HigHway 99 water Main Replacement Project

Highway 99
Water Main Replacement Project
rk
R
d
What is the Highway 99 Water Main
Replacement Project?
B
ev
er
ly
Pa
Center Road
Air
po
PROJECT AREA
rt R
oa
d
Gib
rW
ay
lty
no
Hi
gh
wa
y
99
Ma
W
ay
ll W
ay
ira
ss
e
Rd
m
Ru
so n
Ad
525
SR
Way
Lincol
n Way
iralty
Manor
Way
Alderwood Water and Wastewater District is a special
purpose district responsible for providing water and sanitary
sewer service to areas within southwestern Snohomish
County. In 1933, the District installed approximately 14,000
feet of water main pipe along the east side of Highway 99
between 152nd Street SW and 116th Street SW, and another
13,000 feet of water main pipe on the west side of Highway
99 in 1946. The water mains are nearing the end of their
structural lives and are being replaced to improve the District’s
water service infrastructure. This project will also help assure
the community safe, reliable water service, and help prevent
major traffic interruptions in the future to repair breaks in an
aging water main. The Highway 99 Water Main Replacement
Project will replace the original 1933 and 1946 water mains
with approximately 29,000 feet of new water main together
with replacement of fire hydrants and water services along
Highway 99 and other areas as shown on the project
area map.
Ad m
Project area
5
52
SR
The project is separated into six work schedules, based on
location. Project areas are primarily located in unincorporated
Snohomish County with a small portion in the City of Everett.
148th St. SW
•
•
•
•
•
Lane closures on Highway 99 and Snohomish
County roads
Noise and vibration
Intermittent driveway and sidewalk impacts
Temporary bus stop relocations
Construction activities will not stop traffic on Highway 99
nor block access to businesses
35th Ave W
Anticipated construction impacts
153rd St SW
1 inch = 225 feet
0
225
450
Feet
F:\0049\GIS\MXDs\Alderwood Overview 36x60.mxd
For more information
To learn more about the project or to follow the
project’s progress:
Email [email protected]
Call the 24-hour hotline: 1-888-857-9506
Spring 2012
Highway 99 Water Main Replacement Project
Spring 2012
Pa
rk
Be
ve
r ly
Center Rd
p
Air
PROJECT AREA
or t
Rd
Construction is scheduled to begin in spring
2012 and will continue through summer
2013. Water line installation is scheduled for
completion by fall 2012. The contractor will
return in spring 2013 to complete final paving
for all areas of work. Work in residential areas
will be completed during daytime hours, while
Highway 99 construction will occur at night.
Rd
Construction schedule
Gib
W
ay
ell
Wa
y
Ma
no
Hi
gh
wa
y9
9
rW
ay
ira
lty
ss
m
Ru
Rd
Ad
525
SR
son
Stickney Lake
Linco
Admir
alty W
ay
Lake
Manor Way
ln Wa
y
Seren
e
5
SR 52
148th St SW
KEY
Schedule A
35th Ave W
Schedule B
Schedule C
153rd St SW
Schedule F
Schedule D
Schedule E
2012
Spring
Schedule A:
East side of Highway 99 (north of SR 525)
Schedule B:
West side of Highway 99 (north of SR 525)
Schedule C:
Various sections of Snohomish County roads
Schedule D:
On Admiralty Way and 136th Pl SW
(north of SR 525)
Schedule E:
East side of Highway 99 (south of SR 525),
and near the intersection of 148th St SW
and 35th Ave W
Schedule F:
On 153rd St SW between 35th Ave W and
32nd Ave W, and on Alderwood Water
District property
2013
Summer
Fall
Winter
Spring
Summer
*phasing is approximate and subject to change