Suspended Grid 90/90/90 LB FIRE RATED FLOOR/CEILING SYSTEMS – SECTION 3.2 Suspended Grid JANUARY 2006 SPECIFICATION NUMBER LOADBEARING CAPACITY FIRE RESISTANCE RATING LINING REQUIREMENTS STC IIC SYSTEM WEIGHT APPROX GBSC 90 LB 90/90/90 1 layer 13mm GIB Fyreline® + 1 layer of 16mm GIB Fyreline® 53 43 64kg/m2 CEILING LINING FLOOR FRAMING Timber floor joists complying with NZS 3604 spaced at 600mm centres maximum. Alternatively, a proprietary I-joist system may be used subject to specific structural design and approval by the normal building consent process. FLOORING Minimum flooring shall be nominal 20mm thick particle board or minimum 18mm thick structural plywood fixed to joists in accordance with the manufacturers specifications. Note: If tongue and groove sheet flooring is used, verification of performance must be obtained from the supplier of the flooring system. 1 layer of 13mm GIB Fyreline® shall be fixed parallel to the DGL55D main tees and positioned so tapered edges are located on the main tee. Sheet end butt joints must occur on DGW40D-1200 cross tees. One layer of 16mm GIB Fyreline® shall be fixed parallel to main tees but offset by 600mm in both directions. Sheet end butt joints must occur on DGW40D-1200 cross tees. Sheets shall be touch fitted. FASTENING THE LINING Fasteners INNER LAYER: 25mm x 6g GIB® Grabber® Drywall Self Tapping Screws. OUTER LAYER: 41mm SUSPENSION SYSTEM USG Drywall Grid Suspension System comprising 2.5mm wire hangers or DJ4040 wall angles at 1200mm centres maximum. Hangers support DGW55D main tee at 1200mm centres maximum. DGW40D-1200 cross tees installed at 600mm centres. The distance between the underside of the flooring and the top of the ceiling linings shall be a minimum of 450mm. x 6g and 38mm x 10g Laminator screws as above. Fastener Centres INNER LAYER: 150mm centres around perimeter of each sheet. Single screws at 200mm centres along each DGW40D-1200 cross tee. OUTER LAYER: As above. Where sheet perimeter fasteners do not coincide with steel suspension component, GIB® Grabber® Laminator screws are to be used. Place fasteners 12mm from sheet edges. Note 1: Additional DGW40D-1200 cross tees are required 200mm both sides of sheet end butt joints. WALL/CEILING JUNCTIONS manufacturer’s specification. JOINTING Unstopped. OUTER LAYER: All fastener heads stopped and all sheet joints tape reinforced and stopped in accordance with the publication entitled “GIB® Site Guide”. INNER LAYER: The internal angle between the ceiling and walls must be protected by GIB-Cove® adhered with GIB-Cove® Bond, or boxed corners (square stopped) filled and taped in accordance with the publication entitled “GIB® Site Guide”. 20mm Particle board floor Joists at 600mm centres maximum USG Drywall Grid Suspension System 150mm 600mm Single screws at 200mm centres along main tee and 1200mm cross tee Perimeter fixing at 150mm centres both layers 150mm In order for GIB® systems to perform as tested, all components must be installed exactly as prescribed. Substituting components produces an entirely different system and may seriously compromise performance. Follow system specifications. FOR FURTHER INFORMATION VISIT WWW.GIB.CO.NZ AND SEARCH SPECIFICATION CODES: GBSC 90. ISSUE DATE: JANUARY 2006 GIB® FIRE RATED SYSTEMS Note 2: Suspension system must be installed in accordance with 43
© Copyright 2026 Paperzz