PREPARING A REQUEST FOR PROPOSAL 2016 AGENCY PURCHASING CONFERENCE Presented by: Tara Lyle, Buyer Supervisor COURSE OBJECTIVE By the end of this session, you should be able to… Prepare and adequately plan for a Request for Proposals (RFP), including how to submit the appropriate request in wvOASIS PLANNING: DETERMINE THE PROCUREMENT METHOD Request for Proposals Request for Quotes Problem willing to entertain multiple solutions Usually used for professional service contracts Subjective and objective evaluations Award to highest ranked (70% technical / 30% cost) Protest more likely Know what you want or only one solution is acceptable Primarily used for goods but can be used for services Only objective evaluation Award to lowest cost meeting specifications Protest less likely PLANNING: PRIOR TO THE USE OF AN RFP Conduct market research (begin planning for your vendor lists on the wvOASIS requisition) Written pre-approval needed from Purchasing Description of project Estimated dollar value Must be over $250,000.00 Under $250,000 must be approved by Director Why the RFP process is the best suited procurement method Identify and justify committee members and advisors; include RPK1 any request for an irregular committee (i.e. more than five members, Procurement Officer not a member, etc.) Slide 4 RPK1 Kilpatrick, Robert P, 7/30/2015 PLANNING: PRIOR TO THE USE OF AN RFP Include any other request for pre-approval from Purchasing (i.e. long- term contract, etc.) Any additional relevant information Submit by email to your Purchasing Division Buyer, who will forward to the Director (or his designee) for review and approval/rejection Attach all pre-approvals to a Procurement Note - with the Requisition Procurement State (1) and comments such as “RFP Pre-approvals” - in the requisition’s Procurement Folder. PLANNING: THE EVALUATION COMMITTEE Who should be on your committee? Voting members (3-5) (must have pre-approval for more than five) Chairperson Mediates discussions and time management Prepares consensus evaluation Represents committee in protest Agency Procurement Officer (must have pre-approval to not participate; can be primary or backup) Subject matter experts Non-voting advisory members What is their role in the evaluation process and when do you get them involved? Understand the potential for conflicts of interest. PLANNING: THE REQUISITION What type of Requisition should you use? CRQS for an Award Document that you anticipate will be fixed cost: CPO or CCT CRQM for an Award Document that you anticipate will be Open-Ended: CMA How do you complete the Requisition? Header: Document name and document description Procurement Type ID (CPO, CCT, or CMA?) Maximum budgeted amount PLANNING: THE REQUISITION (CONT’D) How do you complete the Requisition? Header cont’d Shipping/Billing Reporting 1 Field: Number 8, Request for Proposal Attachments: Completed RFP Standard Format (see below) Purchasing Master Terms and Conditions (see Sections Two and Three, below) Any separate Attachments (A, B & C, plus any solicitation-specific documentation) PLANNING: THE REQUISITION (CONT’D) How do you complete the Requisition? Vendor Lists Vendor: Use wvOASIS entities Free-Form Vendor: For non-wvOASIS entities, or wvOASIS entities where Agency has alternate contact information than what appears in VCUST, or Agency representatives who want notified of publication in the VSS (Default Correspondence: Email) PLANNING: THE REQUISITION (CONT’D) How do you complete the Requisition? Commodity lines Should match the intent of the Award Document (Type: Item versus Type: Service) Should match Attachment C: Cost Sheet Accounting, as needed by the Agency to encumber funds Processing: Validate and Submit; Buyer will generate CRFP document by Copying Forward from the Final Requisition RFP STANDARD FORMAT Section One: General Information and Instructions Purpose General information for vendors Schedule of events RFP STANDARD FORMAT Section Two: Instructions to Vendors Submitting Bids Located in the master terms and conditions and contains information regarding the following: Mandatory terms (fixed) Pre-bid meetings (Agency) Deadline for vendor questions (Buyer, with Agency input) Verbal communication guidelines (fixed) Bid submission and opening (Buyer, with Agency input) Addendum acknowledgment (fixed) Bid formatting (eg, convenience copies, Agency) RFP STANDARD FORMAT Section Three: General Terms and Conditions General terms and conditions are to be completed and added to this section of the RFP: Contract term Quantities (CRQS versus CRQM) Bonding requirements Insurance requirements Other required documents Liquidated damages P-Card acceptance and reporting RFP STANDARD FORMAT Section Four: Project Specifications 1. Location (where the work will take place) 2. Background and current operating environment Information the vendor needs to know about your agency, current operating systems, personnel, etc. to present an informed proposal 3. Qualifications and experience (can be evaluated OR mandatory) 4. Project and Goals Include only those which will be scored during the evaluation 5. Mandatory requirements 6. Oral presentations (agency option) RFP STANDARD FORMAT Section Four, Subsection 4: Goals and Objectives Goal(s) Broad Give the vendor an overview of your problem(s) Objective(s) Less broad Define the expectations for evaluating responses in terms of meeting the project goals (What would you like to have, if possible?) Used as benchmarks for deductions and should be flexible enough to allow for the vendor to propose how they will meet your goals (solve your problem) GOALS AND OBJECTIVES EXAMPLE Attachment A: Vendor Response Sheet Section 4, Subsection 3: Should instruct the vendor what the Agency wishes to see relating to their qualifications and experience to demonstrate that they have the skill level necessary to complete the project. Example: “The vendor should provide a list of personnel who will be dedicated to this project including a resume and copy of any certifications and/or degrees applicable.” Section 4, Subsection 4.1: Should instruct the vendor what the Agency wishes to see to demonstrate their approach and methodology to meeting the goals and objectives of the project. Example: “The vendor should provide a copy of their course curriculum and a synopsis for each course demonstrating how the course covers West Virginia Purchasing laws, policies, and procedures.” MANDATORY REQUIREMENTS Section 4, Subsection 5: Mandatory Requirements Mandatory requirements are limited to the duties and responsibilities of the agency as defined in federal or state law and the functions critical to the mission and operation of the agency Mandatory requirements cannot be waived and should be used with extreme caution In the evaluation process, vendors either meet or do not meet these requirements Vendors failing to meet any mandatory requirement must be disqualified MANDATORY REQUIREMENTS Attachment B: Mandatory Specification Checklist Reiterates all mandatory specifications contained in the RFP May ask Vendor to demonstrate adherence to the mandatory requirements (proposal versus contractual mandates) Certifies that the vendor acknowledges and meets the mandatory requirements Example: “The successful vendor must provide training based on procurement law, policies, and procedures set forth in the West Virginia Purchasing Handbook, WV State Code of Rule 148CSR1, and WV State Code 5A-3. Training must also include any other Code and Rule sections as they relate to procurement. Please provide a copy of all training materials demonstrating adherence to the aforementioned requirement.” COST SHEET Attachment C: Cost Sheet Must reflect the content of the specifications Must allow for an “apples to apples” comparison of the received proposals Should consider all factors applicable to the cost to assure that the lowest received cost is the lowest cost for the project RFP STANDARD FORMAT Section Five:Vendor Proposal Reiterates instructions regarding the Vendor’s Technical Proposal from Sections Three and Four: Attachment A Attachment B Provides specific instructions on how the Vendor should complete the Cost Proposal using Attachment C Explains the difference between Technical and Cost Proposal Openings to the bidders RFP STANDARD FORMAT Section Six: Evaluation and Award Evaluation criteria Qualifications and experience Approach and methodology Oral interview, if applicable Cost Evaluation should directly correlate to your specifications Cover all areas Weigh the elements of project which are of the highest importance to you Should be a total of 100 points, with cost a minimum of 30 Exceptions must be pre-approved by Purchasing Director Questions? Be sure to sign the attendance sheet. Tara Lyle [email protected] (304) 558-2544
© Copyright 2026 Paperzz