Highway 99 Water Main Replacement Project rk R d What is the Highway 99 Water Main Replacement Project? B ev er ly Pa Center Road Air po PROJECT AREA rt R oa d Gib rW ay lty no Hi gh wa y 99 Ma W ay ll W ay ira ss e Rd m Ru so n Ad 525 SR Way Lincol n Way iralty Manor Way Alderwood Water and Wastewater District is a special purpose district responsible for providing water and sanitary sewer service to areas within southwestern Snohomish County. In 1933, the District installed approximately 14,000 feet of water main pipe along the east side of Highway 99 between 152nd Street SW and 116th Street SW, and another 13,000 feet of water main pipe on the west side of Highway 99 in 1946. The water mains are nearing the end of their structural lives and are being replaced to improve the District’s water service infrastructure. This project will also help assure the community safe, reliable water service, and help prevent major traffic interruptions in the future to repair breaks in an aging water main. The Highway 99 Water Main Replacement Project will replace the original 1933 and 1946 water mains with approximately 29,000 feet of new water main together with replacement of fire hydrants and water services along Highway 99 and other areas as shown on the project area map. Ad m Project area 5 52 SR The project is separated into six work schedules, based on location. Project areas are primarily located in unincorporated Snohomish County with a small portion in the City of Everett. 148th St. SW • • • • • Lane closures on Highway 99 and Snohomish County roads Noise and vibration Intermittent driveway and sidewalk impacts Temporary bus stop relocations Construction activities will not stop traffic on Highway 99 nor block access to businesses 35th Ave W Anticipated construction impacts 153rd St SW 1 inch = 225 feet 0 225 450 Feet F:\0049\GIS\MXDs\Alderwood Overview 36x60.mxd For more information To learn more about the project or to follow the project’s progress: Email [email protected] Call the 24-hour hotline: 1-888-857-9506 Spring 2012 Highway 99 Water Main Replacement Project Spring 2012 Pa rk Be ve r ly Center Rd p Air PROJECT AREA or t Rd Construction is scheduled to begin in spring 2012 and will continue through summer 2013. Water line installation is scheduled for completion by fall 2012. The contractor will return in spring 2013 to complete final paving for all areas of work. Work in residential areas will be completed during daytime hours, while Highway 99 construction will occur at night. Rd Construction schedule Gib W ay ell Wa y Ma no Hi gh wa y9 9 rW ay ira lty ss m Ru Rd Ad 525 SR son Stickney Lake Linco Admir alty W ay Lake Manor Way ln Wa y Seren e 5 SR 52 148th St SW KEY Schedule A 35th Ave W Schedule B Schedule C 153rd St SW Schedule F Schedule D Schedule E 2012 Spring Schedule A: East side of Highway 99 (north of SR 525) Schedule B: West side of Highway 99 (north of SR 525) Schedule C: Various sections of Snohomish County roads Schedule D: On Admiralty Way and 136th Pl SW (north of SR 525) Schedule E: East side of Highway 99 (south of SR 525), and near the intersection of 148th St SW and 35th Ave W Schedule F: On 153rd St SW between 35th Ave W and 32nd Ave W, and on Alderwood Water District property 2013 Summer Fall Winter Spring Summer *phasing is approximate and subject to change
© Copyright 2026 Paperzz