Long Form Subcontract

Subcontract Agreement
THIS SUBCONTRACT (the “Subcontract”) is made as of this
day of
, 20
(“Effective Date”) by and between the
Contractor and Subcontractor as identified below. Capitalized terms used in this document entitled Subcontract Agreement and not
defined herein shall have the meanings assigned to them in Exhibit E.
PROJECT NAME:
PROJECT ADDRESS:
PROJECT NUMBER:
SUBCONTRACT NO.:
VENDOR NO.:
COST CODE REFERENCE:
CONTRACTOR:
Skanska USA Building Inc.
HOME OFFICE ADDRESS:
SUBCONTRACTOR:
ADDRESS:
CONTACT:
el
p
m
a
CONTACT:
TELEPHONE:
TELEPHONE:
FACSIMILE:
FACSIMILE:
CONTRACTOR’S LICENSE NUMBER (IF REQUIRED):
SUBCONTRACTOR’S LICENSE NUMBER (IF REQUIRED):
WHEREAS, Contractor has entered into a contract with
(the “Owner”) dated as of the
day of
, 20
“Owner Contract”) to perform the construction and related work and services at the project commonly referred to as
“Project”):
OWNER:
ADDRESS:
S
(the
(the
ARCHITECT:
ADDRESS:
TELEPHONE:
FACSIMILE:
WHEREAS, Subcontractor desires to perform, and Contractor has agreed to enter into this Subcontract with Subcontractor for the
performance of, a portion of the work required to complete the Project.
NOW THEREFORE, for and in consideration of the covenants and agreements of the parties contained herein, Contractor and
Subcontractor agree as follows:
1.
Subcontractor agrees to perform and complete the work required by this Subcontract, which generally consists of the
“Work”).
2.
As full consideration for complete performance of the Work, and except for increases or decreases by Change Order as provided
for in Exhibit E, Subcontractor shall be paid the lump sum of
Dollars ($
) (the “Subcontract Amount”).
3.
Subcontractor
is
is not (Mark the appropriate box with an “X”) required to provide performance and payment bonds
securing the performance of the Work and the payment of Sub0subcontractors. Subcontractor
is
is not (Mark the
appropriate box with an “X”) required to enroll in Contractor’s Subguard performance insurance program.
Page 1 of 2
Subcontract Agreement
(06/2006 ed. Rev. 1)
(the
4.
Subcontractor shall perform the Work in accordance with and comply with all requirements contained in the following Exhibits,
each of which is included as an integral part of the Subcontract:
Exhibit A:
Exhibit B:
Exhibit C:
Exhibit D:
Exhibit E:
Exhibit F:
5.
MANDATORY SUBCONTRACT EXHIBITS
Scope of Work/Supply and
Exhibit G:
Skanska Standard Insurance Requirements
Clarifications/Qualifications
Drawings and Sketches, Specifications,
Exhibit H:
Skanska Standard Interim Estimate for
Addenda and Other Documents
Payment, Waiver and Release
Alternates, Unit Prices and Labor Rates
Exhibit I:
Skanska Standard Final Estimate for
Payment, Unconditional Waiver and
Release
Project Schedule/Milestones
Exhibit J:
Skanska Standard Subcontractor
Environmental Health and Safety
Requirements
Skanska Standard Subcontract Terms and
Exhibit K:
Skanska Standard Change Order
Conditions
Skanska Code of Conduct
Exhibit N:
Supplemental Terms and Conditions for use
in the State of WA
el
p
m
a
Subcontractor shall also perform the Work in accordance with and comply with all requirements contained in the Exhibits marked
in the following list, each of which marked Exhibit is included as an integral part of the Subcontract (Indicate which Exhibits
apply by inserting an “X” in the box next to the Exhibit):
Exhibit L:
Exhibit M:
Exhibit O:
Exhibit P:
Exhibit Q:
Exhibit R:
Exhibit S:
Exhibit T:
Exhibit U:
OPTIONAL SUBCONTRACT EXHIBITS
Supplemental Terms and Conditions for
Exhibit V:
Guarantee to Owner
Federal Government Projects
Project Specific Requirements
Exhibit W:
Owner Confidentiality and Non0
Disclosure Requirements
Payment and Performance Bonds
Exhibit X:
Site Requirements and Logistics
Reserved
Exhibit Y:
Supplemental Terms and Conditions for
Subcontractors with Design
Responsibility
Skanska Standard Environmental Insurance
Exhibit Z:
Not Used
Requirements
Project Specific Quality Management
Exhibit PS1: Reserved
Program
Reserved
Exhibit PS2: Reserved
Reserved
Exhibit PS3: Reserved
Sub0subcontractor Identification
Exhibit PS4: Reserved
S
IN WITNESS WHEREOF, Contractor and Subcontractor have executed this Subcontract to be effective as of the Effective Date.
Contractor:
Subcontractor:
SKANSKA USA BUILDING INC.
By:
By:
(Signature)
(Date)
(Signature)
(Date)
(Printed Name)
(Title)
(Printed Name)
(Title)
Page 2 of 2