ITEM 3 DEVELOPMENT APPLICATION – 090/444/2016/DIV – 162 CROSS ROAD, MALVERN 5061 (UNLEY PARK) DEVELOPMENT APPLICATION NUMBER: 090/444/2016/DIV ADDRESS: 162 Cross Road, Malvern 5061 DATE OF MEETING: 21 March 2017 AUTHOR: Chelsea Spangler DEVELOPMENT PROPOSAL: Land Division - Community Title - Create 5 allotments from 1 existing HERITAGE VALUE: Nil DEVELOPMENT PLAN: 5 May 2016 ZONE: Residential B300 APPLICANT: N Rewal and A Patel APPLICATION TYPE: Merit PUBLIC NOTIFICATION: Category 2 REPRESENTATIONS RECEIVED: NONE DAP'S CONSIDERATION IS REQUIRED DUE TO: Manager’s Discretion RECOMMENDATION: Approval KEY PLANNING ISSUES: Non-compliance with depth requirements 1. PLANNING BACKGROUND 090/287/2016/BA - Development Approval to demolish the existing dwelling and other structures on site was granted 13 May 2016. Planning Application 090/192/2016/C2 was lodged with Council 24 March 2016 seeking approval for the construction of five (5) two storey dwellings with associated garages, verandahs and a 2m high masonry fence along the front boundary. This application is on the agenda to be considered after the subject land division application. 2. DESCRIPTION OF PROPOSAL The applicant seeks to divide one (1) allotment into five (5) community title allotments, and common property to be utilised for access, driveway, landscaping and three (3) on site visitor spaces. To ensure that the crossover and driveway are in parallel, a street tree located near the western side common boundary is also required to be removed. This is page 19 of the Development Assessment Panel Agenda for 21 March 2017 Item 3 Development Application – 090/444/2016/DIV – 162 Cross Road, Malvern 5061 (Unley Park) - Continued The average size of each allotment is 311.96m2. 3. SITE DESCRIPTION The subject site is located on the northern side of Cross Road between Cambridge Terrace to the west and Duthy Street to the east. The allotment is rectangular in shape with an area of 1560m2. The allotment has a frontage of 30.46 metres to Cross Road. The site currently contains a single storey detached dwelling and other associated domestic structures. The site is currently accessed via one crossover near the western boundary of the site. There are no regulated trees or easements affecting the subject site. 4. LOCALITY PLAN Subject Site Locality 1 Representations 5. LOCALITY DESCRIPTION Land Use The predominant land use within the locality is residential. This is page 20 of the Development Assessment Panel Agenda for 21 March 2017 Item 3 Development Application – 090/444/2016/DIV – 162 Cross Road, Malvern 5061 (Unley Park) - Continued Land Division/Settlement Pattern There are a variety of allotment sizes within the locality. It is evident that a transition is occurring from traditionally larger allotments to smaller infill allotments that reflect the desired character of the RB300 Zone. Cross Road in particular has a number of sites that have been divided into community title, two storey developments. For instance, four (4), two storey dwellings within a community title development were granted Planning Consent at Council’s last Development Assessment Panel meeting. These dwellings are to be constructed at 166 Cross Road, a mere three allotments west of the subject site. 6. STATUTORY REFERRALS As per Schedule 8 of the Development Regulations 2008, the application required referral to the Department of Planning, Transport and Infrastructure (DPTI) as the development involved a division of land where the land abuts a controlled access road. DPTI advised that it is their policy to minimise the number of access points on the arterial road network in the interests of road safety. As such it is strongly recommended that all access to / from the proposed allotments is gained via the common property access only. No additional access onto Cross Road will be supported by DPTI. DPTI is satisfied that the width of the common property access will cater for any simultaneous two-way vehicular movements and thereby minimise disruption to traffic on Cross Road. DPTI does highlight that it appears that it will be necessary to remove an existing street tree in order to achieve a crossover that will be aligned with the driveway and to provide a crossover that can achieve two-way vehicle movements. The applicant has confirmed that they are aware of the need to remove a street tree in order to satisfy the conditions directed by DPTI. DPTI also advises that the Integrated Transport and Land Use Plan identifies that the Cross Road/ Duthy Street/ Harrow Terrace intersection is to be upgraded within medium (6- 15+ years) timing. Although further planning will be required to determine the exact widening requirements, it is presently envisaged that a strip of land up to 4.5 metres in width may be required from the Cross Road frontage of this site for future upgrading of the said intersection. With this in mind, DPTI supports the additional 4.5 metres added to the length of the shared access area, to ensure that a 6.0 metre onsite storage area can still be catered for at the common property access should the full extent of the road requirement be acquired in the future. Given the above, DPTI has directed that a number of conditions be attached to any approval given. Council has reviewed the conditions, and has included these conditions within the list of Planning Consent conditions recommended at the end of this report. 7. NON-STATUTORY (INTERNAL) REFERRALS The application was referred to Council’s Arborist due to the removal of a street tree (located near the western side common boundary). Council’s arborist confirmed that he has no issue with the removal and has provided a costing for the removal and This is page 21 of the Development Assessment Panel Agenda for 21 March 2017 Item 3 Development Application – 090/444/2016/DIV – 162 Cross Road, Malvern 5061 (Unley Park) - Continued replacement of this tree (based on valuation methods outlined in Council’s Vegetation Management Policy). The applicant has accepted the costs associated with the street tree removal. 8. PUBLIC NOTIFICATION Category 2 notification was undertaken in accordance with Table Un/8 of the Unley Development Plan. No representations were received during the ten (10) business day notification period. 9. ADMINISTRATION NEGOTIATIONS Council has assessed the land division application concurrently with the proposed built form application. Amendments to the built form application, specifically concerning vehicle turning movements and access, has resulted in an amended land division plan being provided. The land division plan attached (Attachment A) is consistent with the proposed Built Form application (090/192/2016/C2). 10. DEVELOPMENT DATA Site Characteristics Total Site Area Frontage Depth Averaged Allotment Sizes 311.96m2 30.46m L1&L2 20m L3 L4 L5 18.9 m 18.89 m 18.87 m Development Plan Provision 300m2 22m – four (4) dwellings 20m (items in BOLD do not satisfy the relevant Design Technique) 11. ZONE & POLICY ASSESSMENT Zone Desired Character and Principles of Development Control Residential B300 Zone Objective 1: Provision for a range of dwellings up to two storeys compatible in form, scale and design with existing positive elements of the character of the area. Desired Character This Zone is intended to continue as an established and attractive housing area offering a variety of dwelling types of not more than two storeys on a range of allotment sizes over much of the Unley area. Housing Types A wide variety of housing types is evident in the Residential RB300 Zone. Development should reflect the type and appearance of housing in its immediate environs having regard to wall heights, roof forms, use of and style of verandahs, external materials, proportions and areas of windows and front and side boundary setbacks. It is intended to continue as an established residential area containing a variety of sound, existing dwellings on individual allotments with limited and This is page 22 of the Development Assessment Panel Agenda for 21 March 2017 Item 3 Development Application – 090/444/2016/DIV – 162 Cross Road, Malvern 5061 (Unley Park) - Continued appropriate infill, mainly in the form of semi-detached dwellings and other forms of infill housing on larger sites or sites containing uses incompatible with living areas or unsound dwellings. Areas adjoining tram and train stations and Cross Road may be most suitable for development. Streetscape The balance between trees and planting and built form as dominant elements in the Zone varies from locality to locality. Development should respond to both elements ensuring a high standard of compatible built form as well as tree planting and landscaping which maintains and improves the appearance of the locality. Assessment The applicant seeks to subdivide an existing residential allotment into four smaller community title allotments. It is considered that the proposed development satisfies the desired character of the RB300 Zone as: The proposed allotments exceed the required minimum average allotment size; The proposed allotments will increase the variety of allotment sizes within the locality; The subdivision of a larger allotment that adjoins Cross Road allows for appropriate infill opportunities as desired by the RB300 Zone; The proposed allotments will obtain access from Cross Road through a common access arrangement, as encouraged by DPTI; Two of the proposed allotments satisfy the minimum depth requirement of 20 metres; The other three allotments that are located to the rear of the subject site, fall short of the minimum depth requirement, however the associated land use application to be determined by the Development Assessment Panel following this land division application, demonstrates that an appropriate built form, that satisfies the provisions of RB300 Zone, can be accommodated for each of the proposed allotments. Relevant Zone Principles of Development Control PDC 2 - Dwellings should have a site area of not less than 300 square metres (averaged for three or more dwellings sharing a common access). In the case of hammerhead allotments or allotments incorporating a right of way or shared access for one or two dwellings, the area of the "handle" or right of way is excluded from individual dwelling site areas. Assessment The land division application proposes five (5) community title allotments and therefore on average, each allotment exceeds 300m2 in site area. It is therefore advised that the proposed allotments satisfy PDC 2 of the RB300 Zone. This is page 23 of the Development Assessment Panel Agenda for 21 March 2017 Item 3 Development Application – 090/444/2016/DIV – 162 Cross Road, Malvern 5061 (Unley Park) - Continued Relevant Council Wide Objectives and Principles of Development Control An assessment against the relevant Council Wide Provisions is provided below. Relevant Council Wide Provisions PC 31 – Neighbourhoods Assessment The proposed land division will create allotments that will complement the emerging pattern of settlement within the RB300 Zone and more specifically along Cross Road; The land division will incorporate a shared access, manoeuvring area and three visitor parking spaces of which will be defined as common property; Vehicle access is available from a public road that has sufficient width to provide safe and functional access. PC 32 & 33 – Residential The proposed allotments are rectangular in shape and Allotments meet the minimum average site area requirements and DT 32.1 & 33.1 frontage. It is noted that the three rear allotments fall short of the 20m depth requirement. It is considered however: The depth of the three allotments is consistent with the emerging pattern of settlement within the area (particularly along Cross Road); That the proposed allotments are able to contain a sufficiently sized dwelling with associated covered car accommodation and private open space; That safe and functional vehicle access and parking is able to be achieved. The associated land use application demonstrates that a dwelling can be sited and constructed on the proposed allotments that will reinforce the desired character of the RB300 Zone. The proposed residential allotments are considered to satisfy PC 32 and 33. 12. CONCLUSION In summary, the application is not considered to be seriously at variance with the Development Plan and is considered to satisfy the provisions of the Development Plan for the following reasons: The proposed allotments satisfy the minimum allotment size requirements of the RB300 Zone; This is page 24 of the Development Assessment Panel Agenda for 21 March 2017 Item 3 Development Application – 090/444/2016/DIV – 162 Cross Road, Malvern 5061 (Unley Park) - Continued The proposed land division is consistent with the emerging pattern of settlement within the locality; The size and shape of the proposed residential allotments have sufficient regard to Performance Criteria 31, 32 and 33 as they are functional and enable safe access and manoeuvring of vehicles on site; The associated land use application demonstrates that the proposed allotments are capable of allowing residential development that reinforces the desired character of the RB300 Zone. The application is therefore recommended for Development Plan CONSENT. 13. RECOMMENDATION MOVED: SECONDED: That Development Application at 162 Cross Road, Malvern 5061 for ‘Land Division Community Title - Create 5 allotments from 1 existing’, is not seriously at variance with the provisions of the City of Unley Development Plan and should be GRANTED Planning Consent subject to the following conditions: PLANNING CONSENT DETAILS OF DECISION: 1. The Development herein approved shall be undertaken in accordance with all plans, drawings, specifications and other documents submitted to Council and forming part of the relevant Development Application except where varied by conditions set out below (if any) and the development shall be undertaken to the satisfaction of Council. 2. All access shall be gained via the common property access only. No additional access onto Cross Road shall be permitted. 3. The driveway shall be a minimum of 6.0 metres wide at both the boundary line and the kerbline to enable simultaneous two-way vehicle movements. The crossover and driveway shall be parallel to each other. 4. The 6.0 x 6.0 metre shared access area and all shared manoeuvring areas shall be clear of impediments (including fencing, meters, letterboxes, vegetation & parked cars) shall be maintained at all times adjacent any Cross Road boundary to this site. 5. Pedestrian sight lines at the access point shall be in accordance with AS/NZS2890.1:2004 figure 3.3. 6. All vehicles shall enter and exit Cross Road in a forward direction. 7. Stormwater run-off shall be collected on-site and discharged without jeopardising the safety and integrity of Cross Road. Any alterations to the road drainage infrastructure required to facilitate this shall be at the applicant’s expense. This is page 25 of the Development Assessment Panel Agenda for 21 March 2017 Item 3 Development Application – 090/444/2016/DIV – 162 Cross Road, Malvern 5061 (Unley Park) - Continued LAND DIVISION CONSENT CONDITIONS: 8. That the existing building on site be demolished prior to the issue of the Section 51 Certificate by the Development Assessment Commission. (All demolition is subject to separate Development Approval.) NOTE: Pursuant to Section 51 of the Development Act 1993, all outstanding requirements and conditions in relation to this approval must be met to the reasonable satisfaction of Council before the required Certificate is issued by the Development Assessment Commission. DEVELOPMENT ASSESSMENT COMMISSION CONDITIONS are as follows: The financial requirements of SA Water Corporation shall be met for the provision of water supply and sewerage services (SA Water H0046613). Payment of $25952 into the Planning and Development Fund (4 Allotments @ $6488/allotment). Payment may be made by credit card via the internet at www.edala.sa.gov.au or by phone (7109 7018), by cheque payable to the Development Assessment Commission marked “Not Negotiable” and sent to GPO Box 1815, Adelaide 5001 or in person, at Ground Floor, 101 Grenfell Street, Adelaide. A final plan complying with the requirements for plans as set out in the Manual of Survey Practice Volume 1 (Plan Presentation and Guidelines) issued by the Registrar General to be lodged with the Development Assessment Commission for Land Division Certification purposes. NOTES PERTAINING TO PLANNING CONSENT: That any damage to the road reserve, including road, footpaths, public infrastructure, kerb and guttering, street trees and the like shall be repaired by Council at full cost to the applicant. That any necessary alterations to existing public infrastructure (stobie poles, lighting, traffic signs and the like) shall be carried out in accordance with any requirements and to the satisfaction of the relevant service providers. The applicant shall contact Council’s Infrastructure Section on 8372 5460 to arrange for the removal of the street tree. The work shall be carried out by Council at full cost to the applicant. List of Attachments A Application Documents B Department of Planning, Transport and Infrastructure (DPTI) Referral Comments Supplied By: Applicant DPTI This is page 26 of the Development Assessment Panel Agenda for 21 March 2017
© Copyright 2026 Paperzz