylaw. managementsystemsthat alsoprovidefordisclosure The Assessment Team was not able to obtain evidence of the forthoseindecisionmaking existence of a code of conduct or ethics endorsed by trade positions associations and chambers of commerce. In the absence of a code of ethics, those interviewed during the performance of theassessmentnotedthattheycomplywiththerequirements ofthePPL,Article26,whichreferstoconflictsofinterest,fraud andcorruption. 2 3 Page62of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment VI. PROGRESSSINCE2006ASSESSMENT 29. The tables below provide a followͲup of the status of implementation of all recommendations contained in the previous assessment of the public procurement system issued by the Operations Policy and Services Unit for Europe and Central Asia Region of the World Bank in August 2006, Report No. 38028ͲAL “Albania Country Fiduciary Assessment.” It should be noted that the 2006 assessmentwasbasedonadifferentlegalframeworkthantheonecurrentlyinplace.Thecurrent legalframeworkisalignedwiththeEUDirectives,thusmakingsomeofthe2006recommendations, suchastheincorporationofthedefinitionsof“forcemajeure”,and“emergency”,redundant. 30. Forpurposesofproducingthefollowingupdate,thestatusofimplementationofrecommendations has been classified as either: “implemented”, when substantially all elements contained in the originalrecommendationhavebeenassessedasbeinginplaceandoperatingadequately;“Partially Implemented”,whennotallelementsoftherecommendationhavebeenassessedasbeinginplace or operating adequately; “Under Implementation”, when the elements contained in the recommendation are in the process of being put in place and consequently their level operation cannot be assessed; and, “Not Implemented”, when the elements referred to in the original recommendationhavebeenassessedasnothavingbeenimplementedandconsequentlytheyare notinplace. 31. All recommendations either “Partially Implemented”, “Under Implementation”, and “Not Implemented”, that were deemed substantial for the proper operation of the public procurement systemhavebeenincorporatedascurrentrecommendationsresultingfromthe2010assessmentof thepublicprocurementsystemofAlbania. # 1 2 3 PillarIͲLegislativeandRegulatoryFramework 2006Finding/Recommendation 2010Status Thereisapracticeofdisclosing“limitfunds” Not Implemented Ͳ Although the PPL does not (estimatedcost)inbidnotices. require publication of the “fund limit”, PPA requires all CAs to publish the maximum “fund limit”ineachtender. NotApplicableͲThecurrentlegalframeworkis Strengthenprovisionsonuseofdirect procurementbydefiningthe“forcemajeure,” alignedwiththeEUDirectives,thusmakingthe “emergency,”andurgentsituations(Article17 need to define “force majeure,” and and19). "emergency,”redundant. Implemented – Public utilities are an integral PPLshouldberevisedtoregulatethepublic utilitiesseparatelyfromotherprocurement, partofthePPLunderChapterV/1“Procedures eitherasaseparatechapterunderexistinglaw for Awarding Sectoral Contracts”, Articles 58/1 orseparatelaw. to58/10. Page63of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment PillarIͲLegislativeandRegulatoryFramework # 2006Finding/Recommendation 2010Status 4 Improveandstrengthenconsultingservices Partially Implemented – PPL Articles 3 and 4, provisionstoselectconsultantsnotbasedon provides for rules for procedures governing thelowestprice,butbasedonqualifications procurement of consulting services. However, andqualityofservices(Article21). these rules do not allow for the selection of consultants solely on the basis of technical qualificationsandtheyarenotadequatelyclear on the procedures and methodologies for combining price and technical capacity under differentcircumstances. 5 RevisePPLtoinclude,ataminimum,allrelevant Implemented – Contract awards are published informationforcontractawardnotice. in the PPA’s website. PPL properly define the minimum information to be included in the contract award notice, in compliance with best practicesinpublicprocurement. Implemented – PPL Article 20 complemented 6 AmendPPLtofullydefinenonͲdiscrimination,Ͳ includinganygrounds,notjustonthebasisof bytheRulesandRegulations. nationality(Article9). Implemented – PPL Article 22, and Chapter IV 7 AmendPPLtoindicatethemethodofdelivery ofbids,whetherbymail,hand,courier,orany “Electronic Procurement” set the basis for the othermodality(Article30–31). method of delivery of bids, requiring advanced electronicsignatureforelectronictenders. 8 Createaseparatecomplaintreviewbodyother Implemented – The PPL established the PPC, thanPPA. andinApril2010,thePPCwasformallyinplace and operating with an organization structure providingfor18staffpositionsandadedicated budget ensuring its independence and capacity toperformitsfunctionsasintended. Not Implemented Ͳ This recommendation has 9 Thetimeforpreparationofbidsinlocalopen tendersisrelativelyshort“minimum20days.” not been implemented. Instead, Article 43 of Thisshouldbeincreasedto28days(Decision the PPL has been amended to allow – in the No.335). caseofelectronicbids–ashorteningby7days of the time limits for preparation. The Assessment Team finds this amendment illͲ advised. 10 Biddersshouldbegiventheopportunityto Implemented – Bidders can appeal debarment appealdebarmentdecisions(DecisionNo.335). decisionsthroughthecourts. 11 Limitfund(estimatedprice)shouldbe Implemented – PPL Chapter III “Common calculatedrealisticallybasedonmarketprices. Procurement Rules”, Article 28, “Methods for Page64of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment # 12 13 14 15 PillarIͲLegislativeandRegulatoryFramework 2006Finding/Recommendation 2010Status Also,nationalstandardsoncostanalysisfor calculating the estimated value of public constructionworksshouldbeupdatedregularly contracts.” andthenused(InstructionNo.1). Thereisaneedtopreparehighqualitytechnical Partially Implemented – Although the PPA has specificationstopromotethebroadestpossible managed to attain some improvements with competitionfollowinginternationallyaccepted respect to the situation assessed in 2006, the standards. review of more than 40 procurement tenders, still shows that the nature of complaints received by the CAs and PPA, points at a considerable number of instances where technical specifications where either wrong or lacked of sufficient information. This reveals unevencapacityinthedifferentCAs. SBDsshouldbeamendedtomandatesigningof Implemented theminutesofbidopeningbybidders,inorder toavoidsubsequentchangesbyprocuring entities. Implemented SBDsshouldbeamendedtospecifythatthe bidsforalltenders,ifsubmittedbeforethe deadlineforbidsubmission,shouldbekept safely. SBDsforgoodsshouldbeimprovedtodecrease Implemented changesinquantitiesafterthecontractsigning. According to the PPL, the maximum allowance Maximumallowancecouldbeupto15percent upto90daysaftercontractsigningis20%. increase/decreaseofofferedquantity.The currentlimitof30percentisveryhigh. # 1 2 PillarIIͲInstitutionalFrameworkandManagementCapacity 2006Finding/Recommendation 2010Status Theprocurementplanningprocessshouldstart Partially Implemented – Timing for atleastthreemonthspriortotheupcoming procurement budget planning has substantially fiscalyear.TheMTBPandannualbudgetshould improvedin2009.However,thereisnolinkage belinked,andexpenditurecyclemaderealistic between the budget and the public sothatcompetitiveprocurementmethodsand procurementsystemyet. efficientuseofresourcesareensured. Implementationshouldbefollowedthrough Partially Implemented – Reporting has greatly betterreportingandacommitmentshouldbe improvedthroughtheimplementationoftheeͲ madetoestablishacontrolsystem. GP platform. However, more work is still needed, along with Albania’s adoption and implementation of a common integrated internal control framework across the Page65of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment # 3 4 5 6 7 8 PillarIIͲInstitutionalFrameworkandManagementCapacity 2006Finding/Recommendation 2010Status government. ThePPAdirectorandallotherprofessionalstaff Implemented – The PPA director and all other shouldbecivilservantsinordertoavoid professional staff are considered members of politicalinterference(Article8). thecivilserviceasstatedinthePPL. Implemented Ͳ The PPL established the PPC, AnindependentProcurementReviewBody shouldbeestablishedtohandlecomplaints and its members, organizational structure and (Article8). budgetwereformallyapprovedandputinplace inApril2010. WebͲbasedprocurementinformationshouldbe Implemented–PPA’swebsitethroughtheeͲGP publishedwithaprovisionforsystematic platform and the weekly “Public Procurement updateoftenderinvitations,RFPs,andcontract Bulletin”, provides information of tenders, awards,andsoforth. RFP’s,contractawardsandpenalties. Thewebsiteshouldalsocontainannual Partially Implemented – Statistical information statisticsonprocurement,whichshouldbe on procurement procedures is not updatedregularly. systematically collected and reported yet, only for total number of tenders advertised and awarded. Additional statistical information is reportedannuallyinthePPA’sAnnualReport. Not Implemented – PPA has been working ThePPAshouldbetaskedwithdevelopinga nationalstrategyforpublicprocurement towards strengthening its focus on training. training,andthegovernmentshouldallocate With that aim in mind, it implemented a adequateresourcestoimplementsuchstrategy dedicatedpositionfortraining.However,lackof overthenext3to5years. funding and information has hampered developmentofatrainingstrategy. PPAorganization,funding,andstaffingshould Implemented – Chapter II “Public Procurement bereviewedbythegovernmenttoincreaseits Organization”, Article 13, defines the PPA as a levelofindependenceandauthority centralbody,withalegalandpublicpersonality reportingtothePrimeMinister,andfinancedby thestatebudget. # 1 PillarIIIͲProcurementOperationsandMarketPractices 2006Finding/Recommendation 2010Status Maketherequiredlevelofcompetenceamong Partially Implemented – Although overall procurementstaffconsistentwiththeir capacityhasimprovedsince2006,therearestill responsibilities.ThePPAneedstoinitiatea significant capacity gaps both at central and dialogwithingovernment.Inparticular,the local government levels. A separate career Page66of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment # 2 3 4 5 PillarIIIͲProcurementOperationsandMarketPractices 2006Finding/Recommendation 2010Status DepartmentofPublicAdministration(DOPA) stream, as well as specific job descriptions for shouldestablishaseparatecareerstreamfor public procurement officials has yet to be procurementinthecivilservice,bothatcentral established. andlocalgovernmentlevels.Thisactionshould besupportedwithseparatejobdescriptions, qualificationrequirements,careerstructures, andsalaryscalesforprocurementofficers. Capacityininternalauditunitsintheministries Partially Implemented – The EUͲTwinning shouldbestrengthenedtotakeamoreactive projecthasprovidedmuchneededtrainingand roleinassuringcompliancewithpublic supporttoboththeStateSupremeAuditors,as procurementprocedures. well as to the creation of the internal audit function in each line ministry. However, consolidation of the internal audit function across the government is a process that is expected to take a couple of years. Specially, considering that the government lacks of an integratedinternalcontrolframework. Standardbiddingdocumentsshouldincludean Not Implemented – Standard bidding alternativedisputeresolutionmechanism,such documents do not include an alternative asarbitration. dispute resolution mechanism as recommended. Not implemented – Implementation of this Theprivatesectorshouldbeseenasa developmentpartner.Moreoutreachprograms recommendation requires full engagement of shouldbeorganizedtoimproveprivatesector theprivatesectoraspartasastrategyincluding capacityinbiddingforpublicprocurement training and an open discussion forum. PPA as tender. defined in the PPL does not contemplate outreach activities with the private sector as one of its mandates, and lacks of budget resourcestosupportsuchactivities. However,thePPAhasprovidedlimitedtraining to the private sector and would be willing to continue to do so to the extent private sector institutions are willing to defray the related trainingcosts. Adequateaccesstocreditshouldbeensured Implemented – Access to credit by private throughsuitablepolicychangesbygovernment. sectoroperatorsisconsideredhasconsiderably improvedoverthepastfewyears.However,the internationalfinancialcrisisisalsoaffectingthe local financial market posing some constraints intherelevanttermsofavailablefinancing. Page67of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment # 6 PillarIIIͲProcurementOperationsandMarketPractices 2006Finding/Recommendation 2010Status Contractadministrationshouldbestrengthened Not Implemented – Contract administration is throughsuitabletrainingofstaff. not considered part of the procurement cycle under the purview of the PPA. The latter, coupled with the lack of an integrated internal control framework, and insufficient training, contributes to perpetrate weaknesses in contractmanagement. # 1 2 3 4 5 6 7 PillarIVͲIntegrityandTransparencyofthePublicProcurementSystem 2006Finding/Recommendation 2010Status Anumberofjudgesshouldbespecializedfor PartiallyImplemented–Sometraininghas procurementdisputecases beenprovidedthroughtheSchoolof Magistrates. PartiallyImplemented–StartingApril2010, ThePPAwebsiteshouldcontaincomplete informationonthecomplaintsandstatusofthe PPCisresponsibleforaddressingallcomplaints complaints andassuchshouldbealsoresponsiblefor publishingrelevantstatisticalinformation. Implemented AbeginningineͲprocurementshouldbemade bypublishingallprocurementnoticesand awardresultsonthePPAwebsite. Implemented–ThePPCwasformallyputin ThePPLshouldberevisedtoestablishan IndependentProcurementReviewBody(also placeandstartedoperationsinApril2010.It coveredinPillarI)toincreasetheconfidenceof hasanorganizationalstructureprovidingfor18 theprivatesectorandotherstakeholdersinthe staffpositions,adirectlineofdependencyfrom system. thePrimeMinisterandadedicatedbudgetthat ensuresitsindependenceandfunctioning. ThePPLshouldbeamendedtodefine PartiallyImplemented–Fraudulentandcorrupt fraudulentandcorruptpractices. practiceshavebeendefinedasintheDirective. However,thePPLdoesnothaveadirectcrossͲ referencetothebodyoflawcontainingthose definitionsandtheirscope. Alistofdebarredcompaniesshouldbeposted Implemented–Debarredcompaniesare onthePPAwebsite publishedinthewebsiteofthePPAandalsoin thePublicProcurementBulletins. NotImplemented–NeitherthePPLorthe PPL(Articles12,16)envisagesactionsfor fraudulentpractices.Theseprovidefor ProcurementRulesandRegulationscontainthe debarment,butproceduresneedtobedefined administrativeproceduresguidingdecisionsand fordebarmentcompanies. proceedingsleadingtothedebarmentof Page68of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment # PillarIVͲIntegrityandTransparencyofthePublicProcurementSystem 2006Finding/Recommendation 2010Status companies. Page69of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment MatrixCapacityActionPlanAnnex1 Criteria inGovernment Policy Difficulty Impact PossibleActions International Practices Competition Transparency Efficiency AreasforImprovement TimeRequired Assessment24 C B A PillarIͲLegislativeandRegulatoryFramework X X X 1. The PPL does not coverconcessions.Art. 4 of the PPL 1.UndertakeareviewofthePPLaimedat: vaguely references to the application of other laws that are not specified. Furthermore, the PPL provisions for x Incorporatingthetreatmentofconcessionsinto procurement by public utilities (a.k.a. sectoral contracts) thescopeofthePPL. lack clarity and congruency. This condition creates x Clarifying provisions applicable to the confusionamongpublicutilitiesastohowtobestchannel procurement by public utilities ensuring that theirprocurementtobeincompliancewiththelaw.This their needs are properly covered without resultsininconsistenciesandopensthedoortopotential leavingloopholesorprovisionsrequiringfurther nonͲcompliance and less than transparent procurement clarification. 24 Timerequired:Referstotheapproximateamountoftimetocompletetheaction.“A”requireslessthansixmonthsforimplementation,“B”requiresfromsix monthstoayear,and“C”requiresatleastoneyear. Degreeofdifficulty:Anestimateofthedegreeofpolitical,financial,ormanagerialdifficultyinvolvedinimplementingthechange.“A”meanslow,“B”means average,and“C”meanselevated. Impact:Estimatedeffectonthesystem’squality,administrativeexpenses,andefficiencyingeneral.“A”meanssignificant,“B”meansmoderate.LowͲimpact measuresarenotproposed. Actionsrated“A”inallthreecategoriescanbeimplementedrelativelyquicklyandeasilyandhavesignificantimpact. Page70of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Criteria inGovernment Policy X X Impact X 2. Although the PPL provides for the use of framework contracts, their application and use has not yet been decided by the PPA. Accordingly, the Rules and Regulationsdonotincludeguidanceonthepotentialuse offrameworkcontracts. In the particular case of Albania, and given government Difficulty practices. For instance, Article 58/6 provides for the unnecessary exclusion from the scope of application of the PPL of purchases of energy, fuels and water if such goodsareusedfortheproductionofenergy. X PossibleActions International Practices Competition Transparency Efficiency AreasforImprovement TimeRequired Assessment24 B B A x Revise the contents of the PPA’s webͲsite to IncludecrossͲreferencestothespecificbodyof law where the meaning and scope of the followingrelevantlegaltermsandconceptsare properlyexplained: o Fraudandcorruption; o Emergencyandforcemajeure; o NonͲdiscrimination o Quality based selection of consultants (i.e. based on technical qualifications alone);and, o Debarred parties’ opportunities to protest or appeal the debarment decision. 2. Undertake the necessary steps to effect implementation of the framework contract modality in the shortͲterm. Such steps should encompass –among others–thefollowing: x RevisionoftheeͲGPplatformtoaccommodate framework contracts, by providing for Page71of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Criteria inGovernment Policy International Practices Competition X X efforts about improving –among othersͲ the efficiency electronic catalogs and onͲline bidding by andeffectivenessofitspublicprocurementsystem,useof qualifiedeligiblevendors/suppliers. frameworkcontractswouldresultinacostͲeffectiveand x Detailed guidance on the scope of application transparent solution for the procurement of and implementation of the various types of commodities, recurrent items and small purchases, as framework contracts, such for small value well as for purchases by public utilities, such as energy. purchases, concentrated procurement such as EspeciallyconsideringthatthePPLdoesnotprovidefora office supplies; medicines; computer direct purchasing modality applicable to pettyͲcash equipment; etc.; and purchases by public purchases(i.e.smallvalueprocurementthatarebasedon utilities,suchaspurchasesofenergy. considerations of costͲeffectiveness are normally purchaseddirectlyandpaidthroughpettyͲcash). If properly implemented, framework contracts would helpsimplifyprocurementwhilecontributingtoincrease the level of participation and competition amongst potential eligible participants. This in turn will produce considerable savings while improving the overall transparency,competitivenessandcostͲeffectivenessof thepublicprocurementprocess. 3.PriortothemandatoryadoptionoftheeͲGPplatform 3. Review the current instruction to reduce time limits asthesoleconduitforallpublicprocurementprocesses, stated under Article 43 of the PPL, up to 7 days due to the use of the eͲGP platform, in order to conform to timelimitsforparticipationwere: internationalbestpractices. x 20 days from publication to the contract notice Impact X PossibleActions Difficulty X Transparency Efficiency AreasforImprovement TimeRequired Assessment24 B A A Page72of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Criteria inGovernment Policy x x x x Impact PossibleActions Difficulty International Practices Competition Transparency Efficiency AreasforImprovement TimeRequired Assessment24 for restricted or negotiated procedures with publication,valuedabovethehighthreshold; 20 days for receipt of tenders from the date in which invitations for restricted procedures are sent; 30 days for receipt of tenders from the date of publicationforopenproceduresvaluedbetween thehighandlowvaluethreshold; 15daysforrequeststoparticipate,fromthedate of publication of the contract notice for restricted or negotiated procedures with publication valued between the high and low thresholds;and, 15daysforreceiptsoftenders,fromthesending oftheinvitationforrestrictedproceduresvalued betweenthehighandlowthresholds. InpreparationofthemandatoryuseoftheeͲGPplatform, Article 43 of the PPL was amended to provide for a reductionofupto7daysincaseofallprocurementtime limits, including the 52 day time limit applicable to internationalopentenders. Page73of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment This reduction seems to be illͲconceived since the additionaleffectivenessintroducedthroughtheadoption of an eͲGP platform does little or nothing to reduce the time or effort required by potential bidders to prepare and submit their bids. Furthermore, some of the time limits described in Article 43 of the PPL were already consideredshorterthanthoseconsideredbestpractice. 4. According to Article 43, the time limit applicable to purchasesbyutilitiesshouldbeof52days.Thistimelimit is considered impracticable for purchases of energy by KESH, the government owned electric power generating company. Energy markets are shortͲterm focused (spot market). Accordingly, international suppliers that can be in a position to supply energy to Albania during the draught season would typically add a considerable surcharge to their prices when asked to quote a price todayandkeepitvalidformorethan7or10days. Given this constraints, KESH has resorted to using the restricted modality with negotiation, which allows them to have more flexibility given its much shorter legally requiredtimeͲframe. 4. As part of the review of the legal framework, clarify the use of time limits for public utilities providing for more flexible and advantageous applicable time frames that contemplate the nature of the particular market accessed by public utilities to satisfy their specific procurement needs resulting from operational requirements. X Impact PossibleActions International Practices Competition AreasforImprovement Difficulty X Assessment24 TimeRequired X Transparency Efficiency Criteria inGovernment Policy C A A Page74of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment A review of purchases of energy by KESH shows that it wouldgreatlybenefitfromusingframeworkcontractsto purchase energy during the draught season. Should that be thecase, framework contractscould be structured to qualifyinternationalprovidersofenergycommittingthem to supply energy based on availability at international market prices at the time of actual purchase. Using the framework contract modality, when there is a need for energy, KESH would submit a request to the qualified eligible international providers, who would then transparently compete amongst themselves to offer the lowest possible price. Use of this modality would also contribute to reducing the risk of untimely responses to energyneedsduringthedraughtseason. 5.WhilethePPLinArticle56providestheframeworkfor dealing with abnormally low tenders, it is through the Rules and Regulations, as amended by the Council of MinistersonJanuary29,2009thatprovisionismadefora specificprocedureforascertainingwhenanofferistobe considered abnormally low. According to this provision, an offer is abnormally low when it is greater than the 5. Amend the Rules and Regulations for Public Procurement to discontinue the use of a formula to ascertain abnormally low prices and replace it instead with a common sense and simple rule based on a relative value referred to the estimated market price, below which bidders have to provide written explanations for their pricing and cost components X Impact PossibleActions International Practices Competition X AreasforImprovement Difficulty X Assessment24 TimeRequired X Transparency Efficiency Criteria inGovernment Policy B A A Page75of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment arithmeticalmedianofallthediscounts(differencefrom the ceiling price) of all remaining offers plus one fifth of that difference. This rule is inappropriate since it artificially produces an abnormally high number of abnormally low offers to the extent that the majority of offersreceivedareclosertotheceilingprice.This,inturn, causes Contract Authorities (CA) to consider as abnormally low, offers that otherwise would be considerednormalinallmaterialrespects. justifying thequoted bid price. For instance, offers that are priced below 20% of the estimated market price shouldbeconsideredabnormallylowandinordertobe qualified, further written price justification is to be required from bidders. (see UNCITRAL’s recommendationsonlowͲballing) Implementationofthisrecommendationwouldresultin potential savings and contribute to making the public procurement process less discretionary, and more simpleandtransparent. 6. Amend the Rules and Regulations for Public Procurement to discontinue the practice of advertising the fund limit or ceiling fund in all public procurement tenders. X 6.WhilethePPLdoesnotrequiretheuseofaceilingfund ormaximumfundavailable,theRulesandRegulationsfor Public Procurement when referring to the contents of “contractnotice”,specificallyrequiretheuseofaceiling fund or maximum fund available. Accordingly, all government tenders state the ceiling fund in the face of callsfortender. Thispracticehasundesirableeffects,suchasencouraging bidders to either bid amounts very close to the ceiling fund or to decrease the quality of goods and services in Impact PossibleActions International Practices Competition X AreasforImprovement Difficulty Assessment24 TimeRequired X Transparency Efficiency Criteria inGovernment Policy A A A Page76of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment ordertoofferapriceascloseaspossiblebelowtheceiling fund. Furthermore, when combined with the technical specifications,itcanbeeffectivelyusedtofavoraspecific supplier. Furthermore,incaseofprocurementofgoodsorservices where technology is a major component, the use of a ceiling price can deprive the government from obtaining best value in procurement and may lead to additional administrativecosts. 7. Despite the 2009 amendments to the PPL, while procurement rules and regulations have been frequently updated, they are neither optimally organized hierarchically,norwellͲstructuredformally. 8. While overall the PPL and the Rules and Regulations appear to contain sound provisions for preͲqualification, thereviewofasampleofprocurementtenderprocesses revealed instances in which bidders may have been unfairly disqualified due to the inclusion of either unwarrantedorunreasonablerequirements. 7.Aspartoftheimplementationofamendmentstothe PPL, revise the contents, structure and organization of the Rules and Regulations for public procurement, and assess the adequacy of the rules governing the internal processesandproceduresofthePPCthatwererecently developed,inlightofitsfunctions.. 8.AspartoftherevisionofboththePPLandoftheRules and Regulations for Public Procurement, clarify the scope of preͲqualification requirements and the importanceoftheprinciplesofensuringfaircompetition and nonͲdiscrimination through the inclusion of requirements that are relevant and commensurate to X X X X X X Impact PossibleActions Difficulty AreasforImprovement TimeRequired Assessment24 International Practices Competition Transparency Efficiency Criteria inGovernment Policy C B A C B B Page77of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment In one instance, a CA included as a preͲqualification conditionaturnoverforthethreeyearsprecedingthecall for tender equivalent to the total value of the contract. The explanation given by the CA was that they had appliedtheprovisionsofArticle46ofthePPL,referredto the principle of proportionality of financial guarantees. Given the nature of the procurement in question, automobiles, and the relatively low risk for the government in case of a potential nonͲperformance by the bidder, this rule, as applied, appears to be discriminatory. Itshouldalsobenotedthattheinitialcomplaintsoftwo bidders was dismissed by the CA and that a subsequent appealbyoneofthebiddersdirectlytothePPAwasalso dismissed. 9. A Guide on Procedures for Public Procurement was produced by a USAIDͲfunded project in 2007, and adopted by the PPA. This guide is still available for consultationonthePPA’swebsiteat: https://app.gov.al/ep/ProcurementManuals.aspx. the risk to which both the government and the private sectorfaceinconnectionwithaparticularprocurement process. X 9. Update the Guide on Procedures for Public Procurement and organize it in a way that makes it simple to update its content as new legislation is produced. Impact PossibleActions International Practices Competition AreasforImprovement Difficulty X Assessment24 TimeRequired X Transparency Efficiency Criteria inGovernment Policy B A A Page78of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Criteria inGovernment Policy Difficulty Impact PossibleActions International Practices Competition Transparency Efficiency AreasforImprovement TimeRequired Assessment24 C C A Unfortunately,thisguidehasnotbeenupdatedtoreflect the substantial amendments introduced since 2007. Accordingly,theguideisoflittleornovaluetousers,and noongoingeffortsseemtobeinplacetoupdateit. PillarII–InstitutionalFrameworkandManagementCapacity X X X 10. The PPL, which sets the organization of the public procurement function, incorporates as an annex, the budgetary structure, which defines as a budgetary unit each entity that has an assigned budget. Consequently, the PPA consists of approximately 1,700 Contract Authorities,eachofwhichhasaminimumrosterof3staff – as stated in the PPL – yielding approximately between 5,100and8,500civilservantsassignedtoperformpublic procurementwork. Both the sheer number of individuals assigned and the delegation of authority down the line resulting from the currentstructureseemexcessiveforacountrythesizeof Albania and with the volume and nature of Albania’s publicprocurementoperations. 10. Assess the current organizational structure of the publicprocurementfunctionandaspartoftherevision of the PPL, contemplate a substantial streamlining of thecurrentstructureinlinewiththesizeandcomplexity ofAlbania’spublicprocurementneeds. Implementation of this recommendation should be effected jointly with a governmentͲwide change management strategy to emphasize and properly “sell” toallstakeholdersinvolved,theneedforchange. Itshouldbenotedthattheproposedstreamliningofthe structureofcontractingauthoritiesinlineministriesand public offices does not purport a modification of the organizational structure of those line ministers and Page79of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Criteria inGovernment Policy International Practices Competition X X The implicit and explicit costs associated to the current public procurement structure, coupled with the lack of capacity and tight budget environment, pose a heavy burdenonthesoundoperationofthepublicprocurement function, and an undue financial strain to the citizens of Albania. 11.Thepublicprocurementprocesscommenceswiththe signing of the purchase order (PO) by the authorized governmentofficialineachinstitution.Thesigningofthe PO assumes that sufficient funds are available in the budget to pay for its cost. The eͲGP platform starts the procurement process based on the PO, which is not entered into the system, and the eͲGP platform is not linked to the financial management system (i.e. financial accounting, budgetary and integrated financial informationsystems).Asaresult,noassuranceisgivento the availability of funds to cover all procurement processesinitiatedinanygivenyear.Inaddition,budget availability continues to be the main focus of procurement plans instead of the prioritization of institutional needs aligned with strategic government objectives. Impact X PossibleActions Difficulty X Transparency Efficiency AreasforImprovement TimeRequired Assessment24 C B A publicofficesthemselves. 11.AspartofthebroaderconceptofeͲGovernment,link theeͲGPplatformwiththepublicfinancialmanagement platform (i.e. financial accounting, budgetary, treasury andintegratedfinancialinformationsystem). Provide for specific procedures and criteria to ensure alignment of procurement planning with the implementationofgovernmentstrategicobjectives. Page80of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Furthermore, a review of a sample of procurement contracts shows that payments are processed with significant delays due to lack of sufficient funds. This situation, directly affects development of the local procurement market putting local firms at peril, and is compounded by lack of integration of the eͲGP platform withthepublicfinancialmanagementsystem. 12.ThePPLdoesnotcontemplate aspartof PPA’svarious responsibilities,theoversightofcontractimplementation ortheproactiveengagementoftheprivatesectorinthe developmentofthemarket. As a result, the public procurement environment in Albaniaischaracterizedbyageneralsenseofmistrustin procurement officials and in the fairness and transparencyofthepublicprocurementprocessatlarge. Contractors feel that procurement contracts contain harsh legal covenants designed to ensure their compliancebutnottoprotectthemfromnonͲcompliance by the government, such as lack of timely payment for 12. Revise the scope of work of the PPA to encompass from oversight of the procurement planning process throughcontractmanagementandcompletion. Concurrent with expanding its scope, PPA should developastrategyforfosteringaclosepartnershipwith theprivatesectorandcivilͲsocietytofurtherdevelopthe procurement market in Albania and the continuous improvement of the public procurement process. Such strategy should provide –among others – for the developmentof: x PublicͲprivatepartnerships x Effective mechanisms to foster open dialogue X Impact PossibleActions International Practices Competition AreasforImprovement Difficulty X Assessment24 TimeRequired X Transparency Efficiency Criteria inGovernment Policy C C A Page81of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Criteria inGovernment Policy International Practices Competition X X goods,worksandservicesrendered. A review of general conditions for government procurement contracts, as well as a review of contract management for a sample of contracts, showed uneven application and compliance with legal covenants by CAs. Hence,providingareasonablebasisfortheprivatesector belief of an overall lack of capacity, resulting in discrimination and uneven balance of contractors’ rights andobligations. 13. Following the start of operations of the PPC in April 2010, the GOA transferred 18 staff positions previously assignedtotherosterofthePPA.Thisdecisionresulted incuttingthestafflevelofthePPAbyhalf,sincepriorto the creation of the PPC, the PPA had 36 positions, of which approximately 2 were assigned to dealing with complaints. Itshouldbenotedthatpriortothisreductionandbased on the facts and information gathered by the consulting team during the assessment of the public procurement system, it appeared that the PPA’s could have benefited x Impact X PossibleActions Difficulty X Transparency Efficiency AreasforImprovement TimeRequired Assessment24 A B A and broad participation of all relevant stakeholders Publiccommunicationandtraining 13. Reassess the workͲload of the PPA ensuring the adequacy of its structure, staff level and budget, to enableittoproperlydischargeitsvariousresponsibilities asrequiredbythePPL. The assessment of the PPA’s workload should be undertaken taking into consideration not only the currenttasksassignedtothePPA–asperthePPL–but alsoconsideringtheadditionaltasksandresponsibilities associated to the implementation of the capacity developmentopportunitystatedunder“PossibleAction” number12,above. Page82of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Criteria inGovernment Policy Difficulty Impact PossibleActions International Practices Competition Transparency Efficiency AreasforImprovement TimeRequired Assessment24 B B A from a workͲload assessment to more adequately dimensionitsstafflevelinlightofthefunctionsthatitis expectedtoperform. Accordingly,thereductionofthestafflevelfrom36to18 positions appears illͲadvised and directly affects the capacity of the PPA to perform its core functions, and makesitunviableforittoexertthenecessaryleadership required to undertake the implementation of the action planoutlinedthroughtheserecommendations. PillarIII–ProcurementOperationsandMarketPractices X X X X 14.PPAlacksastrategyandasystemcapabletogather, analyze and report procurement information to adequately support the decision process inherent in managing and developing a sound public procurement system. WhilethecurrenteͲGPplatformcontainsalltransactions processed since January 2009, existing hardware and software limitations preclude the ability to store all procurementinformationandtorunqueriesandreports 14.AspartofthescopeoftheongoingauditoftheeͲGP platformbeingconductedbyaconsultingfirmfundedby the World Bank, analyze the capacity of the current platformintermsofsupportingdataͲminingandadͲhoc queries and reporting to supportprocurementplanning anddecisionͲmaking. Page83of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment that are considered essential to support the decision makingprocess. 15. PPA is formally tasked with the responsibility of designing a strategy for the training of public procurement officials, both at central and local governmentlevels. Training funding is the responsibility of the Training Institute for Public Administration (TIPA), which has an annual budget equivalent to US$ 90,000 to train up to 6,000governmentofficials. The above budget is considered largely inadequate to satisfy the training needs of the more than 5,100 civil servants involved in procurement, which accounts for almostthesamenumberoftotalgovernmentemployees thatTIPAisrequiredtohelptrainannually. Trainingin2009wasonlyfocusedontheuseoftheeͲGP platform and encompassed approximately 700 and 900 employeesatthelocalandcentrallevels,respectively. 15. The PPA should develop a comprehensive training strategy based on specific curricula for procurement official encompassing from the basic tenets and procedures applicable to public procurement through the more advance concepts, procedures, tools and practices. TheGovernmentofAlbaniashouldsupportdevelopment of the institutional capacityas a means of attainingthe type of improvement of the public procurement that it seeks.Suchsupportshouldbeintermsofanaggressive changemanagementprocessandthroughtheallocation of the proper resources to attain a positive transformation of the knowledge and skills of procurement officials, and to develop the kind of information and reporting tools required to support decisionͲmakingandoversight. X Impact PossibleActions International Practices Competition X AreasforImprovement Difficulty X Assessment24 TimeRequired X Transparency Efficiency Criteria inGovernment Policy B B A Page84of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Criteria inGovernment Policy International Practices Competition X X Training plans for 2010 were still being prepared at the time of this assessment though the training will also be focusedontheuseoftheeͲGPplatform. 16. There is not a specific career path for civil servants assigned to perform as public procurement officials. Accordingly, formulation of a strategy for attracting a cadreofqualifiedprofessionalsbecomesahaphazardous exercise. The procurement function in Albania needs to beperformedbyindividualswiththetypeofprofessional educationandexperiencetoallowthemtobeproficient intheperformanceoftheirduties. The public procurement function requires a combination of technical skills such as: accounting; business administration; economics; law; engineering; management; and information systems, just to cite the mostrelevantones. Once individuals with those skills are in place, it is also required to have a training strategy that would progressivelyfocusthetrainingofthedifferentspecialties intheprogressivelymorechallengingandcomplextypes Impact X PossibleActions Difficulty X Transparency Efficiency AreasforImprovement TimeRequired Assessment24 B C A 16.InclosecollaborationwiththeDepartmentofPublic Administration(DOPA),developadedicatedcareerpath for the different specialties involved in public procurement.Basedontheresponsibilitiescontainedin the various job descriptions and the scope of authority assignedtoeachpositionalongthecareerpath,develop andimplementatrainingstrategycoveringa3to5year horizon,alongwiththecorrespondingperformanceand qualitativeindicatorstomeasureitssuccess. Page85of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Criteria inGovernment Policy International Practices Competition X X of procurement processes and contract management issues,fromalegalandoperationalstandpoint. 17. The PPA has developed standard bidding documents 17. PPA should update SDBs to explicitly refer to the (SDBs) to support different types of procurement. applicableADRmechanism. However, those SDBs do not contain information on the applicable alternative dispute resolution mechanism (ADR),butreferonlytocourts Impact X PossibleActions Difficulty Transparency Efficiency AreasforImprovement TimeRequired Assessment24 A A B C C A PillarIV–IntegrityandTransparencyofthePublicProcurementSystem X X X X 18.Asstatedinthe“PolicyPaperandActionPlanforthe Public Internal Financial Control for 2009 – 2014 (PIFC)”, Albania is in the process of improving its managerial accountability, internal controls, risk management, accountingservice,andmonitoring. This in an on itself is a very challenging and demanding exercise, which requires no only to have the required level of financial resources, but above all the political commitment and the support from the majority of stakeholdersinvolved. 18. The Ministry of Finance should prioritize implementation of a riskͲbased integrated internal controlframework,inaccordancetoPIFC,obtainingthe political commitment and stakeholders’ support required to consolidate implementation of all reforms articulatedinthePIFC. Thedauntingmagnitudeandchallengeofthesereforms, necessitates of a concurrent and wellͲarticulated and financed changeͲmanagement strategy, to ensure adequateandsuccessfulimplementationofthereforms Page86of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Criteria inGovernment Policy International Practices Competition X Currently, Albania does not have a uniform internal control framework. As a result, each institution sets its own.Thisprocessresultsinagreatdealofinconsistencies among various entities and opens the door to potential undueexposurestononͲcomplianceincriticalareas.Lack of an integrated control framework also imperils SSA’s auditors as well as internal auditor’s ability to plan and conductperformanceaudits. Furthermore, the review of procurement transactions revealedaratherformalisticapproachtoauditingwitha focusoncompliance. Giventheexistingcapacitygapandthelackofexperience in the country with modern approaches to riskͲbased integrated internal control frameworks, and riskͲbased and operational auditing, the magnitude of the changes to be undertaken would necessitate a governmentͲwide changemanagementstrategy. 19,ThedesignoftheeͲGPplatformdoesnotcontemplate aseparateuserprofiletograntSSAandinternalauditors withunrestrictedaccesstoprocurementtransactions.As Impact X PossibleActions Difficulty X Transparency Efficiency AreasforImprovement TimeRequired Assessment24 B A A sought. 19. Revise the contents of the Audit Law in order to guarantee SSA with unrestricted access to all procurementtransactionsintheeͲGPplatform,withthe Page87of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment a result, both internal and the State Control Auditors (SSA), need to obtain permission from the head of the entity they want to audit, for them to access a specific procurementprocess. Suchsecuritydesignnegatestheverynatureoftheaudit function. Pronouncement of the International Auditing Standards applicable to the external audit function (INTOSAI), as well as the Standards for the Professional Practice of Internal Auditing (SPPIA) of the International Institute of Internal Auditors (IIA), state that auditors should have unrestricted access to all relevant informationrequiredtoperformtheirwork. The current situation coupled with the lack of training availableforinternalandSSAauditors,castsdoubtsover the level of transparency that should characterize the operations of government entities and in particular over their procurement operations, while negating the benefitsofanelectronicprocurementsystem. exceptionoftransactionskeptinthelockbox.Aspartof such revision, modify the eͲGP platform, creating a dedicated access profile for both, SSA and internal auditors and grant them access to all procurement informationononͲgoingandexecutedtransactions,with the exception of those included in the lockbox pending eͲopeningofthetender. Impact PossibleActions Difficulty AreasforImprovement TimeRequired Assessment24 International Practices Competition Transparency Efficiency Criteria inGovernment Policy Page88of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment 20.Areviewofasampleofprocurementtransactionsand contract administration at 10 government institutions, revealed several instances of inconsistent application of criteria in dealing with complaints, both at the level of CAsandatthePPA. Whiletheunevenandsomewhatrandomcriteriaapplied by CAs and the PPA might be explained by lack of skills combinedwithinsufficienttraining,someoftheinstances observed,raisevalidconcernsabouttheoverallfairness, objectivity and independence of the complaint mechanism. 21. The PPA is empowered to exclude economic operators(i.e.individualsandfirms)fromparticipatingin procurementproceduresforupto3years.ThePPAalso has the capacity to impose penalties and recommend sanctions(rangingfrommonetarypenaltiestodebarment offirmsandindividuals,aswelltoCAsandcivilservants). However, the range of penalties and sanctions are not well defined either in the PPL or in the Procurement 20. Assess PPC25 and CAs experience dealing with complaints accumulated since 2009 and through today. The assessment should be aimed at extracting lessons learned, and apply them to the implementation of the internal procedures to be applied both by the Public Procurement Committee and by CAs in dealing with complaints. International Practices Competition X PossibleActions X X 21. As part of the amendment to the PPL and of the Rules and Regulations, include a wellͲdefined set of vendor sanction provisions articulating the range of penaltiesandsanctionsthatcanbeimposedbythePPA in connection with inappropriate behavior, fraud and corruption. Impact X X AreasforImprovement Difficulty X X Assessment24 TimeRequired X Transparency Efficiency Criteria inGovernment Policy B B A B B A 25 ThroughApril2010,thatthePPCwasformallyputinplace,allprocurementcomplaintsweretheresponsibilityofthePPA. Page89of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment 22.AccordingtothescopeconferredbytothePPAbyin thePPLinconnectionwiththeperformanceof administrativeinvestigations,ChapterVII,Article66 “Actionsfollowingtheconclusionofadministrative investigation,”paragraph1,states:“Oncethe investigationisover,thePPAmaytakethefollowing decisions: 22. Revise the role of the PPA in connection with the conductofadministrativeinvestigationsasitiscurrently statedinthePPL,ChapterVII,Article66,paragraph1. The revised text should state that all decisions in connection with complaints are the sole prerogative of thePPC,whichatitsdiscretionmayrequestthePPA,the State Control Auditors or any other competent body to startandadministrativeinvestigationinconnectionwith complaints involving public procurement matters broughttoitsattention. Impact PossibleActions Difficulty AreasforImprovement TimeRequired Assessment24 International Practices Competition Transparency Efficiency Criteria inGovernment Policy A A A Rules. X X X a)toclosetheinvestigationastheactions,or failuretoact,oftheCAunderinvestigation,did notinfringethePPL,noranyother administrativeorcriminalprovision. b)toissueareasonedopinioninwritingtothe CAinvolved,orderingtostoptheillegalbehavior withinasettimeͲlimit. The above article effectively creates a loophole and a potentialconflictbyprovidingthePPAwiththeauthority to investigate and decide in connection with complaints thatmaynothavebeenroutedeitherbythecomplainer orbytheCAdirectlytothePPC. Page90of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Criteria inGovernment Policy International Practices Competition X X Creation of the PPC was done with the intent that all investigations and decisions in connection with complaints related to public procurement would be the prerogative of the PPC. The PPC –at its discretion – can then instruct the PPA to start an administrative investigationonitsbehalf. ThisfindingwasdiscussedandagreedwiththeDirectorof the PPA, the Chairman of the PPC; and the Deputy DirectoroftheDSDConJune14,2010. 23. The Public Procurement Advocate (PPAV) plays a supportive and effective role to the reviews or investigations conducted either by the PPA or other competent authorities. However, the PPAV has been directly involved in the conduct of independent investigations of allegations of potential irregularities involvingpublicprocurement. Toalargeextent,suchinvestigativefunctionsconstitutea duplication of the functions conferred in the PPL to the PPC, which through April 2010, date in which the PPC formally started operations, had been performed by the 23.OncethePPChasbeen inplace andfullyoperational for about a year, there should be a revision of the investigative role of the PPAV so as not to incur in an unnecessaryduplicationoffunctions. Additionally, such assessment should encompass a thorough review of the functions performed by other stakeholders within the public procurement system to ensuretherearenounnecessaryduplicationoffunctions andtheprincipleofeconomyofcontrol. Impact X PossibleActions Difficulty X Transparency Efficiency AreasforImprovement TimeRequired Assessment24 B B B Page91of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment PPA. 24.ThereisnoexplicitreferenceinthePPA’swebsitetoa dedicated eͲmail and hotline to report allegations of potential improprieties in connection with public procurement processes or the actions of civil servants involvedinpublicprocurement. 24. Modify the contents of the PPA’s webͲsite to highlight the telephone numbers reserved for the hotline and provide content explaining that those numbersaretoencouragethepublictoreportinstances ofpotentialfraudorcorruption. X Impact PossibleActions International Practices Competition AreasforImprovement Difficulty X Assessment24 TimeRequired Transparency Efficiency Criteria inGovernment Policy A A A Page92of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment ListofContactsandProcurementEntitiesReviewedAnnex2 InaccordancewiththeOECD/DACMethodology,theAssessmentTeamcomplementedtheassessment ofthe12BLIindicatorsandtheir56subͲindicatorswiththeresultsofareviewofasampleoftenderand contractmanagementdocumentationcorrespondingto8entitiesand2municipalitiesselectedbythe AdvisoryGroup. Theresultingnotessummarizetheworkperformedinconnectionwitheachreviewandanyfindingsand observationsnotedbytheAssessmentTeam. Alistoftheinstitutionsreviewedaswellastheindividualsinterviewedfollows: INSTITUTIONS 1 DSDC 2 PublicProcurementAgency 3 HighStateAudit 4 USAID 5 ProcurementAdvocate 6 MinistryofHealth RESPONSIBLE PERSON ValbonaKuko AlpinaQirjazi Klodiana Cankja Reida Shahollari Anilda Sefgjini GjergjiMocka ElvanaTivari PjeterBeleshi KocoSokoli SeanHuff IlirjanaDana SokolAliko Kreshnik Karalliu Fatbardh Vrioni GjergjGoxhi GjergjiVesho AnjezaAlliu IlvaCavo Theodhoraq Zguri Skender Carcani CONTACTDETAILS Director HeadoftheTraining,Integration,Financeand HumanResourcesDepartment DeputyDirector ITexpert Director,LegalQualityControl ExpertonprocurementAudit LegalExpert SupervisoryProgramOfficer DeputyProgramOfficer MCCProjectManager Inspector Inspector Director HeadofProcurementUnit LegalExpert Procurement HeadofInternalAudit HeadofFinanceDepartment Page93of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment INSTITUTIONS 7 MinistryofEducation 8 MinistryofInterior 9 MinistryofTransports 10 KESH 11 INSIG 12 MunicipalityofKamza 13 MunicipalityofTirana RESPONSIBLE PERSON DafinaCaushi SkenderJaku Etjon Kapedani Gezim Cekrezi Marsuela … ErvinAliu Xhevdet Mehmetaj Arben Shkembi MimozaBalla ErletaBucaj … AlionCenolli OsmanHoxha Gezim Sharrra KlaraMullaj IlirIslamaj AstritVeliu Alqivadh Ndini SuelaShanaj ArturKurti EtisXhomo ErionSeferi Antoneta Mancellari ArbenMuja AtliHoti Shpresa Xhakrosa CONTACTDETAILS HeadofProcurementUnit HeadofInternalAudit Generalsecretary DirectorCentralProcurement 9 GeneralSecretary Officer,ProcurementUnit headofProcurementUnit OfficerProcurementUnit Director,Wholesalesupplydepartment Legalexpert ProcurementExpert1 Director,ProcurementDepartment Officer,ProcurementDepartment Officer,ProcurementDepartment Officer,ProcurementDepartment Officer,ProcurementDepartment Officer,ProcurementDepartment DirectorEconomicDepartment HeadofFinanceUnit HeadInternalServices HeadofFinanceDepartment DeputyChairman Director,LegalDepartment Head,ProcurementUnit Page94of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment 14 15 1 INSTITUTIONS CFCU GRD Interviews AmericanChamberof CommerceinAlbania RESPONSIBLE PERSON MirsaTitka OlsaNikolla FloretaLuli Faber Vladimir Konomi 4 InfosoftSystemssh.a. AlbanianConstruction Association AlbanianConstruction Association 5 ALPET 6 Profarma IlirHebovija Albana Laknori Anja Novosela EDILALͲIt FICADEXAlbania FortuneAlbania Xhilda Dervishi MariaDushi ErionCela 2 3 7 8 9 CONTACTDETAILS Officer Director,LegalDepartment Director SalesManager LuigjAleksi, President EditorinChief ChiefofJuridicalDepartmentAffaires TechnicalAssistant HeadTenderUnit Administrator Officer,TechnicalDepartment Page95of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment MeetingswiththeAdvisoryGroupAnnex3 ThisannexcontainsallminutessummarizingthemeetingsheldbytheAdvisoryGroupandthe AssessmentTeamduringthecourseofthework. Page96of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page97of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page98of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page99of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page100of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page101of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page102of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page103of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page104of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page105of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page106of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page107of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page108of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page109of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page110of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page111of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page112of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page113of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page114of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page115of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page116of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page117of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page118of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page119of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page120of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page121of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page122of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page123of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Annex4 RawstatisticaldataobtainedtoanalyzeCPIs The information depicted below was provided by the PPA to the consulting team for the purpose of populating the compliance and performance indicators or “CPIs” suggested in the OECD/DACmethodologyfortheassessmentofpublicprocurementsystems. Asitistypicallythecaseinmanyothercountries,thelevelandnatureofstatisticalinformation available prior to the mandatory use of the eͲGP platform, effective January 1, 2009, was not sufficient to help populate all of the required indicators. However, the range and type of information available was sufficiently adequate to help populate the most relevant indicators and coupled with the result of the tenders reviewed during the field work phase, helped to provide the consulting team with the required information to assess the actual level of performanceandcomplianceofthesystem. STATISTICALDATAONPUBLICPROCUREMENTPROCEDURESforyears2007Ͳ2009 DetailedmonthlytablesforMarchthroughtoDecember2007 MARCH2007 Openprocedure No.ofprocedures Limitfund Realisedfund Savedfund Civilworks 0 0 0 0 Goods 1 1,500,000 1,489,894 10,106 Services 1 2,000,000 1,991,000 9,000 Solicited proposal Civilworks 3 3,900,000 3,690,236 209,764 Goods 9 9,533,000 8,439,244 1,093,756 Services 1 9,533,000 8,439,244 1,093,756 Civilworks 0 0 0 0 Goods 0 0 0 0 Restricted procedure Services 0 0 0 0 Other procedures Civilworks 0 0 0 0 Goods 0 0 0 0 Services 0 0 0 0 15 26,466,000 24,049,618 2,416,382 Total Page124of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment No.ofpublishedopenprocedures 2 No.ofpublishedsolicitedproposalprocedures No.ofpublishedrestricted procedures No.ofotherpublishedprocedures(consultancyservices,negotiationsandwith publication) 13 No.oftotalpublishedprocedures 15 3,500,000 Solicitedproposalprocedurelimitfund Restrictedprocedurelimitfund Otherprocedurelimitfund(consultancyservices,negotiationsandwith publication) 22,966,000 0 Totalpublishedprocedurelimitfund 26,466,000 Openprocedurelimitfund Totalsavedfund 0 0 0 2,416,382 APRIL2007 Open procedure Solicited proposal Restricted procedure Other procedures Total No.ofprocedures Limitfund Realisedfund Savedfund Civilworks 8 95,479,841 90,007,654 5,472,187 Goods 63 577,738,851 526,137,003 51,601,848 Services 20 83,614,161 78,344,154 5,270,007 Civilworks Goods 33 52,951,265 51,448,021 1,503,244 125 143,014,373 135,387,656 7,626,717 Services 91 91,225,765 85,586,027 5,639,738 Civilworks 0 0 0 0 Goods 0 0 0 0 Services 0 0 0 0 Civilworks 0 0 0 0 Goods 1 1,267,008 1,193,600 73,408 Services 0 0 0 0 341 1,045,291,264 968,104,115 77,187,149 No.ofpublishedopen procedures No.ofpublishedsolicitedproposalprocedures No.ofpublishedrestricted procedures No.ofotherpublishedprocedures(consultancyservices,negotiationsandwith publication) No.oftotalpublished procedures 91 249 0 1 341 Page125of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment 756,832,853 Solicitedproposalprocedurelimitfund Restrictedprocedurelimitfund Otherprocedurelimitfund(consultancyservices,negotiationsandwith publication) 287,191,403 0 Openprocedurelimitfund Totalpublishedprocedurelimitfund Totalsavedfund 1,267,008 1,045,291,264 77,187,149 MAY2007 No.of procedures Limitfund Realisedfund Savedfund Civilworks 18 287,166,171 236,160,670 51,005,501 Goods 145 1,142,251,715 991,877,496 150,374,219 Services 64 308,828,492 300,328,600 8,499,892 Civilworks 45 62,060,311 60,235,574 1,824,737 Goods 175 185,364,089 175,019,275 10,344,814 Services 91 89,331,819 82,776,915 6,554,904 Civilworks 0 0 0 0 Goods 0 0 0 0 Services 0 0 0 0 Civilworks 0 0 0 0 Goods 1 1,150,000 1,150,000 0 Services 3 5,660,000 5,580,550 79,450 542 2,081,812,597 1,853,129,080 228,683,517 Openprocedure Solicited proposal Restricted procedure Other procedures Total No.ofpublished openprocedures No.ofpublishedsolicited proposalprocedures No.ofpublished restrictedprocedures No.ofotherpublishedprocedures(consultancy services,negotiationsandwithpublication) No.oftotalpublished procedures 227 311 0 4 542 Page126of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Openprocedurelimit fund 1,738,246,378 336,756,219 0 6,810,000 Totalpublishedprocedurelimitfund 2,081,812,597 228,683,517 Solicitedproposalprocedurelimitfund Restrictedprocedure limitfund Otherprocedurelimitfund(consultancyservices, negotiationsandwithpublication) Totalsavedfund JUNE2007 Solicited proposal Restricted procedure Other procedures Total Limitfund Realisedfund Savedfund Civilworks 37 580,854,376 504,602,587 76,251,789 Goods 134 1,707,275,376 1,383,254,056 324,021,320 Services 52 186,262,335 162,606,230 23,656,105 Civilworks 35 55,089,012 53,704,283 1,384,729 Goods 171 185,487,960 173,568,981 11,918,979 Services 52 82,242,066 75,394,234 6,847,832 Civilworks 0 0 0 0 Goods 0 0 0 0 Services 0 0 0 0 Civilworks 0 0 0 0 Goods 0 0 0 0 Services 3 7,208,309 6,788,394 419,915 484 2,804,419,434 2,359,918,765 444,500,669 Open procedure No.of procedures No.ofpublished openprocedures No.ofpublishedsolicitedproposal procedures No.ofpublishedrestricted procedures No.ofotherpublishedprocedures(consultancyservices, negotiationsandwithpublication) No.oftotalpublished procedures 223 258 0 3 484 Page127of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Openprocedurelimitfund Solicitedproposalprocedurelimitfund Restrictedprocedurelimitfund Otherprocedurelimitfund(consultancyservices,negotiations andwithpublication) Totalpublishedprocedurelimitfund 2,804,419,434 444,500,669 Totalsavedfund 2,474,392,087 322,819,038 0 7,208,309 JULY2007 No.of procedures Limitfund Openprocedure Realisedfund Savedfund Civilworks 142 2,492,936,849 2,122,161,392 370,775,457 Goods 173 1,137,976,064 1,059,138,087 78,837,977 Services 48 214,081,383 191,295,308 22,786,075 Civilworks 149 171,926,123 168,313,556 3,612,567 Goods 210 165,736,702 158,276,674 7,460,028 Solicitedproposal Services 115 70,995,141 69,017,446 1,977,695 Restricted procedure Civilworks 1 239,080,000 238,652,538 427,462 Goods 0 0 0 0 Services 0 0 0 0 Civilworks 1 702,400 680,000 22,400 Otherprocedures Goods 0 0 0 0 Openinternational procedure Services 9 61,535,731 61,146.500 389,231 Civilworks 1 395,850EURO 360,830Euro 849 4,554,970,393 4,068,681,501 486,288,892 Total No.ofpublishedopen procedures No.ofpublished international procedures No.ofpublishedsolicitedproposal procedures No.ofpublished restrictedprocedures No.ofotherpublishedprocedures(consultancyservices, negotiationsandwithpublication) No.oftotalpublished procedures 363 1 474 1 10 849 Page128of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Openprocedurelimit fund Solicitedproposalprocedurelimitfund Restrictedprocedure limitfund Otherprocedurelimitfund(consultancyservices,negotiationsand withpublication) Totalpublishedprocedurelimitfund 3,844,994,296 408,657,966 239,080,000 62,238,131 4,554,970,393 AUGUST2007 No.of procedures Limitfund Openprocedure Realisedfund Savedfund Civilworks 158 2,726,367,621 2,491,062,094 235,305,527 Goods 121 984,034,505 911,911,677 72,122,828 Services 40 394,880,409 382,845,094 12,035,315 Civilworks 103 156,182,232 152,080,122 4,102,110 Goods 112 102,660,487 98,279,527 4,380,960 Solicitedproposal Services 56 51,663,618 50,484,187 1,179,431 Restricted procedure Civilworks 1 0 0 0 Goods 1 333,000 298,460 34,540 Services 0 0 0 0 Civilworks 0 0 0 0 Goods 2 5,818,646 5,057,940 760,706 Services 2 39,559,000 39,261,818 297,182 596 4,461,499,518 4,131,280,919 330,218,599 319 271 2 4 596 Otherprocedures Total No.ofpublishedopen procedures No.ofpublishedsolicitedproposalprocedures No.ofpublishedrestricted procedures No.ofotherpublishedprocedures(consultancyservices,negotiations andwithpublication) No.oftotalpublished procedures Openprocedurelimitfund Solicitedproposalprocedurelimitfund Restrictedprocedurelimit fund Otherprocedurelimitfund(consultancyservices,negotiationsand withpublication) Totalpublishedprocedurelimitfund Totalsavedfund 4,105,282,535 310,506,337 333,000 45,377,646 4,461,499,518 330,218,599 Page129of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment SEPTEMBER2007 Openprocedure No.ofprocedures Limitfund Realisedfund Savedfund Civilworks 226 3,075,562,404 2,953,508,966 122,053,438 Goods 153 1,098,238,495 1,020,193,501 78,044,994 Services 52 275,986,780 262,827,573 13,159,207 Civilworks 204 293,834,949 288,265,074 5,569,875 Goods 92 85,938,084 83,567,420 2,370,664 Solicitedproposal Services 59 59,921,132 58,136,225 1,784,907 Restricted procedure Civilworks 2 76,279,237 73,247,079 3,032,158 Goods 9 271,000,000 268,250,890 2,749,110 Services 2 139,738,233 139,003,566 734,667 Civilworks 0 0 0 0 Goods 3 13,367,166 13,271,900 95,266 Services 11 29,416,665 28,393,008 1,023,657 813 5,419,283,145 5,188,665,202 230,617,943 431 355 13 14 813 Otherprocedures Total No.ofpublishedopen procedures No.ofpublishedsolicitedproposalprocedures No.ofpublishedrestricted procedures No.ofotherpublishedprocedures(consultancyservices,negotiationsand withpublication) No.oftotalpublished procedures Openprocedurelimitfund Solicitedproposalprocedurelimitfund Restrictedprocedurelimitfund Otherprocedurelimitfund(consultancyservices,negotiationsandwith publication) 4,449,787,679 439,694,165 487,017,470 42,783,831 Totalpublishedprocedurelimitfund 5,419,283,145 230,617,943 Totalsavedfund Page130of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment OCTOBER2007 Openprocedure No.ofprocedures Limitfund Realisedfund Savedfund Civilworks 244 2,784,495,296 2,616,424,265 168,071,031 Goods 122 1,263,928,127 937,928,481 325,999,646 Services 96 654,844,683 596,001,552 58,843,131 Civilworks 196 399,667,400 356,511,713 43,155,687 Goods 156 181,125,563 174,649,872 6,475,691 Solicitedproposal Services 118 159,330,893 156,846,138 2,484,755 Civilworks 2 736,339,461 641,519,207 94,820,254 Goods 1 39,230,000 39,053,000 177,000 Restrictedprocedure Services 1 1,000,000 990,000 10,000 Civilworks 12 568,856,125 548,979,917 19,876,208 Goods 9 104,435,000 98,465,996 5,969,004 Services 5 37.781.481 36,454,020 1,327,461 962 6,931,034,029 6,203,824,161 727,209,868 462 470 4 26 962 4,703,268,106 740,123,856 776,569,461 Otherprocedures Total No.ofpublishedopen procedures No.ofpublishedsolicitedproposalprocedures No.ofpublished restrictedprocedures No.ofotherpublishedprocedures(consultancyservices, negotiationsandwithpublication) No.oftotalpublished procedures Openprocedurelimit fund Solicitedproposalprocedurelimitfund Restrictedprocedurelimit fund Otherprocedurelimitfund(consultancyservices,negotiationsand withpublication) 711,072,606 Totalpublishedprocedurelimitfund 6,931,034,029 727,209,868 Totalsavedfund Page131of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment NOVEMBER2007 Open procedure No.ofprocedures Limitfund Realisedfund Savedfund Civilworks 151 5,387,170,099 4,877,409,480 509,760,619 Goods 93 1,058,544,393 737,006,682 321,537,711 Services 47 635,808,403 555,469,248 80,339,155 Civilworks 108 150,572,193 145,067,437 5,504,756 Goods 43 52,710,887 50,471,732 2,239,155 Services 52 55,623,626 52,775,750 2,847,876 Civilworks 0 0 0 0 Goods 0 0 0 0 Services 0 0 0 0 Civilworks 0 0 0 0 Goods 4 20,408,036 20,400,000 8,036 Services 3 49,666,666 29,688,514 19,978,152 501 7,410,504,303 6,468,288,843 942,215,460 291 No.ofpublishedsolicitedproposalprocedures No.ofpublished restrictedprocedures No.ofotherpublishedprocedures(consultancyservices, negotiationsandwithpublication) No.oftotalpublished procedures 203 0 7 501 7,081,522,895 258,906,706 0 70,074,702 7,410,504,303 Solicited proposal Restricted procedure Other procedures Total No.ofpublishedopen procedures Openprocedurelimit fund Solicitedproposal procedurelimitfund Restrictedprocedure limitfund Otherprocedurelimitfund(consultancy services,negotiationsandwithpublication) Totalpublished procedurelimitfund Total saved fund Page132of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Openprocedure Civilworks 186 7,928,242,955 7,607,989,732 320,253,223 Goods 96 942,515,158 791,168,323 151,346,835 Services 85 1,184,180,210 1,136,759,696 47,420,514 Civilworks 95 170,412,756 161,691,673 8,721,083 Goods 57 72,552,170 70,922,348 1,629,822 Services 39 39,691,617 37,976,464 1,715,153 Civilworks 2 458,328,065 455,853,073 2,474,992 Goods 0 0 0 0 Services 0 0 0 0 Civilworks 3 84,740,250 79,336,800 5,403,450 Goods 6 11,813,832 11,560,687 253,145 Services 20 150,157,990 146,957,474 3,200,516 589 11,042,635,003 10,500,216,270 542,418,733 Otherprocedures Total No.ofpublishedopen procedures No.ofpublishedsolicitedproposal procedures No.ofpublished restrictedprocedures No.ofotherpublishedprocedures(consultancyservices, negotiationsandwithpublication) Totalno.ofpublished procedures Openprocedurelimit fund Savedfund Restrictedprocedure Realisedfund Solicitedproposal DECEMBER2007 No.of procedures Limitfund 367 191 2 29 589 10,054,938,323 282,656,543 458,328,065 Solicitedproposalprocedurelimitfund Restrictedprocedurelimit fund Otherprocedurelimitfund(consultancyservices, negotiationsandwithpublication) 246,712,072 Totalpublishedprocedurelimitfund 11,042,635,003 542,418,733 Totalsavedfund Page133of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment SUMMARYTABLEPERMONTH2007 No.ofprocedures Limitfund Realisedfund Savedfund January 0 0 0 0 February 0 0 0 0 March 2 3,500,000 3,480,894 19,106 April 91 756,832,853 694,488,811 62,344,042 Openprocedure May 227 1,738,246,378 1,528,366,766 209,879,612 June 223 2,474,392,087 2,050,462,873 423,929,214 July 363 3,844,994,296 3,372,594,787 472,399,509 August 319 4,105,282,535 3,875,818,865 229,463,670 September 431 4,449,787,679 4,236,530,040 213,257,639 October 462 4,703,268,106 4,150,354,298 552,913,808 November 291 7,081,522,895 6,169,885,410 911,637,485 December 367 10,054,938,323 9,535,917,751 519,020,572 January 0 0 0 0 February 0 0 0 0 March 13 22,966,000 20,568,724 2,397,276 April 249 287,191,403 272,421,704 14,769,699 Solicitedproposal May 311 336,756,219 318,031,764 18,724,455 June 258 322,819,038 302,667,498 20,151,540 July 474 408,657,966 395,607,676 13,050,290 August 271 310,506,337 300,843,836 9,662,501 September 355 439,694,165 429,968,719 9,725,446 October 470 740,123,856 688,007,723 52,116,133 November 203 258,906,706 248,314,919 10,591,787 December 191 282,656,543 270,590,485 12,066,058 January 0 0 0 0 February 0 0 0 0 March 0 0 0 0 April 0 0 0 0 Restricted procedure May 0 0 0 0 June 0 0 0 0 July 1 239,080,000 238,652,538 427,462 August 0 0 0 0 September 13 487,017,470 480,501,535 6,515,935 October 4 776,559,461 681,562,207 94,997,254 November 0 0 0 0 December 2 458,328,065 455,853,073 2,474,992 Page134of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment January 0 0 0 0 February 0 0 0 0 March 0 0 0 0 Otherprocedures April 1 1,267,008 1,267,008 0 May 4 6,810,000 6,730,550 79,450 June 3 7,208,309 6,788,394 419,915 July 10 62,238,131 61,826,500 411,631 August 4 45,377,646 44,319,758 1,057,888 September 14 42,783,831 41,664,908 1,118,923 October 26 711,072,606 683,899,933 27,172,673 November 7 70,074,702 50,088,514 19,986,188 December 23 246,712,072 237,854,961 8,857,111 5,683 45,777,572,686 41,855,933,422 3,921,639,264 Total SUMMARYTABLEFOR2007 Proceduretype No.ofprocedures Limitfund(lekë) Realisedfund(lekë) Savedfund Openprocedure 2,776 39,212,765,152 35,617,900,495 3,594,864,657 Solicitedproposal 2,795 3,410,278,233 3,247,023,048 163,255,185 Restrictedprocedure 20 1,960,984,996 1,856,569,353 104,415,643 Otherprocedures 92 1,193,544,305 1,134,440,526 59,103,779 5,683 45,777,572,686 41,855,933,422 3,921,639,264 TOTAL Page135of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page136of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page137of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Page138of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment I. OpenProcedures RestrictedProcedures NegotiatedProcedures withPriorPublication DesignContests RequestsforProposals 8302 procedures Procedures with e-procurement Manual (paper-based) Procedures 373 7929 ProcurementProcedures Procedures announced througheͲ procurement4% Manual(paperͲ based) procedures(fast track)96% Page139of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Below find a chart showing the percentages of Award Notices through Eprocurement. AwardNoticesaccordingtoTypeofProcurement 3% EͲprocurement: 177procedures PaperͲbased: 5618procedures 97% 2009 6.4.1. Statistics related to the number of announcements for public procurement during 2009 - The total number of announcements of public procurement procedures during 2009, according to types of contracts (services, goods, works) on the website of the APP is 7277, of which: Page140of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Contract Announcements for 2009 Services Type of Procedure Consulting services and design contests Negotiated procedures with prior publication International, Open Procedures Open Procedures RFPs Restricted Procedures Total Goods Number of contract announcements Type of Procedure Works Number of contract announcements Type of Procedure Number of contract announcements 216 1 3 447 725 4 1396 Negotiated procedures with prior publication International, Open Procedures Open Procedures RFPs Restricted Procedures Internally open, restricted procedures Total 5 5 1154 1853 5 Negotiated procedures with prior publication International, Open Procedures Open Procedures 3 3 1599 RFPs 1252 Restricted Procedures 2 3024 Total 2857 - Total number of published awards is 3615, of which: Page141of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Award Notices for 2009 Services Type International, open Goods Number Type 1 Open Procedure 150 RFPs 289 International, open Open Procedure RFPs Works Number Type 5 607 785 International, open Open Procedure RFPs Number 1 944 734 2 International, restricted International, restricted 1 International, restricted 1 Consulting Services Total 95 535 Total 1400 Total 1680 - Total number of announcements for executed contracts with prior publication is 3634 of which: Page142of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Notices of Executed Contracts for 2009 Services Type International, open Open Procedures RFPs Goods Number Type 1 150 289 International, open Open Procedures RFPs Works Number Type 26 607 785 International, open Open Procedures RFPs Number 944 734 1 Restricted Procedures 1 Restricted Procedures Restricted Procedures 1 Consulting Services Total 95 536 Consulting Services Total Consulting Services 1419 Total 1679 During 2009, there have been published 1,182 executed contracts following procedures without prior publication. The chart below provides data on the number of public procurement procedures for 2009, the ceiling amounts, and % of savings: Page143of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Tootal number of Published Procedures divided according to the type of procedure between January 3, 2009 and December 31, 2009 Total number of Published Procedures The total ceiling amount of the Published Procedures Consulting services Value of consulting services Negotations with prior publication Value of Negotations with prior publication Open, international Value of Open, International Open, domestic Value of open, domestic RFPs Value of RFPs International, restricted Value of International, restricted Domestic, restricted Value of Domestic, restricted Negotations without prior publication Value of Negotations without prior publication 8459 110,722,796,084 216 2,185,956,022 9 17357490 11 12,904,892,615 3,200 80,276,016,724 3,830 9,125,111,004 2 1,960,868,000 9 497,672,013 1,182 3,754,922,217 Page144of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Procurement Procedures conducted through the E-platform January 3, 2009 through December 31, 2009 Total Procedures Total value of ceiling amount for published procedures Total number of published procedures still in process Total value of ceiling amount of published procedures still in process Total number of published procedures which have been cancelled Value of total ceiling amount of published procedures which have been cancelled Total number of awarded procedures Total amount of procured ceiling amount Total value of offers % of offers to total ceiling amount procured Total value of savings % of savings to total amount of procured ceiling amount 7277 106,967,873,867 1034 21,169,037,580 2628 25,746,131,128 3615 60,052,705,159 51,358,000,549 85% 8,694,704,610 15% Page145of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment E-procurement Procedures and Negotiated Procedures without Prior Publication which have been published and concluded with an executed contract January 3, 2009 through December 31m, 2009 Total number of published procedures Total value of ceiling amount for published procedures Total number of awarded e-procurement procedures Total ceiling amount for Total number of awarded eprocurement procedures Total offers for e-procurement procedures Number of Awarded negotatied Procedures without Prior Publication Their total value Total amount for negotiated procedures without prior publications % of ceiling amount for negotiated procedures with prior publication to ceiling amount of procedures that have concluded with an executed contract % of ceiling amount for negotiated procedures without prior publication to ceiling amount of procedures that have concluded with an executed contract % of ceiling amount for negotiated procedures without prior publication to total amount of offers for procedures that have concluded with an executed contract Total number of awarded procedures (e-procurement + negotiation without prior publication) Total ceiling amount procured (e-procurement + negotation without prior publication) Total offers (e-procurement + negotation without prior publication) % of offers to ceiling amount Total Savings % of savings to ceiling amount procured 8459 110,722,796,084 3615 60,052,705,159 51,358,000,549 1182 3,754,922,217 3,522,045,649 24.6% 5.9% 6.4% 4797 63,807,627,376 54,880,046,198 86% 8,927,581,178 14% Page146of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Data on public procurement procedures conducted and concluded with an award during 2009 Type of Procedure Total Open Procedures (International+domestic) (award notice) RFPs (award notice) Restricted Procedure (domestic) (award notice) Negotiation with Prior Publication (award notice) Consulting Services (award notice) 8,694,704,610 % of savings of celing amount to procured celing amount 15.00% Total procedures Ceiling Amount Procured Offered Amount 3615 60,052,705,159 51,358,000,549 % awarded celing amount to procured ceiling amount 85.00% 1708 54,593,844,173 46,403,638,462 85.00% 8,190,205,711 15.00% 1808 4,603,835,484 4,119,891,168 89,49% 483,944,316 10.51% 3 56,436,433 55,832,600 99.00% 603,833 1.00% 1 4,166,660 4,101,152 98.43% 65,508 1.57% 95 794,422,409 774,537,167 97.00% 19,885,424 3.00% Savings II. In the charts below we provide data on procedures published on the website of the APP during 2009 as compared to 2008: Page147of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Totalnumberofpublished proceduresfor2009: 7085 Totalnumberofpublished proceduresfor2008:8758 III. CivilWorks Services Goods IV. In the chart below we provide data on award notices published on the website of the APP during 2009 as compared to 2008: Page148of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Totalnumberofprocedures concludingwithanawardnotice in2009:3871 Totalnumberofprocedures concludingwithanawardnotice in2008:5893 Number of offers on the website of APP during 2009 compared to 2008, as well as the median number of offers for type of procedure: Page149of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Totalnumberofoffersfor 2008is11786 Totalnumberofoffersfor 2009is36225 MedianNumberofOffers Statistical data on number of complains 2007-2009 2007 Page150of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment NUMBER OF COMPLAINTS FILED WITH THE PPA DURING 2007 Total number of complaints during 2007 645 Number of V. Number of complaints complaints lodged made during during first half second half of of 2007 2007 148 497 Hence, the complaints considered in the first half of 2007 amounted to 148 for around 3,000 procurement procedures conducted over that same period. It was found that 54 out of the 148 complaints considered by the said Directorate, were invalid through failure to duly fill in the standard form and to observe the stages of the complaints procedure and time-limits as prescribed by law. With regard to 36 of the complaints the go-ahead was given for the procurement procedure, given that the complainant’s allegations did not stand. A decision was taken to cancel procedure for 30 of the complaints, and to reconsider procedure for 28 of them. In the second half of 2007, the number of complaints increased as compared to the first half. This increase, however, is in proportion with the increase in the number of procurement procedures conducted over these six months. In the second half, the said Directorate considered 497 complaints for around 5,000 procurement procedures conducted. Failure to duly fill in the standard form and to observe the stages of complaints procedure, as well as the legal time-limits, rendered 105 out of the 497 complaints considered by the said Directorate invalid. For 186 of them, the go-ahead was given for the procurement procedure, because the complainant’s claims did not stand. The decision was taken to cancel procedure for 99 of them (adding also Page151of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment those complaints that were cancelled by the authorities following reconsideration, they total 140). The decision for 41 of them was to reconsider procedure and to observe the requirements contained in Article 42 for modifying the documents. And for 66 complaints, a final decision was taken to enforce legislation without initiating any administrative inquiry. 2008 Chart #1 Processing of Complaints regarding Public Procurement Procedures during 2008 Total Complaints 564 No. Of Complaints in which a decision was made to Investigate the Complaint 188 No. Of Complaints which have been Quashed 169 No. of Complaints in which a decision was made to reevaluate 25 Invalid Complaints (failure to observe steps, or improper forms) 143 Complaints without legal basis Complaints in which a decision was made to allow modification of documents 27 2009 Chart #1 Processing of Complaints regarding Public Procurement Procedures during 2009 Page152of166 12 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Total Complaints 1100 1200 No. Of Complaints in which a decision was made to Investigate the Complaint No. Of Complaints which have been Quashed 213 257 No. of Complaints in which a decision was made to reevaluate Invalid Complaints (failure to observe steps, or improper forms) 38 592 1100 1000 800 592 600 400 213 257 200 38 0 Total Complaints Complaints leading to Decisions Complaints leading to Decisions Complaints leading to Decisions Invalid Complaints 1100 213 257 38 592 Total number of Complaints filed with APP in 2009 Total Complaints in 2009 Total Complaints in Total Complaints in nd the 1st six months of the 2 six months of 2009 2009 Page153of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment 1100 534 566 Page154of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Annex5 1. 2. 3. 4. 5. 6. ListofAlbanianLegislationReviewedfortheAssessment TheConstitutionoftheRepublicofAlbania(1998); TheCodeofAdministrativeProceduresoftheRepublicofAlbania,(1999); Law on Public Procurement No. 9643 of 20.Nov. 2006, consolidated with Amending Laws no.9800 of 10. Sep. 2007; no.9855 of 26.Dec.2007, and no. 10 170 of 22. Oct. 2009; LawonCompilingandImplementingtheStateBudgetoftheRepublicofAlbania,no. 8379of29.Jul.1998; LawonManagingtheBudgetSystemoftheRepublicofAlbania,no.9936,of 26.Jun.2008; Decision of the Council of Ministers no. 1, of 10.Jan.2007, On the Rules of Public Procurement, consolidated with Amendments (additional decisions of the Council of Ministers) no.153 of 22.Mar.2007, no.135 of 03.Feb.2008, no.392 of 08.Apr.2008, no.822 of 18.Jun.2008, no.46 of 21.Jan.2009, no.495 of 15.May.2009, and no.398 of 26.May.2010. Page155of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Annex6 DispositionofcommentsreceivedfromtheAdvisoryGroup Casals & Associates and Claro & Associates would like to thank the members of the AdvisoryGroupfortheirsupportandhelpfulcommentstotheReportsubmittedonJuly 20,2010. Aspartofthereportfinalizationprocess,belowisalistofcommentsreceivedfromthe membersoftheAdvisoryGroupassembledbytheUNDPforpurposesofaccompanying the performance of the assessment of the public procurement system of Albania undertakenbytheConsultingTeam. To facilitate thereviewof the disposition of each comment, therationale followed by theconsultantstoeitherincludetotallyorpartiallyortoexcludeaparticularcomment isstatedfollowingeachone. Additionally,commentsreceivedfromtheAdvisoryGrouparecitedinblack,whilethe actionbytheconsultantsisincludedinblueitalics. 1. European Commission: Only one comment, related to Page 9: The statement that the "Introduction of the eͲGP platform undoubtedly had a very positive effect in reducing corruption and overall opacity of the public procurement system,whileincreasingtransparency.Asanexampleindicativeofthispositive trend, the average number of offers per bidding process increased from 2 in 2008,tomorethan6in2009;whilethenumberofcomplaintswasreducedfrom 1every21offersto1every33offers." Whilst we can agree thatthe eͲplatform has contributed to reducingsystemic vulnerabilities to corruptionͲit is not clear that this representsa significant factorindecreasingactualcorruptioninPP.Thedecreaseincomplaintsdoesnot necessarily imply a decrease in corruption, and on the same line the increased publicityoftendersdoesnotautomaticallyguaranteetransparency. ThereforeIwouldsuggesttorephraseforexampleasfollows: "introductionoftheeͲGPplatformhasreducedsystemicrisksofcorruption......." Action:Nomodificationtoexistingwording Reviewingthesubstanceofyourcomment,wecouldnotagreemorewithyouin that both the increase in the number of offers per bid and the decrease in the number of complaints are simply indicators of a positive trend as stated in the Page156of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment paragraphonpage9.Furthermore,asitistypicallythecaseinanyothercountry whereaneͲGPsystemhasbeenintroduced,itsmereintroductionhashelpedto increasetransparencyaswellasreduceopacity,whichareregardedashavinga positiveeffectinreducingcorruption,asalsostatedintheparagraph. However,webelievetheparagraphinquestiondoesnotexplicitlyusetheword “significant,” nor implicitly imply that introduction of the eͲGP platform constitutesasignificantfactortowardsreducingcorruption.Measuringtowhat extent specific factors may have contributed individually or collectively to reducing corruption is a much more complicated subject that has to do with amyriadother factors that escape the scope and nature of the assessment we wereengagedtoperform. 2. European Commission: Furtherto [our previous] message of last 11 June regardingcomments to the PP Assessment, I would like to addthe belowcomment. From the section of the report concerning "Institutional Framework and Management Capacity" it is confirmedthe important role of the PPA and the challenges ahead regarding both the improvement of the PPA management capacityand the role the PPAis expected to playin raising the management capacities of Albanian contracting authorities as a whole.The assessment and then the reportinevitably refer to an institutional framework/management capacities of the PPA that were present at the time of the experts mission in Tirana(Feb./March),allofwhichhavechangedsignificantlyinApril. In this context, I would like to suggest that the "Institutional Framework and ManagementCapacity"partofthereportbeupdatedinordertobettertakeinto accountthenewstructureofthePPA,aftertherestructuringwhichtookplaceat theendofApril. Action: Modifications introduced to reflect changes in the staffing level of the PPAsubsequenttocreationofthePPC. Allappropriatesectionsofthereporthavebeenupdatedtoreflectthechanges introducedtothestaffinglevelofthePPAsubsequenttothecreationofthePPC. TheMatrixcontainingalldetailedfindingsandrecommendationsincludesanew recommendationNo.13,whichaddressestheneedtoreassessthestaffinglevel and resources of the PPA in light of the many responsibilities it is required to performaccordingtothePPL. Page157of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Please refer to the recommendations contained in the PowerPoint presentation thatwasdeliveredtothemembersoftheAdvisoryGrouponJune14(seeAnnex 3attheend),wherethereisaspecificrecommendationtoassesstheworkͲload ofthePPA. With regards to [your previous comment] of June 11th, please see our answer above. 3. Austrian Development Agency: Referring to the recent DIP meeting, the GTZ representative,UlrikeGantzerͲSommermentionedthatGTZiscurrentlycarrying out a gap analysis on the Albanian procurement law in relation to EU procurement regulations, etc. If this is the case, you may consider to mention thisGAPanalysisinthereportandincluderelatedfollowupactionsintheAction plan. Perhaps the EU integration process/adjustments to EU standards could be reflected more prominently in the action plan and the change management processes.MyunderstandingisthatEUMemberstatesdealtdifferentlywiththe issueofadjustmentsrelatedtoEUvsexistingnationalprocurementregulations, etc.. However, in case the Albanian government has already decided how to proceedwiththeseadjustmentprocessesthenpleaseignoremycomment. Action:Nomodificationsweremadetofinalreport. Rationale: The assessment of the Albanian public procurement system was performedinfulladherencetotheOECD/DACmethodology,whichincorporates bestpracticesasthebasisforassessingthegapbetweentheexistingsystemand processes. In addition to assessing the gap with respect to internationally recognizedbestpractices,theConsultingTeamalsocomparedtheEUͲDirectives to the Albanian legal framework and practices in public procurement. Specific referencestoexistinggapsareincludedintheappropriatesubͲindicatorsineach ofthefourpillarsencompassedbytheassessment. WedonothaveenoughinformationontheGTZ’sgapassessmentmentionedin theeͲmail,specificallywhetheritsscopeandnaturewouldconsistsofaspecific studyoftheremaininggapswithrespecttoEUͲDirectivessoastoputaspecific commentinourreport.However,theGOAmay,ifdeemedappropriate,includea referencetoitintheirdetailedactionplanforimplementingtheMatrixCapacity ActionPlanlaidoutinAnnex1oftheassessmentreport. 4. WorldBank:Wewouldliketonotethatthefollowingobservationsareintended to comment on the report in our function as member of the Advisory Group. Page158of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment They do not represent the Bank's own assessment of Albania's country procurement system and the Bank expressly reserves the right to separately comment on Albania's Public Procurement System at a later time. In addition, the Bank's comments should not be considered as an endorsement of the scoringprovidedintheassessmentreport.Withthatinmind,wewouldliketo providethefollowingmajorcomments/observationsonthereport: x I.Introduction:Concerningthemethodologyfortheassessment,ithasbeenour understanding that the OECD/DAC methodology assessment would include the Compliance and Performance Indicators (CPIs) in addition to the Base Line Indicators (BLIs). This is also confirmed in paragraphs 3.1 and 3.2 of the assessmentreportwhichstatethattheassessmentcombinesbothBLIsandCPIs, wheneverapplicable.Tothisend,thereadermayexpectaseparatesectionon the CPIs in consistency with the proposed structure of the OECD/DAC methodology.Weacknowledgethattheconsultantmighthavefaceddifficulties incollectingthedataandwebelievethatsuchdeficiencyofthesystemshould bestatedinthereport.However,wenotedthatthereportattachesatablewith CPIsapparentlydiscussedwiththeprivatesector(andChambersofCommerce), butwecouldnotfindwherethecollecteddatawasincorporated.Alternatively, atablecouldbeincludedwithonlythoseindicatorsforwhichinformationwas possibletoobtain.Furthermore,thereferencetotheauditoftheeͲGPplatform financedbytheWorldBankshouldbecorrectedfroma"fullͲscopesystemaudit" toa"highͲlevelassessmentoftheGovernmentofAlbania’seͲGPprocessesand system".Onanotheraspect,wenotedthatthemainsummaryofthereportdoes notprovidethebasisfortheassessmentespeciallyintermsoflegalframework thatincludesinteralia:theprimarylegislation,secondarylegislation,datesand numbers of legislative instruments, amendments to these documents, etc. For purposesoflegalcertaintyandclarity,itisexpectedthatacompletelistwould bedisclosedtothereadersofthereport. Actions:Nochangesintroduced. All pertinent statistical information available to populate the most relevant compliance and performance indicators contained in Part II of the OECD/DAC Methodology (Version 4) is displayed primarily in Table 1 and in Annex 4. Additionally,informationpertainingclaimsandnumberofbiddersisalsostated intheanalysisofthecorrespondingsubͲindicators,totheextentthattheresults oftheanalysisofCPIs,whichincludedthereviewofmorethan50procurement processes in their entirety (from budgetary appropriation to execution of contract), were used to complement the rating assigned to each subͲindicator, whereapplicable. Page159of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment ReferencetothehighͲlevelreviewoftheeͲGPplatformbyanindependentfirm financed by the World Bank was included in the appropriate paragraphs of the reportreplacingthepreviouswording. Annex 5 to the report contains a list of the legal documents reviewed by the consulting team in connection with the assessment of the legal framework of Albania. x II.OverviewoftheExistingSystem:Wenotedthatthestructureofthissection does not follow the same order of the OECD/DAC methodology and we were wonderingwhetheritshouldbestructuredalongthefourpillars.Inaddition,we missedsomereferencetotheimplementationandoperationofeͲGPamongthe listedresponsibilitiesofthePPA(boxonpage8).RegardingtheeͲGPplatformin Albania, we think that the introduction of the eͲGP system has been a major achievement. International best practice has shown that such systems need to beimplementedgradually.Tothisend,theuseofeͲGPcanbeconsideredabig successwhileitappearsquitenaturaltoaddmorefunctionalityinfuture.Before adding new features such as the integration with other systems (e.g. budget planning) or contract management, the currently identified issues should be addressed.AlthoughreferencetotheeͲGPauditfinancedbytheWorldBankhas been mentioned in the report, we think that the connectivity issue mentioned under 7.9. On page 12 may require additional clarification to avoid the perception as if the bidders are excluded from participating in public procurementduetoconnectivityissues,whichitselfwouldconstituteaviolation ofoneoftheprinciplesofpublicprocurement,i.e.openandfaircompetition. Action:Somechangesweremade Rationale: According to the OECD/DAC Methodology (Version 4) “Assessment Report,”paragraph22statesthatthecontentsfortheoutlineofthereportare “suggested.”Forpurposesofclarityofpresentationandbasedontheexperience gatheredonpreviousapplicationsoftheOECD/DACMethodology,particularlyin theassessmentoftheMexicanpublicprocurementsystem,theconsultingteam decidedtofollowasimilarpresentationasthatappliedinthatopportunityfora joint assessment team conformed by the World Bank and the InterͲAmerican DevelopmentBank.Analysisofthesystemandprocessesfollowingeachofthe four pillars depicted in the OECD/DAC Methodology can be found in greater detailunderSectionV.oftheassessmentreport. ThecontentsofresponsibilitiesofthePPAstatedinBox8.,havebeenexpanded to also incorporate those pertaining the establishment, operation and maintenanceoftheeͲGP.However,itshouldbenotedthatsuchresponsibilities are not expressly stated in the PPL, Chapter II, “Public Procurement Page160of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment Organization,” Article 13 “The Public Procurement Agency (PPA),” paragraph 2. Thelatterwasalsonotedinthetextappendedtotheendoftheresponsibilities depictedinBox8. The text on paragraph 7.9 was revised along the lines suggested by the World Bank to avoid a perception that uneven connectivity in the interior of Albania results in potential bidders being excluded from participating in public procurement. x III.MainFindingsandRecommendations:Thissectionisverybriefconsidering thatAnnex1iscomprehensivelylistingalltheproposedactionstobeconsidered byGoA.WebelievethatthisactionplanshouldbeagreedwiththeGovernment of Albania, who will be responsible for its implementation. In addition, we believethatonemajorconcernshouldberaisedinthissection:thefactthatthe PPAisexpectedtodomorewithless.Ontheonehand,thePPAneedstotakeon more responsibilities, such as developing a training strategy for contracting agencies and economic operators, improving the eͲGP platform including new functionalities,implementationoftheFrameworkAgreementagenda,etc.;while on the other hand, there are no additional resources allocated to the PPA, at least in the form of headcounts, even worse, the PPA staff is cut in half (see comment on subͲindicator 4 c below). As lead agency for public procurement, the PPA should have sufficient staff to be able to manage public procurement based on a comprehensive public procurement strategy which seems to be missingatthemoment. Action:Onechangewasmade Please note that as stated under III. Main Findings and Recommendations, the detailed findings and resulting recommendations are contained in Annex I, whereas the findings depicted in Section III are intended to provide the reader with arelevant summary of the main weaknesses affecting theAlbanian public procurementsystem. With regards to the comment about the need to agree all findings and recommendationswiththeGOA,pleasenotethatasstatedinthedraftminutes of the Advisory Group meeting held at the UNDP office in Albania on June 14, 2010,theGOA,whichwasrepresentedbytheDirectorofthePPAandtheDSDC, stated their agreement with the contents, findings and recommendations contained in the preliminary draft report that was circulated to all members of theAdvisoryGrouppriortothemeeting.Theintroductiontothereport,aswell asthescopesectioncontainsadetaileddescriptionofthevettingprocess,which alsoincludedconsiderationofthecommentsreceivedbytheAdvisoryGroup. Page161of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment With regards to comments pertaining the significant reduction on the staffing levelofthePPA,pleasetakenoteoftheinclusionofrecommendationNo.22.,in the Matrix Capacity Action Plan in Annex 1., as well as comments in the appropriate sections and subͲindicators. A specific recommendation was contained in the PowerPoint presentation that was delivered by the consulting teamleadertotheAdvisoryGrouponJune14,2010. x IV.ProgressSince2006Assessment:Wenotedthatthereporttakesstockofthe recommendations of the 2006 assessment which the team of the World Bank proposed at that time based on a different legal framework than the current assessment. We would like to draw your attention to the fact that the comparison between the 2006 and 2010 assessments may be perceived as if progress is measured against the same legislative framework which is not the case.Therefore,wewouldadvisethatthereportincludesatleastreferenceto the different legislative frameworksas basis for the assessments in 2006 and 2010 respectively. For example: the definition of "force majeure" and "emergency" were necessary under the previous PPL considering the highly abusivepracticesindirectprocurementduetothesetwoclauses.ThenewPPL includesthenegotiatedprocedurewithoutorwithpriorpublicationofacontract noticeandtheconditionsforuseofthismethodareveryspecificandrestrictive thusreducingtheriskofabusebycontractingauthoritiesandmakingredundant theneedtodefine"forcemajeure"and"emergency".Anotherexampleisuseof preͲqualification which could have been beneficial under the previous PPL, but under the new law that is aligned with EU Directives, preͲqualification is not a sepearate proceeding, but is integrated into the procedure for restricted tendering. Action:Allchangesweremadeassuggested. x V. Detailed Benchmarking Analysis:In several instances, the summary assessmentgivenforeachindicator/subͲindicatorseemstomisssomerelevant information while in other instances, it seems to beyond the scope of the indicator.Afewexamplesaresharedbelow.Inaddition,wefindthatthereport explains in many cases the provisions of the EU procurement Directives. While weunderstandthattheyareforeasyreferencetothereader,morereferenceto theavailablefeaturesinthesystemcurrentlyunderreviewshouldbeincluded. x SubͲindicator 1(a): Scope of application of the legislative regulatory frameworkͲthesummaryofthissubͲindicatorcouldbenefitbyexplaining brieflythelegalsystemofthecountry,hierarchyoflegalinstruments,a bitofhistoryofprocurementlegislation,howitevolvedcompletecurrent legislative framework and its major features. The current summary includes multiple topics that are not easily readable and may be confusing for the reader. In addition, the summary refers to "initial Page162of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment version of the PPL that resembles UNCITRAL model law". Is this about firstPPL(1996)ortheinitialversionofthecurrentPPL? Action:Wordingofsubindicator1(a)wasrevisedassuggested. x SubͲindicator (1b): Procurement methods Ͳ although they are not yet operational,thePPLprovideselectronicreverseauctionandthedynamic purchasing system (article 37), which could be considered as additional procurement methods. We suggest to include some reference to them here. Action:Changemadeassuggested. x x SubͲindicator1(e):TenderDocumentationandtechnicalspecificationsͲ the summary for this sub indicator could benefit from confirming upͲ front that the country has Standard Bidding Documents, mandatory for use by contracting authorities. It may then provide a short description andcontentofSBDsandnotonlyrefertotheimplementingregulations. Action:Changemadeassuggested. SubͲindicator 1(h): complaints ͲThis indicator is probably one of the most important considering the weaknesses noted in the complaints review system in Albania for a long time. The summary of the subͲ indicatorcouldbenefitfromcoreinformationsuchas:allocationoftasks of each entity involved in handling the complaints, identify any overlapping between the functions of entities, gaps in institutional framework, independence and adequacy of the complaints review, capacity of human resources. It should further explain the procedures envisaged by the PPL to treat the complaints, possibility for appeal,deficiencies,etc.Wewouldadvisetoremoveanyreproductionof theEURemediesDirectivesfromthereport.Sincethisassessmentmight have started at a time when the Procurement ReviewCommissionwas not yet operational, but completed when the PPC was functional (April 2010), the summary could briefly describe the previous Complaints reviewmechanism(byPPA)andthechangesthattookplaceinOctober 2009(byPPC). Action:TextinsubͲindicatorwassupplemented. Please note that the governing rules for the operation of the PPC were beingdraftedatthetimeofthelastmissionperformedbytheconsulting teamleaderonJune3through14,2010.Additionally,theMatrixCapacity Page163of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment x Action Plan in Annex 1, includes a specific recommendation (No. 22) addressing the need to revisit the responsibilities for starting administrativeinvestigationsoncomplaints,whicharestillwiththePPA (seePPLArticle66). SubͲindicator4(c):ThesummaryreferstoPPAwith36staff.TheBankis aware that the PPA has been downsized by half of the staff since April 2010. This is a major step back in the process of strengthening and building capacity of PPA. We believe that this should be incorporated intothereportasitwillaffecttheabilityofPPAtocarryouteffectively theregulatoryandmonitoringfunction. Action:Changemadeassuggested. Please note inclusion of recommendation No. 13 in the Matrix Capacity ActionPlan,Annex1.Additionally,thisrecommendationhadalreadybeen reflectedinthePowerpointpresentationprovidedbytheconsultingteam leadertothemembersoftheAdvisoryCommitteeonJune14,2010. Annex1ͲMatrixCapacityActionPlan:Itisnotexpresslystatedinthereportwhether theactionplanisagreedandendorsedwiththeGovernment,butitisquitethorough inrecommending numerous changes in four pillars most notably on legislative framework.Weadmitsomeofthemarenecessarytofillintheloopholesinthesystem, but for others we would suggest that they should be consistent with the principles of theEUDirectives.Forexample: x PPL does not include concessions: Albania has a concessions law which regulates the concessions contracts in the country. Since the country is aiming to align the legislation withthe acquis communitaire, any proposalforlegislativechangeshouldpossiblycomplywithsuchregime. In this respect, the EU Procurement Directives leave it to the states to decide how to treat these two types of public contracts. However, it is important that the broad principles of procurement and concessions contractexpressedinrespectivelawsarethesameandnotinconsistent. To that end,it may not be necessaryto "host" concessions under the procurementlaw.Infact,thatmightbeconfusingnowthatthecountry hasseparatelaws. Action:Nochangesweremade. Asstatedabove,itisuptothestatestodecidewhethertheconcessions law should be integrated into the procurement law or constitute a separatelawaltogether.Theconsultingteamisoftheopinionthatgiven Page164of166 AlbaniaǦReportonBenchmarkingandDraftCapacity 2010 Assessment thatthebroadprinciplesofprocurementoughttobethesame,andsince the PPA has also been charged with the responsibility of oversee the concessions law, it would be more practical to integrate it as part of a newchapterofthePPL. x Timelimits:theactionplanproposestoincreaseagainthetimelimitsin caseofapplicationofeͲGP.Wewouldsuggestthatifthesetimelimitsare withinthelimitsallowedbyEUDirectives,theremaynotbeaneedfor changing them. However, if during the implementation of new time limits, the business community complains on these time limits being insufficient,GoAmayreturntothislater. Action:Nochangesweremade. Asstatedinthereport,theconsultingteamhasnotfoundanydiscernible facts indicating that the introduction ofeͲGP resulted inefficiencies (i.e. time savings) significantly reducing the time needed by economic operators to prepare their offers in response to public tenders. Accordingly, the consulting team is of the opinion that the provision authorizingthePPAtoreduceby7daysalltimelimitsstatedinthePPL forbidderstoprovideoffersisunwarranted. Thisrecommendationaswellasallotherfindingsandrecommendations were thoroughly discussed and agreed with GoA prior to finalizing the preliminarydraftreportcirculatedforcommentstotheAdvisoryGroup. ***** TheConsultingTeamtruststhatthisdocumentwillhelpthetimelyreviewofthe FinalReportandisgratefultotheGovernmentofAlbaniaandalldonorsforthe opportunitytobeofassistancewiththisimportantproject. Page165of166
© Copyright 2026 Paperzz