578 North Marine Corps Drive | Tamuning | Guam 96913 Meeting Minutes Project Purpose Location IFB-04-ENG-2012 - PW05-08 Construction of Central Guam Water Reservoir Pre-Bid Conference DNA Building, Suite 503, 238 Archbishop Flores Street, Hagatna, Guam (GWA Engineering Conference Room) Facilitator Gloria Bensan Meeting Date & Time 09/12/2012, 10:00AM (ChST) Note Taker Garrett Yeoh Issue Date & Time Names Company Tom Higa Asanuma Corp. Michael Erwin DN Tanks Nick Belmont DN Tanks Kevin Peacock DN Tanks Nelson Degala dck pacific Mario Acabado dck pacific/Kinden Roy Dema-ala CRW Trading Inc. Enrique Santiago Watts Constructors Rodelo C. Sardea AIC Int’l. Inc. Mark Leicht Watts Constructors Armando Acosta Orion Const. Corp. Attendees Timothy B. Franklin Orion Const. Corp. Bryan S. Ryley GHD Robert Marks Parsons Carmelo Ledesma dck pacific Garrett Yeoh Guam Waterworks Authority Masoud Teimoury Masoud and Company Masoud Namazi IBC/EGI Derrik Fischer Preload Inc. Philip Ahn Tudor Construction Graeme Ridley Smithbridge Lily Jones SMCC Brett Railey Guam Waterworks Authority Gloria Bensan Guam Waterworks Authority The following is my understanding of items discussed during the Pre-Bid conference. If this differs with your understanding, please let me know. The Pre-bid Conference began at 10:00AM and was chaired by Gloria Bensan, GWA Senior Engineer. A sign-in sheet was handed out. Ms. Bensan introduced members of the project team: Brett Railey (GWA Project Supervisor), Garrett Yeoh (GWA Project Engineer), Robert Marks (Parsons), and Bryan Ryley (GHD). GHD will be acting as the construction manager and inspectors for this construction project. The meeting progressed with Ms. Bensan providing a brief description of the project and opening up the floor for questions. *Type | A-Action | I-Information | D-Decision | File: MM20120912 1 of 4 578 North Marine Corps Drive | Tamuning | Guam 96913 Meeting Minutes In response to questions, the following answers were provided: Item 1 Question Conclusion Type I Assignment - Deadline - Can the May 3, 2013 completion deadline be moved? Contractor brings up the issue outside the contractor control such as weather delay during construction. The court ordered deadline of May 3, 2013 was determined by the federal judge. No plans for moving the deadline have been discussed. The Stipulated Order can be found on Guam Waterworks Authority’s (GWA) website http://www.guamwaterworks.org/documents/OrderforPreliminaryReliefREDeadlinesforOutstandingPr ojectsundertheAmendedStipulatedOrder.pdf Item 2 Question Conclusion Item 3 Question Conclusion Item 4 Question Conclusion Item 5 Question Conclusion Item 6 Question Conclusion Item 7 Question Type I Assignment - Deadline - Will GWA consider accepting alternate tank designs, i.e. Type II, III, steel construction? GWA request that bidders submit a RFI. Type I Assignment - Deadline - Will GWA consider a steel tank? What is the reason GWA went with a concrete tank? The merits of various type of tank construction were considered. The preferred type of tank was chosen. GWA recommended that bidders provide a bid for the type of tank identified and designed in conformance with bid documents. Type I Assignment - Deadline - If a re-design is to be submitted, will re-submittals be needed? GWA recommended that bidders provide a bid for the type of tank indentified and designed in conformance with the bid documents. Type I Assignment - Deadline - Did GWA use the procurement process? Contractor says that GWA is doing sole-source procurement. GWA request that bidder submit a RFI. Type I Assignment - Deadline - What is the purpose of the 180 day timeline? The purpose of the 180 day timeline is for GWA and its inspectors to perform structural inspections on the Barrigada #3 tank. Inspections of the reservoirs are part of a separate Stipulated Order requirement. Type I Assignment - Deadline - Bidder suggested close coordination with other governmental agencies in permitting and submittals. *Type | A-Action | I-Information | D-Decision | File: MM20120912 2 of 4 578 North Marine Corps Drive | Tamuning | Guam 96913 Meeting Minutes Conclusion Item 8 Question Conclusion Item 9 Question Conclusion Item 10 Question Conclusion Item 11 Question Conclusion Item 12 Question Conclusion Item 13 Question Conclusion Item 14 Question Conclusion GWA, in order to expedite this project to meet the required deadlines under the Order of the United States District Court dated November 11, will initially apply for the building permit for this project. Upon entry into a written Contract, responsibility for obtaining all permits, including the building permit, will rest with the Contractor. Contractor will immediately take all steps necessary to change the name of the applicant from GWA to the Contractor. Regardless of the nature or state of the application submitted by GWA, Contractor bears the ultimate responsibility and liability for all permits under this Bid. Type I Assignment - Deadline - Where can we find the federal court decision? A copy of the Stipulated Order can be found on Guam Waterworks Authority’s (GWA) website. Type I Assignment - Deadline - RFI acceptance time period? RFI’s will be accepted until five (5) working days prior to the bid opening date. Bid opening date is currently set for October 3, 2012. Type I Assignment - Deadline - Deadline - Deadline - Bidders requested a copy of attendees for the Pre-Bid conference. Yes, a copy of the attendees will be provided. Type I Assignment - What should the bid bond be based on? Base and additive? Bid bond shall be based on the “Base” work. Type I Assignment - Will any “Additive” work need to be completed with the “Base” work? Plans and details delineate between “Base” and “Additive” work. Review the bid schedule and request for clarification via RFI as needed. Type I Assignment - Deadline - Deadline - Is this a Buy American project? Buy American requirements are clearly stated in the bid documents. Type I Assignment - What is the funding source? Funding source for this project is a combination of GWA bond and United States Department of Interior (USDOI) grant. *Type | A-Action | I-Information | D-Decision | File: MM20120912 3 of 4 578 North Marine Corps Drive | Tamuning | Guam 96913 Meeting Minutes Item 15 Question Conclusion Item 16 Question Conclusion Item 17 Question Conclusion Type I Assignment - Deadline - Deadline - Deadline - Will there be a site visit? Yes, a site visit will be scheduled. Date and time will be provided. Type I Assignment - Is the design 100% complete? The design is complete pending GEPA approval. Type I Assignment - Are contractors required to submit bonds under the US Treasury listings? GWA will consult with our Legal Counsel and provide a response through a RFI response. Meeting concluded at 10:36AM. *Type | A-Action | I-Information | D-Decision | File: MM20120912 4 of 4
© Copyright 2026 Paperzz