Capital Improvement Program 2017 – 2021 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM ADOPTION The Roads Advisory Committee recommended adoption of the County Road Fund portion of the Fiscal Year 2016-2017 to Fiscal Year 2020-2021 Capital Improvement Program in February 2016. The Board of County Commissioners adopted this program in May 2016. BOARD OF COUNTY COMMISSIONERS Faye Stewart, East Lane, Chair Pat Farr, North Eugene, Vice Chair Jay Bozievich, West Lane Sid Leiken, Springfield Pete Sorenson, South Eugene ROADS ADVISORY COMMITTEE Kent Flemming, East Lane, Chair Jim Wilcox, South Eugene, Vice Chair Sean Barrett, Member-at Large Jeff Paschall, Member-at-Large Ellen Mooney, West Lane (Vacant), Springfield Tom Poage, North Eugene PUBLICATION The Capital Improvement Program is Published and Distributed by: Lane County Public Works Department, June 2016 Marsha Miller, Public Works Director Peggy Keppler, Interim County Engineer David Reesor, Transportation Planning Supervisor Orin Schumacher, Road Maintenance Manager Daniel Ingram, Senior Engineering Associate MAP SUPPORT AND COVER DESIGN Sharon Joiner, Tech II, Transportation Planning Gary Luke, Geographic Information Systems ONLINE PUBLICATION This publication is available online for download from the Lane County Transportation Planning web site at http://www.lanecounty.org/Departments/PW/TransPlanning/Pages/cip.aspx 2 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS ACRONYMS/ABBREVIATIONS ......................................................................................4 EXECUTIVE SUMMARY .................................................................................................5 INTRODUCTION .............................................................................................................6 INFRASTRUCTURE CONDITIONS ................................................................................ 7 CIP FUNDING ...............................................................................................................11 RELATIONSHIP WITH OTHER PLANNING DOCUMENTS .......................................... 15 CIP PROCESS ..............................................................................................................17 CIP CATEGORIES ........................................................................................................ 19 CIP 15-19 OVERVIEW .................................................................................................. 21 EXECUTIVE SUMMARY TABLES ................................................................................ 23 TABLE 6: ANNUAL EXPENSES BY CIP CATEGORY ....................................................... 25 TABLE 7: RIGHT-OF-WAY .................................................................................................. 26 TABLE 8: GENERAL CONSTRUCTION ............................................................................. 26 TABLE 9: STRUCTURES .................................................................................................... 26 TABLE 10: OVERLAYS AND PAVEMENT REHABILITATION ........................................... 27 TABLE 11: BRIDGE RHABILITATION AND PRESERVATION........................................... 28 TABLE 12: COVERED BRIDGE REHABILITATION ........................................................... 28 TABLE 13: SRS PRESERVATION PROJECTS .................................................................. 29 TABLE 14: SAFETY IMPROVEMENTS .............................................................................. 29 TABLE 15: FISH PASSAGE PROJECTS ............................................................................ 30 TABLE 16: BIKE & PEDESTRIAN IMPROVEMENTS......................................................... 30 TABLE 17: PAYMENTS & MATCHES TO OTHER AGENCIES ......................................... 30 TABLE 18: PROJECT SPECIFIC REVENUES ................................................................... 31 TABLE 19: PROJECTS FOR DEVELOPMENT................................................................... 32 PROJECT LOCATION MAP .......................................................................................... 33 PROJECT DESCRIPTIONS .......................................................................................... 37 PRAIRIE RD AND E. ENID RD PAVEMENT PRESERVATION AND SIDEWALK REHABILITATION PROJECT........................................................................................................ 38 ND SOUTH 2 STREET PAVEMENT PRESERVATION .................................................................. 40 BOB STRAUB PARKWAY: MT. VERNON INTERSECTION IMPROVEMENTS.......................... 42 NORTHWEST EXPRESSWAY PAVEMENT PRESERVATION ................................................... 44 MARCOLA ROAD SCHOOL ZONE SAFETY ............................................................................... 46 3 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Acronym s / Abbreviat ions Following Acronyms / Abbreviations are used in this document. They have been described at first occurrence, and are listed here for quick reference. AASHTO AC ADA ADT ARRA BCC CE CIP DEQ FAST FLAP FHWA FY HB HBP HMAC IGA LHBP MAP-21 MPO MTIP MUTCD NBIS NHCBP NEPA OAR ODOT ODFW ORS PCI PE PED PMP RAC SB SR SRS STP-U STIP TE TPR TSP USFS WFLHD American Association of State Highway and Transportation Officials Asphalt Concrete Americans with Disabilities Act Average Daily Traffic American Recovery and Reinvestment Act Board of County Commissioners Construction Engineering Capital Improvement Program Department of Environmental Quality Fixing America’s Surface Transportation Federal Lands Access Program Federal Highway Administration Fiscal Year House Bill Highway Bridge Program Hot Mixed Asphalt Concrete Intergovernmental Agreement Local Highway Bridge Program st Moving Ahead for Progress in the 21 Century Central Lane Metropolitan Planning Organization Metro-area Transportation Improvement Program Manual on Uniform Traffic Control Devices for Streets and Highways National Bridge Inventory System National Historic Covered Bridge Preservation National Environmental Protection Act Oregon Administrative Rules Oregon Department of Transportation Oregon Department of Fish and Wildlife Oregon Revised Statutes Pavement Condition Index Preliminary Engineering Pedestrian Pavement Management Program Roads Advisory Committee Senate Bill Sufficiency Rating Secure Rural Schools and Community Self-Determination Act 2000 Surface Transportation Program-Urban (for Metro Area) State Transportation Improvement Program Transportation Enhancement Transportation Planning Rule Transportation System Plan United States Forest Service Western Federal Lands Highway Division 4 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Execut ive Sum m ary The Lane County Capital Improvement Program (CIP) is a five-year planning document containing potential roadway related projects that will be publicly bid for construction during the five-year planning period. It is prepared in consideration of the County’s financial projections, external funding opportunities, road maintenance needs, and public input. The CIP for fiscal years 2016/2017 through 2020/2021 was reviewed and discussed at Roads Advisory Committee (RAC) meetings held in Eugene in January 2016 and a public hearing held in February 2016. The Board of County Commissioners adopted the document after a second public hearing in May 2016. This publication becomes effective fiscal year 2016/2017, beginning on July 1, 2016. The CIP is the Public Works Department’s Road Fund expense plan for the next five years. The expenses in this CIP are consistent with the department’s Road Fund financial plan (FinPlan). Lane County anticipates spending about $15.0 million Road Fund dollars for capital improvement projects under the program. The majority of these dollars ($13.98 million) are allocated towards pavement preservation needs during this update cycle. A portion of these pavement preservation funds have been leveraged in cooperation with agency partners to provide local matches required to secure external funding for pavement preservation and rehabilitation work. These leveraged funds are expected to bring in an additional $2.018 million in funding. Primarily externally funded with STP-U funds, these pavement preservation and rehabilitation projects will be designed, bid, and constructed by Lane County. In past years projects funded with STP-U dollars were typically designed and constructed by Lane County, but bid by the Oregon Department of Transportation (ODOT). Moving forward Lane County is working to become a Certified Local Agency and will bid these projects. Local Agency Certification will improve Lane County’s ability to compete for grant monies and improve efficiency in project delivery. The remaining Road Fund allocations focus heavily on preservation, with $500,000 allocated to Bridge Rehabilitation and Preservation, and another $500,000 allocated to Covered Bridge Preservation. This is a reduction from previous CIP levels which allocated $1,375,000 to each of these categories. The remaining $20,540 out of $15 million Road Fund dollars is allocated to Safety Improvements in FY16/17. Because of the lack of Road Fund resources, future allocations of Road Fund dollars to Safety Improvements beyond FY 16/17 are zero. The above allocations are primarily utilized for local matches required to help secure external funds. The local match monies allocated to prioritized projects in this CIP are expected to bring in additional external funding for County roadway improvements in the next five years. Lane County has applied for Local Bridge Program funding through ODOT’s 18-21 STIP program. Two bridge projects have been selected for scoping on ODOT’s 18-21 STIP Local Bridge 150% list. These projects include Battle Creek Road: Coyote Covered Bridge (39C409), and Kitson Springs Road: Salt Creek Bridge (39C627). If funded these projects could potentially bring in an additional $3.791 million in external funds to help fund these important projects. 5 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Utilizing safety prioritized funds, another $159,460 in external funds has been secured from the 15-18 Surface Transportation Improvement Program (STIP) for safety improvements on the Bob Straub Parkway: Mt. Vernon Road Intersection Improvements project. Similar to the preservation and rehabilitation projects mentioned above, the project will be designed, bid, and constructed by Lane County as the County moves forward with Local Agency Certification. Lane County continues to seek Federal Lands Access Program (FLAP) grant funding. While not shown as a Capital Improvement Program project at this time, Lane County was successful in obtaining FLAP funding to study the Kitson Springs Road slide area with the goal of producing 30% design alternatives. This work will put this project in a good position to receive future grant funding to address the ongoing slide issues and improve this important link to National Forest lands. Also while not shown as a Capital Improvement Program project at this time, Lane County has received $174,325 in STP-U grant funding to study the Beaver / Hunsaker / Wilkes corridor. This work will evaluate design alternatives and move this project closer to funding for improvements. This CIP publication provides project information sheets describing project scope, cost, and proposed solutions for each of the projects included in the CIP. In addition to listing funded projects, this CIP update continues to maintain a list of unfunded projects for development. I nt roduct ion Primary obligations of Lane County are to ensure personal safety, security of property, and preservation of infrastructure. The Lane County Public Works Department is tasked with protecting public assets, namely roads and bridges, by maintaining, replacing, or upgrading infrastructure in the transportation system. Maintenance and repair of the road and bridge system includes surface and shoulder maintenance, drainage work, vegetation management, guardrail repair, signing, striping, pavement marking, and signal maintenance. The County road system also needs major improvements beyond regular maintenance and repair. Major improvements to the road system such as adding new road sections, widening existing roadways, providing bike lanes and sidewalks constitute capital improvements. Typically, general construction, bridge structures, safety improvements, and pavement overlays, involve a significant amount of Road Fund expenses. As the custodian of a large inventory of public infrastructure, the County undertakes public improvement projects each year that are of public interest. When additional funding is available, the County allocates available resources to upgrade its existing infrastructure through the Public Works Department’s Capital Improvement Program (CIP). Lane Manual Chapter 15 specifies how capital improvements shall be carried out. It mandates that major improvements to the County road system be scheduled through the CIP with public involvement and prioritization processes. 6 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM The CIP is the planning document that describes the County’s five-year transportation related capital improvement program. As per Lane Manual, the program is periodically updated to allocate limited financial resources to projects providing the greatest return for moving people and goods safely and efficiently throughout the County. The five-year program is reviewed and adopted by the Board of County Commissioners. It identifies candidate projects, their funding, and schedules project executions. The plan helps provide for the most efficient scheduling and allocation of staff and other resources. The capital improvement and maintenance projects that are planned in the CIP are executed through the Engineering and Construction Services (ECS) and Road Maintenance divisions of the Public Works Department. The Transportation Planning Section within the ECS Division is responsible for processing the CIP and publication of this document. The purpose of this publication is to disseminate information to Lane County citizens about construction projects affecting communities. This is in conformance with Oregon Revised Statues (ORS) 279C.305 Least-cost Policy for Public Improvements; cost estimates in budget process; use of agency force; and record of costs. ORS 279C.305 requires a local agency adopt its capital improvement program 30 days prior to budget adoption. The Lane County Capital Improvement Program is adopted in April or May by the Board of County Commissioners. Infrastructure Conditions The County currently maintains about 1436 miles of road and 415 bridges that are open to traffic. Collector and arterial roads comprise about 54% of the County road network. They carry more vehicular traffic and freight than do local roads, so they require frequent maintenance. The road inventory tables below shows about 187 miles of the County’s roadways are urban roads and about 44 miles of roadways are inside city limits. Urban collectors and arterial roads carry higher daily traffic volume. Since they carry higher traffic volumes, past CIPs have prioritized and completed several urban improvement projects. In addition, County roads provide connectivity to national forests within Lane County. The Oregon Forest Highway Inventory maintained by the Western Federal Lands Highway Division has adopted about 182 miles of County roads as “forest highways.” They carry logging trucks and are susceptible to rapid pavement deterioration if not prioritized and maintained periodically. 7 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Table 1: Road Inventory α Functional Class Rural Local Urban Local Rural Minor Collector Urban Minor Collector Rural Major Collector Urban Major Collector Major Collector (Fed) Rural Minor Arterial Urban Minor Arterial Urban Principal Arterial Total Total Miles 538.894 118.590 363.373 15.289 148.117 25.892 181.939 16.867 20.077 7.335 1436.373 Percent 37.52% 8.26% 25.30% 1.06% 10.31% 1.80% 12.67% 1.17% 1.40% 0.51% 100.00% Pavement Type AC Oil Mat 186.420 262.205 109.071 8.947 203.138 91.711 15.289 136.615 11.502 25.598 0.294 181.939 16.867 20.077 7.335 902.349 374.659 Gravel 90.269 0.572 68.524 159.365 Table 2: County Roads inside City Limits Location Total Miles Outside City Coburg Cottage Grove Creswell Dune City Eugene Florence Junction City Lowell Oakridge Springfield Veneta Westfir Total 1392.820 2.119 0.742 0.302 4.539 18.286 2.215 3.706 2.556 2.424 2.362 1.418 2.884 1436.373 AC 863.127 1.995 0.500 0.035 3.136 18.245 2.050 3.635 2.556 2.158 2.099 1.418 2.884 903.838 Pavement Type Oil Mat Concrete 371.032 0.124 0.242 0.267 1.270 0.041 0.165 0.071 Gravel 158.661 0.133 0.266 0.263 373.741 158.794 County roads pavement qualities are inventoried separately under the Pavement Management Program (PMP). Pavement sections are visually inspected for cracks, ruts, and any deformations. The pavement management software converts these visual qualities into an index on a scale of 0 to 100. The Pavement Condition Index (PCI), in most cases, is the basis for pavement maintenance priorities. α As of April 2016 8 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Table 3: Bridge Inventory ♦ Bridge Material / Construction Quantity Concrete Continuous Concrete Steel Continuous Steel Pre-stressed Concrete Continuous Pre-stressed concrete Wood / Timber Total 4 29 3 1 357 6 15 415 Restricted Weight or Width Closed 3 1 3 15 22 0 LC Bridge Conditions Sufficiency Ratings Poor, 15, 4% Fair, 104, 25% Good, 296, 71% Likewise, all 415 County owned bridges are inspected periodically under the state’s bridge inspection program, which uses the National Bridge Inventory System (NBIS). The NBIS informs local agencies about bridges that need attention. The overall physical condition of a bridge is expressed in terms of a “sufficiency rating” on a scale of 0 to 100. A sufficiency rating of 50 or less is considered poor. Poorly rated bridges are candidates for bridge replacement or rehabilitation, and are weight limited or closed. Bridge replacement prioritization is based on bridge inspection reports. Fair rated bridges are provided with regular maintenance with minor repairs. The pie chart above shows the status of Lane County bridges as of December 2015. About 4% of the bridges are candidates for replacement. The CIP funds the major contracted maintenance and preservation projects for the large inventory of roads and bridges in the Lane County transportation system. The preservation and rehabilitation fund category is used to preserve and maintain the existing infrastructure. ♦ As of April 2016 9 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM The general construction and structures categories address upgrade needs of the transportation system. Thanks to past federal funding, the County was able to keep the roads and bridges in good shape. Past CIPs, when funding sources were robust, completed several bridge replacements or urban improvement projects. However, today federal funding is uncertain or absent in future years so urban improvements are receiving no focus in the County CIP. While there is the large inventory of road and bridges to maintain, the County’s funding sources have severely diminished and bridge conditions have deteriorated. In 2013, there were 56 bridges listed as having a “fair” sufficiency rating compared to 104 bridges in the most recent report. The following section discusses the County’s fund sources. 10 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM CI P Funding CIP projects are funded through a variety of funds, as discussed below. Federal Sources of Revenue The majority of land in Lane County is forested, much of it Federal. Historically, harvesting of timber on Federal lands has generated revenue for Lane County, and of significance to the CIP, the Lane County Road Fund. In the early 1990s, timber harvests on Federal forest lands and associated revenues declined significantly. In the latter years of the decade, to address this decline, Congress enacted legislation that provided a guaranteed minimum payment in the event actual receipts dropped below a predetermined level. This guarantee was modified and extended under the Secure Rural Schools and Community Self-Determination Act of 2000 (SRS). Under the bill, the County received steady annual payments from the federal government until 2006. When the SRS lapsed in 2006, Congress extended the bill to 2007. In October 2008, legislation again reauthorized the SRS bill with a modified “step down” payment plan, distributing 90% of the 2006 payment level, followed by 90% of the prior year in each successive year until County FY2011-12 when the final payment was $7.61 million. In 2012, congress passed a one year reauthorization of SRS through Federal FY 2013 resulting in a payment of $7.28 million. In October 2013 congress passed yet another extension which is estimated to provide an SRS payment of $6.91 million in FY2013-14. Today, SRS funding is no longer considered an ongoing funding base for the CIP. In 2007 Douglas and Lane Counties received legislative approval to expend county road fund monies from the United States Forest Service (USFS) for the patrolling of county roads by county law enforcement officials (SB808). This authorization had a January 2, 2014 sunset provision. Today, the sunset date has been removed from this legislation which allows all Oregon counties to use Forest Service revenue for patrol and patrol support services. This has impacted the availability of Road Fund dollars. Responding to the diminishing SRS funding trend and transfers from the Road Fund, the County CIP has aggressively scaled back its capital construction projects, and now emphasizes maintenance, rehabilitation and safety projects as the highest priority. Lane and other counties continue working with congressional representatives to find a longterm solution to the loss of SRS funding. However, at this time continued SRS funding remains uncertain. Table 4 shows SRS payments to the Road Fund, transfers to the sheriff’s office and net SRS payments available to the Road Fund in the past and as projected into future years. 11 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Table 4: SRS Funding Levels Fiscal Year SRS Payments ($ Millions) Road Fund Transfers to the Sheriff's ($ Millions) Net SRS Available to Road Fund ($ Millions) Remarks 2002-03 $19.36 $19.36 2003-04 $19.60 $19.60 2004-05 $19.80 $19.80 2005-06 $20.33 $20.33 2006-07 $20.53 $20.53 SRS 2000 expires 2007-08 $21.77 $1.20 $20.57 SRS extended one year. SB 808* passed allowing road fund transfer for law enforcement patrols until 2014. 2008-09 $19.62 $1.79 $17.83 SRS - Reauthorization with 90% step down 2009-10 $17.65 $1.33 $16.32 Step down, 90% of prior year 2010-11 $15.90 $1.60 $14.30 Step down, 90% of prior year 2011-12 $7.61 $2.83 $4.78 Final Payment under 2008 reauthorization. SB 443** passed extending sunset of road fund transfers to law enforcement patrols until 2016. 2012-13 $7.28 $2.77 $4.51 SRS one year reauthorization payment. 2013-14 $7.19 $4.13 $3.06 SRS one year reauthorization payment during Fed. FY14. $3.87 Two year Federal reauthorization payment, SB 26*** passed eliminating sunset provisions of road fund transfers to law enforcement patrols. SRS no longer viewed as operational revenue. $6.62 Final reauthorization payment, SRS viewed as one time money for budgeting purposes. Future Federal funding uncertain. 2014-15 2015-16 $7.03 $6.62 $3.16 0 * In 2007 Douglas and Lane Counties received legislative approval to expend county road fund monies from the USFS for the patrolling of county roads by county law enforcement officials (SB808). The authorization had a January 2, 2014 sunset provision. ** In the 2011 legislative session SB 443 extended the sunset to January 2, 2016. *** In the 2015 legislative session SB 26, allowed on-going use of forest reserve money to go to law enforcement patrols. Federal Aid Programs In addition to federal County payments under SRS, the County has participated in and received federal funds through several federal aid programs created under past legislation including the Safe, Accountable, Flexible, Efficient, Transportation Equity Act: A Legacy for Users (SAFETEA-LU) and Moving Ahead for Progress in the 21st Century (MAP-21). Some of the programs the County has historically received federal funding for include: Surface 12 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Transportation Program-Urban (STP-U), Local Highway Bridge Program (LHBP), the National Historic Covered Bridge Preservation (NHCBP) program, Transportation Enhancement (TE), and the Forest Highway Program. The majority of these federal programs, such as the NHCBP, require a non-federal dollar match, typically 10.27% of the total project cost. In December 2015, the most recent federal Transportation Bill was signed into law. The Fixing America’s Surface Transportation (FAST) Act provides five years of stable federal transportation funding for State and local governments. The FAST Act represents the first longterm, comprehensive surface transportation policy proposal since 2005’s SAFETEA-LU that authorizes Federal highway, highway safety, transit, and rail programs for five years from federal fiscal years 2016 through 2020. The prior Act, MAP-21, initially provided only two years (FFY 2013-2014) of federal transportation funding and was then followed by several extensions until the recent passage of the FAST Act. Under the new Act, Surface Transportation Program (STP), one of the core Federal-aid Highway Program categories, is renamed as Surface Transportation Block Grant Program (STBGP). The FAST Act authorizes $305 billion from both the Highway Trust Fund (HTF) and the General Fund of the US Treasury. It provides $225 billion in HTF contract authority over five years for the Federal-aid Highway Program, increasing funding from $41 billion in 2015 to $47 billion in 2020. The increase in funding under the FAST Act is relatively modest. While stability will be very helpful in developing a long term capital program, it will not make a significant dent in bridge or pavement needs on the aging County highway system or address County Road Fund shortfalls. The infrastructure improvement needs around the United States, including other states, counties and cities far exceeds the funding currently available. Funding programs are becoming more competitive with often higher local match requirements making it difficult to keep up with the ever-growing need. Title II Funds SRS created Title II Funds that provided resources to improve watersheds to enhance fish and wildlife habitat, reduce the risk of catastrophic wildfires and similar projects on federal land. In the past, the County has received a portion of such funds for fish passage projects on County roads. Without reauthorization of SRS these funds no longer exist. Other Federal Funds In the past, the CIP has successfully leveraged federal grants such as the Federal HighwayRail Crossing Program Section 130 funds. The County participated in the American Recovery and Reinvestment Act (ARRA) of 2009 economic stimulus package. With FAST Act, the County will continue to explore federal funding options available for transportation projects. State Sources of Revenue State highway user fees consist of state motor fuel taxes, state weight-mile taxes for heavy vehicles, motor vehicle registration fees, fines, licenses, and other miscellaneous revenues. The fees and taxes collected are distributed to local government agencies, after debt servicing based upon applicable ORS sections. The resulting distributions are approximately as follows: 61% state, 23% counties, and 16% to cities. The county portion is distributed to all counties based on the ratio of registered vehicles to the statewide total. Lane County currently receives approximately 8.61% of the statewide total distributed to counties. Oregon House Bill 2001 13 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM passed in 2009 modified the transportation related tax and fee structure to offset the potential loss of the federal funding to state and local agencies; however, the increase in the State Highway Fund revenue does not begin to match the decrease in Secure Rural Schools (SRS) revenue. In contrast to past years, when SRS revenues provided more than half of Road Fund revenues, the State Highway Fund now constitutes the primary source of revenue to the Road Fund. Oregon Forest Highway Program Lane County has significant miles of County roads that are inside national forests or connect to a national forest highway. These County roads are designated as forest highways and are eligible for annual forest highway fund grants. The Oregon Department of Transportation, United States Forest Service, and the Western Federal Lands Highway Division, jointly known as the Tri-Agency, administer annual distribution of about $20 million in forest highway funds to participating agencies. In recent years, Lane County has been successful in securing funds for Five Rivers Road culvert replacements and the Sweet Creek Road slide repair maintenance projects under this program. With the implementation of MAP-21 and now the FAST Act, the Forest Highway Program has been replaced with the Federal Lands Access Program (FLAP). Lane County has been successful in securing funding for Row River Trail Crossings and Schindler Landing Wayside under the new FLAP program. Other Funding Sources Lane County has aggressively sought grant funding, including planning funds which can be used for project development and improve the likelihood of future project funding. Lane County has recently partnered with other agencies, combining resources, building consensus and leveraging opportunities to promote projects that benefit Lane County citizens. Among these projects, Lane County partnered with ODOT and the Bureau of Land Management (BLM) in 2014 to complete a new undercrossing at Row River Road at milepost 4 and realignment at milepost 5.2 through the FLAP program. CIP Trend: Looking Ahead The CIP trend chart below illustrates funding for capital investments in the Public Works Department. The department completed several urban improvement projects when the Road Fund was steady and supported by the SRS revenues. As the sunset of SRS approached and uncertainty about alternative revenue sources loomed, CIP funding has significantly dropped from a peak of $107 million in Fiscal Years 2005-2009 to $15 million in the current 2017-2021 CIP update. This declining trend in funding level is inadequate to support even maintenance and preservation needs. Looking ahead, the Public Works Department’s CIP funding will likely remain at minimum levels unless SRS revenue source is renewed or a new funding source is found to replace SRS funds. 14 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Chart 1: Capital Investments Trend 120 107.0 100 98.9 99.9 $ Millioins 80 60 40 51.0 39.5 27.7 26.7 26.1 20 22.2 21.2 19.3 18.0 18.0 15.0 0 Five Year CIP *Per Apr 22, 2014 Board Order No. 14-04-29-08, the CIP is now reviewed on a biennial basis (previously annual). Relat ionship wit h Ot her Planning Docum ent s Transportation System Plan The Lane County Transportation System Plan (TSP) fulfills a statewide planning requirement, while providing guidance on future transportation decision making. The TSP identifies needed multi-modal transportation improvements and policies. It also identifies the function, capacity, and location of facilities, as well as planning-level costs for projects to serve the community over a 20-year period. Staff consults the TSP project list for potential projects every CIP update cycle. The TSP was most recently adopted in 2004. However, an update to the 2004 TSP is currently underway, with adoption anticipated in 2017. The reduction of federal subsidies has made revenue forecasting an uncertain exercise. Revenue streams are insufficient to address the backlog of maintenance and preservation needs and the needs of future transportation investments that support the future economic, health, and well-being of Lane County. Recognizing this context, the TSP includes the County’s best thinking about potential funding sources, but acknowledges that adequate funding to fully implement the needed improvements over the next 20 years is unlikely to be available. The updated TSP is being designed to better prepare Lane County for funding 15 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM opportunities by identifying projects that align with state and federal resource allocation patterns, such as federal access lands, freight routes, emergency lifeline routes, systemic corridor and hot-spot safety treatments, safe routes to schools, and multi-modal amenities. While the TSP prioritizes planned projects, the County may choose to advance any of the identified projects as opportunities arise. The TSP goals and policies can serve as a guide when making these decisions. The existing policies adopted as part of the 2004 TSP that are planned for inclusion in the 2017 TSP, related to funding, are as follows: • Ensure safety as a top priority in making decisions for the Capital Improvement Program and for transportation facility operations, maintenance, and repair. • Realize the economic benefits walking, biking, public transportation, and other active transportation investments can provide to Lane County. • Recognize the importance of resource-related uses such as agriculture and forestry to the local economy, and the need to maintain a transportation system that provides opportunities for the harvesting and marketing of agriculture and forest products. • Consider transportation improvement projects that accommodate all transportation users by including shoulders, sidewalks, bike lanes, and bus stop turnouts, consistent with adopted road design standards. • Provide a multi-modal transportation system that is accessible to all users, improves access to basic needs (e.g., education, employment, food, housing, and medical care) and complies with the American with Disabilities Act (ADA). • Support creation of regional bicycle and pedestrian corridors to facilitate safe travel between and within urban and rural communities in Lane County. • Prioritize improvements within statutory road fund limitations, to access ways, paths, or trails where trail or route improvements help complete a regional planned facility or make connections to an existing or planned facility within an incorporated city within the County. • Strive to distribute funding so that it is balanced between the various needs of the community including modal and geographic considerations. • Ensure operations, maintenance, repair, and preservation of County transportation facilities, which include roads, bridges, sidewalks, and bike facilities, are the priority of the Road Fund and are routinely carried out to protect the public investment in, and to ensure adequate functioning of the County transportation system. 16 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Statewide Transportation Improvement Program The Lane County Capital Improvement Program is comparable to the function of the state’s Statewide Transportation Improvement Program (STIP). These two documents may show identical projects when the CIP leverages ODOT or federally funded projects in the County. Such projects must be adopted in the STIP before any grant pass-through occurs. Metropolitan Transportation Improvement Program The Central Lane Metropolitan Planning Organization (MPO) maintains the metropolitan area Transportation Improvement Program (MTIP) for federal funds management purposes. Lane County is a participating member of the MPO. Lane County projects of regional significance inside the MPO boundary are listed in the MTIP. Typically Lane County CIPs have included local matches for MTIP projects. CI P Process Staff Draft The CIP process begins every other fall with staff evaluation of the previously adopted CIP projects status. The projects in the first two fiscal year of the program in the current CIP are reviewed for project status. Those projects that will be completed or are under construction by fall are removed from the list. Projects in the following year are moved up for execution. County staff evaluates the progress of projects in the latter years of the program and adjusts the program as needed to reflect best estimates of schedules, project scope, and cost. At this stage, staff also evaluates projects in relation to department’s budgets and makes any recommendations for additions or deletions from the program. New projects are added if additional funding is available through external sources. Staff also identifies a list of candidate projects for development that brings benefits to the community that are eligible for external grant opportunities. Benefits of the individual proposed projects are evaluated and ranked. In past CIP cycles, staff has used a tool referred to as the Prioritization Matrix. Because 99.86% of the current Road Fund CIP resources have been allocated to Preservation and Rehabilitation categories, the scope of work in project selection and prioritization has diminished to the point that there is nothing to prioritize as compared to past CIPs, eliminating the need for a Prioritization Matrix. A prioritization process will be reinstituted if and when the Road Fund has funds available to apply toward projects in other categories. Project selection is currently a continuation of previously adopted and prioritized projects, or addresses an urgent safety need. This CIP refines the project costs and adjusts construction schedules. Outside of preservation and maintenance work, or projects funded by external sources, no new projects have been added to the CIP. A few new projects have been placed on the Projects for Development list, either due to an impending maintenance need, a safety issue, or a partnership with another agency. 17 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM In consideration of the County’s financial position, staff recommended to the Roads Advisory Committee that the current CIP focus on preservation and rehabilitation. No enhancement or improvement projects have been proposed in this CIP, outside of those funded by grants. Public Participation Public participation is essential to the CIP process. Citizen input plays an important role in project selection and the delivery process. The public can participate in the process by providing written or oral testimony at public hearings, conducted before the Roads Advisory Committee (RAC) and the Board of County Commissioners (Board). Public notices are published for each public hearing. The CIP related information and documents are posted for public review on the Lane County Public Works web site at http://www.lanecounty.org/Departments/PW/TransPlanning/Pages/cip.aspx. In addition to the public hearings, the public can participate by contacting and/or sending their written comments to staff. Roads Advisory Committee Action The RAC has the important role of promoting public participation in the road related matters, including collecting public input on staff’s draft CIP. The RAC is a committee comprised of volunteer citizens appointed by the Lane County Board of Commissioners (Board). It is tasked with helping the Board on transportation matters including developing the CIP. The RAC seeks public comments on the staff proposed CIP before making a recommendation to the Board. The RAC normally engages in the CIP review process between January and March. Based on public input and other considerations, the RAC may ultimately give preference to certain projects. During the process, staff provides as much information as needed about a proposed project so that the RAC can make informed decisions. After considering information provided by staff and input by the public, the RAC deliberates on the draft and forwards a recommendation to the Board. Once projects are adopted and scheduled for design, citizen input is again sought on specific design concepts for individual projects. In this context, the RAC may elect to set a public hearing before recommending adoption by the Board of a preferred project alternative. Board Action The Board reviews the recommendation forwarded by the RAC. Updates or changes proposed by the public, staff, and the RAC are advisory to the Board. The Board has final approval authority for the CIP and expenditure of the County Road Fund. The Board holds a second public hearing on the draft CIP before adopting it at least 30 days prior to adopting the County budget. The Board may change project priorities at any time; projects may be added, deleted, or combined with new projects as situations arise. 18 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM The Board is typically asked to adopt the CIP. Once adopted the CIP is used to meet County budgeting requirements. The following section provides an overview of the CIP 2017-2021 approved by the Board in May 2016. CI P Cat egories This CIP publication is intended to provide public information regarding Public Work’s roadway improvement projects that will be open to public bid. The adopted projects are listed on the executive tables beginning on page 25 and are grouped in program categories as described below. Right-of-Way This program category lists cost estimates for right-of-way acquisition for CIP projects. Typically, General Construction projects involve right-of-way acquisitions. Maintenance projects also may require construction easements or additional right of way. Cost estimates towards such right-of-way related expenses are shown under this category. These estimates are preliminary and subject to change based on final design of each project and individual acquisitions. County acquisitions are based on appraisals of the land and improvements to be acquired and any associated compensable damages. General Construction This program category addresses improvement needs arising from geometric standards, pavement structure, or safety issues. Lane County has more than 40 miles of urban collector roads primarily inside the Eugene-Springfield metropolitan area. Many of these roads do not meet modern geometric standards. Historically, this category of improvements constituted almost one-third of the CIP allocation. This is not the case now; no General Construction urban improvement projects are proposed in this CIP. Structures Structures are generally localized projects such as bridges and retaining walls. The structures improvement program addresses bridge rehabilitation and replacement as identified and recommended by the National Bridge Inventory System. Non-bridge types of localized structural improvements such as retaining walls and toe walls are also included in this category. Preservation/ Rehabilitation Fund This category has three subcategories of projects to address pavement and bridges preservation and rehabilitation needs. The Overlays and Rehabilitation subcategory is specific to pavement preservation and constitutes the largest component of the CIP. The allocated funds are used towards annual pavement overlay and rehabilitation projects to respond to current pavement conditions. Asphalt Concrete (AC) overlay or chip sealing are commonly used preservation techniques in 19 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Lane County. Although AC overlay projects are maintenance projects, they fall under the definition of public improvements 1 when the depth of AC is two inches or more, or when a proposal has an estimated cost of $125,000 or more. Therefore, AC projects are included in the CIP while Chip Seal projects are typically not included. Individual overlay projects are not itemized in the CIP except when project specific external funding is involved. Pavement condition information is gathered annually and reported as the Pavement Condition Index (PCI). The PCI is the basis for prioritizing preservation and rehabilitation projects for the existing road system. Lane County uses the computer-based Pavement Management Program application and field inspections to prioritize annual pavement preservation projects. The program identifies suitable treatment type and implementation timing. The Bridge Rehabilitation and Preservation program exists to respond to the maintenance and preservation needs of County bridges. Bridge rehabilitation projects are generally significant in scope and in general involve large capital costs. Such projects may be placed under the Structures category. The funds allocated in this category are primarily used for minor repair works and for providing local matches to federal and state funds. Bridge rehabilitation priorities are established using the bridge sufficiency rating as part of the of bridge condition assessment through the statewide bridge inspection program. The inspection report identifies and recommends maintenance for bridges needing repair. The Covered Bridge Preservation subcategory dedicates a portion of the Road Fund towards preservation of fourteen existing covered bridges in the County. In recent years, most covered bridge preservation projects have been funded through the National Historic Covered Bridge Program, however this program is no longer available to fund these projects. Covered bridges must compete for outside funding sources with other bridge needs. The SRS Preservation Projects subcategory has been added to the current CIP in order to account for one time SRS monies received by the Lane County Road Fund in 2016 which will be dedicated to preservation and rehabilitation needs. Safety Improvements Safety improvement projects are intended to address localized problems that do not require major reconstruction. Staff recommends projects as locations are studied and identified. Generally, these projects will have low cost, are small in scope, have limited impact on adjacent properties, and are relatively easy to implement. These funds may be utilized as local matches for external funding applications. Fish Passage Projects The Oregon Department of Fish and Wildlife has identified nearly 300 culverts under Lane County roads that are believed to impede Coho or Chinook salmon passage at some stage in their lifecycles. The establishment of this fund is intended to dedicate Road Fund resources to replace these culverts and make them fish passable. 1 ORS 279C.305 defines resurfacing of highway, roads, or streets at depth of two or more inches and at an estimated cost that exceed $125,000 as a public improvement. 20 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Bike and Pedestrian Improvements The Bike and Pedestrian Improvements category is intended to fund projects that enhance pedestrian and bicycling opportunities. Projects in this category include installation of bike lanes, sidewalks, striping to delineate bike lanes, or the addition of paved shoulders for bike and pedestrian use. Projects for Development The Projects for Development category encompass projects that are unfunded, or have been funded for study, but are highly ranked and prioritized. These projects are candidate CIP projects if funds become available. CI P 1 5 -1 9 Overview The Road Fund allocation for CIP fiscal years 2016/2017 through 2020/2021 is about $15.00 million, which is a 16.7% reduction of $3 million or $600,000 per year from the previous five year CIP. The table below compares the allocation of Road Fund dollars between the previous allocation and the current allocation for each CIP category. Although the total project costs of externally funded projects are shown, only local match portions are included in the table for the Road Fund comparison purpose. Table 5: Program Totals by Category PROGRAM TOTALS BY CATEGORY Right-of-Way General Construction Structures Preservation / Rehabilitation Safety Improvement Payment to other Gov. Agencies Fish Passage Projects Bike Ped Improvements Total CIP 15-19 Amount Percent $0 0% 0% $0 ♣ 0% $0♣ ♣ 98.61% $17,750,000 $250,000 1.39% $0 0% $0 0% 0% $0♣ $18,000,000 100% CIP 17-21 Amount Percent $0 0% 0% $0 ♣ 0% $0♣ ♣ 99.86% $14,979,460 $20,540 0.14% $0 0% $0 0% 0% $0♣ $15,000,000 100% As in the preceding CIP, this CIP allocates a significant percentage of the Road Fund towards Preservation and Rehabilitation. This category is broken down into four subcategories, including Overlays and Pavement Rehabilitation, Bridge Rehabilitation and Preservation, Covered Bridge Preservation, and the SRS Preservation Projects. The CIP allocates $2.78 million to Overlays and Pavement Rehabilitation in FY 16/17 and $2.8 million per year to Overlays and Pavement Rehabilitation for the remaining four years. Annual $100,000 fund allocations are made for Bridge Rehabilitation and Preservation, as well as identical annual allocations towards Covered Bridge Preservation. As shown above, the combined ♣ Adjusted Road Fund expenses for construction costs only. 21 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM preservation and rehabilitation category expenses constitute about 99.86% of the total Road Fund expenses. Due to budget limitations in the Road Fund, there is currently no money available to fund projects under the Right-of-Way, General Construction, Structures, Fish Passage Projects, Bike and Pedestrian Improvements, or the Payments and Matches to Other Agencies categories. Lane County has successfully utilized CIP funds or “In-Kind” Engineering services to leverage grant funding opportunities. Grant funding for this CIP cycle includes $2.018 million in Surface Transportation Program-Urban (STP-U) funds, and $159,460 in Surface Transportation Improvement Program (STIP) Enhance funding. During the peak of the SRS funding, the County shared its revenue and cost of improvement projects with other local partner agencies, including cities and state. The Payments and Matches to Other Agencies category is intended to highlight partnership contributions when they can be made. This CIP does not include any such payments. This CIP does include one pavement rehabilitation project of mutual interest. The South 2nd Street pavement rehabilitation project includes a pedestrian connection to Willamalane Park and Recreation District’s Dorris Ranch multi-use path trailhead. Portions of the work are under both County and Willamalane jurisdiction. In partnership with Willamalane, match contributions are being provided by Willamalane for Engineering as well as full construction costs for the sidewalk connection. The executive tables reflect the Willamalane contributions to the project. The summary tables beginning on page 25 in the next section shows detailed project listings and estimated project costs. 22 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Executive Summary Tables 23 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Intentional Blank Page 24 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Capital Improvement Program Fiscal Years 2017-2021 Summary Table Table 6: Annual Expenses by CIP Category FY 16-17 ANNUAL TOTALS BY CATEGORY RIGHT-OF-WAY (see page 26) GENERAL CONSTRUCTION (see page 26) STRUCTURES (see page 26) PRESERVATION / REHABILITATION FUNDS Overlays and Pavement Rehabilitation (see page 27) Bridge Rehabilitation and Preservation(see page 28) Covered Bridge Preservation (see page 28) SRS Preservation Projects (see page 29) Subtotal Preservation / Rehabilitation SAFETY IMPROVEMENTS (see page 29) FISH PASSAGE PROJECTS (see page 30) BIKE / PEDESTRIAN IMPROVEMENTS (see page 30) PAYMENTS AND MATCHES TO OTHER AGENCIES (see page 30) ANNUAL CIP Project Specific Revenue - (see page 31) NET COUNTY CIP COST FY 17-18 FY 18-19 FY 19-20 FY 20-21 5 YR TOTAL $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,779,460 $100,000 $100,000 $1,450,000 $4,429,460 $250,000 $0 $0 $0 $4,679,460 $1,679,460 $3,000,000 $3,475,034 $100,000 $100,000 $1,950,000 $5,625,034 $50,000 $0 $0 $0 $5,675,034 $2,675,034 $3,000,000 $4,142,730 $100,000 $100,000 $2,450,000 $6,792,730 $50,000 $0 $0 $0 $6,842,730 $3,842,730 $3,000,000 $2,800,000 $100,000 $100,000 $0 $3,000,000 $0 $0 $0 $0 $3,000,000 $0 $3,000,000 $2,800,000 $100,000 $100,000 $0 $3,000,000 $0 $0 $0 $0 $3,000,000 $0 $3,000,000 $15,997,224 $500,000 $500,000 $5,850,000 $22,847,224 $350,000 $0 $0 $0 $23,197,224 $8,197,224 $15,000,000 Acronyms: AC - Asphalt Concrete CE - Construction Engineering CIP - Lane County Public Works Capital Improvement Program FFY - Federal Fiscal Year FLAP - Federal Lands Access Program IGA - Intergovernmental Agreement LHBP - Local Bridge Program MPO - Central Lane Metropolitan Planning Organization NHCBP - National Historic Covered Bridge Program NBIS - National Bridge Inventory System, where the state maintains bridge inventory and inspection records ODOT - Oregon Department of Transportation PE - Preliminary Engineering PED - Pedestrian PMP - Pavement Management Program, a software program for managing pavement inspection data and reporting STP-U - Surface Transportation Program - Urban USFS - US Department of Agriculture, Forest Service WFLHD - Western Federal Lands Highway Division, a division of Federal Highway Administration 25 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Table 7: Right-of-Way CATEGORY: RIGHT-OF-WAY 1 PROJECT FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 5 YR TOTAL FY 20-21 5 YR TOTAL FY 20-21 5 YR TOTAL None 2 TOTAL Table 8: General Construction CATEGORY: GENERAL CONSTUCTION 3 PROJECT FY 16-17 FY 17-18 FY 18-19 FY 19-20 None 4 TOTAL Table 9: Structures CATEGORY: STRUCTURES 5 PROJECT None FY 16-17 FY 17-18 FY 18-19 FY 19-20 6 TOTAL (1) The Right-of-Way category lists cost estimates for right-of-way acquisition for CIP projects. Right-of-way costs are approximate and based on anticipated property impacts that are not defined in the early stages of project development. These costs are subject to change as design concepts are refined. (2) Due to budget limitations in the road fund, there is currently no money available to fund projects in the Right-of-Way category. (3) The General Construction category addresses improvement needs to meet current geometric, pavement, or safety standards. Historically, this category had constituted almost one-third of the CIP allocation, especially when County roads were being upgraded to meet current urban design standards. (4) Due to budget limitations in the road fund, there is currently no money available to fund projects in the General Construction category. (5) The Structures category is generally for new or major replacements of County bridges and/or retaining walls. This category deals with major bridge rehabilitation and replacement as identified and recommended by the National Bridge Inventory System. Seismic deficiencies would also be funded out of this category. (6) Due to budget limitations in the road fund, there is currently no money available to fund projects in the Structures category. 26 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Table 10: Overlays and Pavement Rehabilitation CATEGORY: PRESERVATION / REHABILITATION FUNDS 7 PROJECT FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 5 YR TOTAL Overlays and Pavement Rehabilitation 8 South 2nd Street Pavement Preservation 9 $742,420 E. Enid Road and Prairie Road Pavement Preservation and Sidewalk Rehabilitation Project 10 $742,420 $1,496,412 $1,496,412 $2,779,460 $2,732,614 $2,646,318 $2,800,000 $2,800,000 $13,758,392 Subtotal Overlays and Pavement Rehabilitation $2,779,460 $3,475,034 $4,142,730 $2,800,000 $2,800,000 $15,997,224 PMP prioritized roads 11 (7) The overall Preservation / Rehabilitation Funds category has four subcategories that address preservation and rehabilitation needs: Overlays and Pavement Rehabilitation, Bridge Rehabilitation and Preservation, Covered Bridge Preservation, and SRS Preservation Projects. (8) The Overlay and Pavement Rehabilitation subcategory funds annual pavement overlay and rehabilitation projects responding to managed pavement conditions. (9) The estimated cost of the South 2nd Street Pavement Preservation is $742,420. Funding includes STP-U funds in the amount of $607,262 and a Lane County match of $67,386. A portion of the project includes a pedestrian connection to Willamalane Park and Recreation District's Dorris Ranch Multi-use Path Trailhead. STP-U funds received included "Engineering Only" for the sidewalk connection. The Willamalane portion of the match for Engineering funding is $2118. Willamalane construction funding is estimated at $65,654. (10) The estimated cost of the Prairie Rd and E. Enid Rd Pavement Preservation and Sidewalk Rehabilitation Project is $1,496,412. Funding includes STP-U funds in the amount of $1,342,730 and a Lane County match of $153,682. (11) The PMP identifies individual roads needing preservation treatment; treatment types and timing are based on current pavement conditions. This line item shows funds available for pavement preservation after project specific local matches are set aside. The Public Works FinPlan assumes $2.8 million per year for pavement preservation. Note that in FY 16-17 the 2.8 million has been reduced by $20,540, to cover an otherwise unfunded $20,540 match for Bob Straub Parkway: Mt. Vernon Intersection Improvements project. Note that in FY 17-18 the $2.8 million has been reduced by $67,386 which is the Lane County portion of matching funds for the South 2nd Street project. In FY 18-19 the $2.8 million has been reduced by $153,682 which is the matching fund amount for the Prairie Rd and E. Enid Rd project. 27 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Table 11: Bridge Rehabilitation and Preservation CATEGORY: PRESERVATION / REHABILITATION FUNDS PROJECT FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 5 YR TOTAL $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 Bridge Rehabilitation and Preservation12 NBIS Program Prioritized Works13 Subtotal Bridge Rehabilitation and Preservation Table 12: Covered Bridge Preservation CATEGORY: PRESERVATION / REHABILITATION FUNDS PROJECT Covered Bridge Preservation FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 5 YR TOTAL $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 14 Bridge Program Prioritized Covered Bridges 15 Subtotal Covered Bridge Preservation (12) The Bridge Rehabilitation and Preservation subcategory funds maintenance and preservation needs of County bridges. (13) This line item is for programming bridge maintenance projects as recommended by the National Bridge Inventory System (NBIS). The funds will be utilized to pay for emergency bridge maintenance projects or as local matches required for securing external funding for bridge projects. (14) The Covered Bridge Preservation subcategory dedicates a portion of the Road Fund to preservation of the existing covered bridges in Lane County. (15) This line item is for programming covered bridge maintenance and preservation projects needed in the future after project specific local matches are deducted from the available annual $100,000 allocation. These funds are intended to provide emergency maintenance or local matches to secure external funds. 28 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Table 13: SRS Preservation Projects CATEGORY: PRESERVATION / REHABILITATION FUNDS PROJECT FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 5 YR TOTAL SRS Preservation Projects 16 NW Expressway Pavement Preservation 17 Prioritized SRS Preservation Projects $1,100,000 18 $1,100,000 $350,000 $1,950,000 $2,450,000 $0 $0 $4,750,000 Subtotal SRS Preservation Projects $1,450,000 $1,950,000 $2,450,000 $0 $0 $5,850,000 FY 19-20 FY 20-21 Table 14: Safety Improvements CATEGORY: SAFETY IMPROVEMENTS 19 PROJECT Bob Straub Parkway: Mt. Vernon Road Intersection Improvements 20 Marcola Road School Zone Safety Safety Improvements Fund 21 FY 16-17 FY 18-19 5 YR TOTAL $200,000 $200,000 $50,000 $50,000 22 TOTAL FY 17-18 $0 $50,000 $50,000 $250,000 $50,000 $50,000 $100,000 $0 $0 $350,000 (16) The SRS Preservation Projects category shows one time SRS monies received by the Lane County Road Fund in 2016 and dedicated to preservation needs. (17) The estimated cost of the NW Expressway Pavement Preservation project is $1,100,000. This project has been funded by an allocation of SRS monies. (18) The Prioritized SRS Preservation Projects includes monies allocated to meet preservation and rehabilitation needs. Projects are in the process of being prioritized. The projects are funded by one time SRS monies received by the Lane County Road Fund in 2016. (19) The Safety Improvements category is intended to address funding of localized safety problems that do not require major reconstruction. (20) The estimated cost of the Bob Straub Parkway: Mt. Vernon Rd Intersection Improvements project is $200,000. The project will be funded with 15-18 STIP Enhance funds in the amount of $159,460. The City of Springfield will provide $20,000 and Lane County $540 of the $20,540 required 10.27% match. Lane County will provide $20,000 as an overmatch which was used to help secure funding. The $20,540 of County Funds was allocated to meet the obligation from preservation funds. (21) The cost of the Marcola Road School Zone Safety project is estimated at $50,000. The project is located on Marcola Road near Wendling Road and is to address a significant safety need to provide students with a safe crossing of Marcola Road. Relocation of the Marcola Elementary School to Wendling Road has magnified the severity of this problem. This project has been funded by an allocation of SRS monies received by the Lane County Road Fund in 2016. (22) This line item is the net un-programmed safety improvement funds available to respond to minor safety improvements or to provide local matches for any external funding opportunities after project specific expenses are identified. The $50,000 shown in FY 17-18 and $50,000 shown in FY 18-19 has been allocated from one time SRS monies received by the Lane County Road Fund in 2016. 29 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Table 15: Fish Passage Projects CATEGORY: FISH PASSAGE PROJECTS 23 PROJECT FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 5 YR TOTAL None 24 TOTAL $0 $0 $0 $0 $0 FY 19-20 FY 20-21 $0 $0 Table 16: Bike and Pedestrian Improvements CATEGORY: BIKE AND PEDESTRIAN IMPROVEMENTS 25 PROJECT None FY 16-17 FY 17-18 FY 18-19 5 YR TOTAL 26 $0 TOTAL $0 $0 $0 $0 $0 FY 19-20 FY 20-21 $0 Table 17: Payments & Matches to Other Agencies CATEGORY: PAYMENTS & MATCHES TO OTHER AGENCIES 27 PROJECT FY 16-17 FY 17-18 FY 18-19 None 28 5 YR TOTAL $0 TOTAL $0 $0 $0 $0 $0 $0 (23) The Fish Passage Projects category is intended to direct resources toward replacing culverts under Lane County roads believed to impede Coho or Chinook salmon passage. The set-aside amount can be used for future capital bid projects or allows Public Works and partner agencies to plan for and / or seek funding opportunities. (24) Due to budget limitations in the Road Fund, there is currently no money available to fund capital projects in the Fish Passage Projects category. (25) The Bike and Pedestrian Improvements category is intended to fund projects that enhance pedestrian and bicycling opportunities. Projects in this category include installation of bike lanes, sidewalks, striping to delineate bike lanes, or the addition of paved shoulders for bike and pedestrian use. (26) Due to budget limitations in the Road Fund, there is currently no money available to fund capital projects in the Bike & Pedestrian category. Lane County is required by ORS 366.514 to spend at least one percent of State Highway Fund revenues in a fiscal year. In recent years Lane County has exceeded 3% annually. (27) The Payments and Matches to other Agencies category historically funded the County/City Road Partnership Program and the Board's Capital Project Partnership Program (CAPP). Payments in this category were also used for matching funds on grant opportunities for other Agencies. (28) Due to budget limitations in the road fund, there is currently no money available to fund payments and matches to other agencies. 30 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Table 18: Project Specific Revenues CATEGORY: REVENUE 29 PROJECT FY 16-17 Revenue (Lane County Bid Projects) Bob Straub Parkway: Mt. Vernon Road Intersection Improvements 30 South 2nd Street Pavement Preservation FY 18-19 FY 19-20 FY 20-21 5 YR TOTAL $179,460 31 $179,460 $675,034 E. Enid Road and Prairie Road Pavement Preservation and Sidewalk Rehabilitation Project 32 SRS Funded - NW Expressway Pavement Preservation 33 SRS Funded - Marcola Road School Zone Safety 34 SRS Funded - Prioritized SRS Preservation Projects SRS Funded - Safety Improvement Projects TOTAL FY 17-18 36 35 $675,034 $1,342,730 $1,342,730 $1,100,000 $1,100,000 $50,000 $50,000 $350,000 $1,950,000 $2,450,000 $4,750,000 $50,000 $50,000 $1,679,460 $2,675,034 $3,842,730 $100,000 $8,197,224 $0 $0 (29) The Revenue category shows revenue from one time SRS monies and revenue from external funding secured for specific Lane County CIP projects outside of Road Fund resources. (30) The Bob Straub Parkway: Mt. Vernon Rd Intersection Improvement project will be primarily funded with 15-18 STIP Enhance funds in the amount of $159,460. In addition, the City of Springfield is contributing $20,000 towards the 10.27% match requirement, providing combined total revenue of $179,460. These outside funds are shown as revenue. (31) The South 2nd Street Pavement Preservation project will be primarily funded with 16-18 STP-U funds in the amount of $607,262. In addition, a portion of the project includes a pedestrian connection to Willamalane Park and Recreation District's Dorris Ranch Multi-use Path Trailhead. A portion of the STP-U funds received included "Engineering Only" for the sidewalk connection. The Willamalane portion of the match for Engineering funding is $2118. Willamalane Construction funding for the sidewalk connection is estimated at $65,654. The total estimated outside funds shown as revenue for this project is $675,034. (32) The Prairie Rd and E. Enid Rd Pavement Preservation and Sidewalk Rehabilitation Project will be primarily funded with 16-18 STP-U funds in the amount of $1,342,730. As shown, the $1,342,730 in 16-18 STP-U funds is the total estimated outsides funding revenue for this project. (33) The NW Expressway Pavement Preservation project will be funded with one time SRS monies received by the Road Fund in 2016 and are shown as project specific revenue in the CIP. (34) The Marcola Road School Zone Safety project will be funded with one time SRS monies received by the Road Fund in 2016 and are shown as project specific revenue in the CIP. (35) The Prioritized Preservation Projects will be funded with one time SRS monies received by the Road Fund in 2016 and are shown as revenue in the CIP. (36) The Prioritized Safety Projects will be funded with one time SRS monies received by the Road Fund in 2016 and are shown as revenue in the CIP. 31 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Table 19: Projects for Development Green Hill Road to Veneta via County Rds. Bike and Ped Improvements Kitson Springs Road: Salt Creek Bridge Kitson Springs Road (M.P. 0.25 to M.P. 0.28) Alignment Description Others Highway 126 Bike Path: Southern Alignment Design Work Only Unknown Corridor Study Special Studies Structures River Road to Division Avenue & Division Avenue to Wilkes Drive Paving Beaver / Hunsaker / Wilkes Corridor Study Right-of-way Unknown Storm Drainage General Construction Curb/Gutter Kitson Springs Road Turn Lanes Kitson Springs Slide Repair 30% Design Bike Lane Category Sidewalks Limit Estimated Construction Cost Range Project Name Shoulder Scope of Work Projects funded for various stages of Lane County planning study or design Federal Lands Access Program grant in the amount of $183,947 has been secured to study the slide area and produce 30% design alternatives. Analyze Hunsaker Lane - Beaver Street between River Road and Division Avenue and evaluate connection of Beaver Street to Wilkes Drive all in relation to the Beltline study, City of Eugene projects, and overall multi-modal connectivity. Lane County has secured STP-U funds for the study in the amount of $174,325. Lane County will provide 12.84% in matching funds totaling $25,675. This planning study may form the basis for future grant applications to fund improvements. Active projects associated with either a current Planning Study or submitted Grant Application(s) Battle Creek Road: Coyote Creek Covered Bridge London Road Culvert @ Cedar Creek Structures Battle Creek Road M.P. Covered Bridge Preservation 0.10 to M.P. 0.13 London Road @ M.P. 5.8 City of Veneta, ODOT & Lane County partnership to construct improvements to provide a viable bicycle route between Veneta and Eugene. ODOT has taken the lead agency roll on this project at this time. $1,500,000 - $2,500,000 Replace Kitsons Springs Road - Salt Creek Bridge which is a 3-Span concrete bridge that is subject to extreme hydraulic loading and scour. Lane County has applied for Local Bridge Program (LBP) funding through ODOT's 18-21 STIP. The project has been selected for scoping on the 150% list indicating that it may be funded through the program. Scoping will occur in March or April 2016. Funding decisions will be made after scoping. If funded, the awarded funding is anticipated to be $3,536,259 and Lane County would be required to provide a 10.27% match of $404,741 to receive funding. $3,941,000 $284,000 Fish Passage $500,000 - $750,000 Sweet Creek Road Culvert @ Sweet Creek Road @ Martin Creek M.P. 2.1 Fish Passage $300,000 - $400,000 Territorial Highway: Gillespie Corners to Lorane Territorial Hwy (M.P. 32.06 - M.P. 37.77) Gillespie Corners to Lorane General Construction $9,000,000 - $9,500,000 Embankment Failures County Wide Preservation / Rehabilitation Unknown Replace deteriorating leaking roof with new roof. Lane County has applied for Local Bridge Program (LBP) funding through ODOT's 18-21 STIP. The project has been selected for scoping on the 150% list indicating that it may be funded through the program. Scoping will occur in March or April 2016. Funding decisions will be made after scoping. If funded, the awarded funding is anticipated to be $254,833 and Lane County would be required to provide a 10.27% match of $29,167 to receive funding. Replace deteriorating culverts with fish friendly arch span. Design work is at 70%. The project is on hold as Lane County seeks grant funding opportunities. This project parallels a Weyerhaeuser Road with similar problems and similar challenges. Lane County and Weyerhaeuser are exploring possible joint solutions. Replace deteriorating culvert with fish friendly arch span. Design work is at 90%. The project is on hold as Lane County seeks grant funding opportunities. Lane County has taken the lead agency roll in an ODOT & Lane County partnership to reconstruct this substandard narrow section of Territorial Highway with the goal of improving safety for multi-modal uses. Lane County received funding and is currently nearing completion of a corridor plan for the section. The study formed the basis of application for 2018-2021 STIP funding in the amount of $1,000,000 to complete project design. It appears at this time that design funding is likely through the State Highway Leverage Program. Lane County and ODOT will continue seeking funding to move this project forward through design and construction. Projects addressing ongoing or emergent safety, preservation or operational improvement of County Roads or Bridges Repair embankment failures at numerous locations county wide. Projects included from past Lane County TSP or input from past CIPs from other agencies 31st / 28th St. City Limits to Yolanda Ave. Bolton Hill Road Phase II Dogwood Ln to UGB Green Hill Road Royal Ave. to Clear Lake High Pass Road Hwy 99 to Oaklea Dr Laura Street Lindale Dr to Q St Prairie Road Maxwell to Beltline General Construction General Construction General Construction General Construction General Construction General Construction Upgrade to urban standards providing better connectivity between local schools on Yolanda Avenue and new development to the south. Upgrade to urban standards providing connectivity to a number of new subdivision proposals. Upgrade facility by constructing curbs, a separated path and/or shoulder widening to improve connectivity and enhance multi-modal transportation opportunities between Royal Avenue and Clear Lake Road. Upgrade to urban standards improving multi-modal connectivity between multiple residential developments and Highway 99. $800,000 - $1,300,000 Upgrade to urban standards improving multi-modal connectivity between residential and commercial areas to the north and south. $1,600,000 - $2,000,000 Upgrade to urban standards Improving multi-modal connectivity as well as freight movement through this heavily traveled truck corridor. $300,000 - $450,000 $1,400,000 - $1,700,000 $2,700,000 - $3,200,000 $2,300,000 - $2,800,000 32 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Project Locat ion M ap 33 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM PROJECT NOTES AND MAP KEY NUMBERS (1) Prairie Road and E Enid Road: The project scope includes providing pavement preservation to a section of Prairie Road and all of E Enid Road. A part of the Prairie Road portion of the project will also include replacement of a deteriorating asphalt concrete walk with a new concrete sidewalk along the west side of the roadway, providing needed connectivity between existing sidewalks north of Carol Ave. and at Irving Rd. to the south.. This project is approved for federal STP-U funding. nd (2) South 2 Street: The project scope includes pavement preservation and structural improvements to the nd Lane County portion of South 2 Street between the beginning of Lane County maintenance and Dorris Ranch Park. The project will also include repair of an embankment failure area, replacement of damaged sidewalks, upgraded and improved bicycle pavement markings, as well as a pedestrian connection between nd the south end of South 2 Street and the Middle Fork Path within Willamalane’s Dorris Ranch Park. The Willamalane Parks and Recreation District will contribute to the project and Lane County will act as the lead agency providing design and construction services to the project. A green bike lane will be added at the nd intersection of Harbor Drive and South 2 Street, improving safe access to the park. This project is approved for federal STP-U funding. (3) Bob Straub Parkway: The intersection at Mount Vernon Road is proposed for a pedestrian crossing. The project scope includes the construction of a Pedestrian Hybrid Beacon System. It is anticipated that this project will be funded with 15-18 STIP Enhance funding. (4) Northwest Expressway: The project scope includes pavement preservation between the Chambers Connector and Irvington Drive. The City of Eugene will participate in the project, providing funding for the portion within the City’s jurisdiction. (5) Marcola School Zone Safety: This project is intended to improve pedestrian safety for students crossing Marcola Road within the school zone in the community of Marcola. Marcola Elementary School is being replaced with a new building adjacent to the existing Marcola High School on Wendling Road. A safety issue has existed for high school students crossing Marcola Road in route to the High School on Wendling Road. The addition of elementary school students heightens the severity of the problem with more vulnerable users. The project will include installation of school zone flashers and upgraded pavement markings better warning roadway users that they are entering a school zone which should help in the reduction of traffic speeds when children are present. 34 Marcola D R G IN ND L WE #5 MARCOLA RD (SCHOOL SAFETY ZONE) RR RIVE D N. COBURG RD ! ( MEADOWVIEW RD (E) Coburg D R (E) D SCENIC DR S PR ING C R DR #1 PRAIRIE RD & E. ENID RD SU RM WILKES DR RIVER LP #1 CA MP CR R D D K HAYDE N BR RD O LD M DR HAYDEN BR RD M CA LAURA ST N D) NB HAYDEN BR WAY O HA W ( WY #4 NW EXPRESSWAY R 19TH ST AH EX PR ES SW AY W E N Z IE VIE 23RD ST GAME FARM RD W ES T MC K DE L T ROYAL AVE TH D LAKE DR RR RIVE NO R DE L TA HW Y (S BN D ) D GROVE ST UP PE R R RM FA ME GA N. RUBY AVE RG ST RD R AY SS W VE AR D H U NSAK ER LN -B E A MA RC OL IRVING RD CO BU RE E XP E ST TH W NOR IE RD PR AIR CLEAR LAKE RD HYACIN TH ST IRVINGTON DR RD CROCKER RD A I RP T E ND RIVER LP #2 E. ENID RD OR RD AWBR EY LN AN BE AC ON HILL R GREEN HILL RD D IE R AIR PR ! ( BEACON DR (W) P CR R D CENTENNIAL BLVD GLENWOOD BLVD Eugene PA R R ST O N R D #3 BOB STRAUB PARKWAY (PED CROSSING) KW AY Y HIL L RD Lane County Roads BA IL E M RD UB GI ILL #2 SOUTH 2ND ST JASP ER RD State Highways PL H TH U A TR BS Interstate Freeways HENDER SON AVE (N) ! ( Springfield BO Projects ! ( S. 57TH ST Lane County Capital Improvement Projects 2017 - 2021 30 TH LORANE HWY AV E 35 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Project Descript ions 37 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Prairie Rd & E Enid Rd Pavement Preservation & Sidewalk Rehabilitation Project Estimated Road Fund Cost $153,682 Map Key No. 1 Project Scope: Pavement preservation on E. Enid and a portion of Prairie Rd; replacement of deteriorating asphalt concrete walk on the west side of Prairie Rd with a new concrete sidewalk between existing sidewalks north of Carol Avenue and at Irving Road to the south. Project Limit Functional Class Length Funding Status IRVING RD – HWY 99 Urban Minor Arterial/ Urban Minor Collector 1.88 miles Grant/Contribution Existing Roadway Condition ADT 3650 Pavement Type Asphalt Concrete PCI Varies Width Varies Road Name Project Status Prairie Rd/E Enid Rd Funded (STP-U) Project Category Project Number Pavement Pres. Crash Rate Sidewalks Curbs Bike Lanes Prairie Road East Enid Road 38 0.51 crash/mil vm LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Define the Problem In a predominately industrial area, these roads are showing significant signs of distress. The heavy truck traffic in this area has the potential to significantly accelerate this deterioration. The 2003 overlay of E Enid Rd is already cracking, among other signs of distress and this section of Prairie Road is also cracking, which could lead to premature failure. The existing asphalt walkway does not provide a complete and long-term connection to existing sidewalks providing safe and convenient active transportation options to local residents. Proposed Solution Prairie Rd, MP 1.09 to1.59: 2” mill & fill in the travel lanes, followed by a 1½” overlay; replacing the asphalt walk with concrete and bringing up the intersections to ADA standards. Prairie Rd, MP 1.59 to 2.03: 3½” mill and fill in the travel lanes, followed by a 2” overlay of the entire surface. E Enid Rd: 2 ½” overlay. Project Cost ($,000s) Project Element Preliminary Engineering Construction Engineering ODOT costs (2%) Construction Total Cost Total FY16-17 FY17-18 FY18-19 FY19-20 FY20-21 $145 $145 $120 $120 $24 $24 $1,207 $1,207 $1,496 $1,496 Funding Source ($,000s) Fund Source Road Fund a STP-U Funding b Total Fund Total FY16-17 FY17-18 FY18-19 FY19-20 FY20-21 $153 $153 $1,343 $1,343 $1,496 $1,496 Factors for Project Selection Safety Improvement Structural Capacity Enhancement Congestion Improvement Provides Bike /Ped Connectivity Leverages Other Projects/Funds Degree of Users Benefit Plan Consistency Economic Development Supports Tourism, Recreation Preserves Bridge / Pavement Has Public Requests / Support Total Factors Considered a This is the amount shown in the CIP and represents the Lane County required match for Surface Transportation Program – Urban (STP-U) funds. b This is the amount of STP-U funds awarded to the project, and represents 89.7% of project costs. 39 5 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM South 2nd Street Pavement Preservation M.P. 0.36 to M.P. 0.88 Map Key No. 2 Estimated Road Fund Cost $67,846 Project Scope: Pavement preservation of the County portion of S. 2nd Street from the beginning of County maintenance to Harbor drive and will include sidewalk repair as well as necessary sidewalk ramp replacement to meet ADA standards. The project will also include a green bike lane at the intersection with Harbor Drive, and a new sidewalk connection between S. 2nd St. and the Middle Fork Path within Dorris Ranch. Project Limit Functional Class Length Funding Status MP 0.36 to 0.88 Urban Major Collector 0.52 miles Grant / Contribution Existing Roadway Condition ADT 1300 PCI 64 Width 28 Lanes 2 Pavement Type AC Road Name Project Status Project Category Project Number Crash Rate Sidewalks Curbs Bike Lanes Pedestrian Traffic S. 2nd St. ( north) Vicinity Map S. 2nd Street Funded (STP-U) Pavement Pres. 0.48 crash/mil vm S 2nd St (south at park entrance) 40 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Define the Problem S. 2nd Street has significant signs of distress; pavement preservation will serve to avoid more costly repairs in the future. Several sidewalk sections are in need of repair. The current bike lane terminates abruptly at the intersection before the park entrance, with a right-turn conflict between modes, and would be improved with pavement markings. There is not a good connection presently between the Middle Fork Path and S 2nd Street. Proposed Solution The pavement travel lanes will be milled & filled, and upon completion the entire road surface will be upgraded with an asphalt overlay. The work will also include stabilization repairs, replacement of damaged sidewalks, and new pavement markings. A green bike lane will be added at the intersection of Harbor Drive and S. 2nd Street to improve safety and provide better bicycle access into the park. The project includes a new sidewalk connection between S. 2nd Street and the Middle Fork Path within Dorris Ranch Park. Bike and pedestrian markings will be replaced to improve visibility and safety throughout the project. The improvements will benefit all travel modes. Project Cost ($,000s) Project Element Preliminary Engineering Construction Engineering ODOT costs (2%) Construction a Total Cost Total FY16-17 FY17-18 FY18-19 FY19-20 FY20-21 $82 $82 $71 $71 $10 $10 $579 $579 $742 $742 Funding Source ($,000s) Fund Source Road Funda Willamalane STP-U Funding b Total FY16-17 FY17-18 FY18-19 FY19-20 FY20-21 $67 $67 $68 $68 $607 $607 Total Fund Factors for Project Selection Safety Improvement Structural Capacity Enhancement Congestion Improvement Provides Bike /Ped Connectivity Leverages Other Projects/Funds Degree of Users Benefit $742 $742 Plan Consistency Economic Development Supports Tourism, Recreation Preserves Bridge / Pavement Has Public Requests / Support c Total Factors Considered a 8 This is the amount shown in the CIP and represents the Lane County required match for Surface Transportation Program – Urban (STP-U) funds. b This is the amount of STP-U funds awarded to the project, and represents 81.8% of project costs. 41 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Bob Straub Parkway: Mt. Vernon Road Intersection Improvements Bob Straub Parkway at MP 0.87 Estimated Road Fund Cost $21,000 Map Key No. 9 Project Scope: Improve pedestrian crossing at the Bob Straub Parkway / Mt. Vernon Road intersection by installing the Pedestrian Hybrid Beacon system Project limit MP 0.86 to 0.87 Project Status Length Road Name 0.1 Bob Straub Parkway Project Category Functional Class Existing Roadway Condition ADT 9,000 Pavement Type Asphalt Concrete PCI ~90 Width 76 feet 15-18 STIP Enhance Funding Anticipated Safety Improvement Minor Arterial Crash Rate Sidewalk None on BSP Curb Bike Lane /Shoulder Proposed Pedestrian Hybrid System Vicinity and Project Area Maps 42 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Define the Problem The City of Springfield forecasts the intersection of Bob Straub Parkway (BSP) and Mt. Vernon Road will have a high level of pedestrian traffic when the Jasper-Natron area is fully developed. BSP is a high-speed facility (55 mph), and crossing the 76-foot wide facility is intimidating and unsafe for pedestrians. As traffic on the facility increases over the years, pedestrian crossing will be more challenging. Proposed Solution The City explored 17 different mitigation options to address the pedestrian safety issue. The Pedestrian Hybrid Beacon system a is recommended as a solution for this area. The system assembly would display red indicator followed by flashing red beacon, when a user wishing to cross BSP initiates the beacon display. The system is bike friendly. Project Cost ($,000s) PROJECT ELEMENT Preliminary Engineering Right-of-way Construction Engineering Construction Utility relocation Total Cost Funding Source ($,000s) FUND SOURCE City of Springfield (Match) b Road Fund c STIP Enhance Funding TOTAL FY16-17 FY17-18 FY18-19 FY19-20 FY20-21 $21 $21 $17 $162 $17 $162 $200 $200 TOTAL FY16-17 FY17-18 FY18-19 FY19-20 FY20-21 $20 $20 $21 $21 $159 $159 Total Fund Factors for Project Selection Safety Improvement Structural Enhancement Congestion Improvement Provides Bike/Ped Alternative Degree of Users Benefits Leverages Other Projects/Funds $200 $200 Plan Consistency Economic Development Support Tourism, Recreation Preserves Bridge / Pavements Has Public Support (Public Request) d Total Factors Considered a 9 The Roads Advisory Committee in February 2011 reviewed pedestrian safety options for BSP and recommended the Pedestrian Hybrid Beacon System for inclusion in the County CIP as an unfunded Project for Development project. Staff anticipates the project will be funded with a 15-18 STIP Enhance award. b The City of Springfield will provide $20,000 in match funds as part of the required 10.27% match for the STIP Enhance funding. c Lane County will provide a Road Fund allocation of $20,540 to meet the balance of the required 10.27% match and to provide an overmatch of $20,000. The overmatch amount has made the project more competitive and has helped in securing the likely funding for this project. d This project is in the CIP with the request from the City of Springfield. Previously, the City Council received a public petition for a safety project at this location. 43 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Northwest Expressway Pavement Preservation Estimated Road Fund Cost Map Key No. 4 Project Scope: Pavement preservation on NW Expressway Project Limit Functional Class Length Funding Status MP 0.00 to 4.45 (w/city) Urban Minor Arterial 4.45 miles SRS(2016)/City Eugene Existing Roadway Condition ADT 8276 (2011) Pavement Type Asphalt Concrete PCI Varies (but less than 76 reported in 2014 ) Width 40 feet Road Name Project Status Project Category Project Number Crash Rate Sidewalks Curbs Bike Lanes North South Vicinity Map 44 NW Expressway Secure Rural Sch. Pavement Pres. 0.46 crash/mil vm LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Define the Problem The County portion of the Northwest Expressway was last resurfaced with an open graded hot mix asphalt concrete pavement. Despite a fog seal in 2013, the road continues to deteriorate and is in need of a surface preservation as raveling and cracking continue to accelerate. Between the Chambers Connector and Irvington Drive, there are two City of Eugene sections which total 0.934 miles. The city sections are in very poor condition, as they have received less maintenance than the county sections. The project scope includes pavement preservation between the Chambers Connector and Irvington Drive, including both city and county sections of roadway. The City of Eugene will participate in the project, providing funding for the portion within the City’s jurisdiction. Proposed Solution Design alternatives are being reviewed to achieve a 20 year design life and stay within the project budget. Because the SRS monies were only recently allocated to the CIP, a cost has not yet been determined for the City of Eugene portion of the project. The tables below include only estimated Lane County project costs. City of Eugene costs will be determined and reimbursed by the city as the project progresses. Project Cost ($,000s) Project Element Preliminary Engineering Construction Engineering City Portion of Project Construction Total Cost a Total FY16-17 FY17-18 FY18-19 FY19-20 FY20-21 TBD TBD TBD TBD TBD TBD $1,100 $1,100 $1,100 $1,100 Funding Source ($,000s) Fund Source SRS (2016 payment) City of Eugene Portion Total Fund b Total FY16-17 FY17-18 FY18-19 FY19-20 FY20-21 $1,100 $1,100 TBD TBD $1,100 $1,100 Factors for Project Selection Safety Improvement Structural Capacity Enhancement Congestion Improvement Provides Bike /Ped Connectivity Leverages Other Projects/Funds Degree of Users Benefit Plan Consistency Economic Development Supports Tourism, Recreation Preserves Bridge / Pavement Has Public Requests / Support Total Factors Considered a 5 The total project cost shown does not include yet to be determined (TBD) costs for the City of Eugene portion of the project. The estimated construction cost of the County portion of the project is shown. b The total project funding shown does not include yet to be determined (TBD) funding from the City of Eugene for their portion of the project. The county portion of the project will be funded from one-time 2016 SRS funding. 45 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Marcola Road School Safety Zone Estimated Road Fund Cost: Map Key No. 5 Project Scope: Addition of pavement markings and flashers Project Limit Functional Class Length Funding Status MP 11.50 to 11.65 Rural Major Collector 0.15 miles SRS(2016) Existing Roadway Condition ADT 2257 (2011) Pavement Type Asphalt Concrete PCI Not Applicable Width Not Applicable Road Name Project Status Project Category Project Number Crash Rate Sidewalks Curbs Bike Lanes North South Vicinity Map 46 Marcola Road Secure Rural Sch. Safety 0.88 crash/mil vm LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Define the Problem Marcola Elementary School is being replaced with a new building adjacent to the existing Marcola High School on Wendling Road. A safety issue has existed for high school students crossing Marcola Road in route to the High School on Wendling Road. The addition of elementary school students heightens the severity of the problem with more vulnerable users. Proposed Solution This project is intended to improve pedestrian safety for students crossing Marcola Road within the school zone in the community of Marcola. The project will include installation of school zone flashers and upgraded pavement markings better warning roadway users that they are entering a school zone which should help in the reduction of traffic speeds when children are present and provide for safer crossing of Marcola Road. Project Cost ($,000s) Project Element Total Construction Total Cost a Funding Source ($,000s) Fund Source $50 $50 Total SRS (2016 payment) Total Fund b $50 $50 FY16-17 FY17-18 FY18-19 FY19-20 FY20-21 $50 $50 FY16-17 FY17-18 FY18-19 FY19-20 FY20-21 $50 $50 Factors for Project Selection Safety Improvement Structural Capacity Enhancement Congestion Improvement Provides Bike /Ped Connectivity Leverages Other Projects/Funds Degree of Users Benefit a b Plan Consistency Economic Development Supports Tourism, Recreation Preserves Bridge / Pavement Has Public Requests / Support Total Factors Considered 5 The estimated cost of the project includes the costs of school zone flashers and upgraded pavement markings. This project will be funded from one-time 2016 SRS funding. 47 LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM Lane County Public Works Department 3040 North Delta Highway Eugene OR 97408-1696
© Copyright 2026 Paperzz