RECOMMENDED PRACTICE DNV-RP-A204 Quality Survey Plan (QSP) for Offshore Class New-building Surveys SEPTEMBER 2011 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version DET NORSKE VERITAS AS FOREWORD DET NORSKE VERITAS (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property and the environment, at sea and onshore. DNV undertakes classification, certification, and other verification and consultancy services relating to quality of ships, offshore units and installations, and onshore industries worldwide, and carries out research in relation to these functions. DNV service documents consist of amongst other the following types of documents: — Service Specifications. Procedual requirements. — Standards. Technical requirements. — Recommended Practices. Guidance. The Standards and Recommended Practices are offered within the following areas: A) Qualification, Quality and Safety Methodology B) Materials Technology C) Structures D) Systems E) Special Facilities F) Pipelines and Risers G) Asset Operation H) Marine Operations J) Cleaner Energy O) Subsea Systems © Det Norske Veritas AS September 2011 Any comments may be sent by e-mail to [email protected] For subscription orders or information about subscription terms, please use [email protected] Computer Typesetting (Adobe Frame Maker) by Det Norske Veritas This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this document, and is believed to reflect the best of contemporary technology. The use of this document by others than DNV is at the user's sole risk. DNV does not accept any liability or responsibility for loss or damages resulting from any use of this document. Recommended Practice DNV-RP-A204, September 2011 Contents – Page 3 CONTENTS 1. GENERAL ............................................................................................................................. 4 1.1 1.2 1.3 Preamble ...............................................................................................................................................4 Objective ...............................................................................................................................................4 Scope ......................................................................................................................................................4 2. DEFINITIONS....................................................................................................................... 4 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 Customer ...............................................................................................................................................4 Owner.....................................................................................................................................................4 Builder....................................................................................................................................................4 Society ....................................................................................................................................................4 IACS .......................................................................................................................................................4 Flag state ................................................................................................................................................4 Surveyor.................................................................................................................................................4 Hull Structure .......................................................................................................................................4 Documents .............................................................................................................................................5 Survey Methods.....................................................................................................................................5 3. APPLICATIONS ................................................................................................................... 5 3.1 3.2 Certification of Equipment and Materials .........................................................................................5 Locations of Construction ...................................................................................................................6 4. REVIEW OF THE CONSTRUCTION FACILITY .......................................................... 6 5. NEW BUILDING SURVEY PLANNING........................................................................... 6 5.1 5.2 5.3 Kick-off Meeting ..................................................................................................................................6 Quality Standards .................................................................................................................................6 Survey Extent .......................................................................................................................................6 APP. A CATEGORIZATION OF SYSTEMS FOR TESTING AND COMMISSIONING ... 23 DET NORSKE VERITAS AS Recommended Practice DNV-RP-A204, September 2011 1. General – Page 4 1. General 1.1 Preamble This is a guide only for a typical drillship and should be used no more than as an example to prepare a project specific Quality Survey Plan (QSP) that addresses all the requirements related to a specific project. A project specific Quality Survey Plan with agreed extent of participation from DNV shall be submitted by the Builder/ Owner (as applicable) for approval by DNV prior to commencement of activities. This guide contains requirements obtained from IACS unified requirements, Z23 “Hull Survey for New Constructions”. For the convenience of users, various cross references to relevant rules and guidelines are provided in addition to IACS documents. IACS unified requirements; Z23 “Hull Survey for New Constructions” is available from www.IACS.co.uk. This Guide also incorporates relevant requirements of IACS UI SC234, UI LL76 and UI MPC96 regarding initial statutory surveys at new construction. Updates to IACS Z23 are also incorporated. 1.2 Objective The objectives of this Guide is to ascertain various activities that are necessary for the Classification of a unit, to identify Customer’s, DNV’s and various standards and procedures that are applicable to those activities, and to define the extent of involvement by the Customer and DNV. 1.3 Scope The scope is defined in the contract between the Customer and DNV but typically covers the requirements of applicable rules related to main Class, Statutory and additional class notation. The scope of the typical Quality Survey Plan should include all the activities of the new building project as much as possible, but the contents of QSP shall not be considered as covering the detailed scope to the as specified in the contract. Description of principles and procedures for DNV’s services related to new-building projects are described in the various Rules for Classification e.g., DNV Rules for Classification of Offshore Drilling and Support Units DNV-OSS-101, Rules for Classification of Floating Production and Storage Units DNV-OSS-102, etc. 2. Definitions 2.1 Customer Customer is the party who has requested the Society's service and may mean the Owner or the Builder of the Unit. 2.2 Owner The registered owner of the vessel or any other organization or person who has assumed the responsibility for operation of the vessel and who on assuming such responsibility has agreed to take over all the duties and responsibilities. 2.3 Builder Builder is the party contracted to build a vessel in compliance with the Society's rules. 2.4 Society Det Norske Veritas AS. 2.5 IACS The International Association of Classification Societies’ IACS unified rules, interpretations, guidelines and recommendations may be found on www.iacs.org.uk. 2.6 Flag state State under whose laws the vessel is registered or licensed. 2.7 Surveyor Surveyor to Det Norske Veritas, authorized to carry out surveys and to conclude whether or not compliance has been achieved. 2.8 Hull Structure The hull structure is defined as follows: i) Hull envelope including all internal and external structures ii) Superstructures, deckhouses and casings iii) Welded foundations (e.g., main engine seating) DET NORSKE VERITAS AS Recommended Practice DNV-RP-A204, September 2011 Page 5 – 3. Applications iv) Hatch coamings, bulwarks v) All penetrations fitted and welded into bulkheads, decks and shell vi) The fittings of all connections to decks, bulkheads and shell, such as air pipes and ship side valves – all ILLC 1966, as amended vii) Welded attachments to shell, decks and primary members (e.g., crane pedestals, bitts and bollards), but only as regards their interaction on the hull structure. 2.9 Documents Reference to documents also includes electronic transmission or storage. 2.10 Survey Methods Definition of survey methods which the Surveyor is directly involved in: Survey: Signifies a systematic and independent examination of a unit, materials, components or systems in order to verify compliance with rules and/or statutory requirements. Surveys will be carried out at the prefabrication sites, onboard the unit, as well as at sub-suppliers and other locations at the discretion of DNV, which also decides the extent and method of control. Unscheduled surveys (U): are planned activities undertaken by DNV to verify that applicable fabrication, installation, and testing during mechanical completion phase, testing and commissioning activities related to systems are carried out in accordance with applicable procedures in order to comply with the project requirements. Review (R): A systematic examination of drawings, design documents and/or records in order to evaluate their ability to meet requirements, to identify any problems and to propose necessary actions. Witness (W): Attending tests or measurements where the surveyor verifies compliance with agreed test or measurement procedures. Verification (V): Confirmation through the provision of objective evidence (analysis, observation, measurement, test, records or other evidence) that specified requirements has been met. MPQA: Manufacturer Product Quality Assessment (MPQA) is a tool to assess a Customer’s ability to control product quality by using rating methodology. Where DNV has no recent experience with offshore activities at the fabrication facility and/or when significant new infrastructure has been added, DNV may initiate an MPQA and conclude the Customer’s QAQC-performance and set the initial survey scope on basis of the rating methodology. Survey Category I (Structure): is related to survey of “special areas” as defined and outlined in DNV-OS-C101 Design of Offshore Steel Structures. General (LRFD method) Section 4 C202 and C300. Survey Category II (Structure): is related to survey of “primary areas” as defined in DNV-OS-C101 Design of Offshore Steel Structures. General (LRFD method) Section 4 C202 and C300. Survey Category III (Structure): is related to survey of “secondary areas” as defined in DNV-OS-C101 Design of Offshore Steel Structures. General (LRFD method) Section C202 and C300. Survey Category I (Systems): Systems which needs to be in continuous operation for maintaining the unit’s manoeuvrability and position keeping. The definition is extended for systems associated with drilling and production plants to cover systems which are needed to be available on demand to prevent development of, or to mitigate the effects of an undesirable event, and to safeguard the personnel, environment and the installation. Survey Category II (Systems): Generally defined as systems in continuous operation for maintaining the unit’s manoeuvrability and station keeping, but which are necessary to maintain the unit’s main functions. The definition is extended for systems associated with drilling and production plants to cover systems, which ensures reliable operation and which maintains plant operation within given operational limitation. Survey Category III (Systems): Defined as a system, which are neither Category I nor Category II. 3. Applications Using this as a model document, a project specific Quality Survey Plan (QSP) that clearly identifies the agreed level of participation by the Society shall be prepared by the Customer and accepted by the Society for use in all new building classification projects. 3.1 Certification of Equipment and Materials This document does not cover the certification of equipment and materials. Evidence of acceptance for such items shall be provided by the Client by way of accompanying documentation from a Class Surveyor at manufacturer’s or other applicable location and verified at the Customer’s location. DET NORSKE VERITAS AS Recommended Practice DNV-RP-A204, September 2011 4. Review of the Construction Facility – Page 6 3.2 Locations of Construction This document applies to the offshore construction activities at any of the following: i) Customer’s construction facilities ii) Subcontractors at the Customer’s construction facilities iii) Subcontractors at their own facilities or at other remote locations. 4. Review of the Construction Facility DNV is to familiarize itself with the Customer’s production facilities, management processes, and safety procedures for consideration in determining the contents and application of Table 5-1. This familiarization shall take place prior to starting any fabrication or construction. Such familiarization will take place under the following circumstances: i) Where DNV has no recent experience at the construction facility (typically after a lapse of one year) or when a significant new infrastructure to the facility has been added ii) Where there has been a significant management or personnel restructuring, having an impact on the ship or offshore construction processes or, iii) Where the builder contracts to construct a vessel of a different type or substantially different in design. In order to assess compliance with specified Rules, Standards and Regulations, the Society may require additional documentation and carry out an assessment of yard’s processes, systems, and personnel related to the classification projects. The results of the assessment should be used as a basis to decide on the extent of the involvement of surveyors of the Society. The extent of the Classifications Society’s involvement for the site survey activities shall be clearly reflected in Table 5-1 in this document. Where DNV has no recent experience with new building activities at the builder’s construction facility or its subcontractors and/or when significant new infrastructure has been added, DNV may initiate an MPQA and evaluate the Customer’s QA/QC-performance and set the initial survey scope on basis of the MPQA rating methodology. 5. New building Survey Planning 5.1 Kick-off Meeting Prior to commencement of any new building project, the Customer and DNV are to discuss at a kick-off meeting the survey activity items listed in Table 5-1. The purpose is to agree how the list of specific activities shown in the Table is sufficiently comprehensive, to be adjusted, if necessary and to be addressed. A record of the meeting is to be made, based upon the contents of the Table, (the table can be used as the record with comments made inserted in the appropriate column). The Customer may be asked to agree to undertake ad hoc investigations during construction where areas of concern arise. DNV is to be kept informed of the progress of any investigation. Whenever an investigation is undertaken and, if warranted by the severity of the problem, the Customer should suspend relevant construction activities until counteractive measures are satisfactorily implemented, reviewed and accepted by the Society. 5.2 Quality Standards Construction quality standards for the hull structure, piping, electrical, HVAC and other disciplines during new building project are to be properly listed in this document, reviewed and agreed during the kick-off meeting. 5.3 Survey Extent It shall be underscored that the QSP table is not exhaustive, and in cases where the QSP is incomplete and/or not necessarily covering all survey aspects, it shall be the prerogative of DNV to require such activities/items added. The QSP only covers survey activities and does not cover the technical interpretations of the statutory requirements or approval of plans, designs and manuals required by the Regulations. DET NORSKE VERITAS AS Sl. No. Activity Reference to Rules Procedures (Yard/DNV) Quality Records generated Extent of Attendance Yard DNV Typical Activities A. Hull Structure And Hull Outfitting 1.1 1.2 2.1 DET NORSKE VERITAS AS 2.2 2.3 2.4 3.0 3.0 Material Receipt Control DNV-OS-C401 Material traceability during production DNV-OS-C401 Welding Consumables DNV-OS-C401 Welder Performance Qualification Welding Procedure Specification (WPS) DNV-OS-C401 DNV-OS-C401 Post weld heat treatment (PWHT) DNV-OS-C401 Welding Environment DNV-OS-C401 WPT Welding Production Test DNV-OS-C401 Traceability records Nesting plans, traceability records V R V R V U V R V W/R V R V U W W Procedure for handling of consumables Welders’ records WPS Heat treatment records QC report checklist QC report checklist — Review files, review of material certificates and records, Verify that plates and profiles are marked according to procedure — Random verification in shop of material traceability against nesting plan. — Review of traceability — Review type approval status, — Review that storage, handling and treatment are in accordance with procedure and manufacturers requirements. — Verify consumables against type approval — Verify compliance with procedures in temporary and permanent storage facilities — Verify compliance with handling in shops and outdoor conditions. — Review of welder certification records — Verify welder qualifications according to agreed recognized standards — Verify welders approval for weld positions — Verify validity of certificates and required training — Verify that only WPS approved according to DNV standard are used for the project. — Verify that wide gap welding procedures are qualified on gaps specified by IACS 47 — Verify that reference is given to preheating, incl. repairs — Review records for heating, temperature differences, soaking and cooling in accordance with approved procedures. — Verify that fabrication facilities are protected from adverse weather, e.g. wind, rain, snow, draughts and kept dry. — Verify that outdoor areas applying welding with shielding gases and flux arc are protected — Verify that fabrication facilities are protected from adverse weather, e.g. wind, rain, snow, draughts and kept dry. — Verify that outdoor areas applying welding with shielding gases and flux arc are protected Comments Recommended Practice DNV-RP-A204, September 2011 Page 7 – 5. New building Survey Planning Table 5-1 QSP - Survey Activity Items Table 5-1 QSP - Survey Activity Items (Continued) Sl. No. 3.1 4.0 4.1 4.2 4.4 Welding and Fabrication Supervision, production Edge preparation (pre-assembly) (pre-erection) Fit-up and alignment, General (pre-assembly) (pre-erection) Reference to Rules Procedures (Yard/DNV) DNV-OS-C401 Quality Records generated DNV-OS-C401 QC report checklist DNV-OS-C401 Fabrication records Extent of Attendance Yard DNV V U W U/R W Cut outs in structural member s etc U/R Fabrication records Fit-up and alignment, Special areas (Survey Category I) DNV-OS-C401 NDT DNV-OS-C401 W U/R W U/R W U/R Fabrication records NDT records Repair records Typical Activities Comments — Verify that sufficient number of skilled inspectors are kept during fabrication — Verify that welding equipment is in good order and calibrated as per procedure — Verify that edge preparation is kept within the agreed standard — Verify that procedures are in place to compensate for wide gaps and alignment — Deviations and that remedial actions have been taken to counteract with reported nonconformances — Update as built and get it approved prior to start of the work — Verify that the fabrication has been carried out properly and inspected — Review that alignment and fit-up have been checked against Class requirements for special areas. — Verify that alignment and fit-up conform with fabrication records — Review that NDT extent has been carried out according to NDT plans and that all repairs have been tested. — Review that defect rates are within acceptable limit. — Verify that NDT is documented such that the performed examination is properly duplicated. — Verify that repaired areas are satisfactorily carried out and not more that twice unless procedure available Cut outs in hull, frames, girders, columns, braces to approved prior to any work being carried out Recommended Practice DNV-RP-A204, September 2011 5. New building Survey Planning – Page 8 DET NORSKE VERITAS AS 4.3 Activity Sl. No. 4.5 DET NORSKE VERITAS AS 4.6 5.0 Activity Final block inspection Reference to Rules Procedures Quality Records generated (Yard/DNV) DNV-OS-C401 Fabrication history records and status Records design changes and status Unscheduled inspection nonconformity records and status NDT records and status QCH final records and status Block erection welding DNV-OS-C401 (Survey Category II and III) IACS 47 Tightness testing, including leak and hose testing, hydro pneumatic testing DNV-OS-C401 Fabrication history records and status Records design changes and status Unscheduled inspection nonconformity records and status NDT records and status QCH final records and status Inspection records and test results Extent of Attendance Yard DNV W U/R W U/R W W/U Typical Activities — Review that blocks are controlled and completed by production and finally checked by QCH according to approved drawings agreed fabrication procedures and standard for workmanship. — Review tolerance records — Review that NDT has been completed according to NDT plans. — Verify that the general welding and workmanship standard are maintained — Verify that scantlings and details are carried out according to approved drawings. — Verify that weld surface preparation is kept according to standard and that specified weld surface preparation for enhanced fatigue life is satisfactorily carried out. — Verify that DNV’s unscheduled records are dealt with. — Review that blocks are controlled and completed by production and finally checked by QCH according to approved drawings agreed fabrication procedures and standard for workmanship. — Review that NDT has been completed according to NDT plans. — Prior to inspection review that the Customer has performed own inspection. — Review that any specified leak testing in subassembly shops have been witnessed and accepted. — Review that tightness testing of penetration has been carried out. — Review that hose testing has been carried out by the Customer, — Verify that all boundaries and interfaces between blocks subject to tightness testing are covered by the inspection — Verify that all subject boundaries and penetrations are in absent of leaks — Verify that all boundaries and connections subject to hose testing are not leaking. Comments Recommended Practice DNV-RP-A204, September 2011 Page 9 – 5. New building Survey Planning Table 5-1 QSP - Survey Activity Items (Continued) Table 5-1 QSP - Survey Activity Items (Continued) Sl. No. 5.1 6.1 6.2 Structural testing Corrosion Protection Systems (e.g., coatings, cathodic protection, impressed current) Application of antifouling systems Reference to Rules Procedures Quality Records generated (Yard/DNV) DNV-OS-C401 Inspection records and test results DNV-OSS-101 DNV-OS-C101 DNV-OS-C401 DNV-OS-E101 Coating included in the SOLAS Reg. II PSPC: Application of Protective Coatings for Dedicated Seawater Ballast Tanks in all Types of Ships and the International Convention for the Control and Management of Ships’ Ballast Water and Sediments is applicable to offshore units (semi submersibles, floating platforms, FSUs and FPSOs) as defined in Articles 1-12 and 3 of the Convention Dimensional Measurement Extent of Attendance Yard DNV W W W R W R W U/R Installation records Builder's and manufacturer's records and manufacturer’s declaration QC records and manufacturer’s data sheets, Approved CTF QC records Typical Activities — Prior to inspection review that the Customer has performed own inspection. — Review that correct testing pressures have been used — In case the structural test shall be combined with tightness testing, review that no protective coating has been applied — Verify that the structural integrity is maintained and all boundaries and interfaces between blocks subject to tightness testing are free from protective coating and covered by the inspection — Verify that all subject boundaries and penetrations are free from leaks — Review that coating standard has been confirmed in order by manufacturer and Customer. — Verify that anodes are provided with appropriate documentation, and that number and locations as per approved drawings. — Verify that impressed current system is installed and tested — B600 Corrosion protection systems — B601 Application of coating, steel surface preparation with respect to application of coating and fabrication and installation of sacrificial anodes and impressed current cathodic protection systems are not included in DNV’s scope of work unless upon special agreement. — Kick off meeting with customer and owner. — Review and monitoring the implementation of the coating Verify that applied coatings are approved Comments Recommended Practice DNV-RP-A204, September 2011 5. New building Survey Planning – Page 10 DET NORSKE VERITAS AS 6.0 Activity Sl. No. 7.0 8.0 9.0 10.0 11.0 DET NORSKE VERITAS AS 11.1 Activity Freeboard Mark Inspection Load Line and Draft Mark Inspection Reference to Rules Procedures Quality Records generated (Yard/DNV) DNV-OS-C301 QC records ILLC 1966 In- Water Survey Mark (BIS) Bottom Survey Before Launching Ship Rules Inclining Experiment and Deadweight Measurement DNV-OS-C301 Watertight integrity of internal and external openings Weather tight integrity DNV-OS-C301 QC records QC records DNV-OS-C301 Extent of Attendance Yard DNV W W W W W W W W W W W W/U Inclining test report Installation and testing and records Approved drawings Installation and testing records Approved freeboard plan Typical Activities — Verify freeboard marks in accordance with load line assignment — Verify draft marks in accordance with the agreed tolerances — Water tight integrity to be verified, including openings, attachments etc — DNV stability surveyor to verify that the inclining experiment has been carried out according to approved procedure. — Verify that watertight integrity is maintained — Verify that weather tight integrity is maintained B. Quality Survey Plan Piping Systems 1.0 1.1 Piping fabrication facilities Welding Procedure Specification (WPS) DNV-OS-D101 DNV-OS-D101 Pipe fabrication records NDT and testing records Welders’ record W U/R V W/R Procedural coverage records — Review that pipe fabrication is carried out and documented according to agreed procedures and job instructions. — Review of traceability system and records — Review records qualification — Review of testing facilities. Verify by qualified survey that the pipe fabrication facilities are generally in good order that piping fabrication is carried out to good workmanship standard — Verify receipt control and traceability of materials during fabrication. — Review that qualification of personnel is according to procedure and that welding machines and nondestructive testing facilities are calibrated — Review that all weld joint types, weld positions and weld processes, including repairs, are covered by approved welding procedures according to agreed qualification method — Verify that only WPS's approved according to DNV standard DNV-OS-D101 are used for the project.(ASTM American Society for Testing Materials ASME B31.3 ASME Code for Pressure Piping) Comments Recommended Practice DNV-RP-A204, September 2011 Page 11 – 5. New building Survey Planning Table 5-1 QSP - Survey Activity Items (Continued) Table 5-1 QSP - Survey Activity Items (Continued) Sl. No. 2.0 Activity Marine Class I Piping Reference to Rules Procedures Quality Records generated (Yard/DNV) DNV-OS-D101 Fabrication Records Shop pressure testing records 2.2 DNV-OS-D101 Class I Drilling and Production piping DNV-OS-E101 and E201 Class II Drilling and Production piping 2.4 Installation Inspection 2.5 Post Weld Heat Treatment (PWHT) Nondestructive Examination Cleaning & Flushing (WaterAir Etc.) 2.6 2.7 2.8 Hydro-test (Class I) 2.9 Hydro-test (Class II and III) DNV-OS-D101 PWHT Procedure NDE Procedure Cleaning, Flushing & Preservation Procedure Hydro Test Procedure Hydro Test Procedure — Review of fabrication records include NDT — Review that PWHT if required is carried out and documented as per procedure. Verify by visual examination that the fabrication standard is acceptable. — Review of fabrication records include NDT — Review that PWHT is carried out documented as per procedure — Review of fabrication records include NDT — Review that PWHT if required is carried out and documented as per procedure — Verify by visual examination that the fabrication standard is acceptable. — NB More extensive documentation required for HP Drill to be furnished by builder — Review of fabrication records include NDT — Review that PWHT if required is carried out and documented as per procedure — Verify by visual examination that the fabrication standard is acceptable. — P & ID walkthrough U/R W U/R W U/R W U/R Piping Installation Check Sheet PWHT Record W U/R W R NDE Report W R W R W W/U/R — Review Chart Recorder Calibration and Hydro Test Chart (Record) W U/R — Review Chart Recorder Calibration and Hydro Test Chart (Record) Fabrication Records NDT and PWHT records Fabrication Records Shop pressure testing records NDT and PWHT records Fabrication Records Shop pressure testing records NDT and PWHT records Piping Installation Check Sheet Test Record Piping Installation Check Sheet Test Record Comments Recommended Practice DNV-RP-A204, September 2011 5. New building Survey Planning – Page 12 DET NORSKE VERITAS AS 2.3 Marine Class Piping Class II and III Typical Activities W NDT and PWHT records 2.1 Extent of Attendance Yard DNV Sl. No. Activity Reference to Rules Procedures (Yard/DNV) Quality Records generated Extent of Attendance Yard DNV Typical Activities C. Electrical and Instrumentation Installations 1.0 1.1 DET NORSKE VERITAS AS 1.2 Cable tray and installation Cable type Cable Segregation DNV-OS-D201 DNV-OS-D201 MC check sheet V R V R V U W U W U TA certificate Cable list Ship Rules Pt.6 Layout drawing DNV-OS-D201 Layout drawing — Verify that Cable ladders and trays with their fixing devices are made of corrosion resistant steel.(Hot galvanizing or stainless) — Verify that TA certificate are available. Cables for services, required to be operable under fire conditions shall be of fire resistant type complying with the requirements of IEC 60331-, where they pass through high fire risk areas. — Special requirement, — i.e. Norwegian flag require Halogen free cables in living quarters. — Verify cable segregation on an ongoing basis. 1.2 Cable Installation 1.2.1 Generator cables 1.2.2 Emergency generator cables DNV-OS-D201 Layout drawing 1.2.3 Steering gear cables Layout drawing DNV-OS-D201 1.2.4 Emergency fire pp cables SOLAS CH II-2 Layout drawing 1.2.5 Heating cable installation DNV-OS-D201 1.2.6 Segregation of low and high DNV-OS-D201 voltage cables Layout drawing Maker’s instruction Layout drawing 1.2.7 Segregation of power cables DNV-OS-D201 and cables for control circuits Layout drawing W U W U W U W U W U — Verify that generator cables shall be divided between two or more cable runs.(Both for power and control cables) — Verify that generator cables are not going through cofferdams. — Verify that Power cable inside steering gear room shall running as wide as possible — Power cable from ESBD shall not pass through ER — Control cable from local to bridge shall running separately. — Verify that the power cable from ESBD is not passing through E or other high fire risk area. — Verify that earth fault circuit breaker is provided. — Verify that at least 300 mm from each other unless mechanically separated by earthed metal partitions or pipes. — Verify that they are not running in the same bunch or pipe. Comments Recommended Practice DNV-RP-A204, September 2011 Page 13 – 5. New building Survey Planning Table 5-1 QSP - Survey Activity Items (Continued) Table 5-1 QSP - Survey Activity Items (Continued) Sl. No. 1.2.8 Activity Single core cables Reference to Rules Procedures Quality Records generated (Yard/DNV) DNV-OS-D201 Layout drawing Cable Penetrations DNV-OS-D201 1.2.10 Mechanical protection of cables DNV-OS-D201 1.2.11 Cable bends and fixing DNV-OS-D201 Maker’s instruction 1.2.12 Cable expansion DNV-OS-D201 Layout drawing 1.2.13 Termination of cables (High voltage cable) DNV-OS-D201 Maker’s instruction 1.2.14 Cable entrance Maker’s instruction TA certificate W U W U W U W U W U W U W U V R V R V R V U W W DNV-OS-D201 Typical Activities — Verify that the phases preferably in a triangular formation. — Verify that all phases belonging to the same circuit are running together in a common bulkhead penetration (MCT) — A sampling shall be witnessed under maker’s instruction. — Focus on below the floor in engine and cargo hold area. — Verify that cable bending is properly considered during cable ladder installation. — Installation of expansion shall be agreed with yard at early stage. — Termination kits approved or recommended from the cable manufacturer and made by qualified people. — It is recommended that Hi-pot test will be down for the first cable after termination, if successful then do others. — Verify that the size of glands shall match with cable size. — Verify that the integrity of the enclosure is not impaired. 2.0 Main Power supply 2.1 DNV-OS-D201 Test procedure 2.2 System voltages and frequency Voltage drop DNV-OS-D201 Approved calculation 2.3 2.5 Harmonic distortion Switchboard arrangement DNV-OS-D201 DNV-OS-D201 Approved calculation Layout drawing — Focus on long loops, i.e. lighting loops in offshore unit. — Normally caused by powerful frequency converter — Make sure that No pipes installed above, no dead end corridors if more than 7m. — Passage ways for switchboards, and insulation mat in front of and behind of switch boards. 3.0 Emergency Power supply 3.1 Emergency Generator protection — Short circuit protection (Trip ACB) — Over current protection, only alarm, NOT trip ACB. Comments Recommended Practice DNV-RP-A204, September 2011 5. New building Survey Planning – Page 14 DET NORSKE VERITAS AS 1.2.9 Extent of Attendance Yard DNV Sl. No. Activity 3.2 Emergency generator used as harbour generator Starting arrangements for emergency generating sets 3.3 Reference to Rules Procedures (Yard/DNV) Quality Records generated Extent of Attendance Yard DNV W W W R/V Typical Activities — Same as main generator D. Fire Detection Systems 1.1 DET NORSKE VERITAS AS 1.2 1.3 1.4 Smoke Detection SOLAS/ FSS Code 2001 Test Records Spare Components Onboard FSS Code 2001 Address Identification FSS Code 2001 Main and emergency power supplies and battery charging failure fault signal Inventory List Test Records Test Records Test indication of disconnected loop and fault signal for earth fault, short circuit and wire break in detection loops. Perform lamp test if applicable Fire and Smoke Detection above ceilings in corridors and stairways FSS Code 2001 Test Records 1.7 Manual call point Test function FSS Code 2001 Test Records 1.8 Audible Alarms FSS Code 2001 Test Records 1.5 1.6 1.9 Test activation of alarm W W W W W W W W W W FSS Code 2001 FSS Code 2001 W W W W W W W W Test Records — Smoke detection is required in all locations where fire detection is required, except in galleys, saunas and cold rooms with temperature below 5 °C, where heat detection is required. Pay special attention to installations in hazardous areas — E.g. fire detectors of all types used in the system. — Switch off main power supply. Observe visual and audible fault signals and automatic change-over to emergency source — Simulate indication of disconnected look and wire break by disconnection of inputs for selected loops. Simulate earth fault and short circuit on input circuits for selected loops. — Applicable where ceilings and suspension contain combustible materials, which is allowed for pre SOLAS 1974 vessels. — Fire detector Test function of smoke detectors above ceilings in corridors and stairways — Test at least one per loop. Verify visual and audible fire signal in the fire central — Verify that audible alarm can be heard throughout the crew accommodation and service spaces, control stations and machinery spaces of category A — If the fire signal at the fire central has not received attention within two minutes, the fire alarm shall be activated Comments Recommended Practice DNV-RP-A204, September 2011 Page 15 – 5. New building Survey Planning Table 5-1 QSP - Survey Activity Items (Continued) Table 5-1 QSP - Survey Activity Items (Continued) Sl. No. Activity Reference to Rules Procedures (Yard/DNV) Quality Records generated Extent of Attendance Yard DNV Typical Activities Comments 2.0 Hydrocarbon gas detection system, fixed 2.1 2.2 Gas detector Test function Examine and test function SOLAS 2000 Ch.II-2 DNV-OS-D301 Test Records SOLAS 2000 Ch.IIMODU-code Test Records — Test one detector in each loop or area. Use span gas and verify alarm at a defined percentage of the lower explosion level (LEL). Oil carriers with keel laid on or after 2002-07-01 10%, oil carriers with keel laid before 2002-07-01 30%, gas carriers 30%, offshore units 25% - 60%, other vessels 30%. — Applicable for all fixed systems on board. Test audible and visual alarm at a continuously manned position. W W W W W W W W SOLAS 2000 Ch.II-2 2 and Ch.VI MODU Code- W W SOLAS 2000 Ch.II- W W — Verify quantity on board. Normally minimum two units W W — Verify that the foam concentrate has a valid certificate or test report W W — Examine all hoses, nozzles and applicators that hose boxes contain correct coupling spanners for hydrants and nozzles. Hoses shall be of a nonperishable type. Nozzles shall be of an approved dual-purpose (spray jet) type incorporating a shut off W W 3.0 Hydrocarbon gas detection system, fixed 3.1 3.3 Quantity Test Records — Refer to the manufacturer's instructions — Verify that calibration and maintenance has been carried out in accordance with the manufacturer's recommendations. — Normally minimum two units 4.0 Oxygen detection, portable unit 4.1 Quantity 5.0 Fire fighting – On board documentation 5.1 Fixed firefighting system service report Fixed firefighting system service report 6.0 Fire water system 6.1 Fire hoses & Fire hose SOLAS 2000 stations including equipment Ch.II- 7.0 Fire water supply system, main 7.1 Fire water pumping units, — Perform examination while in running condition Recommended Practice DNV-RP-A204, September 2011 5. New building Survey Planning – Page 16 DET NORSKE VERITAS AS 3.2 Test function as far as practicable Calibration Sl. No. Activity Reference to Rules Procedures Quality Records generated (Yard/DNV) SOLAS Ch.II-2 Test Records 7.2 Fire water pumping units, main 7.3 One of the fire pumps is SOLAS Ch.II-1 supplied from the emergency source of electric power Extent of Attendance Yard DNV Typical Activities — Verify Operation Test W W W W — Verify that one of the fire pumps is supplied from the emergency source of electric power ICLL and MODU Test Records Code- 2001 W W — Test operations of valves, check valve position indicators and check for water on deck — Verify remote operation of sea suction valve SOLAS 2000 Ch.II-2 Test Records W W Operation with supply from the emergency source of electric power SOLAS 1996 Ch.II-1 Test Records W W International Shore Connection SOLAS 2000 Ch.II-2, MODU Code W W W W Test Records 8.0 Fire water supply system, emergency 8.1 Fire water supply piping, emergency 9.0 Fire pumping units, emergency 9.1 DET NORSKE VERITAS AS 9.2 9.3 Operation test — Test primary and secondary starting arrangements. Verify that pumps installed above the lightest water line are of self priming type — Applicable for electrically driven pumps. Verify that the emergency generator is able to deliver to the emergency fire pumps simultaneously with other consumers — At least one international shore connection shall be provided, enabling use on both sides of the vessel. Gasket, 4 bolts, 4 nuts and 8 washers shall be available 10.0 Fire water distribution system 10.1 Fire hydrants operation test Test Records 10.2 Fire main pressure test Test Records 10.3 Fire main - Main nozzle pressure under main pump operation SOLAS 2000 Ch.II-and MODU Code- W W W W Test Records — Spot check by opening and closing of valves. — Not applicable for vessels with pressurized systems. Verify that all hydrants outlets are closed and that all isolation valves are open. Examine the fire main whilst under pressure from two pumps running simultaneously and verify no leakage. Test function of safety valves, if fitted. — Verify nozzle pressure at the highest hydrant, with two hoses connected to the highest hydrants and two pumps running. Minimum pressures for vessels with gross tonnage >= 6000 GT 0.27 Nmm2, other vessels 0.25 Nmm2. Comments Recommended Practice DNV-RP-A204, September 2011 Page 17 – 5. New building Survey Planning Table 5-1 QSP - Survey Activity Items (Continued) Table 5-1 QSP - Survey Activity Items (Continued) Sl. No. Activity 10.4 Fire main - Hose throw under emergency pump operation 10.5 Reference to Rules Procedures (Yard/DNV) Quality Records generated Fire main Verify no MODU Code connections other than those necessary for fire-fighting purposes Extent of Attendance Yard DNV W W W W Typical Activities Comments — Perform test with two hoses connected to the highest hydrants. Verify that both hoses throw 12 m simultaneously. — Perform test with two hoses connected to the highest hydrants. Verify that both hoses throw 12 m simultaneously. 11.0 Fire water supply control and monitoring system 11.1 Test Records Verify local start of main fire SOLAS 2000 pump Ch.II-2 and MODU Code- Test Records W W W W — Applicable in case of periodically unattended machinery space, when only one person is required on watch, or if dangerous goods is carried, unless a system permanently pressurized by one of the main fire pumps is installed. — Start pumps locally and verify function and pressure W W — Including pilot bottles, piping, pull pistons, wire pull etc. W W — Examine connection to the manifold. Bottle rooms shall contain no storage W W W W W W W W W W 12.0 Machinery space fixed gas fire fighting system 12.1 Examination Of Release Mechanism 12.2 Examination of Gas reservoir condition 12.3 Function Test of Release Alarm Function Test 12.4 SOLAS 2000 Ch.II-2 MODU Code SOLAS 2000 Ch.II-2 and MODU CodeFSS Code 2001 SOLAS 2000 Ch.II-2 and MODU Code- Test Records Test Records — For internal systems, use outlet to deck 13.0 Machinery space fixed local application water spraying fire extinguishing system 13.1 Examination of Type Of Nozzles 13.2 Pumping unit – Operation under main power supply 13.3 Test system according to requirements in type approval certificate SOLAS Ch.II-2 Test Records — The bulb shall be in accordance with approved plans. Examine for dirt, clogging and mechanical damage Recommended Practice DNV-RP-A204, September 2011 5. New building Survey Planning – Page 18 DET NORSKE VERITAS AS 11.2 Test remote start of main fire SOLAS 2000 pump Ch.IIMODU Code Sl. No. Activity 13.4 Function Test – as far as possible 13.5 Sufficient number of spare sprinkler heads Reference to Rules Procedures Quality Records generated (Yard/DNV) SOLAS 2000 Test Records Ch.II-2 MODU CodeFSS Code 2001 Extent of Attendance Yard DNV Typical Activities W W — Test manual release, from local and remote location of operation controls W W — Total no. < 300, 6 spares. Total no. 300 - 1000, 12 spares. Total no. > 1000, 24 spares W W — Test automatic start of pump at pressure drop in system W W — Visual and audible alarm shall be activated whenever any sprinkler comes into operation. Test flow alarm in each section by simulating alarm condition. Alarm panel shall also include fault alarm W W W W W W W W — Total no. < 300, 6 spares. Total no. 300 - 1000, 12 spares. Total no. > 1000, 24 spares W W — Use water if possible; if not blow through with air. Verify that all nozzles are open W — Storage tank fuel pumps shall be provided with means which permit shutdown from a safe remote location in the event of a fire. Where a gravity-fed fuelling system is installed, equivalent closing arrangements shall be provided. 14.0 Accommodation fixed water spraying fire extinguishing system 14.1 Testing automatic start of pump FSS Code 2001 Test Records 14.2 Testing flow alarm at control FSS Code 2001 station or bridge Test Records DET NORSKE VERITAS AS 14.3 Operation under main and emergency power supply 14.4 Piping - pressure gauges are FSS Code 2001 fitted 14.5 14.6 FSS Code 2001 System Test in accordance SOLAS 2000 with TA/manufacturer’s test Ch.II-2 procedure MODU Code Sufficient number of spare sprinkler heads Test Records FSS Code 2001 — At each section stop-valve and at a central station. Glass gauges are not required on pressure tanks for water mist system — Test operation of valves. A test valve shall be provided for each section valve. Test automatic alarms for each section of sprinklers. 15.0 Drilling area water spraying fire fighting system 15.1 Piping system – Blow Through Test FSS Code 2001. Test Records 16.0 Helicopter deck foam fire extinguishing system 16.1 Helicopter fuel remote control stop valve Test function SOLAS 2000 Ch.II- MODU Code Test Records W Comments Recommended Practice DNV-RP-A204, September 2011 Page 19 – 5. New building Survey Planning Table 5-1 QSP - Survey Activity Items (Continued) Table 5-1 QSP - Survey Activity Items (Continued) Sl. No. Activity Reference to Rules Procedures (Yard/DNV) Quality Records generated Extent of Attendance Yard DNV Typical Activities Comments 17.0 Helicopter fuel storage and distribution arrangement 17.1 Helicopter fuel remote control stop valve Test function SOLAS 2000 Ch.II-2 MODU code Test Records W W W W — Storage tank fuel pumps shall be provided with means which permit shutdown from a safe remote location in the event of a fire. Where a gravity-fed fuelling system is installed, equivalent closing arrangements shall be provided. 18.0 Fire extinguishing equipment, mobile 18.1 18.2 18.4 SOLAS 2004 Ch.II- Fire extinguisher, portable Verify quantity of spare charges SOLAS 2000 Ch.II-2 Fire extinguisher, portable Verify type, number and location at helicopter deck SOLAS 2000 Ch.II-MODU Code — As shown on the 'Fire control plan' — According to the fire control plan, including semi portable fire extinguishers; 135 l foam in each boiler room, and 45 l foam in each machinery space containing combustion engines. — Spare capacity 100% for the first 10 required extinguishers and 50% for the remaining. Not more than 60 spare charges are required. For extinguishers that cannot be recharged on board, spare extinguishers shall be provided. Extinguishers installed in excess of the requirements can be counted as spares — At least two dry powder extinguishers having a total capacity of not less than 45 kg. Carbon dioxide extinguishers of a total capacity of not less than 18 kg or equivalent. W W W W W W SOLAS 2000 Ch.II-2 W W SOLAS 2000 Ch.II-2 W W — Refer to the 'Fire control plan'. If not shown on the plan, the plan shall be amended and verified at next survey W W — Examine cleanliness of filters and quality of air supply. Start and verify operation. SOLAS 2000 Ch.II-2 19.0 Emergency escape breathing arrangements 19.1 19.2 Emergency escape breathing device (EEBD), Verify number of devices installed in the accommodation spaces Emergency escape breathing device (EEBD), Verify number of devices installed in the machinery spaces — At least two devices plus one spare 20.0 Breathing air supply 20.1 Breathing air compressor unit Examine condition and test function SOLAS 2000 Ch.II Test Records Recommended Practice DNV-RP-A204, September 2011 5. New building Survey Planning – Page 20 DET NORSKE VERITAS AS 18.3 Fire extinguisher, nonportable wheeled Verify number and location, Fire extinguisher, portable Verify type, number and location Sl. No. Activity Reference to Rules Procedures (Yard/DNV) Quality Records generated Extent of Attendance Yard DNV Typical Activities 21.0 Fire-fighter's outfit 21.1 21.2 Verification of lifeline Examine stowage — One lifeline shall be provided for each required breathing apparatus. The lifelines shall be fireproof. — The outfits shall be stored in widely separated positions. SOLAS 2000 Ch.II-2 W W SOLAS 2000 Ch.II-2 W W W W W W — Required for Halon and CO2 systems. May also be arranged for other gas fire extinguishing systems. W W — If arranged. Shut down may be initiated by fire or gas detection. W W — Fans shall be of certified safe type. W W — Exhaust fans shall be of certified safe type. SS Jan. 2004 Pt.4 Ch.8 Sec.2 I400 22.0 Ventilation systems for machinery spaces 22.1 Verify arrangement SOLAS 2000 Ch.II- — Arrangements shall be fitted to permit the release of smoke in the event of fire. Inlets and outlets shall be located at least 4.5 m above freeboard deck 23.0 Ventilation control and monitoring system DET NORSKE VERITAS AS 23.1 Test automatic shutdown of ventilation in spaces protected by gas fire extinguishing systems SOLAS 1981 Ch.II-2 Test Records 24.0 Ventilation systems for accommodation spaces 24.1 Ventilation systems for accommodation spaces, fan units Test automatic shutdown MODU code Test Records 25.0 Ventilation systems for hazardous stores 25.1 Condition examination MODU Code 26.0 Ventilation systems for battery rooms 26.1 Condition examination MODU Code 27.0 Ventilation systems for drilling areas 27.1 27.2 27.3 Ventilation systems for drilling areas, ducting Test function of fire dampers MODU code Ventilation systems for drilling areas, fan units Test remote stop MODU Code- Test function MODU Code Test Records Test Records W W W W W W — Perform spot checks. Test local operation and remote operation if arranged. Test automatic operation if arranged. Verify open and closed position indication locally at dampers and remotely if arranged — Power ventilation shall be capable of being stopped from an easily accessible position outside the space being served. — Test start and stop Comments Recommended Practice DNV-RP-A204, September 2011 Page 21 – 5. New building Survey Planning Table 5-1 QSP - Survey Activity Items (Continued) Table 5-1 QSP - Survey Activity Items (Continued) Sl. No. Activity Reference to Rules Procedures (Yard/DNV) Quality Records generated Extent of Attendance Yard DNV Typical Activities Comments 28.0 Emergency shut down safety system 28.1 Test selective shut down of ventilation and ignition sources MODU and DNV-OS-A101 28.2 Verify Ex-protection of live equipment after shut down MODU Code and DNV-OS-A101 28.3 Verify operability of emergency systems after emergency shut down Vessel operation manual, MODU Ch.6.5 and DNV-OS-A101 Test Records W W W W W W Test Records E. HVAC and Other Similar Systems Should be added using the examples above 1.0 Testing and Commissioning 1.0 Survey Category I Systems DNV-OS-D101 & Testing and Commissioning DS-OS-E101 Records W W 1.2 Survey Category II Systems DNV-OS-D101 & Testing and Commissioning DS-OS-E101 Records W U/R 1.3 Survey Category III Systems DNV-OS-D101 & Testing and Commissioning DS-OS-E101 Records W U/R — Verify that all class and statutory related testing and commissioning is carried out satisfactorily — Verify that all class and statutory related testing and commissioning is carried out satisfactorily — Verify that all class and statutory related testing and commissioning is carried out satisfactorily Recommended Practice DNV-RP-A204, September 2011 5. New building Survey Planning – Page 22 DET NORSKE VERITAS AS — Shut down shall be possible from at least two strategic locations outside hazardous areas. Selectivity shall at least cover: 1. Ventilation, except combustion air. 2. Main electric power. 3. Emergency electric power. — Equipment located outside enclosed spaces shall be suitable for zone 2 — At least emergency lighting required for escape and disembarkation, blow-out preventer control system, general alarm system, public address system and battery-supplied radio communication installations Recommended Practice DNV-RP-A204, September 2011 Page 23 – APPENDIX A Categorization of Systems for Testing and Commissioning APPENDIX A CATEGORIZATION OF SYSTEMS FOR TESTING AND COMMISSIONING Table A-1 No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Category 1 Systems for Commissioning (for Integration) Name of the System Fire Main System Inergen System Fire Water Deluge System Main Diesel Generator Sea Water Cooling System Thruster S.W. Cooling System Thruster 11Kv Switchboard 690V HPU MCC 690V Drilling VFD Switchboard 690V Thruster VFD Switchboard 230V AC UPS 230V AC UPS Battery 230V AC UPS Main Distribution Board 230 AC UPS DB ICMS, Fire And Gas, ESD & DP With Sensor And Reference System Telecom System Column And Pontoon Machinery Rooms Ventilation Systems Electrical And Auxiliary Machinery Rooms Ventilation Systems Engine Rooms Ventilation Systems Port/Stbd/Aft Machinery Rooms Ventilation Systems LQ HVAC Power Management System Dynamic Positioning System Test (DPS) Machinery Unmanned Test Table A-2 No. 1 2 3 4 Category II Systems for Commissioning (for Integration) Name of the System Ballast System Aux. Cooling F.W. System 460V LV Switchboard 230V LV Switchboard Table A-3 No. 1 2 3 4 5 6 7 8 9 10 11 Category I Systems for Commissioning (as independent systems) Name of the System Lifeboat & Launch System Mob Boat Launch Device System Column Room Lift emergency bilge system Emergency Shut Off System (Quick closing valves) Drill Floor Elevator Escape Chute 230V AC UPS 230V AC UPS Battery 230V AC UPS Main Distribution Board 230 AC UPS DB DET NORSKE VERITAS AS Integrated with F&G/Deluge/control F&G/HVAC/PA F&G PMS&S/T&DP Consumer Capacity Test S/T S/T PMS SIT SIT DP/PMS ESD ESD ESD ESD ESD/HVAC ESD ESD ESD ESD ESD ESD DRILL/DP CONTROL E0 Integrated with Semi Recovery Test S/T & SIT S/T S/T Recommended Practice DNV-RP-A204, September 2011 APPENDIX A Categorization of Systems for Testing and Commissioning – Page 24 Table A-3 No. 12 13 14 15 Category I Systems for Commissioning (as independent systems) (Continued) Name of the System Water Tight Door Helideck Fire-Fighting System Inclining Experiment & Light Weight Measurement Procedure Dynamic Positioning System Test (DPS) Table A-4 No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Category II Systems for Commissioning (as independent systems) Name of the System Misc.Lifesaving Equipment Helicopter Refueling System Ballast System Dirty Drain System Fire Main System Inergen System Fire Water Deluge System Main Diesel Generator Steam Generating System Sea Water Cooling System Starting Air System For Main Engine Thruster S.W. Cooling System Sewage & Gray Water Discharge System Anchor Winches Thruster Bilge System Diesel Gen. F.W Cooling System 11Kv Switchboard 690V HPU MCC 690V Drilling VFD Switchboard 690V Thruster VFD Switchboard Nav. And Signal Light U-Light And Foghorn Obstruction Light Remote Sounding System ICMS, Fire And Gas, ESD & DP With Sensor And Reference System Telecom System HPU For V/V Operation Ram Rig Travelling Yokes Main/Aux. Tong Lift System LIR / HVAC Room, HVAC DDM-1000-HY-RR/DDM-650-HY-RR Rotary Table Main/Aux.(Including Power Slips) DAT System Guideline Winch & Tensioner System LP/HP Nitrogen System Mud Bucket Bulk Powder Handling System Mud Storage And Transfer System Mud Mixing And Additive System Mud Supply System Mud Return And Treatment System Pontoon Mud, Brine, Oil Storage & Transfer System System BOP Package Diverter Package Tubular and Riser Feeding Machine/Shuttle, Main Rig DET NORSKE VERITAS AS Recommended Practice DNV-RP-A204, September 2011 Page 25 – APPENDIX A Categorization of Systems for Testing and Commissioning Table A-4 No. 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 Category II Systems for Commissioning (as independent systems) (Continued) Name of the System Lower Guiding Arm including Heads and Rail, Main/Aux Trolley For Riser Guiding Riser Chute DP/DC, Casing & Riser Fingerboard Direct Lift Bridge Crane DP/DC/CSG, Main Rig/Aux. Rig Hydraulic Roughneck MH 1899 Multi Scope Arm (Casing Modem) Hydraulic Cathead, Brake Out, including Wire Tail in Arm Multi Manipulator Arm (DFMA) Piperack Gantry Crane Riser Handling Crane (w/ Rail) BOP Skid/X-Mas/ LMRP Transportation/Handling Miscellaneous Guides Access Basket BOP Overhead Crane/X-mas Tree Overhead Crane Underhull Guiding Main/Aux. Overhull Guiding Utility Winch & Manrider Winch Burner Boom Ringline HPU And Distribution System Ramrig HPU And Distribution System Dual Derrick Simultaneous Operation Integrated BOP & Riser Handling System Integrated Drill String Test (Simulated Spud-in Mode) LQ HVAC Power Management System Navigation Equipment Machinery Unmanned Test Anchor Test PA Coverage Measurement Table A-5 No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Category III Systems for Commissioning (as independent system) Name of the System Monorail System Air Winches & Towing Equipment Drill Water System Deck Bilge System Service Air System Steam & Drain System Seawater Service System Aux. Cooling F.W. System Diesel Oil Transfer & Drain System Lub. Oil Storage, Transfer & Drain System Distilled & Make-Up Water System Potable & Sanitary Supply System Cold Starter Generator MGPS (Marine Growth) Heat Trace System 460V LV Switchboard 230V LV Switchboard Small Power DB DET NORSKE VERITAS AS Recommended Practice DNV-RP-A204, September 2011 APPENDIX A Categorization of Systems for Testing and Commissioning – Page 26 Table A-5 No. 19 20 21 22 23 24 25 26 27 28 29 30 31 Category III Systems for Commissioning (as independent system) (Continued) Name of the System Lighting And Small Power Shore Connection Box Column And Pontoon Machinery Rooms Ventilation Systems Electrical And Auxiliary Machinery Rooms Ventilation Systems Engine Rooms Ventilation Systems Port/Stbd/Aft Machinery Rooms Ventilation Systems HVAC Duck Air Leak Test Procedure for Hull & Topside ICCP Pneumatically Operated Door Provision Cold Store & Freezer System Noise Level Measurement Vibration Level Measurement Helideck Drains Table A-6 Category I Systems for Commissioning (CRANE) No. Name of the System 1 Deck Crane Note: 1) New Technology and Applications including Changes to Approved Design: Applications of new technology and non-traditional applications of existing technology shall be approved by DNV. Any changes to design that is already approved by DNV shall be submitted to DNV for re-approval e.g., scaling up equipment/design, etc. In most cases, such changes will be treated as Survey Category 1 for follow up during construction, mechanical completion, testing and commissioning. 2) Additional systems based on the choice of additional class notations should be added in addition to the above. ---e-n-d---of---N-o-t-e--- DET NORSKE VERITAS AS
© Copyright 2024 Paperzz