Ordinary Meeting of Council 17 March 2010 3.4 PROPOSED MODIFICATION TO OUTLINE DEVELOPMENT PLAN NO 139/A - LOT 4 (285) RAILWAY PARADE, UPPER SWAN (Ellenbrook) (Development Services) KEY ISSUES • The subject site is bounded to the west by The Vines (Mews Estate), the future Ellenbrook Village 7 development area to the north and Railway Parade to the east. Bush Forever Site No. 300, which includes portions of the Ellen Brook and Sawpit Gully, dissects the site and is zoned Parks and Recreation Reserve under both the Metropolitan Region Scheme (MRS) and Local Planning Scheme No.17 (LPS 17). The site is also affected by two Conservation Category Wetlands. • A condition of subdivision requires: “(31) A Fire Management Plan being prepared and implemented to the specifications of the local government and the Fire and Emergency Services authority and such easements required to facilitate emergency access being shown on the Deposited Plan.” • The applicant has advised that both the City of Swan and Fire Plan WA want the subdivision design to be amended in order to provide for fire separation for lots on the southern boundary, in the south western corner of the site. • The applicant has submitted a modified Outline Development Plan (ODP). The proposed modifications are considered minor in nature and entails a road interface between the development and Ellen Brook in the South Western corner of the site in order to achieve ‘fire separation’ as recommended by a Fire Management Plan. • The proposal was advertised for public comment and referred to relevant agencies in accordance with Local Planning Scheme No. 17 requirements. One objection from a nearby landowner was received. The objection to the proposed modification relates to potentially increased noise associated with increased traffic. The proposed modification does not increase the lot yield that has already been endorsed by Council or increase or change the road connections to the existing Vines road network. It is recommended that Council resolve to endorse the modified ODP 139/B in accordance with the plans date stamped received 16 November 2009 subject to the annotations on the plan. AUTHORITY/DISCRETION Council has discretion under Clause 5A.1.14.1 of Local Planning Scheme No. 17 to approve Outline Development Plans and modifications to Outline Development Plans. Page 1 Ordinary Meeting of Council 17 March 2010 BACKGROUND Applicant: Owner: Zoning: TPS - MRS Development Scheme: Existing Land Use: Lot Size: Area: Use Class: TPG Town Planning & Urban Design Clarendon Residential Group Pty Ltd Directors: Jonathan Peter Callaghan, Scott Douglas MacDonald, Lloyd Robert Jenkins. Residential Development, General Rural, Special Use, Regional Reserve - Parks and Recreation. Urban, Parks & Recreation, Rural LPS 17 Residential 28.1696ha 28.1696ha Residential “P” DETAILS OF THE PROPOSAL History The original ODP 139 encompasses 28.1696 hectares of land area of which approximately 6.77 hectares of the site is zoned for Parks and Recreation Reserve under the Metropolitan Region Scheme and Local Planning Scheme No. 17. ODP 139 was originally endorsed by Council at its meeting of 7 June 2000 and subsequently by the WAPC. The original plan provided for 227 residential lots varying in density from R2.5 to R40, a country club site, a total of 3.5 hectares of public open space and land zoned for Parks and Recreation Reserve. In 2005 the applicant lodged an application for the modification of ODP 139. The proposed modification to the endorsed plan sought to create 205 residential lots at an R25 density, one rural lot in the south eastern corner of the site, one grouped dwelling site coded R60 with the potential for a maximum of 16 dwellings, a retirement village lot with the potential for a maximum of 159 aged person's accommodation adjacent to a private conservation area, a commercial site of 350m2 and an 11,140m2 area of public open space. The application was presented to Council at the OCM held on 14 June 2006. Council resolved to endorse the modified ODP 139/A, subject to modifications. The requested modifications were made and the Council resolution was forwarded to the WAPC for consideration. On 5 October 2007 the WAPC resolved to support ODP 139/A, subject to further modifications being made. The requested modifications were completed and endorsed by the City of Swan. In 2008, the applicant lodged an application to subdivide the site, in accordance with the provisions of ODP 139/A, with the WAPC. The application was referred to the City of Swan for comment. The City requested that a condition of subdivision be included on the subdivision approval requiring the applicant to fund the construction of Railway Parade, from Apple Street, including the construction of a bridge over Ellen Brook. Page 2 Ordinary Meeting of Council 17 March 2010 The applicant subsequently appealed the abovementioned subdivision condition to SAT. Following the SAT mediation process, a Minute of Consent Orders was signed resulting in the cost contribution condition being deleted and replaced with the following: “1. (a) Prior to endorsement of the Diagram of Survey/Deposited Plan for Stage 1 (Lots120 – 211) the following are required: (i) The subdivider is to pay a contribution to the City of Swan for the upgrade to Henley Brook Drive in accordance with the City of Swan Policy C-088 ‘Subdivider Contributions – Henley Brook Drive (south of Morgan Fields, Henley Brook and North of Park Street) and Millhouse Road’ (POL-C-088) (ii) The subdivider is to construct a cul-de-sac treatment to Champagne Terrace to the specifications of the City of Swan; and (iii) The subdivider is to prepare a Deed with the City of Swan to provide for a contribution to the upgrade and/or construction of Railway Parade from Apple Street to the southern boundary of the subject land to the specifications of the City of Swan, such contribution is not liable to be calculated and paid until lodgement of the Deposited Plan for Stage 2. (b) Prior to endorsement of the Diagram of Survey/ Deposited Plan for Stage 2 (Lots 1 – 117), suitable arrangements being made with the Local Government for the upgrading and/or construction of Railway Parade, from Apple Street to the southern boundary of Lot 4, including the crossing of Ellen Brook, to the specifications of the City of Swan and the satisfaction of the Western Australian Planning Commission. The cost of upgrading/construction of Railway Parade is a matter to be negotiated between the subdivider and the Local Government. (c) If as a result of any modification to ODP 139/A to connection from the subject land along Railway Parade to Apple Street is not required, prior to endorsement of the Diagram of Survey/Deposited plan for Stage 2 other suitable arrangements must be made by the subdivider with the City of Swan for: (i) construction/upgrade of a road connection to Maralla Road, and (ii) a contribution to Henley Brook Drive upgrade in accordance with the City of Swan POL-C-088.” The subdivision approval was also amended to include the following condition: “(31) A Fire Management Plan being prepared and implemented to the specifications of the local government and the Fire and Emergency Services authority and such easements required to facilitate emergency access being shown on the Deposited Plan.” Both the City of Swan and Fire Plan WA have advised the applicant that the subdivision design will need to be amended in order to provide for fire separation for lots on the southern boundary, in the south western corner of the site. The proposed modification to ODP 139/A includes a road interface between the development and Ellen Brook in the South Western corner of the site. The modification has been proposed in order that the development can comply with the Page 3 Ordinary Meeting of Council 17 March 2010 recommendations of the Fire Management Plan in order to clear the condition of subdivision. The subdivision cannot be cleared until ODP 139/A has been modified in the manner requested by the applicant and is further endorsed by advice provided to the applicant by the City of Swan and Fire Plan WA. DESCRIPTION OF SITE Lot 4 has a total area of 28.1696ha. The site is bounded to the west by The Vines (The Mews), the future Ellenbrook Village 7 development area to the north, Railway Parade to the east and rural properties to the south along Railway Parade. Bush Forever Site No. 300 covers portions of the land affected by the Ellen Brook and Sawpit Gully which dissects the subject land to the south east. The Bush Forever site is protected by a Parks and Recreation Reservation under both the Metropolitan Region Scheme and Local Planning Scheme No. 17. Lot 4 has an existing dwelling and associated outbuildings. A large horse training track is located on the south western corner of the site. A large man made dam is located on the eastern side of the property. The site is largely cleared with the exception of vegetation along the Ellen Brook and the Sawpit Gully. The land is gently undulating in topography in the south western portion of the site becoming quite steep along the banks of the Sawpit Gully, Ellen Brook and around the man made dam on the site. Two designated wetland areas exist on the site, both of which are classified by the Department of Environment and Conservation as ‘Conservation Category Wetlands’ (CCW). SITE HISTORY/PREVIOUS APPROVALS Development Applications Subdivision Applications 02/04/2009, Signage 16/10/2009, Sales Office & Temporary Road 18/06/2007, Subdivision (Residential & POS) 20/10/2009, Subdivision (209) 20/10/2009, Approval Issued (State Administrative Tribunal DR509/08 Subdivision (209), 09/02/2009, Subdivision OTHER RELEVANT PREVIOUS DECISIONS OF COUNCIL OCM 7 June 2000 – Council resolved to endorse ODP 139 OCM 14 June 2006 - Council resolved to endorse an amendment to ODP 139/A which resulted in the adoption of ODP139/B. Page 4 Ordinary Meeting of Council 17 March 2010 APPLICANT'S SUBMISSION In relation to the comment of objection from the consultation period, the applicant has advised: “Whilst Investa acknowledges that the development will introduce additional traffic to the existing road system, the proposal to modify the ODP results in exactly the same lot yield as that previously approved and no additional connections are proposed to the existing road network. There therefore should be no increase in traffic or associated impacts generated by the proposed modification in the subdivision layout” In relation to the comment received from the Ellen Brockman Catchment Group, the applicant has advised: “As stated in the submission Investa has undertaken significant revegetation work with the Management Group including in all of the areas in the estate indicated on the attached plan. Investa has a very good relationship with the Management Group and has an excellent reputation of environmental revegetation and management as also demonstrated by its work in the Swan River environs in Guildford. It is a requirement of the Urban Water Management Plan (UWMP) for stormwater to be treated for nutrient removal before it is discharged into the Ellen Brook and this will continue to occur as part of the approved UWMP for the modified ODP area. Again Investa acknowledges the importance of water quality, the revegetation works and the work undertaken with the Ellen Brockman Integrated Catchment Group. This environmental awareness is why Investa has far exceeded its obligations for weed eradication and revegetation on the property to date and will continue to ensure that the development continues to enhance the water ways and their environments.” In relation to the comment received from the Swan River Trust, the applicant has advised: “The Trust’s support of the proposal to introduce a road interface with land to the south of the site is acknowledged. An Urban Water Management Plan (UWMP) is currently being prepared to address a condition of approval of the current subdivision and this will also include requirements relating to the proposed modifications to the ODP.” In relation to the comment received from the Department of Indigenous Affairs, the applicant has advised: “The heritage significance of Ellen Brook is noted and no disturbance to the Brook or its immediate environs is proposed. Investa has already undertaken significant revegetation and weed eradication on the site which should enhance the Brook and its tributary of Saw Pit Gully. Investa is also aware of its obligations under The Aboriginal Heritage Act 1972.” Page 5 Ordinary Meeting of Council 17 March 2010 PUBLIC CONSULTATION The application was advertised in accordance with the provisions of LPS 17. During the consultation period 1 objection was received and 2 comments of support were received. The objection was related to the perceived negative impacts from potential increases in traffic in the Vines CONSULTATION WITH OTHER AGENCIES AND/OR CONSULTANTS • Western Power – No Objection to the proposed modification to ODP 139/A. • Department of Environment and Conservation– No Objection to the proposed modification to ODP 139/A. • Department of Planning – No Objection to the proposed modification to ODP 139/A. • Ellen Brockman Integrated Catchment Group Inc. – concerns over potential impact from water runoff into Ellen Brook, effects on the areas or revegetation of the location and concerns over construction of new road being within 30 metres of the Ellen Brook. • Water Corporation – No Objection to the proposed modification to ODP 139/A. • Telstra – No Objection to the proposed modification to ODP 139/A. • Swan River Trust – “The trust supports this modification having regard to the ongoing management, public access and landscape amenity of public foreshore areas.” • Department of Defence – No Objection to the proposed modification to ODP 139/A. • Department of Indigenous Affairs – This comment provides advice on the obligations under The Aboriginal Heritage Act 1972 that the applicant must have consideration for. • Public Transport Authority of WA – No comment REPORT Traffic The City’s Traffic Engineers have advised that the there are no concerns in regards to the amended road layout. Consultation Page 6 Ordinary Meeting of Council 17 March 2010 It is considered that the applicant has adequately addressed the concerns that were raised during the consultation process from the landowners and the professional agencies outlined previously above. Fire Management The City’s Natural Environment Assets Manager has advised that there are no concerns over the proposed amendment to ODP 139/A; the revised road layout will provide the necessary fire separation from the adjacent Bush Forever site. Lot Yield The proposed modifications to ODP 139/A reflected in the modified ODP 139/B do not alter the lot yield of the development that has already been endorsed by Council. OPTIONS AND IMPLICATIONS Option 1: Council may resolve to approve the proposed modification to ODP 139 Lot 4 Railway Parade, Upper Swan as submitted. Implications: Should the proposal be supported unconditionally by the City, the WAPC may interpret that the City has no objections to the ODP as submitted. Option 2: Council may resolve to endorse the modification to ODP 139 subject to conditions and advise the WA Planning Commission accordingly. Implications: The applications will be forwarded to the WA Planning Commission for final endorsement. Approval of the proposed developments will result in the development of the subject land for residential purposes. The proposed design and lot sizes are considered appropriate for the locality. Option 3: The Council may form the view that the proposed ODP is not in the interests of proper and orderly planning and accordingly may exercise discretion and resolve not to approve the modifications to ODP 139 and forward that recommendation to the Western Australian Planning Commission. This option is not supported. Implications: The applicant has a right of appeal to the State Administrative Tribunal within 28 days of the date of determination. In considering the ODP for endorsement the WAPC may agree or disagree with Council’s decision. The final determination rests with the WAPC. Furthermore, the applicant, if aggrieved by the decision of the Council, may exercise a right of appeal pursuant to clause 10.10 of Town Planning Scheme No. 17 and in accordance with Planning and Development Act 2005. CONCLUSION For clearance of the condition of subdivision, it is necessary for the site design to be modified to comply with a Fire Management Plan. The proposed modifications are Page 7 Ordinary Meeting of Council 17 March 2010 considered minor in nature and do not intensify the development or have any impacts on the lot yield. It is recommended that Council resolve to endorse the modified ODP 139 as proposed. ATTACHMENTS • Location Plan; • Approved ODP 139; • Modified ODP 139. STRATEGIC IMPLICATIONS Nil STATUTORY ENVIRONMENT Local Planning Scheme No 17. FINANCIAL IMPLICATIONS Nil RECOMMENDATION That the Council resolve to 1) Endorse the modified ODP 139/A in accordance with the plans date stamped received 16 November 2009 to be designated as ODP 139/B. 2) Forward the endorsed modified ODP 139/B to the Western Australian Planning Commission for their endorsement. 3) Advise those who lodge a submission of Council’s decision accordingly. CARRIED Page 8 Ordinary Meeting of Council 17 March 2010 Page 9
© Copyright 2026 Paperzz