by quad

Quads
001
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Bunker, Victoria
2008
Phase I Archaeological Survey and Identification of Site ME 1.11.
MHPC
Document #
1990
Jane Potter, Andrea Green
South Berwick Hydroeledtric Project Phase I Archaeological Survey Report.
3777
2615
Burgess, William
2008
Route 236 Bridge Replacement Project (PIN 15609.00).
3762
Eldridge, Stuart A.
2003
Report on Phase I Archaeological Survey of the D. Thompson Pier.
3318
Feighner, Edna
1999
Report on Phase I Archaeological Survey of the Eliot Metering and Regulating Station.
3063
Hamilton, Nathan D.
2005
Report on Phase 0 Archaeological Survey of the Littlebrook Airport Subdivision.
3519
2002
Report on Phase I Archaeological Survey of the Proposed Assisted Care Living Complex, Eliot.
3253
Kellogg, Douglas
1999
Kevin Simons
Phase III Data Recovery Excavations at the Neal Garrison Paleoindian Site.
3087
Mack, Karen
2010
Richard Will
Results of Phase I/II Precontact Archaeological Survey Public Service Co of New Hampshire's Eliot Substation
3962
Moore, Edward
3212
2001
Rick Will
Report on Phase I Archaeological Survey of the Proposed Eliot Natural Gas Compressor Station, York County, Maine.
Valimont, Brian
2011
Shorey's Brook Dam Removal and Stream Restoration, South Berwick and Eliot, Phase I Archaeological Survey
4016
3760
2008
Proposed Floating Dock, 4 Cove Landing.
2007
Proposed Pier and Access Ramp, 30 Eventide Road, Eliot.
3723
2006
Report on Phase I Archaeological Survey of the Eliot Business Park.
3520
2006
Report on Phase I Archaeological Survey of Proposed Pier, Ramp and Float, Houde Road, Eliot.
3567
Wheeler, Kathleen
1994
Results from the Spring 1994 Archaeological Investigation at the Hamilton House, South Berwick.
2807
Will, Richard T.
2003
Report on the Phase I Archaeological Survey of the Proposed Three Rivers Substation Expansion, Eliot.
3340
Wilson, Deborah B.
1997
Report on Phase I Archaeological Survey of the River Run Trail, Vaughn Woods State Park.
2954
001, 002
Bouras, Edward
2010
Result of Archaeological Walkovers for the Great Works Regional Land Trust, York County
4118
001,002,004
Kellogg, Douglas
1997
K.Wheeler, R.Kingsley
Report on Phase IB Archaeological Survey of the PNGTS Pipeline, New Hampshire and Maine.
2996
001,003,004, John Milner Associates
1993
Granite State Gas Phase IA Archaeological Survey of the Hanesville to Portland Pipeline.
007,008
3662
001,004
2956
Kellogg, Douglas
1997
Report on Phase II Archaeological Evaluation of Prehistoric Sites, Joint Pipeline Project.
001,004,007, Clark, James
2007
Scope of Archaeological Recon Survey for the Maguire Road Project.
008
3663
001,013,033, Feighner, Edna
1999
022
Cultural Resource Management Report-PNGTS.
3064
Elena Lippotis
Quads
002
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Baker, Emerson W.
2012
Phase I Test Excavations at 165-175 River Road, York, Maine
Bunker, Victoria
2007
Supplemental Phase I Lewis Farm Subdivision.
MHPC
Document #
4101
3712
1990
Phase I Archaeological Survey of the Bolt Hill to York Harbor Project.
Eldridge, Stuart A.
2007
Report on Phase I Archaeological Survey of Craig Briggs' Dock Installation, York.
2606
3735
2006
Report on Phase I Archaeological Survey of a Dock Installation, Al Shair Property, Kittery.
3551
2003
Report on Phase I Archaeological Survey of the Robinson-Anderson Pier, Kittery Point.
3313
Hardlines Design Co.
2010
Integrated Cultural Resources Management Plan, Portsmouth Naval Shipyard
Mercer, Henry C.
1897
An exploration of aboriginal shell heaps revealing traces of cannibalism on the York River, Maine.
Publications of University of Pennsylvania, Series in Philology,Literature and Archaeology. 6:111-137
Valimont, Brian
2012
Prehistoric Archaeology Report For Quarters N (ME 2.29), Portsmouth Naval Shipward
3969
4055
2010
Archaeological Monitoring Proposed Rock Pile Removal, Mt. Agamenticus, York
3927
2009
Archaeological Phase I, Proposed Pier, Ramp, Float, 35 Major McIntire Rd., York
3902
2009
Archaeological Phase I Survey Proposed Residence, 134 Cider Hill Road, York
3869
2008
Report on Phase I Archaeological Survey of Driveway and House Construction at 6 Schooner Landing.
3775
2007
Report on the Phase I Archaeological Survey of the Proposed Sewer Pump and Valve Replacement.
3670
Wheeler, Kathleen
1995
Richard Will
2871
Archaeology on Clark's Island, Portsmouth Naval Shipyard.
Will, Richard T.
1986
Rebecca Cole-Will
2449
A Survey for Prehistoric Archaeological Sites, York,Maine
002, 033,
028
Haugh, Sarah
2013
Three Ring Binder Project, Round 2 Replacement Telephone Pole survey
4139
002,005
Will, Richard T.
1986
A Report of a Preliminary Survey for Prehistoric Archaeological Sites in York County, Maine
2441
002,005,008
003
1995
EmersonBaker,J.Cormier,J.Clark
Rachel Carson National Wildlife Refuge Historic and Prehistoric Archaeological Resource Survey.
2862
Bradley, Bruce
2013
The Lord-Collins Site (MAS #3.12): A Late Pleistocene Human use of Southeastern Maine?
4167
Clark, James
2006
Report on Phase I Archaeological Survey of the CMP Section 118 Rebuild.
3608
Eldridge, Stuart A.
2005
Phase II Archaeological Survey Report: Deerfield Estates Subdivision Project, North Berwick, York Co., Maine.
3463
2002
Janelle Lavallee
Report on Phase I Archaeological Survey of the Deerfield Estates Subdivision, North Berwick.
Hamilton, Nathan D.
2007
Report on Phase I Archaeological Survey of the Al Darraji Residential Subdivision.
3262
3704
Quads
003
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Hamilton, Nathan D.
2006
3569
An Archaeological Phase I Survey of the Proposed James Austin Residential Subdivision off Governor Goodwin Road,
North Berwick, Maine.
2006
3581
An Archaeological Phase I Survey of the Proposed Ferguson Brook Residential Subdivision off Old Pine Hill Road and
Sullivan Street, Berwick, Maine.
2005
An Archaeological Phase I Survey of the Proposed Veterans Cemetery off Stanley Road, Springvale, Maine.
3631
2003
Report on the Phase I Archaeological Survey of the Italo Lane Subdivision.
3347
Moore, Edward
2013
Phase I Archaeological Resource Survey Section 116 Transmission Line, Berwick Reinforcement (CMP) Project
4111
2013
Phase I Archaeological Resource Survey: Section 185 Transmission Line Reinforcement (CMP), Berwick
4110
2013
Phase II Archaeological Evaluation of Site 3.15, Precontact Archaeological Site, Sanford, within the Berwick
Reinforcement Project (CMP)
4108
Mosher, John P.
2012
Phase I Archaeological Survey of the Tibbetts Farm LMF Conservation Easement, Berwick
1992
Nathan D. Hamilton
4098
2724
An Archaeological Phase I Survey of the Proposed Lebanon Sand and Gravel Mineral Extraction Site, Lebanon, Maine.
1990
Rob Florentin & N. D. Hamilton
Archaeological Phase I Testing of Monticello Estates Subdivision, Berwick.
Shaffer, Gary
2013
Field Assessment for Brian Gibbons, Berwick
2013
Field Assessment for Nancy Sewell's Tract 1723, Berwick and North Berwick
003,004
2579
4136
4134
Tomaso, Matthew S.
1990
R.Florentin,J.Mosher,NHamilton
Archaeological Phase II Testing of the Monticello Estates, Berwick.
2612
Valimont, Brian
2009
Proposed Pepin & Sons Gravel Pit, Twombley and Old Mill Roads, Sanford
3897
2009
Proposed Gravel Pit, Sanford, Phase I, II and III Archaeological Investigations
3862
2008
Phase I Archaeological Investigation of the Proposed Gravel Pit, Sanford.
3783
2007
Mill Yard Walk and Community Garden, Sanford: Phase I Archaeological Investigation.
3716
Wilson, Deborah B.
1991
Report on Phase I Archaeological Survey of Hillcrest Nursing Home Site, Sanford.
2663
Bunker, Victoria
1998
Report on the Phase I Archaeological Survey of Noble Hill High School, North Berwick.
3020
1990
Phase I Archaeological Survey Section 112, Inland Corridor Project, Sanford to South Gorham.
2563
003,004,005, Will, Richard T.
1997
Deborah Cox
008
Cultural Resources Investigations, Joint Pipeline Project, Archaeological Survey.
2944
003,004,007, Bunker, Victoria
1990
Jane Potter
008
Phase I Archaeological Survey Section 182-186 Inland Corridor Project, Sanford to South Gorham, ME.
2601
Quads
003,007
004
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Bunker, Victoria
1991
Jane Potter
Conclusion to Phase I Archaeological Survey Section 182-186 Inland Corridor Project.
MHPC
Document #
2641
Mosher, John P.
1991
Nathan Hamilton, Thomas Bennet
Phase II Archaeological Testing at Four Prehistoric Sites on Sections 182 and 186 of the Southern Inland Project.
2675
Bibber, Marjorie
1990
Rob Florentine, N.D.Hamilton
Archaeological Phase I Testing of Cold Water Farms Subdivision, Kennebunk.
2589
Bouras, Edward
Beach Plum Farm Preliminary Walkover.
2008
3758
Bunker, Victoria
1990
A.Green,J.Potter,A.Strauss
2607
Estes Lake Hydro Project Phase I Archaeological Survey.
Burgess, William
2005
Arthur Spiess
Kennebunkport Greenbelt Initiative Archaeological Survey for LMFB.
2002
Arthur E. Spiess
Denet Bridge Replacement (PIN 8943.00) Archaeological Phase II Testing (Site 4.18).
Callum, Kathleen
1994
Geoarchaeological Investigations at the Hedden Site.
Corey, Richard
2004
3518
3224
2823
Robert Bartone
3427
Report on Phase I/II Archaeological Survey of the Proposed Biddeford-Saco Water Co. Transmission Main.
Doucette, Diana PAL
2010
Phase I Archaeological Survey Rachel Carson National Wildlife Refuge Tract 11007c Project Area
3943
Doucette, Dianna
2010
Phase I Survey Rachel Carson National Wildlife Refuge Tract 11007c, Wells
4081
Eldridge, Stuart A.
2005
Sarah M. Haugh
3467
Phase IA and IB Archaeological Survey Report: "The Cornfield" Lot 51 Residential Subdivision Project, Alfred, York Co.,
Maine.
2004
Report on Phase I Archaeological Survey of the Amirault Lot 33 Access Project.
3413
2001
Phase IA Archeological Survey of the Sanford Gravel Pit.
3186
Feighner, Edna
2000
PNGTS Cultural Resources, Post Construction Monitoring Report: Year Two, Assessment Two.
3144
Hamilton, Nathan D.
2008
Report on the Phase I Archaeological Survey of the Proposed 37 Lot Residential Subdivision, Bragdon Road.
3767
2008
Report on Phase I Archaeological Survey of the Proposed Arundel Seasonal Cottages (Whitten and Porter parcels).
3754
2007
Report on Phase I Archaeological Survey of the Proposed Marshwood Estates Expansion.
3706
2007
3709
An Archaeological Phase I Survey of the Proposed North Country Land Gravel Pit between Route 4 and Bernier Road,
Sanford.
2007
Report on Phase I Archaeological Survey of the Cedar Woods Subdivison, Bernier Road.
3718
2006
Report on Phase I Archaeological Survey of the Proposed Summer Village Development-Cole Parcel.
3559
2004
An Archaeological Phase I Survey of the Proposed Genest Concrete Retail Center - Route 109, Sanford, Maine.
3407
Quads
004
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Hamilton, Nathan D.
2004
Report on Phase I Archaeological Survey of the Proposed Kennebunk Pond Road Gravel Pit, Lyman.
MHPC
Document #
3405
2003
Report on Phase 0 Archaeological Survey of the Arundel Woods Campground.
3367
2000
Report on the Phase I Archaeological Survey of the Proposed Hampton Glen Condominium Development.
3141
2000
Report on the Phase I Archaeological Survey of the Proposed York County Jail Property.
3143
1996
Letter on Phase I Archaeological Survey of the Ocean Breeze Golf Resort, Wells.
2923
1988
Thomas C. Bennett
2514
An Archaeological Phase 1 Survey of the Proposed Sea Road School - SAD 71 Kennebunk, Maine
Haugh, Sarah
2008
Report on Phase I Archaeological Survey of the Oakwoods Driveway Expansion.
3769
Hedden, Mark H.
1992
Arthur Spiess
Maine Turnpike Exit 2 North Bound Ramp Phase I Archaelolgical Survey Report.
2726
1992
Arthur Spiess & Leon Cranmer
2734
Portland - Boston Rail Study, Wells Station.
Hight, Shelley
Report on Wells Human Remains
2007
Josephs, Richard
2004
3668
Arthur Spiess
Micromorphological Investigations at the Hedden Site (4.10), a Buried Occupation along the Southern Maine Coast
Current Research in the Pleistocene 21:53-55
Kellogg, Douglas
1996
Kathleen Wheeler
2893
Report on Phase I Archaeological Survey of Two Proposed Access Roadsfor Proposed Granite State Gas Pipeline, Wells.
1995
2852
Report on the Phase I Archaeological Survey of the Proposed Granite State Transmission Lynfield Natural Gas Facility,
Wells.
2878
1995
Wells Maine LNG Facility (Letter).
Mack, Karen
2011
Maine Power Reliability Project Kennebunk Plains off right of way road
4042
Mosher, John P.
2005
3455
Report on Phase I Archaeological Survey of the Kennebunk Plains LMFB Purchase in Kennebunk and Sanford, Maine.
1993
Arthur Spiess
2769
1992 Field Season at the Hedden Site.
Smith, J. N. Leith
2010
Archaeological Reconnaissance Survey, Oliver Nutter House Site MDOT PIN 16677, Alfred
3925
Sorg, Marcella
2006
Report on Skeletal Remains, Rachel Carson National Wildlife Refuge.
3632
Spiess, Arthur E.
1995
JMosher,K.Callum,N.Asch Sidell
Fire on the Plains: Paleoenvironmental Data from the Hedden Site.
MAS Bulletin, 35:1:131995
John P. Mosher
2873
The Hedden Site 1994 Season: Progress on Environmental Reconstruction.
1994
John Mosher
Fire on the Plains: The Hedden Paleoindian Site Report on the 1993 Field Season.
2830
Quads
004
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Spiess, Arthur E.
1994
John Mosher
Hedden: A Paleoindian Site on the Kennebunk Plains.
MAS Bulletin, 34:2, 25-54.
1990
Mark Hedden
Archaeology on the Kennebunk Plains.
MHPC
Document #
1979
Cultural Resources Survey: Rachael Carson National Wildlife Refuge Headquarters Parcel.
Valimont, Brian
2011
Proposed Boat Launch, Intervale Road, Kennebunk
2610
2772
4023
2010
Phase I Proposed Pier, Ramp and Float, Seagrass Lane, Kennebunk
3951
2009
Proposed Kennebunk cell tower, Webber Hill Road
3848
2009
Proposed Anderson Cell Tower, North Berwick
3851
2009
3849
Proposed Sanford Cell Tower
2008
Proposed Snowmobile Trail Bridge, Southern Maine Sno-goers.
3768
2008
Report on Phase I Archaeological Survey of the Proposed Brackett Hill Road Bridge Repair.
3741
2007
Report on Phase I Archaeological Survey of the Proposed Oaks Residential Subdivision.
3724
2007
Proposed Levee Kennebunk Wasewater Treatment Facililty: Phase I Archaeological Investigation.
3714
Wade, Steve
1992
D.A. Hurd Library Artifact Collection, North Berwick.
2683
Wheeler, Kathleen
1995
T. Crist
Report on the Phase II Evaluation of Proposed Granite State Gas Transmission, Inc. LNG Facility, Wells.
2859
Will, Richard T.
2886
1995
James Clark
Report on Phase I Archaeological Survey of the Amdiral's Pond Subdivision, Kennebunk.
Wilson, Deborah B.
2004
Report on Phase I Archaeological Survey of the Kennebunk Marketplace Shopping Center.
004,005
3375
2003
Report on the Phase I Archaeological Survey of the Taylor Estates Subdivision.
3348
2002
Report on Phase I Archaeological Survey of the Alfred Water District's Proposed Well, Access Road, Pump Station.
3243
2002
Report on Phase I Archaeological Survey of the Keywork Manor Development.
3216
1991
Report on the Phase I Archaeological Survey of the Genest Gravel Pit in Alfred.
2673
1991
Preliminary Phase I Archaeological Survey of the Proposed Marsh Brook Estate Mobile Home Park, Sanford.
2629
1993
Report on the Phase I Archaeological Survey of a Proposed Retail Site in Biddeford.
2765
004,005,007, Mosher, John P.
1992
Springs Island and Bradbury Dams Drawdown on the Saco River in Biddeford - Saco: Phase I Archaeological Canoe
008
Survey.
2727
Quads
004,005,008
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Cranmer, Leon E.
1991
Arthur Spiess
Maine Turnpike Wetlands Creation Archaeological Survey Report.
Spiess, Arthur E.
Turnpike Archaeology.
MAS Bulletin, 38:1:1-22.
1998
2677
Mark Hedden, Leon Cranmer
1991
Robert Bradley
Responses to Maine Turnpike Widening Question, Army Corps of Engineers.
1990
MHPC
Document #
Leon Cranmer and Mark Hedden
2973
2562
Maine Turnpike Widening, Archaeological Phase II Study.
1988
L. Cranmer,C.Monahan,E.BakerJr
2516
An Archaeological Phase I Survey of the Maine Turnpike Widening Project in Southern Maine.
004,007,008
Clark, James
2002
Archaeological Survey Report: Maine Power Reliability Program, Segment 24.
004,008
Slater, Lee D.
2000
N.Hamilton,S.Sandberg,M.Jankowski
Magnetic Prospecting at a Prehistoric and Historic Settlement in Maine.
Archaeological Prospection 7:31-41 (2000).
004,033,049, Gramly, R. Michael
1979
Report on Archaeological Reconnaissance of the Gilead and Bethel 7.5' Quadrangles, Oxford County, Maine
065,081+
3791
3301
2129
004,12,23,39 Pollock, Stephen G.
1999
N. Hamilton, R. Bonnichsen
3156
,36,81,+
Chert form the Munsungun Lake Formation (Maine) in Paleoindian Arch. Sites in NE North America: Recognition of its
Journal &ofDistribution.
Archaeological Science (1999): 26:269-283.
Occurrence
004,12,23,39
,36,81,1
1999
N. Hamilton, R. Bonnichsen
Chert from the Munsungun Lake Formation (Maine) in Palaeoamerican Archaeological Sites in NE North
Journal of Archaeological
Science (1999):
26:269-283.
America:Recognition
of its Occurrence
& Distribution.
004,7,15,27, Sidell, Nancy Asch
1999
Prehistoric Plant Use in Maine:Paleoindian to Contact Period.
53,69,90
Current Northeast Paleoethnobotany, edited by John P. Hart. New York State Museum Bulletin:494:191-223.
005
Burgess, William
2005
John P. Mosher
Phase I Archaeological Testing of the LMFB Acquisition at Ferry Beach State Park.
3445
Cole-Will, Rebecca
2006
Archaeological Monitoring of Residence Construction, UNE.
3572
Cowie, Ellen R.
3153
2000
Geraldine Baldwin
A Report on the Phase I Archaeological Survey of Parkside by the Falls.
Crane, Pamela
2008
Peter Morrison
New Float and Dock, Goat Island, Cape Porpoise Harbor.
3784
Fathom Research LLC
2010
Remote Sensing Archaeological Survey, Camp Ellis Beach, Saco
3974
Hamilton, Nathan D.
2004
Report on Phase I Archaeological Survey of the Richardson Brook Subdivision.
3421
1985
James B. Petersen
2169
Archaeological Survey and Testing of the Proposed Biddeford Airport Runway, Extension, York County, Maine
Lore, Robert J.
2006
Adaptations in the Edge Environment: Faunal Analysis of an Armouchiquois Indian Village
Maine Archaeological Society Bulletin 46(1):1-22
Mack, Karen
2000
Richard Will
Results of Phase III Archaeological Testing of the Proposed University of New England's Marine Studies Center,
Biddeford.
1999
Richard Will
Additional Phase I Archaeological Survey ofthe Proposed University of New England Marine Center.
3095
3056
Quads
005
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Valimont, Brian
2011
Proposed Diamond Match Park, City of Biddeford
MHPC
Document #
4017
Will, Richard T.
1998
Karen Mack
Report on the Phase I Archaeological Survey of the Proposed University of New England's Marine Studies Center.
3016
005,008
Haugh, Sarah
2007
Report on Phase I Archaeological Survey of the Lincoln Street River Access Project, Saco.
3672
006
Corey, Richard
3820
2006
Robert Bartone
Archaeological Phase I Survey of the Proposed Moose Pond Subdivision Project, Acton
Eldridge, Stuart A.
2009
Sarah Haugh
3889
Phase I Archaeological Report Shapleigh Gravel Pit Project
Freedman, Jacob
2006
Richard Will
3623
Results of the Phase I Prehistoric Archaeological Survey of the Limerick Business Pard Subdivision in Limerick, York Co,
ME
Hamilton, Nathan D.
2005
Phase 0 Archaeological Survey of the Wilderness Acres II Subdivision.
1996
John P. Mosher
Report on Phase I Archaeological Survey of the Proposed Woodward Sand and Gravel Pit.
006,007
3492
2903
Shaffer, Gary
2013
Archaeological Assessment of Richard Nass's Tract 1732, Acton, York Co.
4133
Valimont, Brian
2008
Proposed North Shapleigh Cell Tower (#853452)
3816
2008
Report on Phase I Archaeological Survey of the Proposed Limerick East Cell Tower.
3788
Eldridge, Stuart A.
2006
Sarah Haugh
Report on Phase I Archaeological Survey of the Lake Arrowhead Water Main Project.
3548
006,036,124, Spiess, Arthur E.
1992
Cranmer, Hedden, Trautman
120,133
Diamond Occidental Purchase Reconnaissance Archaeological Survey.
2681
007
2739
Bartone, Robert N.
1992
James B. Petersen
Report on Phase I Archaeological Survey of The Proposed Bonny Eagle Schools Project.
Clark, James
2008
Summary Report on 2006 Emergency Archaeological Mitigation, Little Ossipee South Site (Site 7.9), Bonny Eagle
Project (FERC No. 2529).
3742
Cowie, Ellen R.
1989
James B. Petersen
Archaeological Phase II Survey and Testing of the Bonny Eagle Project (FERC 2529).
2544
1988
James B. Petersen
An Archaeological Phase I Survey of the Bonny Eagle Project (FERC 2529), Cumberland and York Counties, Maine.
2479
Crock, John
1992
James B. Petersen
An Archaeological Phase IB and Phase II Testing for the Maine Army National Guard Hollis Training Center.
2711
Eldridge, Stuart A.
4170
2013
Lindsey Weeks
Phase II CMP Section 172 Transmission Line Rebuild
2012
Phase I Archaeological Report, Geotechnical Soil Borings, CMP Sec 172 Rebuild,
4063
2005
Report on Phase IA Survey of the Lord Road Air-strip Project.
3489
Hamilton, Nathan D.
2006
Report on Phase I Archaeological Survey of the Proposed Josie's Brook Residential Subdivision.
3562
Quads
007
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Hamilton, Nathan D.
2004
Report on Phase I Archaeological Survey of the Proposed Subdivision, Church Hill Road.
MHPC
Document #
3434
1999
Report on Phase I Archaeological Survey of the Proposed Town House Woods (Phase II) Subdivision, Waterboro.
3034
1996
John P. Mosher
Report on Phase I Archaeological Survey of the Proposed Richard's Way Subdivision, Saco.
2906
1994
John Mosher
The Boothby Gravel Pit (ME 7.39), East Limington, York County.
MAS Bulletin, 34:2, 1-10.
1993
John Mosher
2770
Report on Phase II Archaeological Survey of the Boothby Gravel Pit, East Limington.
1988
Thomas C. Bennett
An Archaeological Phase 1 Survey of the Proposed Cohen Subdivision Dayton, Maine
Haugh, Sarah
2008
Report on Phase I Archaeological Survey of the Green Court Acres Subdivision Water Line.
2008
Phase I Archaeological Survey of Green Court Acres Subdivision Phase I.
Hedden, Mark H.
1994
Arthur Spiess
2513
3771
3789
2797
Route 5 Bridge Approaches to the Saco River in Biddeford (PIN 4626).
McPheters, Hutch
2012
Robert Bartone
4086
Lake Arrowhead Community Proposed Water Transmission Maine
Moore, Edward
2013
Karen Mack, Richard Will
Phase III Mitigation of site 7.48, Bar Mills project (FERC 2914)
2012
Karen Mack, James Clark, Richard Will
Archaeological Data Recovery Mitigation Site 7.52, Saco River, Hollis
4161
4080
2011
4114
Results of 2006-2009 Phase III Data Recovery Mitigation at the Little Ossipee South Site (7.9) as part of NextEra Energy
Resources Bonny Eagle Project
2011
Alice Kelley
3997
2005
Richard Will
3473
Phase III Data Recovery at Site 7.55, Hollis
Phase I and Phase II Archaeological Study of the Maine National Guard Hollis Training Facility, Hollis, York Co.
2003
Rick Will
Phase II Investigation of the Bar Mills Project (FERC 2194).
3295
2002
Richard T. Will
Report on Phase I Archaeological Survey of the Bar Mills Project (FERC 2194).
3234
Mosher, John P.
2010
Arthur E. Spiess, J. N. Leith Smith
Archaeological Phase I Survey and Phase II Test of the Indian Cellar LMF Acquisition, Hollis, Maine
2006
Report on Phase I Archaeological Survey of the the Gannett Tract LMFB Acquisition in Hollis, Maine.
2004
3939
3533
Arthur Spiess
A Late Ceramic Period Occupation at Site 7.58, West Buxton, Maine.
MAS Bulletin, 44:1:21-29.
1997
Report on Phase I Archaeological Survey of the Brrokside II Subdivision in Dayton.
1994
The Shaker Valley Cranberry Site (7.46): Report of Phase I Archaeology Survey in Waterboro, ME.
2949
2827
Quads
007
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Mosher, John P.
0
Expanding Maine's Wildlife Management Areas: Phase I Arch Survey Crossman LMF Property, Hollis
Paquin, Charles
1989
J.B.Petersen, Patricia Baker
Archaeological Phase II Testing of the Skelton Project (FERC 2527), York County.
1988
Patricia Baker and JB Petersen
An Archaeological Phase I Survey of the Skelton Project, York County, Maine.
MHPC
Document #
4034
2521
2482
Robinson, Brian S.
1991
Maine Army National Guard Training Sites Phase IA Report.
2653
Shaffer, Gary
2008
Report on Phase I Archaeological Survey of Richard Rudolph's Composting Facility and Drainage Facility.
3764
Smith, J. N. Leith
2010
John Maron, Karen Mack
Report on the Archaeological Reconnaissance Survey of Pleasant Point Park, Buxton
3965
Spiess, Arthur
2011
An Isolated Fluted Point from Hollis, Southwestern Maine
Maine Archaeological Society Bulletin 51(1):5-12
Spiess, Arthur E.
2003
John P. Mosher
Phase II Archaeological Testing of Site 7.58, West Buxton.
Valimont, Brian
2008
Proposed Goodall Medical Complex Expansion.
3293
3765
2007
Archaeological Survey of the Proposed Salmon Falls Cell Tower, 202 McKenny Road, Saco.
3732
2007
Report on Phase I Archaeological Survey of the Proposed Pump Station and Water Main, Waterboro.
3646
Weeks, Lindsey
2013
Stuart Eldridge
CMP Section 172 Transmission Line Rebuild Project: Phase I Archeological Investigation
4102
Will, Richard T.
1999
Edward Moore, James Clark
Limington Rips Site (007.004): Results of Phase III Prehistoric Archaeological Mitigation.
3039
1999
Edward Moore, James Clark
3048
A Report on the Phase III Archaeological Survey of Mitigation of Chartier Field (7.12), Bonny Eagle Project, Standish.
1996
James Clark, Edward Moore
2904
Phase III Archaeological Data Recovery at the Little Ossipee North Site (7.7), Bonny Eagle Project (FERC #2529),
Cumberland Co., Maine.
Wilson, Deborah B.
2004
Report on Phase I Archaeological Survey of the Spring Brook Subdivision, Gorham.
3376
1992
Report on Phase I Archaeological Survey of Sokokis Estates Partnership Gravel Pit, North Waterboro.
2712
1991
Report on the Preliminary Phase I Archaeological Investigation of Robert's Farm Subdivision, Lyman.
2631
1991
Report on the Phase I Archaeological Survey of the Boothby Gravel Pit in East Limington, ME.
2650
1991
1991 Report on Phase I Archaeological Survey of the Six Oaks Subdivision, Standish.
2617
007, 012,
013
Mack, Karen
007,004
Mosher, John P.
2001
A Report on the Phase I Archaeological Testing of the Route 35 Upgrade (PIN 8546) in Lyman and Dayton.
2012
Edward Moore
4051
Phase I and Phase II Evaluation CMP Section 187, Buxton to Gorham, York and CUmberland Counties
3173
Quads
007,008
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Mack, Karen
2000
Rick Will, James Clark
3131
Report on the Phase I Archaeological Survey of the Proposed ANP 345kv Electrical Transmission Line, South Gorham to
Buxton.
Wilson, Deborah B.
2002
Report on Phase I Archaeological Survey of the Parson's Pit Expansion and Hancock Ridge Subdivision, Gorham.
3236
007,024,062, Clark, James
2005
Results of Archaeological Site Monitoring--Wyman (FERC 2329), Weston (FERC 2325), Gulf Island/Deer Rips (FERC
069,086
2283) and Bonny Eagle Projects.
3441
007,036,024,
053,117+
3217
2002
Richard T. Will
Descriptions and Data Recovery Plans for Twelve Monitored Erosion Sites at Moosehead, Gulf Island, Bonny Eagle and
Oakland.
2002
007,24,36,37 Will, Richard T.
ARC, Inc.
,52,69+
Results of Annual Archaeological Site Monitoring,Wyman Project (FERC #2329), Weston Project (FERC #2325), Gulf
Island/Deer Rips Project (FERC 2283), Oaklan
3288
007,36,37,52 Clark, James
2002
Monitored Erosion Sites: Wyman, Weston, Gulf Island Deer Rips, Oakland/Automatic and Bonny Eagle.
,53,69,+
3215
007,8,24,39,
40,14,++
3530
Rick Will, Jacob Freeman
2006
Phase I Archaeological Survey: Maritimes and Northeast Pipeline, Phase IV.
007?
Valimont, Brian
2007
Report on Phase I Archaeological Survey of the Buxton Center Cell Tower.
3676
008
Beale, David W.
3574
2006
Ellen Cowie
Archaeological Phase I Survey of the Proposed Castle Estates Subdivision (MHPC #0464-06) Old Orchard Beach,
Cumberland County, Maine.
Brigham, Michael
2007
Phase II Testing of Site 8.30, Cascades Project.
3691
2007
Ellen Cowie
Report on Phase I Archaeological Survey of the Proposed Cascades Development, Saco.
2004
Robert Bartone
3647
3380
Report on Phase I Archaeological Survey of the Thomas Project in Saco, York Co., Maine (MHPC # 0686-04).
Burgess, William
Deguio Mill Bridge Replacement.
3757
2008
2006
Report on Phase I Archaeological Survey of the Old Orchard Beach Rails to Trails Project.
Clark, James
2004
Edward Moore
Report on Phase I Archaeological Survey of the Fuller Farm Estates.
1995
Rebecca Cole-Will
Report on Phase I Archaeological Survey of the Philip Hall Subdivision, Holmes Rd, Scarborough.
Clark, Julia
2000
Richard Will
3544
3416
2880
3117
Phase I Archaeological Survey of the Calpine Electrical Transmission, Gorham to Westbrook.
Cole-Will, Rebecca
1998
Karen Mack
3035
Report on Phase I Archaeological Survey of the Watson Woodlands Subdivision, Scarborough.
1995
Richard T. Will
Phase I Arcaeological Survey of the Holmes Road Subdivision (Hale Property), Scarborough.
Cranmer, Leon E.
1999
William Burgess
A Report on the Phase I Archaeological Survey for the Proposed Westbrook Interchange.
2864
3049
Quads
008
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Cranmer, Leon E.
1999
A Report on the Phase I Archaeological Survey of the Highland Lake Dam Project.
Eldridge, Stuart A.
2012
Phase IB Prehistoric Survey, CMP Section 105 Saco Bay ADSS Rebuild, Old Orchard Beach
MHPC
Document #
3086
4071
2009
Phase I Prehistoric Archaeological Investigation Report: Gorham Road Development Project, Scarborough
3868
2007
Report on Phase I Archaeological Survey of Site 8.20, Village at Little Falls Project.
3689
2006
Report on Phase I Archaeological Survey of the Middle Nonesuch River Salt Marsh Restoration.
3535
2004
3417
Sarah Haugh
Report on Phase I Archaeological Survey of the Mitchell Heights Subdivision.
2004
Report on Phase I Archaeological Survey of the White Subdivision.
3403
2001
Report on Phase I Archaeological Survey of the Fall Brook Channel Improvement, Portland.
3205
Feighner, Edna
2001
Report on Phase I Archaeological Survey of the Hidden Creek Subdivision, Scarborough.
3197
2000
Report on Phase I-B fo the Proposed Falmouth Community Park Project.
3106
1999
A Report on Phase I Archaeological Survey of the Falmouth Community Park.
3068
1999
A Report on the Phase I Archaeological Survey of Portland Air Freight Project, Scarborough.
3077
Jake Grindle, Robert Bartone, Ellen Cowi
Gammon, James G.
2010
3929
Phase I/II Testing of Newly Identified Native American Site 8.31 at Proposed Country Village Mobile Home Park, Saco
Grindle, John
2009
Robert Bartone
Country Village Mobile Home Park Expansion Project Ph I/II
3880
Hamilton, Nathan D.
2011
Phase I Prehistoric Survey Test Areas A, B, and C, Central Maine Power Saco Bay Reinforcement Project
3968
2008
Report on Phase I Archaeological Survey of the Proposed Elementary School, Stevens Site.
3751
2008
Report on Phase I Archaeological Survey of the Proposed Storage Facility, Running Hill Road, Scarborough.
3759
2006
3634
An Archaeological Phase I Survey of the Proposed Stoudwater Landing Development between Spring and Sroudwater
Streets, Westbrook, Maine.
2006
3633
An Archaeological Phase I Survey of the Proposed Subdivision of the South Coast Community Property, 368 Gorham
Road (Rt 114), Scarborough, Maine.
2004
An Archaeological Phase I Survey of the Proposed Harrisburg Avenue Subdivision Westbrook, Maine.
3410
2003
An Archaeological Phase I Survey of the Proposed Pheasant Knoll Development Gorham, Maine.
3319
2000
Report on Phase I Archaeological Survey of Presumpscot River Place Phase 3 Subdivision.
3229
1998
Report on Phase II Archaeological Survey of Proposed Industrial Park Expansion Site, Saco.
3009
Quads
008
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Hamilton, Nathan D.
1997
John P. Mosher
Archaeological Testing at Falmouth Oaks, Falmouth.
1994
Report on Phase I Archaeological Survey of Proposed Saco Sewer Project.
MHPC
Document #
2933
2803
1990
Test Excavation of the Walker Site, Presumpscot River Drainage, Falmouth.
Maine Archaeological Society Bulletin 30:1-24
1989
2549
An Archaeological Survey and Test Excavation of the Walker Site (008.007), Presumpscot River Drainage, Falmouth.
1988
Thomas C. Bennett,John Mosher
2511
An Archaeological Phase 1 Survey of the Proposed Eaglebrook Commercial/Office Park Scarborough,Maine .
1988
Matthew S. Tomaso
Archaeological Phase I Survey of the Proposed Green Trees Subdivision, Gorham
2508
1988
Thomas C. Bennett
An Archaeological Phase 1 Survey of the Proposed Gables Development at Clarks Pond South Portland,Maine
2512
1987
John P. Mosher, Dave Carpenter
An Archaeological Phase I Survey of the Proposed USM Woodside HousingProject, Gorham.
2471
Haugh, Sarah
2009
Phase I Presumpscot River Trail Expansion Project
3903
2008
Report on Phase I Archaeological Survey of Dragonfly Knoll Subdivision.
3780
2007
Phase I Archaeological Survey of the Portland Jetport Stormwater Treatment Pond Project.
3727
Haugh, Sarah M.
2012
Phase I Prehistoric Report, Cascade Falls Subdivision (formerly Marshview Subdivision), Scarborough
4064
Kellogg, Douglas
1997
Kathleen Wheeler
Report on Phase IB Archaeological Survey of the Joint Pipeline Project, Westbrook Lateral.
2963
Maynon, Jeff
2007
Report on Phase I Archaeological Survey of the South Portland Air National Guard Station.
3659
McPheters, Hutch
3542
2006
Robert Bartone
Report on Phase I Archaeological Survey of the Ocean Park Property, Old Orchard.
2004
Tim Dinsmore, Rob.Bartone, Ellen Cowie
3378
Archaeological Phase I Survey of the Fuller Farm, Scarborough.
Moore, Edward
2002
Rick Will
Report on Phase I Archaeological Survey of the Portland International Jetport, South Portland.
3284
Morrison, Peter
2011
4032
Phase I Prehistoric and Historic Archaeological Surveys for a Proposed Public Park on Black Point Road, Scarborough
Mosher, John P.
2010
Phase I Archaeological Survey of the Rt 100/26 Bridge Replacement over the Presumpscot River, Falmouth
2006
Leon Cranmer
3916
3622
Report on Phase I Archaeological Survey of the Gorham Bypass (PIN 8151.00), Gorham, Maine.
2003
Report on Phase I Archaeological Survey of the Presumpscot River Preserve.
3303
2000
Leon Cranmer
A Report on the Phase 0 Archaeological Survey of the Gorham Bypass (MDOT PIN 81851.00).
3158
1997
Nathan D. Hamilton
Report on Phase I Archaeological Survey of Proposed Homer Site Congregate Care Facility, Scarborough.
2959
Quads
008
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Mosher, John P.
1989
N.D. Hamilton & Cynthia Thayer
Archaeological Phase I Survey of the Proposed St. James Place, Scarborough.
MHPC
Document #
Putnam, David E.
1996
Report on Phase I Archaeological Survey of the Flaherty Farm, Scarborough for SCS.
2526
3383
Robinson, Brian S.
1985
An Intertidal Archaeological Survey of the Scarborough Marsh
2160
1984
An Intertidal Survey of the Scarborough Marsh
Shaffer, Gary
2012
An Irrigation System for Rick Grant, Saco, Phase I Archaeological Survey
2003
Report on Phase I Archaeological Survey of the Rusty Knoll Farm Erosion Control.
4155
3333
2002
3259
Trail Improvements and Stream Protection : Fengler and Scarborough Land Trust Properties, Scarborough, A Phase I
Archaeological Survey.
Spiess, Arthur
2009
West Branch Piscataqua River Footbridge Archaeological Testing
3856
Spiess, Arthur E.
2006
Archaeological Fieldnotes Summary: Broadturn Road Project.
3589
2005
William Burgess
3447
Archaeological Survey of the Red Brook Mitigation Site, Scarborough (MDOT PIN 10988).
2000
Leon E. Cranmer
Archaeological Survey of the Scarborough Beach Tract for the LMFB.
Valimont, Brian
2012
Proposed Beachmont Residential Subdivision, Old Orchard Beach, Phase I Archaeological Investigation
3115
4062
2010
Proposed Wetland Mitigation Area, Larrabee Farms Gravel Pit, Scarborough
3933
2009
Proposed Presumpscot Estates Residential Subdivsion, Westbrook
3860
2008
Phase I Survey of the Proposed Ward's Hill Road Water Supply.
3790
2007
Report on Phase I Archaeological Survey of the Proposed Retirement Residences, Elmwood Avenue, Scarborough.
3734
2006
Report on Phase I Archaeological Survey of the Proposed Dunstan Crossing Subdivision.
3566
3626
2006
Affordable Housing Project, Westbrook.
2006
Report on Phase I Archaeological Survey of the Proposed Wood Subdivision, Standish.
3540
2006
Report on Phase I Archaeological Survey of the Stonegate Commons Subdivision, Saco.
3534
Will, Richard T.
2012
Edward Moore
4079
Phase I Assessment of CMP Section 188, Portland and Westbrook
2008
Phase II Archaeological Investigation of Portland International Jetport Improvements.
3786
2003
James Clark
3323
Results of Archaeological Monitoring/Data Recovery, Archaeological Survey Associated with the Removal of Smelt Hill
Dam, Falmouth, ME, Request # DACW33-02-
Quads
008
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Will, Richard T.
1999
Julia Clark
3085
A Report on the Phase I Archaeological Survey of Proposed Calpine Natural Gas Lateral, Gorham to Westbrook.
1998
Phase I Archaeolgical Survey of the Gorham Energy Project.
3002
1998
3010
Report on the Phase I Archaeological Survey of the Proposed West Falmouth Crossing Project, Cumberland County.
1998
Report on the Phase II Archaeological Survey of Site 8.18, West Falmouth Crossing Project.
Wilson, Deborah B.
2007
Preliminary Archaeological Assessment of the R.J. Grondin and Sons Property.
3021
3665
2005
Report on Phase I Archaeological Survey of the Stroudwater Heights Condominium Project.
3446
2005
Report on Phase I Archaeological Survey of Site 8.29, Harding Bridge Farms Subdivision.
3487
2005
Report on Phase II Archaeological Survey of Site 8.29, Harding Bridge Farms Subdivision.
3510
2004
Report on Phase I Archaeological Survey of the Cobb Farm Estates Subdivision, Westbrook.
3382
2003
Report on Phase I Archaeological Survey of the Mill Brook Business Park, Saco.
3336
2003
3310
Report on Phase I Archaeological Survey of R.J. Grondin and Sons' Proposed Commercial Subdivision in Gorham, ME.
2003
3322
Report on Phase I Archaeological Survey Enterprise Business Park, Scarborough, ME, MHPC # 0902-03, US Route 1 and
Willowdale Rd.
008, 013
2002
Report on Phase I Archaeological Survey of the State Manufactured Homes Expansion.
3271
2002
Report on Phase I Archaeological Survey of the Proposed Hunter Point Subdivision.
3222
2002
Report on Phase I Archaeological Survey of the Ballantyne Place Phase I.
3256
2001
Report on Phase I Archaeological Survey of a Proposed Industrial Facility in Saco.
3209
2000
Report on Phase I I Archaeological Survey of the Riverwoods Subdivision, Scarborough, Phase II.
3150
1999
A Report on the Phase I Archaeological Survey of Deep Brook Golf Course, Saco.
3076
1998
Report on the Grandwoods Estates Phase II, Scarborough.
2998
1996
Report on Phase I Archaeological Survey of the Broadturn and Holmes Road Subdivision, Scarborough.
2924
1993
Report on Phase I Archaeological Survey of the Proposed Site of New Middle School in Scarborough.
2771
1992
Report on Phase I Archaeological Survey of the UNUM Life Insurance Co. Property in Portland.
2713
1991
Report on Phase I Archaeological Survey of the Portland Water District's New Transmission Main in Westbrook.
2666
Mack, Karen
2012
Edward Moore
Phase I Archaeological Precontact Assessment CMP Section 103, Westbrook, and Windham
4057
Quads
008, 013
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Will, Richard T.
2013
Edward Moore
2013 Monitoring of Archaeological Sites and Resources within S. D. Warren Company's Presumpscot River
Hydroelectric Projects
MHPC
Document #
4168
008,009,010, Munn, Henry
1956
The shell heaps of Casco Bay.
014,015
Maine Field Naturalist. 12:34-40.
Yesner, David R.
1983
On Explaining Changes in prehistoric coastal economies: the view from Casco Bay, Maine.
IN R.Nash ed. The Evolution of Maritime Cultures on the Northeast and the Northwest Coasts of America. 7790.Publ.#11,Dept of Archae. Simon Fraser Uni
1980
Archaeology of Casco Bay: A Preliminary Report.
008,009,012, Doyle, Richard
1984
A Photographic Catalogue of the Richard A. Doyle, Jr. Collection (Through January 1, 1984)
014,015+
2432
008,012,013
Woodlot Associates
1997
Presumpscot River Erosion Potential Survey.
2982
008,013
Wilson, Deborah B.
2000
Bruce Bourque
Phase II Archaeological Survey Report for Five Archaeological Sites on the Presumpscot River.
3102
1999
3043
Phase I Archaeological Survey Report: S.D. Warren Company's Five Hydroelectric Projects on the Presumpscot River.
1998
Report on Phase 0 Archaeological Survey of 5 S.D. Warren Hydroelectric Projects on the Presumpscot River.
008,013,022, Eldridge, Stuart A.
John Cross, Leslie Shaw
2000
033
Archaeology Survey Portland Gas Transmission System - Gilead to Westbrook, Line Changes, Cross Roads.
009
Barber, Russel J.
1988
The Use of Land Snails from Prehistoric Sites for Paleoenvironmental Reconstruction.
G.P. Nichols, ed. Holocene Human Ecology in Northeastern North America.
Brigham, Michael
2009
S. Scharoun, Robert Bartone, Ellen Cowie
Archaeological Investigations Proposed Cascades Project, Saco
3005
3097
3857
Eldridge, Stuart A.
2007
Sarah Haugh
Report on Phase I Archaeological Survey of Site 9.16, Glickman Family Lots, Great Diamond Island.
3687
Hamilton, Nathan D.
1985
Maritime Adaptation in Western Maine: The Great Diamond Site.
2978
1985
David K. Yesner
Early, Middle and Late Woodland Ceramic Assemblages from Great Diamond Island, Casco Bay, Maine
In Peterson,J.B. Editor: Ceramic Analysis in the Northeast. Occasional Publications in Northeastern Anthropology 9:3972
Mosher, John P.
2003
Leon Cranmer
3312
Report on Phase I Archaeological Survey of the Robinson Woods Parcel: LMFB Purchase in Cape Elizabeth.
1990
Rob Florentin & N.D.Hamilton
Archaeological Phase I Testing of the Proposed Wastewater Treatment and Pump Station, Peaks Island.
2583
Petersen, Anne K.
1977
The Hannaford Cove Site: A Historical and Environmental Study.
2755
Spiess, Arthur
2011
Martin's Point Bridge Project Phase I Archaeological Testing
4008
Valimont, Brian
Proposed Cape Elizabeth Cell Tower
3879
2009
2009
Proposed boat pier, ramp and float, Great Harbor Cove, Haskell Island
Will, Richard T.
1976
Digging Up Prehistory in Southern Coastal Maine
self published
3842
3979
Quads
009
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Will, Richard T.
1972
John Cross
Wooley II: A Report of the Excavation of a Coastal Shell Heap in Maine.
MHPC
Document #
2646
Yesner, David R.
1988
Island biogeography and prehistoric human adaptation on the southern coast of Maine
Archaeology of Prehistoric Coastlines, Cambridge Univ Press
009,010,014, Hamilton, Nathan D.
1991
Final Report for Northeast Casco Bay and Casco Bay Intensive Site Survey: 1988 and 1989.
015
4048
009,010,015
2519
009, 014
1988
2670
Casco Bay Survey
009,013,023, Spiess, Arthur E.
1984
A Catalogue of the Androscoggin Historical Society Collection of Prehistoric Artifacts
024,027+
009,014
Bampton, Matthew
2001
Rosemary Mosher
A GIS Driven Regional Database of Archaeological Resources for Research and CRM in Casco Bay, Maine.
Stancic, Zoran and Tatjana Veljanovski, Computing Archaeology for Understanding the Past CAA 2000, BAR
International Series 931, 28th Conf, Ljubljana.
Yesner, David R.
1980
Preliminary Report on 1980 Casco Bay Archaeological Survey
1979
Preliminary Report on 1979 Casco Bay Archaeological Survey
009,014,015
Hamilton, Nathan D.
1989
Northeast Casco Bay Archaeological Survey and Testing Program 1988.
1985
Maritime Adaptation in Western Maine, The Great Diamond Island Site. Ph.D. dissertation, Dept of Anthropology,
University of Pittsburgh PA
Tomaso, Matthew S.
1990
N. D. Hamilton
Casco Bay Intensive Archaeological Survey and Testing Program: Part Two, 1990.
009,014,015, Yesner, David R.
1979
Casco
Bay
Archaeological
Project:
1978
Progress
Report and Proposal for Continued 1979 Survey Grant to Historic
017
Preservation Commission
009,014,029, Martin, Scott M.
Terrestrial Snails and Slugs of Maine.
030
Northeastern Naturalist, 7:38-88.
009,015
Shaw, Leslie
2429
2156
2155
2550
2447
2598
2154
2000
2004
John Cross
3395
Archaeological Evaluation of Flag Island and Upper Flag Island, Harpswell.
Wilson, Deborah B.
1991
Phase I Archaeological Survey of Deerfield Park Subdivision, Brunswick.
009,015,016, Will, Richard T.
1978
David Sanger
017,026+
An Evaluation of Shell Middens on the Coast of Maine
009,015?
2639
2143
1979
Prehistoric Pottery from Two Maine Sites.
010
Haugen, Einar
The Rune Stones of Spirit Pond, Maine.
Man in the Northeast 4:62-79
Lenik, Edward J.
Report on the Spirit Pond shell heap.
N.E.A.R.A. 12(1):2-5.
1972
1977
1977
The Spirit Pond Shellheap.
The Archaeology of Eastern North America 5:94-107
1976
The Spirit Pond Shellheap.
1975
Excavations at Spirit Pond
Man in the Northeast: 9:54-60
3469
Quads
010
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Lenik, Edward J.
1974
The Search for Norse Occupation at Spirit Pond, Maine: 1974 Excavation Report
MHPC
Document #
1973
Archaeological Survey of Spirit Pond, Campbell Island, Atkins Bay and Parker Head, Phippsburg, Maine.
2172
3468
1973
The Spirit Pond Sod House
010,015
1973
Archaeological Survey of the Morse Mountain, Morse River and Sprague River Areas, Phippsburg, Maine
2134
1973
Archaeological Survey of the Sabino Head, Silver Lake, and Seguin Island Areas, Phippsburg, Maine
2133
3470
1972
Excavations at Spirit Pond.
010,015,037, Willoughby, Charles B.
1980
facsimile edition of his 1892 manuscript
038,117+
Indian Antiquities of the Kennebec Valley.
Occassional Publications in Maine Archaeology, Number 1, Maine Historic Preservation Commission, Augusta.
011
Sarah M. Haugh
Eldridge, Stuart A.
2004
Phase IA and IB Archaeological Survey Report: MSAD #55 Middle School Project, South Hiram, Oxford Co., Maine.
3464
Hamilton, Nathan D.
1989
John Mosher
An Archaeological Phase I Survey Proposal Saco River Estates, Cornish.
2517
Hedden, Mark H.
2967
1997
Arthur E. Spiess
Report on Phase I Archaeological Survey of the River Road in Hiram for MEMA.
Mosher, John P.
1995
2861
Report on the Phase I Archaeological Survey of Eastern Slopes Regional Airport Runway Expansion Project in Fryeburg.
Petersen, James B.
1993
Report on Phase I Archaeological Survey of Upper Kezar Falls Canoe Ramp.
2778
Shaffer, Gary
2012
Field Check, Susan and Mark Faunce, Limington
4058
2006
3578
Barnyard Water Management, a Grassed Waterway, a Waste Storage Facility for Teresa McClare, Brownfield, Oxford
County, Maine: A Phase I Archaeological Sur
Tomaso, Matthew S.
1989
Nathan D. Hamilton,Karen Hoxie
2551
Archaeological Phase I Survey Report of the Maretta Enterprises Mineral Extraction Project, West Baldwin, ME.
011,021
012
Wilson, Deborah B.
1991
Report on the Phase I Archaeological Survey of Cornish Commons, A Housing Development in Cornish.
2672
Eldridge, Stuart A.
2005
Sarah M. Haugh
Phase IA and IB Archaeological Survey Report of the Cold Spring Source Development Project in Fryeburg and
Denmark, Oxford County, Maine.
3502
Rombola, William F.
1998
The Ceramic Period in the Upper Saco River Drainage: An Analysis of the Helen Leadbeater Collection.
MAS Bulletin,38:2:1-22
Bartone, Robert N.
2006
Report on Phase I Archaeological Survey of the Proposed Wheaton Way Subdivision.
Brigham, Michael
2008
Robert Bartone
3629
3755
Report on Phase I Archaeological Survey of the Proposed Moose Landing Marina.
2005
Robert Bartone
Report on Phase I Archaeological Survey of the Wildland Subdivision, Standish.
Hamilton, Nathan D.
2004
Report on Phase I Archaeological Survey of the Proposed Gravel Pit Site (Jane Cummings) Route 25.
3496
3425
Quads
012
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Hamilton, Nathan D.
1998
Cynthia Thayer
Report on Phase I Archaeological Survey of the Steep Falls Water Supply Site.
MHPC
Document #
2984
1990
John P. Mosher, Cynthia Thayer
2559
Archaeological Phase I Survey of the Proposed Point Sebago Golf Resort Subdivision, Casco, Cumberland County, ME.
1989
John P. Mosher
An Archaeological Phase I Survey of the Proposed Naples Subdivision Project, Naples, Cumberland County, ME.
1988
Cynthia Thayer & John P.Mosher
2545
2485
Archaeological Phase II Test Excavations at the Third Beach site (12-11)...Sebago Lake Estates, Naples, Maine.
Mosher, John P.
Naples Bay Bridge Replacement, PIN 11060
3875
2009
1991
Nathan D. Hamilton
Archaeological Phase II Testing at the Point Sebago Paleoindian Site.
2632
Smith, J. N. Leith
2010
John Mosher
Phase I/II Survey Route 35 Road Realignment and Bridge Replacement over MCRR MDOT PIN 15107 Standish
3921
Spiess, Arthur E.
2006
John Hudson
Cold Rain Pond Water Access Archaeological Assessment.
3527
Wilson, Deborah B.
3145
2000
Bruce Bourque
Phase II Archaeological Survey Report, Sites 12.63, Peabody Pond, Bridgeton.
2000
A Report on the Phase I Archaeological Survey of the Land of Moose Cove Lodge Trust II, Peabody Pond.
3126
012, 007
Moore, Edward
2013
CMP Section 170 Maintenance archaeological survey
4120
012, 013
Murch, Dana
Natural Water Levels of Sebago Lake
2011
4012
012,013
Doyle, Richard
Sebago Area Survey 1980
1980
Nathan Hamilton
2121
Mosher, John P.
1990
Nathan D. Hamilton
2608
Phase I Archaeological Investigation of the Proposed Portland Water District Ozonation Facility, Standish.
Wilson, Deborah B.
2002
Report on Phase 0 Archaeological Survey of the Eel Weir Project (FERC 2984).
3230
012,027
Cranmer, Leon E.
1995
Arthur E. Spiess
Phase I and II Archaeological Report on PIN 1141.01, Site 12.26, Muddy River Bridge, Naples, Maine.
2849
013
Brigham, Michael
2004
Report on Phase I Archaeological Survey of the Gaia Tech Home Depot Property, North Windham.
3414
Clark, James
CMP Pole #47, Section 189 Relocation.
3617
2006
1992
Richard Will
Phase I Archaeological Survey of Proposed Expansion of the Windham Gravel Pit, Grondin Property, Windham.
Corey, Richard
2004
Robert Bartone
2732
3435
Report on Phase I Archaeological Survey of the Sebago Heights Subdivision.
Cowie, Ellen R.
1988
James B. Petersen
2477
An Archaeological Phase I Survey and Phase II Testing of the North Gorham Project, Cumberland County,Maine
1988
James B. Petersen
Archaeological Survey and Testing at two sites near the N.Gorham Project
Cranmer, Leon E.
1998
Report on the Phase I Archaeological Survey of Route 26 By-Pass, New Gloucester/Poland PIN 3517.20.
2503
2993
Quads
013
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Eldridge, Stuart A.
2007
Sarah Haugh
Report on Phase I Archaeological Survey of Loon Run on Notched Pond, Raymond.
MHPC
Document #
3645
2005
Archaeological Monitoring of Water Main Construction, Pineland Farm.
3443
2004
Report on Phase I Archaeological Survey of the Pineland Farm Water Main Project.
3386
2003
Report on Phase I Archaeological Survey of Vanity Farms Elderly Housing Project.
3339
2002
Report on Phase I Archaeological Survey of the Westbrand Subdivision, Cumberland.
3255
2001
Report on Phase I Archaeological Survey of the Manchester Woods Elder Care Facility.
3195
Feighner, Edna
1999
Unanticipated Discovery at the Outlet Brook Site, Windham, ME, PNGTS.
3047
Hamilton, Nathan D.
1998
Report on the Phase I Archaeological Survey of the Cobb Property, Crystal Lake.
3017
John P. Mosher
1989
Archaeological Phase I Survey of the Proposed Basin View Subdivision, Standish, ME.
1987
John Mosher, David Carpenter
2538
2468
An Archaeological Phase I Survey of the Proposed Highland Lake Subdivision Project, Falmouth.
Haugh, Sarah M.
2007
Daniel P. Thomann
3738
Phase I Archaeological Investigation Report: Cliff Corb New House Construction Project, Windham.
Hedden, Mark H.
2004
Field Check of Black Brook Preserve, Windham Center for LMFB.
3399
2636
1991
Pleasant River Phase I Survey, Windham, Maine.
Kellogg, Douglas
1994
Phase II Excavations of the Great Falls Site (ME 13.34) Windham, Cumberland County.
2835
Mosher, John P.
2001
Report on the Phase 0 Archaeological Survey of the Gray Bypass Project (PIN 8871.00).
3167
1997
Report on Phase I Archaeological Survey of the Proposed Cole Farms Golf Course, Gray.
2966
1992
Nathan Hamilton
Report on Phase I Archaeological Survey of the Proposed Woodland Estates Subdivision, Windham.
2725
Putnam, David E.
1998
The Gillespie-Jordan Site (13-39): Probable Late Paleoinidan Lithic Scatter.
Shaw, Leslie
2008
Interpreting Human Activities at Small Sites: The Case of the Outlet Brook Site, Windham.
MAS, 48:2: 23-45
2000
Stuart Eldridge, John Cross
2999
3162
Phase III Archaeolgical Data Recovery at the Outlet Brook Site.
Spiess, Arthur E.
2008
John Mosher
3746
Sabbathday Lake, New Gloucester, Prehistoric Archaeological Survey, Archaeological Assessment for LMFB
2004
A Winged Bannerstone from Maine: Stone and Perishable Archaic Technology.
Massachusetts AS; Fall 2004; 42-52.
Trautman, Elizabeth A.
1992
Arthur Spiess
Report on Archaeological Survey for the Land for Maine's Future Board's Morgan Meadow Property.
2704
Quads
013
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Trautman, Elizabeth A.
1991
Arthur Spiess
Archaeological Survey of the Sebago Lake Parcel
MHPC
Document #
Will, Richard T.
2006
Section 189, Gorham-Windham-Raymond Transmission Line Rebuild.
2006
Archaeological Review of the Section 189 Transmission Line.
2671
3590
3568
Wilson, Deborah B.
2003
Report on Phase I Archaeological Survey of the Ledgewood Farms Subdivision, Gray.
3338
2001
Report on Phase I Archaeological Survey of the Gillespie Farm Irrigation Pipeline.
3201
1997
013,008,033, Eldridge, Stuart A.
John Cross
034,022
Report on Phase I Archaeological Survey of the Portland Natural Gas Transmission System, Gilead to Westbrook.
2955
013,014,107, Hamilton, Nathan D.
1986
Peabody Foundation for Archaeology,Andover MA. (Description of Collections from Maine)
117,118,
2435
013,033
John Cross, Leslie Shaw
2969
013,14,39,53 Will, Richard T.
1999
Karen Mack, Julia Clark
,56,74,+
Cultural Resources Investigations M & NE Pipeline (Phase II): Supplemental.
3090
Eldridge, Stuart A.
1997
Phase II Survey of 5 Prehistoric Sites for PNGTS.
1998
Cultural Resource Investigations Maritimes and Northeast Pipeline, L.L.C., Phase II Pipeline Project.
014
Backman, Dave
1996
The Lady Slipper Midden Site (14.31).
MAS Bulletin, 36:1:1-16.
Bennett, Thomas C.
2010
Nathan D. Hamilton
An 1868 Lecture on the Shell Midden on Goose Island, Casco Bay, Maine
Maine Archaeological Society Bulletin 50(1):9-22
Borstel, Christopher L.
1999
Cultural Resources Survey, U.S. Naval Fuel Depot, Casco Bay, Harpswell.
2991
3089
Ellen Cowie
Brigham, Michael
2004
Report on Phase I Archaeological Survey of the Sydney Parcel, Yarmouth.
3381
Clark, James
3415
2004
Edward Moore, Pete Morrison
Report on Phase I Archaeological Survey of the River's Edge-16 Lambert Rd Development, Freeport.
Cox, Steven L.
1989
Final report Phase I Archaeological Survey of the Lebbe Gravel Pit, Brunswick, ME.
2527
Doyle, Richard
1985
James B. Petersen,other
A Late Archaic Shell Midden on Great Moshier Island, Casco Bay, Maine
1985
James B. Petersen, Nathan D. Hamilton
A Late Archaic Shell Midden on Great Mosher Island, Casco Bay, Maine
Maine Archaeological Society Bulletin 25(1):41-50
Eldridge, Stuart A.
2000
A Report on the Phase I Archaeological Survey of the Durahm River Park Project.
Freedman, Jacob
2010
Richard Will
3159
3931
Phase I Prehistoric Archaeological Survey of Littlejohn Island Subdivision, Yarmouth
Hamilton, Nathan D.
1986
James B. Petersen,other
2452
Archaeological Phase II Testing of ME 14-108 in the Proposed Pejepscot Water Power Project,
Androscoggin,Cumberland and Sagadahoc Counties, Maine.
1985
James B. Petersen,others
An Archaeological Phase I Survey of the Proposed Pejepscot Water Power Project, Androscoggin, Cumberland and
Sagadahoc Counties, Maine
2181
Quads
014
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Haugh, Sarah
2008
3800
Phase 1A and 1B Archaeological Survey Report , Outdoor Adventure Center Project, Town of Freeport, Cumberland Co.
Hedden, Mark H.
1995
An Archaeological Phase I Survey Report on the Route 136 Road Rehab in Durham (PIN 5153).
Morse, Edward Sylvester
1868
Evidences of great antiquity in the shell heaps at Goose Island.
Boston Society of Natural History Proceedings. 11:301-302.
Mosher, John P.
2009
Phase I Archaeological Survey of the Maquoit Bay LMF Purchase, Bunganuc Road, Brunswick
2843
3893
2009
3892
New Century Phase I Archaeological Survey of the Stoddard Family Conservation Easement on Maquoit Bay, Brunswick
2003
Report on the Phase I Archaeological Survey of the Floriday Lake LMFB.
3349
1997
Report on Phase I Archaeological Survey of the Tuttle Road Farm Fence Line.
2961
1996
The Sweetsir Farm Site (ME 14.159):Report on Phase I Archaeological Survey in Yarmouth, Maine.
2910
Pearlman, Stephen
The Sandy Point Site.
2950
1997
Shaffer, Gary
2011
John Ackerman, Durham, tree/shrub establishment, forest trail improvements
2004
Report on Phase I Archaeological Survey of the Bell Farm, Pump Pad and Irrigation Line.
Shaw, Leslie
2005
Archaeological Phase I Survey on Curtis Cove, Harpswell, Maine.
4014
3396
3484
2005
Report on Phase I Archaeological Survey of the Otter Trace II Housing Project.
3437
Peter Morrison
2004
Archaeological Investigations on Whaleback Island, Harpswell.
3379
Spiess, Arthur E.
The Beaver Incisor Knife from Casco Bay.
MAS Bulletin, 45:2:23- .
2005
2005
Royal River Estuary Project, LMFB, Report of Survey Results.
Swan, Joshua L.
1868
The Shell Deposits on Goose Island.
Maine Historical Society Manuscript Collection. Col.110 Box 3c/3
Swan, Rev. Joshua L.
1995
transcribed by Thomas Bennett
The Shell Deposits on Goose Island.
Trautman, Elizabeth A.
1990
Lisbon Falls Bypass: Archaeological Phase I Testing
Arthur E. Spiess
Valimont, Brian
2010
Broad Cove Field Proposed Residential Subdivision, Yarmouth
2009
Proposed Maguire Residential Subdivision, Yarmouth
3465
2846
2614
3928
3854
Will, Richard T.
1985
The Harraseeket Archaeological Survey: Final Report
2175
Wilson, Deborah B.
2000
Phase I Archaeological Survey at the Proposed Toddy Brook Golf Course, North Yarmouth.
3119
1997
Report on Phase I Archaeological Survey of a Parcel of Land in North Yarmouth.
2947
Quads
014
014, 024
014, 074
014,015
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Wyman, Jeffries
1868
Recent examination of shell heaps on Goose Island in Casco Bay, Maine.
Boston Society of Natural History Proceedings: 11:288-289.
Yesner, David R.
1988
Island Biogeography and Prehistoric Human Adaptation on the Southern Coast of Maine (USA).
in Archaeology of Prehistoric Coastlines, edited by Geoff Bailey and John Parkington, Cambridge U . Press, 53-63.
Spiess, Arthur
2012
4148
Route 136 Durham, MDOT Emergency Rebuild Project Phase I survey notes
Betts, Matthew
2012
Susan Blair, David Black
Perspectivism, Mortuary Symbolism, and Human-Shark Relationships on the Maritime Peninsula
American Antiquity 77(4):621-645
Munn, Henry
1955
Shell Heaps of Casco Bay.
Wilson, Deborah B.
1990
Steven L. Cox, Bruce J.Bourque
The Topsham Archaeological Project: Report on the 1988 and 1989 Surveys.
3644
2556
014,039,056, Clark, Julia
1999
Karen Mack, Richard T. Will
075
Cultural Resources Investigation: Maritimes and Northeast Pipeline (Phase II).
3044
014,053,074,
091,108
3080
015
1999
Karen Mack, Richard Will
Prehistoric and Historic Archaeological Investigations Along Proposed Laterals/MNE Pipeline.
Baker, Emerson W.
1995
The 1995 Survey of the Lower Kennebec River.
1985
2875
Robert L. Bradley, A.E.Spiess
2909
Test Excavation on Sagadahoc Island, Georgetown.
1983
The Clarke and Lake Site, 1654-1676: A Place of Trading As Well As Planting.
Occassional Publications
Gordon, Geoffrey
Balogh, James C.
1985
River Terrace Landforms and Soil Morphology at the Hunter Farm Archaeological Site
Borstel, Christopher L.
2001
Archaeological Reconnaissance of Brunswick Naval Air Station BEQ.
2000
Martha Bower
3833
3203
3135
Phase IB Archaeological Survey of the Proposed Bachelor Enlisted Quarters, Naval Air Station Brunswick.
Bourque, Bruce J.
1992
Deborah Wilson
2684
Report on Phase III Archaeological Investigation of the Indian Spring Site, Brunswick, ME.
1992
Report on Phase I Archaeological Survey of the Mid-Coast Hospital Site, Brunswick.
2722
1991
Deborah B. Wilson
Report on the Phase II Archaeological Investigations at Merrymeeting Plaza, a Proposed Retail Development.
2664
1976
Report on an archaeological survey of Merrymeeting Bay.
2597
1973
2105
A Report on Salvage Excavations of Archaeological Material at Sabino Head, Phippsburg, Maine, September 26, 1973
Brain, Jeffrey P.
Fort St. George IV.
2000
3065
1998
3032
1997
2985
1995
2876
Fort St. George III.
Fort St. George II.
Fort St. George.
Quads
015
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Brain, Jeffrey P.
0
Fort St. George XIV
Brown, Harold E.
Animal Remains from the Basin Site
MHPC
Document #
4035
1982
2600
1960
Field notes for the Basin Site (15.20).
Cowie, Ellen R.
2011
Robert Bartone, Stephen Scharoun
3985
Comprehensive Archaeological Identification Survey at NAS Brunswick, Final Report
Cox, Steven L.
2003
Art Spiess
3315
Bath 15' Quad Survey Proposal (and Areas Surveyed).
1994
Report on 1993 Investigations at the Rosie-Mugford Sites.
2826
1992
The Topsham Archaeological Project: Report on 1991 Investigations of Sites 15.223 and 15.238.
2685
1991
Deborah B. Wilson
4500 Years on the Lower Androscoggin River: Archaeological Investigations of the Rosie-Mugford Site Complex.
2624
Deborah Wilson
1991
4500 Years on the Lower Androscoggin: Archaeolofical Investigation of the Rosie-Mugford Site Complex.
Maine Archaeological Society Bulletin 31(1):15-40
1988
Final Report on Phase I Archaeological Survey of the Sandy Ridge Subdivision, Brunswick, Maine.
Mark Hedden, Arthur Spiess
Cranmer, Leon E.
1996
Report on Phase I Archaeological Survey of the Brunswick Bikeway and Construction Road to Brunswick Bypass.
1992
2490
2897
E.Trautman, Arthur Spiess
2691
Emerson Baker
2975
Nathan D. Hamilton
2793
Purinton House Phase III Archaeology Report
Cross, John R.
2008
The Simpson-Stewart Site in East Brunswick, Maine.
MAS Bulletin:48:1:1-18.
Dinsmore, Timothy
1993
Topsham Historic Archaeological Survey 1992
Doyle, Richard
1994
Continued Excavation at the Long Island North Site (15.95), Casco Bay.
Eldridge, Stuart A.
2003
Report on Phase I Archaeological Survey of the Eagle Ridge Subdivision, Brunswick.
3307
2002
Report on Phase I Archaeological Survey of the Topsham Crossing Development.
3263
Freedman, Jacob
2006
Richard T. Will
Harbor Island - Sebasco Estates Archaeological Investigation of Sites 15.269 (ME 348-057) and ME 348-058.
3621
Gramly, R. Michael
1980
Archaeological Survey of the Proposed Brunswick Naval Air Station Clear Zone, Brunswick, Maine
2126
Hamilton, Nathan D.
2007
Report on Phase I Archaeological Survey of the Proposed Sasanoa Shores Subdivision.
3656
1994
Matthew Bampton
2819
Eastern Casco Bay Kayak Survey
1994
John Mosher
(Draft) The Basin site and Archaeology of an Evolving Maine Inlet.
Hedden, Mark H.
1997
Leon Cranmer, Arthur Spiess
Brunswick Bikeway (CMAQ 9927.0) Phase III Archaeological Mitigation.
2829
2935
Quads
015
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Henshaw, Anne
2004
Amy Hodges, Adrienne Heflich
Coastal Studies Center Archaeology Project.
MHPC
Document #
3329
2003
Coastal Studies Center Archaeology Project (Bowdoin).
Kerber, Fred
Site Report 15.273.
3390
3107
1991
Lane, Gardner
1966
2127
An Archaeological Report on Excavations Carried Out at Sabino Head in Popham Beach, Maine - The Site of Fort St.
George - 1607-1608 A.D.
Little, Elizabeth
1993
Radiocarbon Age Calibration at Archaeological Sites of Coastal Massachusetts and Vicinity.
Journal of Archaoeological Science, 20:457-471.
Mathiasson, Kåre
1996
Leon Cranmer, Arthur Spiess
2896
Report on Phase I Archaeological Survey of PIN 1665.20 Topsham-Brunswick Bypass Bay Bridge Wetland Mitigation
Site.
Moore, Edward
2002
Rick Will
Report on Phase I Archaeological Survey of the Proposed Merrymeeting Airfield Project, Bowdoinham.
2002
Ricahrd T. Will
3248
3221
Report on Phase I and Phase II Archaeological Survey and Study of the Maine Natural Gas Midcoast Natural Gas
Pipeline Project from Bowdoin to Brunswick.
Mosher, John P.
2005
Phase I Archaeological Survey of the Skolfield Farm Shores LMFB Purchase.
3444
2001
Leon E. Cranmer
A Report on the Phase I Archaeological Survey of LMFB Land Acquisitions at Thorne Head, Bath.
3177
1999
Richard T. Will
Report on Phase I Archaeological Survey of the Proposed New Pole Location , Brunswick-Bath Transmission Line.
3062
Shaw, Leslie
2009
Phase I Archaeological Survey, Brunswick Commerce Center
3863
Smith, J. N. Leith
3853
2009
John Mosher
Archaeological Phase I Reconnaissance of The Basin Preserve for the Nature Conservancy
Spiess, Arthur E.
1997
Prehistoric Occupations on the Purinton House Property.
Maine Archaeological Society Bulletin, 37:1:1-22.
1990
Leon Cranmer, Kåre Mathiasson
Brunswick-Topsham Bypass Phase Ib and Phase II Archaeological Studies
1989
Leon Cranmer
Brunswick-Topsham by-pass archaeological Phase I survey.
Trautman, Elizabeth A.
2003
Arthur E. Spiess
Reconnaissance Survey of the Trufant Summerton Long Reach Parcel for LMFB.
2003
Arthur E. Spiess
2572
2522
3343
3342
Reconnaissance Survey for LMFB: Brunswick to the Ocean Trail.
Will, Richard T.
1980
Rebecca J. Cole-Will
2153
The Cathance River Archaeological Site Survey
Wilson, Deborah B.
2002
Report on Phase I Archaeological Survey of the Taggart Clay Extraction Operation, Bath.
3239
2000
3136
Report on the Phase I Archaeological Survey of The Highlands North Retirement Community Property, Topsham, ME.
Quads
015
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Wilson, Deborah B.
1999
Pappilardo, Mike
A Report on Phase I Archaeological Survey of the Family Housing Projects, Brunswick.
1997
Final Report 1996 Topsham Archaeological Project.
Arthur E. Spiess
MHPC
Document #
3069
2943
1997
Report on Phase I Archaeological Survey of the William Dodge Property, Blackwater Cove, Bath.
2968
1996
2898
Arthur E. Spiess
Report on Reconnaissance Archaeological Survey of the Parcels of Land in Topsham.
1991
Report on Phase I Archaeological Survey, Proposed Retail Development, Cook's Corner, Brunswick.
2638
1990
Final report on the phase I archaeological survey of the Michaud subdivision, Topsham, ME.
2594
015, 016
Sanger, David
1974
Report on Archaeological Survey of Sagadahoc and Lincoln Counties 1974 (for State Planning Office)
015, 025
Bourque, Bruce J.
2006
Steven L. Cox and Robert A. Lewis
The Archaic Period of the Merrymeeting Bay Region, south Central Maine.
edited by David Sanger and M. A. P. Renouf, The Archaic of the the Far Northeast, University of Maine Press, Orono,
2006.
Tomaso, Matthew S.
1990
N. D. Hamilton, John Mosher
2599
015,010
4078
Casco Bay Intensive Archaeological Survey and Testing Program: 1988.
015,010,025, Spiess, Arthur E.
1984
Promise
of
the
River
Terraces:
1983
Kennebec
Valley Survey for Prehistoric Sites
036,037+
015,016
2166
Cranmer, Leon E.
2000
3100
A Report on the Phase I and II Archaeological Surveys for the Route 127 Bridge Replacement Projects Georgetown.
015,016,026
2001
John P. Mosher
3165
Wiscasset Route 1 Corridor Srudy: Phase 0.
015,023,025, Bourque, Bruce J.
1977
Report on a Preliminary Archaeological Survey of the Lower Androscoggin and Kennebec Valleys
037,053
2110
015,025
1978
Report on an Archaeological Survey of Merrymeeting Bay
2111
015,025,026,
029,037+
1976
Report on an Archaeological Survey of the Lower Kennebec Valley and Adjacent Areas
2109
016
Callum, Kathleen
1995
The Geoarchaeolgy of the Nahanada Site (16.90) Pemaquid Beach, Bristol, Maine.
2850
Campbell, Michelle
1997
Indiantown Island Ceramic Analysis.
B.A. Thesis
Clark, James
2006
Report on Phase I Archaeological Survey of the Bristol Recreational Trail.
3029
Collins, Maxine
1993
Arthur Spiess
Two Prehistoric sites Near Pemaquid Harbor: Collections and Notes Analysis.
2756
Cox, Steven
2009
Phase I Archaeological Survey of Proposed Subdivision on Seal Cove, South Bristol
3847
Cox, Steven L.
2008
Report on Phase I Archaeological Survey of the Linekin Bay Resort.
3761
Crotts, Anita L.
1985
An Examination of Amateur Collections from the Boothbay Region, Lincoln County, Maine
2174
DePaoli, Neill
1994
Report on the Archaeological Survey of the Pemaquid River Estuary.
2820
3605
Quads
016
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Dinsmore, Timothy
2010
Phase I Prehistoric Archaeological Survey Proposed Schoolhouse Cove Subdivision, Bristol
MHPC
Document #
Eldridge, Stuart A.
2006
Report on Phase II Archaeological Survey of Site 16.247, Davis Island Townhouses.
Kellogg, Douglas
1995
How Has Coastal Erosion Affected the Prehistoric Settlement Pattern of the Boothbay Region of Maine?
Geoarchaeolgy 10:65-83.
1994
Why Did They Choose to Live Here? Ceramic Period Settlememt in the Boothbay, Maine Region.
Northeast Anthropology 48:25-60.
1982
Environmental Factors in Archeological Site Location for the Boothbay, Maine Region with an Assessment of the
Impact of Coastal Erosion on the Archeol
3957
3602
2132
Maher, Michael
1996
Remote Sensing and Stratigraphic Analysis of 16.7, Indiantown.
B.A. Thesis
Moorehead, Warren K.
1924
The Ancient Remains at Pemaquid, Maine.
Old-Time New England. 14:132-141.
1923
Report on the Work at Pemaquid.
3030
Mosher, John P.
2002
Report on Phase I Archaeological Survey of the Crooked Farm Project, LMFB, Bristol.
3226
Nickel, Harry G.
Boothbay Region - Site EB 2
3023
1966
1965
The Cameron Point Excavation at Southport Island, Maine
Maine Archaeological Society Bulletin 3
Sanger, David
1985
Prehistoric Occupation at Pemaquid.
3022
1983
Robert Bradley,other
Nahanada, A 17th Century Site on the Coast of Maine.
1981
Report on 1980 Field Season and Analysis, Boothbay Harbor Project
Spiess, Arthur E.
2006
2146
K.Sobolik, D.Crader, J.Mosher,D.Wilson
Cod, Clams and Deer: the Food Remains from Indiantown Island.
2003
Frederick Loomis 1909 Excavation Newspaper Account.
MAS Newsletter 17:2-6.
2001
Leon Crnamer
Native American Occupation at Pemaquid: Review and Results.
MAS Bulletin, 41:2:1-26
Leon Cranmer
2000
Native American Occupation at Pemaquid: MHPC Survey Grant Report.
1998
Leon Cranmer
3327
3146
2994
Site 16.237 and Route 27 in Boothbay Archaeological Phase I and IIa Test.
1990
Mark Hedden
Archaeology at Dodge Point for the Land for Maine's Future Board.
Maine Archaeological Society Bulletin 30:251990
Mark Hedden & Leon Cranmer
Archaeological Survey Report on the Dodge Point Parcel, Newcastle.
Trautman, Elizabeth A.
1993
Arthur Spiess
The Shell Midden at Five Islands: A Remnant Coastal Site in Sheepscot Bay.
2555
2783
Quads
016
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Valimont, Brian
2007
Hunting Island Water and Elecrical Lines.
MHPC
Document #
Wilson, Deborah B.
2004
Report on Phase I Archaeological Survey of a Proposed Pier Location, Hurlbut Property, Pinkham Road, Pemaquid,
Maine.
3654
3428
2003
Report on the Phase I Archaeological Survey of the Malcomb Property, Boothbay.
3354
2002
Report on Phase I Archaeological Survey of the Lobster Cove Meadow Property, Boothbay Harbor.
3245
2002
Report on Phase I Archaeological Survey of the McKenney Parcel, Penny Lake Area, Boothbay Harbor.
3244
1998
Arthur E. Spiess
3011
Final Report Boothbay Paleoindian Project.
1998
Neil DePaoli
Analysis of Prehistoric Components at HTW and WR Lots, Bristol.
2988
3013
1998
Indiantown Island Archaeological Project.
1997
Arthur E. Spiess
2953
Report on Educational Component 1996 Indiantown Island Archaeological Survey.
1996
Indiantown Island Archaeological Project: Report on the 1995 Investigations.
2905
1995
2860
Report on the Phase 0 Archaeological Survey of Back River Limited Partnership Property Barters Island Rd., Boothbay.
016,026
Young, Arthur H.
1967
The Big Dig at Pemaquid.
Yankee Magazine :82-85,170,173.
Young, Robert S.
1992
David Belknap, David Sanger
Geoarchaeology of Johns Bay, Maine.
Archaeology, 7:209-249
Bradley, W.
1957
Radiocarbon age of the Damariscotta shell heaps.
American Antiquity 22(3):296
Castner, Harold W.
1950
The prehistoric oyster shell heaps of the Damariscotta River
The Boothbay Register(no further date)
Goldthwaite, Richard P.
1935
The Damariscotta shell heaps and coastal stability.
American Journal of Science. Series 5, Vol. 30. pp 1-13
Meserve, Charles Francis
1928
Shell Heaps at Damariscotta.
Clipping from the Bath Daily Times. June 30, 1928.
Mary Jo (Elson) Sanger
Sanger, David
1986
Boom and Bust on the River: The Story of the Damariscotta Oyster Shell Heaps.
AENA 14:65-78
Spiess, Arthur E.
1986
Peabody Museum, Salem: Maine Holdings (E.S.Morse Collection 1926)
2442
Wood, Dr.
The Damariscotta shell-heaps. Where were these long shelled oysters taken? Reasons for believing that they were not
Peabody Museum, Tozzer Library, Harvard.
eatenPamphlet,
by Indians.
016,026,074
Carlson, Catherine C.
1986
Maritime Catchment Areas: An Analysis of Prehistoric Fishing Strategies in the Boothbay Region of Maine.
M.Sc.Thesis, Institute for Quaternary Studies
2448
Quads
016,029
017
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Chase, Thomas P.
1986
2979
Shell Midden Seasonality Using Multiple Faunal Indicators: Applications to the Archaeology of Boothbay, Maine.
Atkins, Carrie
2005
Preliminary Analysis of Charcoal Remains from Allen Island and Olsen Sites.
3498
Cox, Steven L.
2006
3522
Report on Phase I Archaeological Survey of a Parcel of Land on the Pleasant Point Peninsula, Cushing. MHPC #3095-05.
2006
3627
Report on Phase I Archaeological Survey of a Proposed Pier Construction Site in New Harbor, Maine, MHPC# 2642-06.
2004
Report on Phase I and II Archaeological Survey of the Out to Sea LLC Pound, Bradford Pt, Cushing.
Downs, Elinor F.
1987
Observations of the Graf Collection of Faunal Remains from the Olsen Site, Cushing.
3402
3207
Eldridge, Stuart A.
2007
Archaeology at the Stanley Site, Monhegan Island, Maine: Implications for Modeling Late Archaic Coastal Adaptations.
MAS Bulletin, 47:2:1-20.
2000
3137
Stanley Site, Monhegan.
2907
1996
Monhegan Survey.
1996
The Stanley Site, Monhegan, Maine Escavation 1994, 1995.
Gage, Mary
2004
2920
James Gage
The Manana Island Petroglyph.
MAS Bulletin, 44:1:15-19.
Mack, Karen
1996
Archaeological Investigation at the Todd Site (17.11) Muscongus Bay.
2902
Rhodin, Anders
1993
Chelonian Zooarchaeology of Eastern New Englnd: Turtle Bone Remains from Cedar Swamp and other Prehsitoric
Sites.Massachusetts Archaeological Society Bulletin, 53:1:21-30.
Skinas, David
1987
The Todd Site: A Case Study of Shell Midden Formation.
2474
Sommer, Jeffrey D.
1997
Investigation of the Faunal Remains from the Todd Site (17-11), Muscongous Bay, Maine.
2977
Spiess, Arthur E.
Site 17.132 Benner Island Summary
2009
3871
2009
3872
Allen Island Site 17.166 Summary Notes
2007
Checking the DeBarre Chart: Fresh Pond Area Archaeological Testing, Allen Island.
3739
1985
Cushing/ St. George Archaeological Survey, 1985
2674
Stuart Eldridge
1984
Allen's Island, Site 17.76, 1983 Test: Report to Andrew and Betsy Wyeth
017,018,027, Eldridge, Stuart A.
1981
Report on the 1981 St. George River Archaeological Survey
028
1980
Report on the St. George River Archaeological Survey: 1980.
Kellogg, Douglas
1985
Implications of Archaeological Deposits for Coastal Stability of the West-Central Maine Coast.
2151
2123
2124
2798
Quads
017,027
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Kellogg, Douglas
1991
Prehistoric Landscapes, Paleoenvironments, and Archaeology of Western Muscongus Bay.
MHPC
Document #
2781
1985
1984 Survey, Testing, and Shore Studies in Western Muscongus Bay
2445
1984
Site Survey and Settlement Pattern Analysis of the Muscongus/St. George Region of the Maine Coast
2165
Spiess, Arthur E.
1984
Muscongus Bay Survey 1983, Vertebrate Faunal Remains.
3219
Eldridge, Stuart A.
1990
Ceramic Period Occupation of the Central Maine Coast: Hunter-Gatherer Estuarine Adaptations in the St. George
River Drainage.
2661
Spiess, Arthur E.
David Hill Collection Inventory.
1993
2918
017?,027?
Wood, Don
An Island Site
1971
018
Shaw, Leslie
2006
Pamela Crane
Report on Phase I Archaeological Survey of the Old Woods Farm Subdivision, Tenants Harbor.
3612
018,028,029
Bourque, Bruce J.
1984
Report on Archaeological Survey Activities in the Mussel Ridge Islands, Western Penobscot Bay
2115
021
Cowie, Ellen R.
4067
017,028
2012
Hudgell, Gemma-Jayne
Molly Ockett School Expansion, Archaeological Phase I Survey
Cox, Steven L.
1994
Report on 1993 Archaeological Investigations in Fryeburg.
2787
1992
Report on the Phase I Archaeological Survey of a Proposed Subdivision in Fryeburg.
2768
1991
Report on the Phase I Archaeological Survey of the Swans Falls Dam Impoundment, Fryeburg.
2717
Cranmer, Leon E.
1994
Arthur E. Spiess
Report on Phase I Archaeological Survey of Route 5 Bridge, Fryeburg, Maine (PIN 5889).
2834
Hedden, Mark H.
3309
2003
Arthur Spiess
Report on Phase I Archaeological Survey of the Route 302 Visitor's Center, Fryeburg.
Leadbeater, Helen M.
Iriquoianesque Pottery at Pequawket
1978
Moore, Edward
2013
Phase I CMP Section 92 Pole 273 replacement, Lovell
4129
Mosher, John P.
2012
4096
Archaeological Survey for Eddy Flats and Little Pond Bridges, Rt 302 Highway Improvements, Bridgeton and Fryeburg
2010
Phase I Archaeological Survey Red Iron and Charles River Bridge Removal, (PIN 16702 and 15095), Fryeburg
1991
Thomas Bennett
3934
2642
Phase I Archaeological Survey of the Proposed GWEN Site CGS-8, Fryeburg.
Shaffer, Gary
2013
Field Check for Green Thumbs Farm, Fryeburg
4145
2013
4147
2011
4028
Field Check for Elbridge Russell, Fryeburg
Field Check, Green Thumb Farms, Fryeburg
Quads
021
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Shaffer, Gary
2008
Report on Phase I Archaeological Survey of the Elbridge Russell's Access Roads, Fryeburg.
MHPC
Document #
2007
3809
3722
Field Check at George Weston's Farm.
021,062,069
021,065,084
022
2007
Report on Phase I Archaeological Survey of Thomas Shaffner's Streambank Erosion Control.
3700
2007
Field Check at George Weston's Farm, Fryeburg.
3675
2005
Nadezha Peterson's Obstruction (Tree) Removal, Stow, Oxford Co, Maine:
3506
2005
Fencing Installation for Andrew Norkin, Denmark and Fryeburg, Oxford Co, Maine: A Phase I Archaeological Study.
3505
Nathan D. Hamilton,Karen Hoxie
Tomaso, Matthew S.
1989
Archaeological Phase I Survey Report of the Proposed Landing at Beaver Pond Subdivision, Bridgeton, ME.
2552
Watchman, Alan
Dating Kezar Lake Petroglyphs.
2938
1996
Lenik, Edward J.
2002
Picture Rocks: American Indian Rock Art in the Northeast Woodlands.
University Press of New England, Hanover and London.
Gramly, R. Michael
1981
Report on Archaeological Survey in Western Maine
Bartone, Robert N.
2013
Stephens Memorial Hospital Horne Street Parking Lot Phase I survey
2012
Jake Grindle
Wetlands Enhancement Moon Valley Project, Archaeological Phase I letter report
2130
4135
4165
Clark, James
1998
Edward Moore, Richard Will
Report on the Phase I Archaeological Survey of the Proposed RPA T/L Transmissions Line Project, Oxford Co.
3018
Eldridge, Stuart A.
2004
Report on Phase I Archaeological Survey of the Sanctuary Cove Subdivision.
3409
2001
Report on Phase I Archaeological Survey of the Spectrum Resources Town Project , Oxford.
3190
2000
IA Visual Assessment of KBS Manufacture Housing Plant, South Paris.
3133
1998
John Cross
Report on Archaeological Survey of Phase I Extensions PNGTS.
2997
Hamilton, Nathan D.
2004
Report on Phase I Archaeological Survey of the Proposed 14 Acre Commercial Development, Rt 26, Oxford.
3433
Haugh, Sarah
2009
Phase I Archaeological Survey Oakwood Drive Development, Oxford
3873
Mosher, John P.
1996
Report on Phase I Archaeological Survey of the Highland's Point Subdivision.
2913
Mulholland, Mitchell
Interim Report, PNGTS.
3006
1998
Norman, Craig
1998
Controlled Surface Collection and Artifact Analysis of the Stevens Brook Site, Presumpscot Watershed.
MAS Bulletin, 38:2:23Spiess, Arthur E.
1986
The Kimball Collection from Bear Pond Inlet(Site 22.8)
Maine Archaeological Society Bulletin 26:2 p15-36
1984
Mark Hedden
A Catalogue of the Kimball Collection from Bear Pond, Waterford, Maine (Site #22.8)
2431
Quads
022
022,023
022,034
023
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Valimont, Brian
2008
Report on Phase I Archaeological Survey of the Proposed Bridgton Cell Tower.
MHPC
Document #
3787
Will, Richard T.
1995
James Clark
Report on Phase I Archaeological Survey of the Pine Ridge Subdivision, South Paris.
2884
Wilson, Deborah B.
1995
Richard Will, Janet Cormier
The Nicholas Site: A Late Paleoindian Campsite in Southern Oxford County, Maine.
2883
1993
Report on the Phase I Archaeological Survey of a Parcel of Land on the Little Androscoggin River in Oxford, Maine.
2767
1991
Report on Phase I Archaeological Survey of Proposed Super Shop n' Save, Oxford.
2665
Moore, Edward
2002
Variablilty and Continuity Between Paleoinidan Assemblages in the Northeast: A Technological Approach.
M.S. Thesis, U Maine.
Hamilton, Nathan D.
2004
Report on Phase I Archaeological Survey of the Proposed Elementary School Development Site, Paris.
3249
Balogh, James C.
1986
Geoffrey Gordon
Soil Classification, Genesis, and Morphology at the Michaud Archaeological Site.
2750
Bartone, Robert N.
3419
2012
Gemma-Jayne Hudgell, Steven Scharoun
4074
2010
Michael Brigham, Ellen Cowie, James Gamm
3918
Rangeley Branch Rail Restoration Project
Phase III excavations Taxiway site (23.39) and Proposed Parallel Taxiway Auburn-Lewiston Municipal Airport, Auburn
2007
James Gammon and Ellen R. Cowie
Report on Phase I Archaeological Survey for the Proposed Parallel Taxi Way for Runway 4-22 and West Terminal
Apron of the Auburn-Lewiston Airport.
3652
2007
Ellen Cowie, Jake Grimdall
C.L.G. Project Survey: Auburn - Lewiston Municipal Airport.
3697
Belcher, William R.
1989
Phase I archaeological Survey of the Sandy Bottom Pond area, Turner, Maine.
2523
Bourque, Bruce J.
2469
1987
Robert Lewis
Littlefield Dam Project (FERC 8158) Report on Archaeological Research Conducted in May, 1987
Brigham, Michael
2009
Robert Bartone, Ellen Cowie
3886
Phase I Survey and Phase II Testing at Newly Identified LaMontagne Site (23.38), Auburn Industrial Park Project
2009
Robert N. Bartone, Ellen Cowie
Phase I and II Testing Lamontagne Site (23.38) Auburn Industrial Park Project
3850
2008
Ellen Cowie
Report on Phase I Archaeological Survey of the Proposed Tambrands Building Expansioon.
3811
2006
Ellen Cowie
Auburn Industrial Park Project, Archaeological Phase II Testing Lamontagne Site
3832
2005
Ellen Cowie
3479
Report on Phase I Archaeological Survey of the Auburn Industrial Park.
2002
Field Inspection of Stump Removal, Auburn Airport.
3286
2002
Report on Phase I Archaeological Survey of the Bath House, Middle Range Pond, Poland.
3265
Clark, James
2012
Edward Moore
Results of Phase I/II Precontact Archaeology Survey of Proposed Tambrands/Proctor&Gamble Expansion, Auburn
4052
Quads
023
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Crock, John
1992
James B. Petersen
Report on Phase I Archaeological Survey of The Auburn Paper Recycling Plant, Auburn.
MHPC
Document #
2740
Eldridge, Stuart A.
2006
Sarah Haugh
Report on Phase I Archaeological Survey of the Brookdale Village Project.
3609
Gammon, James G.
2007
Robert Bartone
Data Recovery Excavation at the Taxiway Site, Auburn-Lewiston Municipal Airport.
3695
2007
Robert Bartone and Ellen Cowie
3664
Archaeological Phase I Survey and Limited Phase II Testing at Paleoindian Site 23.39 ME within the Proposed Parallel
Taxiway for Runway 4-22 and Expanded W
Haugh, Sarah
37 Foster Road Project, City of Auburn
4025
2011
2010
Phase I Archaeological Survey Auburn Industrial Park Project, City of Auburn
3967
2008
Archaeological Survey Report Mechanic Falls Retail Center
3821
Hedden, Mark H.
1994
Lee Cranmer and Art Spiess
Route 26 Rehab at the Little Androscoggin River (PIN 701.10).
1994
Arthur Spiess
2840
2794
Report on Phase I Archaeological Survey of the Auburn Intermodal Transportation Facility, PIN 5643.
Moore, Edward
2002
Richard Will
3267
Report on Phase I Archaeological Survey of the Ferland Farm, Poland.
1998
Richard Will
Initial Investigation of the Janet Cormier Paleoindian Site (23.25).
MAS Bulletin, 38:1:23- .
1997
Richard T. Will
Archaeological Investigations at the Janet Cormier site (23.25), Poland.
2965
Mosher, John P.
2002
Report on Phase I Archaeological Survey of the Auburn-Lewistin Intermodal Facility (PIN7903.00).
3285
1997
2960
Nathan D. Hamilton
Report on Phase I Archaeological Survey of Proposed Poland Middle and High School Complex.
Petersen, James B.
1994
Belinda Cox
2822
Report on the Phase I Archaeological Survey of the Ferland Farm, Poland.
1987
Michael J. Heckenberger
An Archaeological Phase I Survey of the Proposed Littlefield Hydroelectric Project, Androscoggin Co.,ME.
Quinn, Catherine
1994
Harbour Mitchell, III
Report on Phase I Archaeological Survey of the Leo Ferland Project, Androscoggin County.
2457
2832
Spiess, Arthur E.
1989
Wilson, Deborah
Paleoindian lithic distribution in the New England-Maritimes Region.
in Eastern Paleoindian Lithic Resource Use, Christopher J. Ellis and Jonathan C. Lothrop (eds.), Westview Press, pp 7598.
1985
The Michaud Site (23.12): A New Major Fluted-Point Site in Auburn, Maine
Valimont, Brian
2007
Report on Phase I Archaeological Survey of Poland Place Adult Community.
2007
Report on Phase I Archaeolgical Survey of the Proposed Lakeview Heights Subdivison, Poland.
3650
3669
Quads
023
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Weeks, Lindsey
2013
Stuart Eldridge
4105
Town of Oxford, Maine, Waste Water Treatment Facility and Sanitary Collection System: Phase I Archeological
Investigation
Wilson, Deborah B.
1993
Report on Phase I Archaeogical Survey of the Marcal Hydropower Project.
1988
Steven Cox
Phase I Archaeological Survey of the Kittyhawk Subdivision,Auburn
023, 081
Spiess, Arthur
2012
2758
2504
Ellen Cowie and Robert Bartone
Geographic Clusters of Fluted Point Sites in the Far Northeast
pp. 95-110 in Claude Chapdelaine, ed. Late Pleistocene Archaeology and Ecology in the Far Northeast, Texas A&M
Press
023,003,036, Spiess, Arthur E.
1987
Deborah Wilson
037,049+
Michaud:A Paleoindian site in the New England-Maritimes Region.
Occasional Publication in Maine Archaeology 6. Maine Historic Preservation Commission. Augusta.
023,081
Curran, Mary Lou
1996
Paleoindians in the Northeast: The Problem of Dating Fluted Point Sites.
The Review of Archaeology, 17:1:2-10. (published fall 1997)
024
Bartone, Robert N.
2007
3707
Report on Phase I Archaeological Survey of the Route 196 Gayton Road Commercial Development.
Brigham, Michael
2005
Ellen Cowie
3488
Report on Phase I Archaeological Survey of the the Little Andy Park Project.
Burgess, William
2003
J. Mosher, A. Spiess
3302
Report on Phase II Archaeological Survey for Lisbon Bridge Improvements (PIN 10189.00).
Clark, James
2013
Richard Will, Karen Mack
Phase II Evaluation of Site 24.51, CMP Section 255 Lewiston-Auburn Reinforcement Project
4106
2011
Karen Mack
Phase I Precontact Survey Central Maine Power Lewiston Loop Project
3991
2008
Summary Report on 2006 Emergency Archaeological Mitigation, Wilson I Site (Site 24.33), Gulf Island/Deer Rips
Project (FERC No. 2283).
3744
2006
Report on Phase I Archaeological Survey of the M & N Lewiston Meter Station.
3604
2005
Phase I Archaeological Survey of the Johnson Woods Subdivision, 23 Hatch Road, Lisbon, Androscoggin Co.
3477
Corey, Richard
2006
Ellen Cowie
Report on Phase I Archaeological Survey of the Gendron Realty Retail Deveopment, Lisbon.
3521
Cox, Steven L.
1995
Report on Phase I Archaeological Survey of the Lewiston Downtown Development District.
2879
Cranmer, Leon E.
2000
A Report on the Phase I Archaeological Survey of the Sabattus Interchange for the Maine Turnpike Authority.
3114
Crock, John
2736
1992
James B. Petersen
Report on Phase I Archaeological Survey of Anderson Gravel Pit, Leeds.
1992
James B. Petersen
2709
(Brief findings report on) Phase I Archaeological Survey of Anderson Gravel Pit in Leeds.
Eldridge, Stuart A.
2002
Report on Phase I Archaeological Survey of the R. Belanger and Sons Irrigation Project.
3261
Freedman, Jacob
2007
James Clark and Richard Will
Report on Phase I and Phase II Prehistoric Study of the Riverbend Commons Subdivision, Cotton Road, Lewiston,
Maine (MHPC #3294-05)
3671
Quads
024
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Hamilton, Nathan D.
1990
M.Bibber,R.Florentin,M.Tomaso
2595
Archaeological phase I testing of the proposed Durham boat landing facility, Durham, Androscoggin County, ME.
Mosher, John P.
1994
Archaeological Reconnaissance of the Proposed Joatman Estate Subdivision, Auburn.
2817
Quinn, Catherine
1994
Harbour Mitchell, III
Report on Phase I Archaeological Survey of the Steven Keene Farm, Auburn.
2833
Shaffer, Gary
Halleluiah Farm Conservation Practices.
2007
3688
Spiess, Arthur
2009
Rt 136 Relocation, Auburn, MDOT PIN 16337.20
3852
Valimont, Brian
2012
Archaeological Resources Assessment proposed Highland Springs Cell Tower, Lewiston
4075
2006
Report on Phase I Archaeological Survey of the Proposed Auburn South Cell Phone Tower.
3616
024, 025,
027, 038 +
Clark, James
2009
Karen Mack
MPRP Pre-Contact Archaeological Phase II Summary Report
3913
024,025
Valimont, Brian
2006
Report on Phase I Archaeological Survey of the Proposed Grover's Mill Subdivision.
3565
024,036
Cowie, Ellen R.
2484
1988
James B. Petersen
An Archaeological Phase II testing of the Gulf Island/Deer Rips Project (FERC No. 2283).
1987
James B. Petersen
2464
An Archaeological Phase I Survey of the Gulf Island/Deer Rips Project.
024,036,048, Baker, Thomas R.
1989
Phase I Archaeological Investigations Conducted Along the Proposed CMP Transmission Tie to the Hydro-Quebec
049,065+
MAS Bulletin, 29:1:13-20.
Corridor
024,036,050, Petersen, James B.
Thomas Baker
1989
069,081
Preliminary Phase I Archaeological and Historic Structures Survey of the HVDC Tranmission Tie to Hydroquebec
2533
024,36/7,52/ Will, Richard T.
2001
Wyman (FERC 2329), Weston (FERC2325), Gulf Island/Deer Rips (FERC 2283), Oakland and Bonny Eagle (FERC 2529)
3,69,86
Monitored Erosion Sites.
3170
025
2108
Bourque, Bruce J.
1975
Report on an Archaeological Survey on the Lower Kennebec Valley, April-June 1975
Clark, James
2003
3311
Report on Phase I Archaeological Survey of a Proposed Logging Road, Greene Property--Ridge Road, Bowdoinham, ME.
Corey, Richard
2006
Robert Barrone
An Archaeological Phase I Survey of the Proposed Streamside Estates Subdivision.
3636
Cowie, Ellen R.
2000
Ed Kitson
A Report on the Phase I Archaeological Survey of the Cobbossee Campground.
3123
Cranmer, Leon E.
2010
Report on 2009 Archaeological Excavations at Thwings Point, Woolwich, Maine
3946
1995
Upper Kennebec Archaeological Survey Report #12 (Swan Island).
Dunn, Gerald C.
1954
A workshop at Lake Tacoma.
Massachusetts Archaeological Society Bulletin 15(3):57 .
1950
An Indian campsite on Cobbosseecontee Stream.
Massachusetts Archaeological Society Bulletin 12(1):1-8.
2888
Quads
025
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Haugh, Sarah
2013
Summit Natural Gas Pittston Take Station, Phase I Prehistoric Investigation
MHPC
Document #
4104
Heller, Andrew
2013
Alice Kelley
Report of Limited Geophysical Investigations of the Dresden Falls Archaic Site, Dresden
4169
Lenik, Edward J.
1974
A Preliminary Survey of Agry's Point, Pittston, Maine
2135
Mosher, John P.
2011
Phase I Archaeological Survey Lund and Wallentine LMF Acquisitions
3981
2003
Arthur Spiess
3283
Choice View Farm, Dresden, Archaeological Testing for LMFB.
Shaffer, Gary
2012
Field Check for Six River Farm, Bowdoinham
4090
2012
Field check, Jim Economou, Woolwich, high tunnel
4066
Shaw, Leslie
2002
Report on Phase I Archaeological Survey of the Proposed Hiatt Farm Road, Dresden.
3266
John Mosher, William Burgess
Smith, J. N. Leith
2011
Archaeological Phase I Survey of the Route 197 Bridge Replacement and Road Realignment, MDOT PIN 12674.00
Richmond and Dresden
3983
2006
Leon Cranmer, Arthur Spiess
3591
Archaeological Survey of the Umberhind, Detweiler and Gallant Parcels, Bowdoinham, Maine.
Spiess, Arthur
2012
Acquisition and Archaeology of the Dresden Falls Archaic Site
Maine Archaeological Society Bulletin 52(1):7-26
2011
Addendum, Prehistoric Material from Fort Richmond, site 25.58, for Phase II Intenstive Survey of Fort Richmond
4033
4156
2010
Houdlette Field Archaeological Test, site 25.45
Wilson, Deborah B.
2005
Report on Phase I Archaeological Survey of the Streamside Estates Subdivision, Gardiner, Maine (MHPC#1987-04)
2000
Report on the Phase I Archaeological Survey, Richmond Utilities District Project.
3475
3142
025, 39, 53,
71
Mack, Karen
025,053
Bradstreet, Theodore E.
Agry's Point Archeological Project
025?,054?
Dunn, Gerald C.
1964
An Interesting Maine Indian Site as Reported by George Lacome to Gerald C. Dunn
026
Bourque, Bruce J.
1978
2112
An Assessment of the Archaeological Resources of the Damariscotta Mills Portion of the Great Salt Bay Facility Study
Area
2009
James Clark, Maureen Smith, Richard Will
3825
Maine Power Reliabitity Report: Pre-Contact Archaeology Survey Report, Segments 3, 9, 10, 14, 15, 27, 29, 35, 39, 40A
and Substations
1984
Burgess, William
2008
Belvedere Road Bridge Replacement (PIN 15613.00).
Chadbourne, P.
1850
Oyster shell deposit in Damariscotta.
Maine Historical Society of Portland Collections 6:pp345-351
Cranmer, Leon E.
1998
Report on Phase I Archaeological Survey for MDOT PIN 5375.01, Alna.
2117
3763
3026
Quads
026
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Cranmer, Leon E.
1996
Arthur E. Spiess
2895
Phase I and II Archaeological Testing for the U.S. Fish and Wildlife Service and Damariscotta River Association.
Hamilton, Nathan D.
2007
Phase I Archaeological Survey of the CMP Damariscotta Mills Substation Expansion.
3719
Jackson, Dr. Charles T.
1839
(Whaleback Examination Report)
(Maine State Geologic Survey?)
Johnson, Frederick
1935
Excavations in the Glidden Shell Heap on the Damariscotta River, Newcastle, Maine.
Unpublished manuscript. Department of Archaeology, Phillips Academy,Andover, Massachusetts.
Mathiasson, Kåre
1998
Leon Cranmer
3015
3001
Phase I Archaeolgical Survey for MDOT PIN 7416.00-CRDA Project, Newcastle.
Moses, T. F.
1878
Shell Heaps on the Coast of Maine.
Proceedings, Central OH Scientific Assoc., 1:70-76. Urbana, OH.
1878
Shell Heaps on the Coast of Maine.
Proceedings, Central OH Scientific Assoc., 1:70-76. Urbana, OH.
Mosher, John P.
2008
Phase II Testing, Wiscasset Transportation Study (PIN 7991.00).
2007
A.E. Spiess
3537
3772
3680
Report on Phase I Archaeological Survey of the Wiscasset Transportatioon Study (PIN 7991.00).
2002
Arthur E. Spiess
3237
Archaeological Testing at the Whaleback Shell Mound for DRA.
2001
Leon Cranmer, Arthur E. Spiess
A Report on the Phase II Archaeological Testing of Austin Hill Realignment (PIN 9209).
3172
Myers, Alan C.
1965
The Damariscotta Oyster Shell Heaps: Some Further Considerations.
B.A. thesis, Department of Geology, Princeton University.
Shaffer, Gary
2013
Field check for Benjamin Marquis, Whitefield
2865
Spiess, Arthur E.
1999
Glidden Midden Collection Harvard Excavation Collection Examinanation Notes.
3112
1997
Mark Hedden
4142
3113
Catalogue of the Penny Collection Materials from the Damariscotta Shell Middens.
1979
Archaeological Location and Impact Study of the Wiscasset Route 1 Bypass Study Corridor
2150
Spiess, Athur E.
1997
Leon Cranmer
Whaleback Shell Midden A.T. Gamage Collection, Peabody Museum.
3111
Will, Richard T.
1991
James Clark
A Report of Excavation and Analysis in Progress at the Ann(e) Hilton Site.
2678
1989
A Preliminary Report on the Ann Hilton site.
Maine Archaeological Society Bulletin, 29:2:1-12.
1988
Rebecca Cole-Will
Rebecca Cole-Will
2502
Phase II Archaeological Assessment of Site 26.34, Lake Meadow Subdivision, Newcastle
1988
Rebecca Cole-Will
Phase I Archaeological Assessment of the Lake Meadow Farm Subdivision.
Willoughby, Charles B.
1910
edited by F.W. Hodge
Whaleback Shellheap.
IN Handbook of American Indians. Bureau of American Ethnology Bulletin #30 Part 2. p937
2498
Quads
026
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Wilson, Deborah B.
2004
3431
Report on Phase I Prehistoric Archaeological Survey of a Parcel of Land in Wiscassett and Phase II on 26.53 and 26.55.
2001
Finding People: Archaeology, History, and the Damariscotta River Oyster Shell Mounds.
3174
2000
Damariscotta River Oyster Shell Mound Collections.
3110
2000
3124
Features in the Glidden Mound.
026,027
2000
Damariscotta River Association 1999 Field School in Prehistoric Archaeology.
3098
2000
Phase I Archaeological Survey of the Freeman to Attwater Property Transfer, Damariscotta Shell Midden Historic
District.
3118
1999
Damariscotta River Association 1998 Field School in Prehsitoric Archaeology.
3055
1999
Damariscotta River Association 1997 Field School in Prehistoric Archaeology.
3054
Wyman, Jeffries
1869
Whale-back shell heap.
Peabody Museum Reports, No.2:17-19.
Berry, George Stillman
1898
The great shell mounds of Damariscotta.
New England Magazine ns. 19:178-188
Wilson, Deborah B.
1996
Bruce Bourque
Report on Phase II Archaeological Survey of the Damariscotta Mills Hydropower Project (FERC UL89-34-ME).
1995
T. Dinsmore
Report on the Phase I Archaeological Survey of the Damariscotta Mills Hydropower Project (FERC UL89-34-ME).
026,093,094, Kopec, Diane
A Summary of the Brown Collection
095,110+
027
1984
2981
2900
2848
2167
Burgess, William
2011
Phase I Survey Davis Bridge Replacement Project, North Jefferson
3964
Eldridge, Stuart A.
St George River Fish Restoriation Project.
3193
2001
Holmes, Raynold
1994
Gerald Hall Site: A single Component Susquehanna Site.
MAS Bulletin, 34 (1).
Mosher, John P.
2008
Arthur E. Spiess
3814
Phase II Archaeological Testing of Site 27.13 for the Narrows Bridge Replacement (MDOT 12680.00) Damariscotta and
Bremen
Robinson, Brian S.
1996
The Erkkila Site: Late Archaic and Middle Ceramic Period Cemetaries in Warren.
2930
Shaffer, Gary
2012
Jeffrey Nims, Union, T119, obstruction rock removal
4091
2002
Walkover Archaeological Survey of Allen's Blueberry Land, Waldoboro.
3251
Sidell, Nancy Asch
1993
Archaeobotany of Site 27.59 and 27.60, Warren.
3108
Spiess, Arthur
2011
Walkover Survey of Come Spring Farm, Union
3982
Spiess, Arthur E.
2006
Clary Hill Easement: Archeological Assessment for LMFB.
3598
Quads
027
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Spiess, Arthur E.
2005
Leith Smith
Turner Road Bridge Replacement Archaeological Assessment.
MHPC
Document #
3516
1993
Report on US Route 1 Reconstruction Archaeology in Warren.
2749
1988
Lee Cranmer
Route US 1, Waldoboro-Warren Heavy Rehabilitation:Report on Phase 1 Archaeology
2506
Wilson, Deborah B.
2004
Harbour Mitchell, III
3422
Report on Phase I Archaeological Survey of the Sukeforth Pit Access Road.
3264
2003
N.G.C. Lautman Site Report.
027,028,039
Mitchell, Harbour III
2003
St George River Archaeological Survey Survey II: Central Watershed 2002.
3290
027,038
Willoughby, Charles B.
Notes: Explorations in Miane.
3200
028
Cox, Steven
2013
Phase I Archeological Survey Proposed Pier Project, Bodin Property, Glen Cove, Rockport
1894
4159
Cox, Steven L.
2006
3596
Report on a Phase I Archaeological Survey of a Proposed Development on Brewster Point, Rockport, Maine: MHPC#
2946-05.
Dinsmore, Timothy
2006
Report on Phase II Archaeological Survey of the Knox Meeting House Site.
3552
Eldridge, Stuart A.
2006
Report on Phase II Archaeological Survey of Site 28.69, Cottages at Clam Cove.
3613
2001
Report on Phase I Archaeological Survey of the somerset Golf Course and Condominiums.
3187
2000
Survey Report Phase IB Archaeological Survey of Treasure Landing Subdivision, St. George.
3129
Hamilton, Nathan D.
2006
An Archaeological Phase I Survey of the Samoset Resort, Rockport/Rockland, Maine.
3571
Hedden, Mark H.
Burial in Snow's Garden, Site 28.22.
1991
2635
Mitchell, Harbour III
2002
Arthur Spiess
Early Bifurcate Base Point Occupation in the St. George River Valley.
MAS Bulletin, 42:1:15-34.
2001
28.53: 9000 Years of Occupation on the St. George River.
3180
1997
2941
1995
A Testing Effort in Camden: The Tibbetts Site.
2885
28.53: A Site to Behold.
Robinson, Brian S.
1995
The Overlock Site: A Late Moorehead Burial Tradition Site in Warren.
1990
2882
2576
Warren Wastewater Treatment Plant Survey.
Shaffer, Gary
2009
Field check for Bobby Caldwell, Rockport (stone circles)
3898
Smith, J. N. Leith
2011
John Mosher, Arthur E. Spiess
Archaeological Investigation of Matthew Simmons Property Cave, Beauchamp Point, Rockport
4000
Quads
028
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Sorg, Marcella
1993
Osteology and Odontology of Human Remains from Snow's Garden, Sprucehead Island.
MHPC
Document #
2751
1992
Osteology and Odontology of Human remains from Spaulding Island, Maine.
2735
Spiess, Arthur E.
2005
John Mosher
St. George River Valley Archaeological Survey, 2004 Season Preliminary Report.
3450
1988
Joan Robertson, Mark Hedden
The McLaughlin site: A Susquehanna and Woodland Occupation Site on the St. George River
MAS Bulletin 28:2
Valimont, Brian
2011
Proposed CMP Section 48 Rebuild, Rockland and Thomaston
Wilson, Deborah B.
1999
Report on Phase I Archaeological Survey of Grassy Pond, Rockport.
4084
3067
1994
Report on Phase I Archaeology of the Treasure Point Subdivision, St. George.
2814
1990
Final report on the phase I archaeological survey of the Knox Arboretum Subdivision in Warren, ME.
2593
Steven L. Cox
1989
Report on Phase I Achaeological Survey...Wastewater Treatment Facility, Rockport, ME.
2543
028,29
Bourque, Bruce J.
1993
Fox Islands and Mussel Ridge Surveys: Excavations at site 28.4
029
Barbian, Lenore
1994
2775
Ann Magennis
Variability in Late Archaic Burials at Turner Farm, Maine.
Northeast Anthropology
Bourque, Bruce J.
1996
On Misguided Methodology: A Response to Dincauze
The Review of Archaeology, 17:1:50-53. (published fall 1997)
1995
Diversity and Complexity in Prehistoric Maritime Societies: a Gulf of Maine Perspective.
Plenum Press, NY
1992
Report on Archaeological Excavations at the Candage Site (29.178), Vinalhaven.
2695
1985
Final Report on the 1984 Underwater Survey in the Fox Islands
2184
1981
Report on Archaeological Survey Activities Conducted by the Maine State Museum in Penobscot Bay, 1980
2113
1980
Arthur E. Spiess
Fox Islands Archaeological Project: Analyses of Faunal Remains. Final Report to the National Science Foundation.
2872
1976
Report on the archaeological survey of the Fox Islands, June-August, 1976.
2597
1976
The Turner Farm Site: A Preliminary Report
Man in the Northeast, 11:21-30
1975
Comments on the Late Archaic population of Central Maine: the view from the Turner Farm.
Arctic Anthropology 12:2:35-45
1975
Report on Archaeological Survey of Bear, Little Spruce Head and Compass Islands, Penobscot Bay, Maine
Cross, John
1990
Specialized Production in Non-Stratified Society: An Example from the Late Archaic in the Northeast
Ph D. dissertation, U. Mass
Cross, John R.
1993
Craft Specialization in Nonstratified Societies.
Research in Economic Anthropology, 14:61-84.
2107
3831
Quads
029
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Dincauze, Dena F.
1996
Deconstructing Shell Middens in New England.
The Review of Archaeology, 17:1:45-49. (published fall 1997)
Doyle, Robert G.
1982
Banded-Spherulitic Rhyolite on Vinalhaven Island, Maine
MHPC
Document #
Haviland, William
2007
Up from the Depths: A stone axe and sea level change
2122
4152
Robinson, Brian S.
1996
Archaic Period Burial Patterning in Northeastern North America.
The Review of Archaeology, 17:1:50-53. (published fall 1997)
Wilson, Deborah B.
2001
Report on Phase I Archaeological Survey of the slow Sand Filtration Facility, North Haven.
3204
2002
029,016,005, Will, Richard T.
Bone Artifacts: Continuity in Technology and Form in Pre-European Archaeological Sites along the Maine Coast.
044
Northeast Anthropology, 64:5-16.
029,030,042 Doyle, Robert G.
2008
Identification of Lithic Artifacts from Central Coastal Maine Archaeological Sites: a Case Study in Regional Lithic
Flying Passage
Press, Gardiner, ME.
Acquistion
Strategies.
029,041,042
Bourque, Bruce J.
1982
Report on Archaeological Survey Activities in Penobscot Bay, 1981
029?,030?,04 Varney, Lloyd H.
A Blue Hill Bay Coastal Midden Site
1?,042?
030
2114
1971
Belcher, William R.
1994
A Regional Approach to Fish Remains and Seasonality in East Penobscot Bay, Maine.
Fish Exploitation in the Past: 7th ICAZ Fish Remains Working Group. Van Neer, W.(ed).Annales du Musee Royal de
l'Afrique Centrale, Sciences..,Tervuren
1989
The Archaeology of the Knox Site, East Penobscot Bay, Maine.
MAS Bulletin, 29:1:33-46.
1989
Prehistoric Fish Exploitation on East Penobscot Bay, Maine: The Knox Site and Sea-level Rise.
Anthropology of Eastern North America, 17: 175-191.
1989
2539
Archaeological Investigations of the Knox Site (30.21), East Penobscot Bay.
Bourque, Bruce J.
2004
Report on Phase I Survey of Site 30.276, Fog Island, Knox County, Maine.
1985
Steven L. Cox
3404
3191
Report on 1985 Field Season, Lazygut Island.
1981
Steven L. Cox
Maine State Museum Investigation of the Goddard Site, 1979
Carpenter, Edmund
2003
Norse Penny
The Roche Foundation, NY.
Darrah, William Culp
1951
Powell of the Colorado (Especially Chapter 23: Haven).
Princeton University Press, Princeton
Hardy, Manly
1880
A shell heap near the south end of Great Deer Isle,Penobscot Bay: A letter to Professor E.W. Putnam.
Reports of the Peabody Museum:2 pp 197-98
Haviland, William
2003
Safe Passage to the Sea: An Ancient Canoe Route at Deer Isle, Maine.
3300
Hov, Andrew
2010
Lithic Analysis: Experimentation and Edge Wear
3924
MacKay, Robert G.
White Island, ME 30-46
1979
3355
Quads
030
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Mellgren, Guy
1965
The Goddard Site.
Eastern States Archaeology Federation Bulletin. 24( ):13
1958
Edward Runge
Goddard's.
Massachusetts Archaeological Society Bulletin 19:41-43.
Rice, Marshall
1979
A Rare Find
Sanger, David
1990
MHPC
Document #
William Belcher
2578
Eastern Penobscot Bay Survey 1989.
1981
Archaeological Investigations at Frazer Point and Duck Harbor, Acadia National Park, Maine
2145
Seaby, Peter
1979
The First Dateable Norse Find from North America?
Spiess, Arthur E.
1999
Summer at Naskeag: Faunal Analysis of the Goddard Assemblage
1982
A Skeleton in armor: an unknown chapter in Maine archaeology.
Maine Archaeological Society Bulletin 22:1:17-24
Will, Richard T.
2005
Jacob Freedman
3223
3494
Archaeological Survey of the Warren Point Cottages Subdivision, Deer Isle.
030, 042
Hollinger, Eric
2012
4154
Smithsonian Institution Accession Records, Frank H. Cushing work, Brooklin, Maine, Lower Torry Island, Tibbetts Shore
030,031,042
Cox, Steven L.
1981
Report on the 1980 Field Season of the Goddard Archaeological Project.
030,031,042,
043
2554
1983
The Blue Hill Bay Survey
030,031,043, Sanger, David
1974
Archaeological Survey of Acadia National Park
044
Wright, Shannon
2004
M.Mulhollnad,T.Binzen,C.Donta,S.Swihart
Archaeological Overview and Assessment of Acadia National Park, Maine.
030,031,043, Kopec, Diane
1990
Survey of Frenchman Bay and Adjacent Areas 1989.
059
2141
3426
2560
030,041,042
Allison, Roland
1951
Digging and searching the shell heaps of Maine,Algonquin Culture,Eggemoggin Reach, Hancock County, Maine.
Ohio Archaeologist 1(1):16
030,041,042, Bradley, James W.
1994
Preparing for Repatriation: An Assessment of Human Remains from the Maine Collections of the R. S. Peabody
043,057
Museum.
030,042
Haviland, William
2005
A Safe Passage to the Sea: An Ancient Canoe Route at Deer Isle, Maine.
MAS Bulletin, 45:1:25Kellogg, Douglas
1992
David Sanger
Survey for Prehistoric Archaeological Sites Along the Shores of Deer Isle, Maine, June 1991.
Rice, Marshall
Deer Isle Ceramics
2825
2688
1976
1965
Deer Isle Glances
030,042,058
031
Bourque, Bruce J.
1971
Prehistory of Central Maine Coast.
Doctoral thesis: Harvard University
Abbe Museum
1994
The Indian Shell Heap: Archaeology of the Ruth Moore Site.
3651
Quads
031
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Balser, Andrew
2000
Report on Archaeological Investigation of the Potted Raven Site (31.5), Swan's Island.
MHPC
Document #
3147
Bruce, Walter G.
1964
A Preliminary Report of Four Season's Work at Swans Island, Maine
Claesson, Stefan
2009
Arthur Spiess, Daniel Belknap, Joesph Ke
Blue Hill Bay Submerged Prehistoric Landscape Survey
3877
Clark, James
Proposed Elliot Pier, Tremont.
3593
2006
Cole-Will, Rebecca
1997
Report on Archaeological Assessment of Site 31.2, Pond Island.
Cox, Steven L.
1994
Gary Lowless
The Indian Shell Heap: Archaeology of the Ruth Moore Site.
Blackberry Books, Nobleboro, ME.
1994
Report on 1993 Investigations at Site 31.5, Swan's Island.
2976
3148
1992
Archaeological Investigation of Site 31.5, Roderick Head, Swans Island.
2687
1992
Robert Abbe Museum's 1992 Archaeological Investigation at the Ruth Moore Site (31.17) Great Gott Island.
2748
1990
Diane Kopec
3308
Abbe Museum's Excavation at Swan's Island.
MAS Newsletter:4:2:1-5.
Kelley, Joseph
2010
Daniel Belknap, Stefan Claesson
Drowned coastal deposits with associated archaeological remains from a sea-level "slowdown": Northwestern Gulf of
Geology
Maine,
USA 38:695-698
Kopec, Diane
1990
Steven L. Cox
Survey of the Frenchman's Bay and Adjacent Areas, 1990.
2609
National Park Service
NAGPRA Inventory Notice, Pond Island.
3625
2006
Price, Franklin
2007
Blue Hill and Frenchman Bay Fisherman Interview Project.
2007
3720
A.E. Spiess
A New Submerged Prehistoric Site and Other Fishermen's Reports Near Mount Desert Island.
MAS Bulletin, 47:2:21-35.
Sanger, David
1990
Diane Kopec
Report on the Abbe Museum Archaeological Investigation of Site 31.45, Swans Island, ME.
2605
Sorg, Marcella
1992
Osteology and Odontology of Human Remains from Orono Island, Maine.
2693
031(?)
Bruce, Walter G.
Long Cove, A Maine Shell-Deposit Site
1965
031,043
Kopec, Diane
1988
Steven Cox
2509
Survey of Frenchman Bay and adjacent areas - 1988
031,043,044
Prins, Harald
1989
Natives and New Comers: Mount Desert Island in the age of Exploration.
in, An Island in Time, Robert Abbe Museum Bulletin 12.
031,043,044, Kopec, Diane
1987
The Abbe Museum's Frenchman Bay Survey--An Historic Perspective.
058,059
Maine Archaeological Society Bulletin 27:1:10-30
031,043,058,
1986
Survey of Frenchman Bay and Adjacent Areas - 1985
059,060+
2322
Quads
031,043,059
032
032,033
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Cox, Steven L.
1987
Diane Kopec, Tim Kupferschmid
Survey of Frenchman Bay and Adjacent Areas-1987
MHPC
Document #
2470
Haugh, Sarah
2012
Three Ring Binder Project, Gilead Pole Installations
4087
Potter, Jane
1988
The Steven's Brook Site: A Geologic Interpretation
2499
Wheeler, Kathleen
1995
Findings from the 1994 Archaeological Investigation at the Brickett House, White Mtn. National Forest.
2855
Hedden, Mark H.
3324
2003
Leon Cranmer, Arthur E. Spiess
An Archaeological Survey on Route 2 Between Gilead and Bethel, ME (MDOT PIN #9184.00)
033
Bartone, Robert N.
2011
Bethel Water District River Crossing Project-- Phase I Survey
4004
3685
2007
Report on Phase I Archaeological Survey of the Mount Hill Subdivision, Bethel.
Brigham, Michael
2008
Ellen Cowie
Archaeological Phase I Survey of the Bethel Pathway-Telstat Trail Poject, Bethel, End-of-Field Letter Report.
3798
Ellen Cowie
2006
3585
Archaeological Phase I Survey of the Proposed Bethel Pathway-Angevine Park Extension Project (MHPC # 2979-05) in
Bethel, Maine.
Corey, Richard
2010
G-J Hudgell, Robert Bartone, Ellen Cowie
3935
Archaeological Phase I Survey and Phase II Testing of the Proposed Mount Will subdivision Project (MHPC 71-07),
Bethel.
2007
Ellen Cowie
Report on Phase II Archaeological Survey of the Mount Will Subdivision, Bethel.
3699
2004
Robert Bartone
Report on Phase I Archaeological Survey of the Merrill Hill Estates.
3424
J. B. Petersen
Cox, Belinda
1995
Report on Phase I and II of Proposed Bethel Station Project, Oxford Co., Maine.
1994
2844
2838
James B. Petersen
Report on the Phase I Archaeological Survey of the Sunday River Skiway Corporation Proposed Sunday River Project.
Crock, John
1993
2842
James B. Petersen
Report on Phase IIb Archaeological Testing of ME 33-6 on the Maine Army National Guard Bog Brook Training Site.
1992
James B. Petersen
Report on the Phase IB Archaeological Survey for the Maine Army National Guard for the Bog Brook Training Site,
Gilead.
Feighner, Edna
2001
PNGTS Cultural Resources:, Post Construction Final Monitoring
Freedman, Jacob
2006
Rick Will
2716
3166
.
3600
Report on Phase I Archaeological Survey of the Colony Project, Newry.
Hamilton, Nathan D.
1991
Chamberlain Development, Phase II Information.
2634
1985
James B. Petersen
2446
An Archaeological Phase I Survey of the Proposed Colonel Dyke Airfield Runway Project, Bethel, Oxford County, Maine
Mathiasson, Kåre
2007
Bridge Replacement PIN 15619, Route 2, Gilead.
3730
Quads
033
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
McPheters, Hutch
2007
Robert Bartone
Archaeological Monitoring of the Belfast Water District Waterline and Wells.
MHPC
Document #
3736
Moore, Edward
2005
Richard Will
Phase I Archaeological Study of the Maine National Guard Bog Brook Training Facility, Gilead, Oxford Co.
3474
Mosher, John P.
2010
Arthur E. Spiess
Four Ponds Timber Sale Prehistoric Archaeological Survey
3917
2005
Report on Phase I Archaeological Survey of the Sunday River Road Upgrade (PIN 11567.00), from Rt2 to Newry, in
Bethel, Maine.
Mulholland, Mitchell
Interim Report, PNGTS.
3461
3007
1998
O'Toole, Daniel
2012
Archaeological Survey for Albany South Timber Harvest, White Mountains National Forest
4072
Potter, Jane
1987
Stevens Brook: A New Androscoggin River Site.
2462
Putnam, David E.
2007
3678
Results of the Phase I Prehistoric Archaeological Survey of the Proposed "Pines at Sunday River" Development LLC,
Newry (MHPC # 2829-05).
Roenke, Karl
1992
White Mountain National Forest--Crocker Pond.
2730
1992
Report on Phase I Archaeological Survey of Round Pond Timber Sale, White Mountain National Forest.
2699
1992
2701
(addendum to) Report on Phase I Archaeological Survey of Compartment 28 Timber Sale, White Mountain National
Forest.
1992
Report on Phase I Archaeological Survey of Compartment 28 Timber Sale, White Mountain National Forest.
Shaffer, Gary
Ruel Swain, Bethel, stream crossing/ford
2012
Smith, J. N. Leith
2009
2698
4065
John Mosher
4166
Archaeological Phase I and II survey for the Route 2 Realignment and Wild River Bridge Replacement, MDOT #15619,
Gilead
Spiess, Arthur E
Fieldcheck Bear River Bank, Newry, Maine
2009
3864
Spiess, Arthur E.
Bear River Rips Water Access.
2003
3292
1994
Leon Cranmer
Crocker Pond Area Archaeological Survey, White Mountains National Forest.
2796
Thomas, Peter A.
2006
Archaeological Site Identification Survey for MHPC # 2258-05: Hazard Mitigation Grant Application, Sunday River
Erosion Control, Newry, Maine.
3582
Tomaso, Matthew S.
2585
1990
Nathan Hamilton
Phase I Survey of the Proposed Newry Gravel Pit Expansion, Newry, Maine
1990
Nathan D. Hamilton
Archaeological Phase I Survey of the Proposed Chamberlain Development, Hanover, ME.
Valimont, Brian
2010
Proposed Foot Bridge over Androscoggin River to Hastings Island, Bethel Outdoor Adventures
2558
3972
Quads
033
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Wilson, Deborah B.
2005
Report on the Phase I Archaeological Survey of "The Peaks" Subdivision, Newry, Maine, MHPC # 2688-04.
MHPC
Document #
2001
Report on Phase I Archaeological Survey of the Hodson Farm, West Bethel.
3202
2000
Phase I Archaeological Survey of the Proposed Wilson's Ripps Subdivision, West Bethel.
3128
033,034,035, Kellogg, Douglas
1997
Kathleen Wheeler
49,50,51
Report on Phase IB Archaeological Survey of the PNGTS Rumford-Jay Lateral.
033,048
3482
Mosher, John P.
2005
Art Spiess, Lee Cranmer
2964
3491
Ketchum: A Phase I Archaeological Survey of an Abandoned Western Maine Farming and Logging Community in the
Frenchman's Hole LMFB Purchase, Riley Township.
034
Cox, Belinda
1993
J.B. Petersen
Report on the Archaeological Survey of Abbott Mills, Rumford Center for Senior Citizens.
2774
Eldridge, Stuart A.
2009
Spruce Mountain Wind Project, Phase 0 Archaeological Reconnaissance
3911
Mosher, John P.
2012
The Kimball's Ferry Site and the Martin Memorial Bridge Replacement at Rumford Point
Maine Archeological Society Bulletin 52(2):1-26
Leith Smith
2011
3978
Phase I Archaeological Survey for the Martin Memorial Bridge Replacement at Rumford Point
Wilson, Deborah B.
2001
Report on Phase I Archaeological Survey of the Hastings Farm, Bethel.
3208
1998
Report on Phase I Archaeological Survey of a Parcel of Land in Hanover, ME.
2990
1998
Report on Phase I Archaeological Survey of the Leona Kahkonen Property, West Paris.
3031
034, 51, 59
Eldridge, Stuart
2011
Phase I Archaeological Report Three Ring Binder Project GAP 1-7
035
Bartone, Robert N.
2007
Ellen Cowie
The Late Paleoinidan Beaver Pond Site, 35.19, ME.
MAS Bulletin: 47:1:43-48.
2005
Ellen Cowie
4005
3514
2005 Season at Beaver Pond Site, Bear Pond Village.
Beale, David W.
2007
Robert Bartone and Ellen Cowie
3661
Archaeological Phase I Survey and Phase II Testing of the Bear Pond Village Project (MHPC Project # 0709-04), North
Turner.
2006
Ellen Cowie
Archaeological Phase I Survey of the Proposed New Town Center, Canton, Oxford County, Maine.
3575
Corey, Richard
1996
James B. Petersen
Report on Phase I Archaeological Survey of the Maxwell Farm Tract 255, Canton.
2921
Freedman, Jacob
3618
2006
James A. Clark
Report on Phase I Archaeological Survey of the Proposed Nezinscot Meadows Real Estate Subdivision in Buckfield, ME.
Hamilton, Nathan D.
1988
John P. Mosher
2486
An Archaeological Phase I Survey of the Proposed Pine Shore Development, Hartford.
Haugh, Sarah
Commercial Development Project, Turner
2009
Stuart Eldridge
Hedden, Mark H.
2002
Arthur E. Spiess
Report on Phase I Archaeological Survey of the Road Approach to Gilbertville Bridge (PIN 7711.00)
3859
3241
Quads
035
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Hedden, Mark H.
1991
Field Check of Reported Late Archaic Burial Site, Canton.
MHPC
Document #
2659
Mosher, John P.
2006
Arthur E. Spiess
Report on Phase I Archaeological Survey of the Androscoggin River Access Parcel, Canton.
3538
Scharoun, Stephen
2007
Robert Bartone, Ellen Cowie
Limited Archaeological Phase I survey of the Canton Floodplain Relocation and Demolition Project.
3721
2005
3493
Robert Bartone, Ellen Cowie
Report on Phase I Archaeological Survey of the Canton Floodplain Relocation and Demolition.
035, 050
035,036
Shaffer, Gary
2007
Michael Brann's Conservation Practices, Dixfield.
3690
Will, Richard T.
2004
John Maron, Karen Mack
Phase III Data Recovery of the Conant Site (35.15), Riley-Livermore Project (FERC# 2375), Oxford Co., Maine.
3388
Corey, Richard
1996
James B. Petersen
Report on Phase I Archaeological Survey of the Maxwell Farm Tracts 248 and 251.
2927
Eldridge, Stuart A.
2011
Phase 0 Archaeological Reconnaissance, Phase I Prehistoric Survey, Canton Mountain Wind Project
4022
Crock, John
2710
1992
James B. Petersen
An Archaeological Phase I Survey and Phase IIa Testing for the DeCoster Egg Farms, Turner.
035,050,051
Corey, Richard
1997
J.B.Petersen, Ellen R. Cowie
2957
Archaeological Phase I Survey and Phase II Testing of the Riley-Jay-Livermore (FERC 2375) and Otis (FERC 8277)
Projects.
035,051
Moore, Edward
2004
Richard T. Will
Phase III Data Recovery of the Big Pine and Shed Sites, Riley-Jay-Livermore Project.
3374
036
Bartone, Robert N.
2001
Report on Phase I Archaeological Survey of the Varney Farm Manure Storage Pit.
3211
James B. Petersen
1994
Report on Phase I Archaeological Survey of the Lovewell Farm.
Brigham, Michael
2008
Ellen Cowie
2911
3749
Archaeological Phase I Survey of the Proposed Jordan Ventures, Kingfield Development Project (MHPC 2262-07),
Kingfield.
2006
Ellen Cowie
Archaeological Phase I Survey of the Proposed Mountain View Acres Project (MHPC #1181-06) in Leeds, Maine.
Clark, James
1999
Phase III Mitigation of the Quartz Scraper Site.
3580
Richard Will, Janet Cormier
3038
1995
Richard Will, Janet Cormier
Phase III Archaeological Investigation of the C. Varney Site (36.30).
2856
Corey, Richard
1998
Leeds Stumpthumpers Snowmobile Club, Lewiston to Jay Recreational Trail.
3025
Cowie, Ellen R.
1990
Recent Archaeological Investigations on the Southern Androscoggin River valley, Maine.
MAS Bulletin, 30: 1: 1-14
Cox, Belinda
1997
James B. Petersen
The Varney Farm (36-57 Me): a Late Paleoindian Encampment in Western Maine.
MAS Bulletin, 37:2:25-48.
1995
James B. Petersen
The Varney Farm Site (36-57): A Late Paleoindian Encampment in Western Maine.
2868
Quads
036
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Hedden, Mark H.
2000
Athur Spiess
A Report on the Phase II Archaeological Survey of Site 36.64 at Schoolhouse and River Roads, Livermore.
MHPC
Document #
1999
Report on Phase I Archaeological Survey of Route 133 Bridge Over Pocasset Lake Outlet in Wayne (PIN 5720.20).
3099
3037
3149
1999
Fieldnotes on Site 36.63.
1993
Report on Phase I Archaeological Survey of Taylor Pond.
Mack, Karen
2011
James Clark
2914
3995
Phase III Precontact Data Recovery Big Ram Site Gulf Island/Deer Rips Project (FERC 2283), Turner
2011
James Clark
Results of 2008-2010 Phase III Mitigation Wood Island Site (36.37), NextEra Energy Resources
3992
2011
James Clark
Phase III Precontact Data Recovery Cape Site, Gulf Island/Deer Rips project (FERC 2283) Turner
3996
Matson, Don
1994
Arthur Spiess
The Yindra-Barus Site: An Archaic Indian Camp on Androscoggin Lake.
MAS Bulletin, 34:2, 11-24.
Mosher, John P.
2011
Leith Smith
3987
Phase I Archaeology for Turner Center Bridge Replacement (PIN 17234.00) in Turner and Greene
2005
Testing the Route 219 Bridge at Dead River, Leeds: Field Notes.
3478
2004
Leon E. Cranmer
Report on the Phase I and II Archaeological Survey of the Leeds-Turner Bridge Replacement (PIN 10198.00).
3366
Petersen, James B.
1998
Belinda Cox
The Varney Farm Site: Dating the Late Paleoindian Period in Northeastern North America.
Current Research in the Pleistocene, 15:57-60.
1986
Ron Newcomb
An Aboriginal Ceramic Vessel fromn Androscoggin Lake, Androscoggin County, Maine.
MAS Bulletin 26:1 p3-13
Shaffer, Gary
2013
Cattle Yard Improvements for Carlton Pinkham, Fayette, Kennebec County
2007
Report on Phase I Archaeological Survey of Troy Varney's Fencing and Pipeline.
Spiess, Arthur E.
2006
William Burgess
Parker Pond Headlands Assessment: Archaeological Assessment for the Land for Maine's Future Board.
4122
3705
3525
1991
A Red Paint Effigy from Wayne, Maine.
AENA 19:163-170
Will, Richard T.
2008
3745
Preliminary Findings of a Partial Archaeological Data Recovery at the Wood Island Site (Site 36.37), Gulf Island/Deer
Rips Project (FERC No. 283).
2001
A Report on the Phase I Archaeological Survey of the Monmouth Water Maine Interconnection.
037
3164
Bourque, Bruce J.
1991
Report on Excavations at Site 37.5 (Cobbosseecontee Dam South)
2667
1990
Report on excavations at site 37.5 (Cobbosseecontee Dam South).
2596
Brigham, Michael
2010
Stephen Scharoun, Robert Bartone
Archaeological Phase I Survey of the Proposed Bond Brook CSO Abatement Project
3949
Quads
037
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Cranmer, Leon E.
2001
Arthur E. Spiess
A Report on the Phase Iand II Archaeological Survey for the Augusta-Gardiner Bikeway, PIN 6854.
MHPC
Document #
3176
1999
Kåre Mathiasson
A Report on the Phase I Archaeological Survey of the Augusta-Gardiner Bikeway (PIN 6854.00)
3052
1999
A Report on the Phase I Archaeological Survey for the Augusta River Crossing Project (PIN 556.11).
3040
1992
Arthur Spiess
2705
Jamies Pond Reconnaissance Archaeological Survey
Kelley, Alice R.
Archaeology: Site 37.40.
3363
2003
Mosher, John P.
2004
A.E. Spiess, Alice Kelley
Phase II Testing of Site 37.40, Augusta River Crossing Project.
3358
Robinson, Brian S.
Horse Point Gravel Pit Survey, Belgrade.
2577
1990
Spiess, Arthur E.
1987
Deborah Brush
High on a Hill above the Kennebec:The Shepherd Site
Maine Archaeological Society Bulletin 27:2:3-15
Spiess, Athur E.
2006
Mark Hedden
3595
Belgrade Stream, Mt. Vernon, Water Access for LMFB.
Valimont, Brian
Proposed Sidney Cell Tower.
3703
2007
Will, Richard T.
2013
James Clark
Archaeological Evaluation of Preposed Telecommunications Tower, Sidney
037, 052
037, 052,
053
037,038
4144
Clark, James
2009
3829
Results of 2008 Annual Archaeological Sites Monitoring Messalonskee Lake, Oakland/Automatic Project (FERC 2556)
2010
Richard Will
Messalonskee Stream Hydro, Messalonskee Lake Monitored Erosion Sites
Spiess, Arthur E.
2003
Edwards Dam Removal: 2000 Impoundment Margin Prehistoric Archaeological Survey.
MAS Bulletin, 43:1-16.
2001
Edwards Dam Removal: 2000 Impoundment Margin Prehistoric Archaeological Survey.
2000
Leon Cranmer
Edwards Dam Removal Initial Archaeological Survey Results.
MAS Bulletin 40:2:11-34.
Will, Richard T.
1995
James Clark, Janet Cormier
Phase II Archaeological Testing of the Augusta Hydroelectric Project (FERC 2389).
3966
3171
2863
037,038,025, Bourque, Bruce J.
1976
Report on the archaeological survey of the lower Kennebec valley and adjacent areas.
026,015+
2597
037,038,053
Spiess, Arthur E.
2000
Leon Cranmer
Edwards Dam Removal, Initial Archaeological Survey Results.
3122
Will, Richard T.
2640
1991
James Clark, Rebecca Cole-Will
Phase I Archaeological Survey of the Augusta Hydroelectric Project (FERC 2389).
037,052,053
Clark, James
2008
Annual Archaeological Sites Monitoring, Messalonskee Lake (FERC 2556-ME).
3740
2007
Oakland/Automatic Project, Messalonskee Lake Monitored Erosion Sites.
3660
2005
Results of Archaeological Site Monitoring--Oakland Automatic Project (FERC 2559,2555)
3439
Quads
037,052,053
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Crock, John
1992
James B. Petersen
2697
Supplemental Archaeological Phase II Testing of the Oakland (FERC No. 2559) and Automatic (FERC No. 2555) Projects,
Kennebec County, Maine.
1992
Catherine Quinn, J.B. Petersen
2626
Archaeological Phase II Testing of the Oakland Project, Deer Rips Project, Automatic Project and Union Gas Project.
Ferreira, Leigh
1990
James B. Petersen
Archaeological Phase I Survey of the Oakland...,The Rice Rips...,Automatic...and Union Gas projects.
037,073,090, Knight, James A.
1985
Differential Preservation of Calcined Bone at the Hirundo Site, Alton, Maine
154
038
Sidell, Nancy Asch
Site 38.53 Floral Remains.
2001
Spiess, Arthur E.
2004
The Hassen Collection, Otter Creek Points, and the Archaic on the Kennebec River near Augusta.
MAS Bulletin, 44:1:1-14.
2000
Leon Cranmer
The Dow Site: a Late Ceramic Camp and Historic Mill Complex.
1992
A Hell Gap Point and Late Paleoindian in Maine.
MAS Bulletin, 32:2:31-.
Trautman, Elizabeth A.
1996
A Gouge, a Scraper, an Adze Lying Amongst the Glads: a Further Look at the Cates Farm Site.
MAS Bulletin, 36:2:25-.
1991
Arthur Spiess
2557
2188
3188
3140
2643
The Cates Farm: A Descriptive Report.
039
Wilson, Deborah B.
1999
A Report on the Phase I Archaeological Survey in Weeks Mills.
3061
Cox, Steven L.
1998
Wired: Investigating a High Voltage Paleo-Indian Site in Searsmont, Maine
NEAA meeting, March 14, 1998
1994
Bruce Bourque, Richard Corey++
Phase II Investigation of of Site 39.1, Searsmont.
3914
Mitchell, Harbour III
2002
St. George River Archaeological Survey: The Northern Watershed, 2001.
3225
Shaffer, Gary
2011
Patricia Crawford, Searsmont, tree/shrub establishment
4015
2789
039,24,14,36 Clark, James
2008
Karen Mack, Maureen Smith, Rick Will
,37,38,4
Maine Power Reliability Program; Pre-Contact Archaeology Survey Report for Segments 1,4,6,17,18 and 19.
3794
040
3105
Burgess, William
2000
Leon Cranmer
Report on Phase I Archaeological Survey of the Ducktrap Property for LMFB.
Cranmer, Leon E.
1995
Arthur Spiess
2851
Report on the Phase I and II Archaeological Survey on PIN 1872, Site 40.8, Ducktrap River Bridge, Route 1, Lincolnville,
Maine.
Mitchell, Harbour III
1992
A Salvage Effort on the Coast of Maine: The Lehmann Site (40-3)
MAS Bulletin, 32:2:1-14.
1991
40.3: The Lehmann Site.
2676
Mosher, John P.
2009
Leith Smith
Phase I Archaeological Survey of the Appleton Preserve on the St. George River
3840
Shaffer, Gary
2011
Springdale Jerseys, Inc., Waldo, deep tillage (letter report)
3986
Quads
040
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Will, Richard T.
2003
Snowmobile Bridge Repair, Ducktrap River.
MHPC
Document #
3351
040,041
Bourque, Bruce J.
1975
Report on Archaeological Survey and Salvage at Sears Island and Kidder Point, Searsport, Maine
2106
041
Bock, Paul
2013
Sharon Catus
"The Indian Carrying Place": An Initial Investigation of Lowder Brook, Cape Jellison, Stockton Springs
4107
Cox, Steven L.
2007
Report on Phase I Archaeological Survey of a Proposed Pier Construction Site in Brooksville, ME.
3673
2005
Report on Phase I and II Archaeolgical Investigations of a Parcel of Land on Northeast Point, Isleboro, Maine.
Cranmer, Leon E.
1996
Arthur E. Spiess
Report on Phase I and Phase II Archaeological Survey of Sears Islandand Kidder Point, PIN 99.10.
Hedden, Mark H.
1991
A Winged Figure Incised on a Slate Pebble.
Maine Archaeological Society Bulletin 31(1):41Mitchell, Harbour III
1997
1000 B.P. in West Penobscot Bay: 41.68 & 41.68A.
Maine Archaeological Society Bulletin, 37:1:231996
The Middle and Late Ceramic Period in West Penpbscot Bay: sites 41.68 and 41.68a.
3592
2891
2928
2854
1995
Phase I Testing of the Belfast Bay Site.
2805
1994
41.68a: The Edwin Ames Site, A Preliminary Report.
1993
The Carr Site (41.66): a Middle Ceramic Period site in Northport, Maine.
MAS Bulletin 33(2):331993
41.68a: The Edwin Ames Site, A Preliminary Report
Morrison, Peter
2005
Report on Phase I/II Archaeological Survey of the New (Water) Facility, Wither Hill, Castine.
Petersen, James B.
2004
3460
Malinda Blustain, James W. Bradley
Mawooshen Revisited: Two Native American Conact Period Sites on the Central Maine Coast
Archaeology of Eastern North America 32:
Spiess, Arthur
2010
Fort Point Beach Site 41.54, Stockton Springs, Additional Information
Spiess, Arthur E.
1999
Archaeological Test of MBNA's Lincolnville Picnic Area.
1983
2782
3947
3075
Mark H. Hedden
Kidder Point and Sears Island in Prehistory
041, 042,
056
041, 42
041,026
Will, Richard T.
2004
Ocean Falls Estates, Lincolnville (Field Visit).
3368
Wilson, Deborah B.
1994
Report on the Phase I Archaeological Survey of the Mosman Park, Searsport, Maine.
2821
Petersen, James
2004
Malinda Blustain, James W. Bradley
"Mawooshen" Revisited: Two Native American Contact Period Sites on the Central Maine Coast
Archaeology of Eastern North America
Petersen, James B.
2004
Malinda Blustain
In the Land of Mawooshen: Native American Perishables from Two Contact Period Sites on the Central Maine Coast
Perishable Material Culture in the Northeast, ed by Penelope B. Drooker, NYSM Bulletin 500
McDonald, Jerry N.
1987
Susan L. Woodward
Indian Mounds of the Atlantic Coast
McDonald and Woodward Publishing, Newark, Ohio.
Quads
042
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Byers, Douglas S.
1979
The Nevin Shellheap
Andover: Phillips Academy
Cox, Steven L.
2009
Archaeological Investigations at the Scott's Midden Site, Deer Isle.
MHPC
Document #
3881
2008
2007 Scott's Midden, Island Heritage Trust, Archaeological Field School.
3770
2007
Preliminary Archaeological Testing of the Scott's Midden Site (42.82).
3726
Crader, Diana
1995
Nathan D. Hamilton, Arthur Spiess
4037
Late Archaic Faunal Remains from Occupation I at the Nevin Site, Blue Hill, Maine
Cutten, Deborah
1991
Nathan Hamilton
Nevin (42.1) and Richards (42.2) Site Catalogue (4 Volumes).
2637
Dinsmore, Timothy
2010
Phase I Prehistoric and Historic Archaeological Survey Cell Tower Lease 409 North Deer Isle Road
3975
Mack, Karen
1998
Report on the Phase I Archaeological Survey of the Loomis Parcel, Flye Point.
3008
Shaw, Leslie
1988
A biocultural evaluation of the skeletonal population of the Nevin site, Bule Hill,Me.
Archaeology of Eastern North America 16:55-77
Smith, J. N. Leith
2006
Arthur E. Spiess
3524
Billings Pond, Blue Hill Water Access Project: Archaeological Assessment for the Land for Maine's Future Board.
Snow, Dean R.
1970
A Middle Woodland Site on the Coast of Maine.
Van Horn, David M.
2002
Liberty School Test Excavation at the Woodger Site.
3275
Will, Richard T.
2006
Report on Phase II Archaeological Survey of the Herrick Bay Subdivision.
3603
Rebecca Cole-Will
1989
Phase I archaeological assessment of the Littlefied Property, Brooksville, ME.
2529
042,030
Reed, Jessica
2005
Accession Number 29020: Final Collection Report (Smithsonian).
3649
042,043
Cox, Steven L.
1983
Blue Hill Bay Survey: Report on 1982 Field Work
2119
042,074,091
Snow, Dean R.
Recollecting Maine Archeology, 1966-1970.
043
Brigham, Michael
2009
Stephen Scharoun, Ellen R. Cowie
Phase II Survey of Site 43.38, Proposed Indian Point Road Subdivision Project, Bar Harbor
2006
3890
Carter, Benjamin
2010
3945
Two Sites Downeast: Archaeoloigcal Investigations of the Richmond/Castle and Joy/Flood sites, Drew University Field
School
Cole-Will, Rebecca
2003
Richard Will
3320
Preliminary Report on Archaeological Testing, Site 43.9, Allen Island.
1997
2945
Examination of Fish Point Shell Midden.
1997
Report on Phase I Archaeological Testing of a Portion of Site 43.75, Fish Point, Great Cranberry Island.
1996
Richard Will
A Probable Middle Archaic Cemetary: The Richmond-Castle Site in Surry, Maine.
AENA, 24:95-148.
2958
Quads
043
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Cowie, Ellen R.
2006
3573
Report on Phase II Archaeological Survey of Site 43.38 ME Located in the Proposed Indian Point Road Subdivision
(MHPC #2313-05), Bar Harbor, Hancock County
Freedman, Jacob
2007
Richard T. Will
Report on Phase I Archaeological Survey of the Knote Property.
3657
Putnam, David E.
2008
Report on Phase I Archaeological Survey of the Kim Graham Property Development.
3752
Sanger, David
1989
Insights into Native American Life at Fernald Point.
in, An Island in Time, Robert Abbe Museum Bulletin 12.
1980
Barbara Johnson,others
2144
Archaeological Salvage and Test Excavations, Fernald Point, Acadia National Park, Maine
Spiess, Arthur E.
2008
Abbe Museum Field School 2007: Site 43.18 and Feature 1.
MAS Bulletin: 48:1:27-36
2008
Abbe Museum Field School 2007; Site 43.18 Feature 1 Notes.
Valimont, Brian
Proposed Lamoine Cell Tower
3843
2009
Will, Richard T.
2006
Report on Phase I Archaeological Survey of the Otter Lane Subdivision, Lamoine.
2004
3748
Peter Morrison, James Clark
3529
3377
Reconnaissance Archaeological Survey on LMFB Parcel on Tinker Island, Hancock Co., ME.
Wilson, Deborah B.
2005
Report on Phase II Archaeological Survey of Prehistoric Site 43.28, Vicinity of the Proposed Egbert Pier, Tremont,
Maine.
043,044
Johnson, B.A.
1977
David Sanger
Final Reports,archaeological studies,investigations and excavations, various locations, Acadia National Park.
Report submitted to Denver Service Center, National Park Service
Kopec, Diane
1985
Mount Desert Island Area Survey: Site Forms and Site Photographs.
Mastone, Victor T.
1979
Alan E. Strauss
3462
3091
2137
Archaeological Investigation of a Portion of the Areas to Be Deleted from Acadia National Park
043,044,058, Sanger, David
1973
An Archaeological Survey of a Portion of Hancock County, Maine
059
2140
043,058
Clark, James
2007
Jacob Freedman
Report on Phase I Archaeological Survey of the Bangor Hydro Hancock County Rehabilitation Project.
3641
Cole-Will, Rebecca
2000
Survey of Frenchman's Bay - Coastal Hancock County:1999-2000.
3157
044
Berger, Louis, Group
2005
3485
Cultural Resources Survey Report on the Naval Satellite Operations Center, Detachment Alfa, Prospect Harbor, Maine.
Cole-Will, Rebecca
2006
Report on Phase I Archaeological Survey of a Pier on the North End of Heron Island.
1994
Evaluation of Prehistoric Archaeological Sites in Frenchman's Bay: Report of 1994 Activities.
3528
2831
1994
2801
1993
2811
Report on Site Visit to Taft Point.
Site Visit to Taft Point (44.6).
Quads
044
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Cox, Steven L.
2008
3812
Report on Phase I Archaeological Survey of Propsed Developmanet on the Tarasov Property, Schooner Head Road, Bar
Harbor.
Hadlock, Wendell S.
1943
Bone implements from shell heaps around Frenchman's Bay,Maine.
American Antiquity 8:341-53
1941
Three Shell Heaps on Frenchman's Bay
Robert Abbe Museum Bulletin 6
1941
Three Shell Heaps on Frenchman's Bay
3915
4125
1941
Three shell heaps on Frenchman's Bay.
Robert Abbe Museum Bulletin 6
1939
The Taft's Point Shellmound at West Gouldsboro,Maine.
Robert Abbe Museum Bulletin 5
Kimball Kessi Watters
2011
From Earth to Hearth: A Ceramic Analysis of the Ewing-Bragdon Site Collection
Maine Archaeological Society Bulletin 51(2):29-51
Moore, Edward
2004
Report on Phase I Archaeological Survey of Stanton Bagley's Pier.
3438
Rowe, John H.
1940
Excavations in the Waterside Shell Heap, Frenchman's Bay, Maine
4046
1940
Excavations in the Waterside Shellheap, Frenchman's Bay, Maine.
Papers of the Excavators Club.
Sanger, David
1990
Report on Field Examination of Summer Harbor Subdivision for Archaeological Properties.
3042
Smith, Walter B.
1929
The Jones Cove Shell-Heap at West Gouldsboro, Maine.
3653
1929
The Jones Cove Shell-heap at West Gouldsboro, Maine.
Robert Abbe Museum Bulletin #1.(Layfayette National Park Museum Bulletin #1).
Sorg, Marcella
1994
Osteology and Ondontology of Human Remains from the Taft Point Site, Gouldsboro.
1993
Osteology and Odontolgy of Human Remains from the Taft Point Site, West Gouldsboro.
2604
2802
2810
Valimont, Brian
2009
Proposed Sandpiper Shores Residential Subdivision, Gouldsboro
3846
Will, Richard T.
2003
James Clark
Report on the Phase I Archaeological Survey of the Proposed Jones Pond Subdivision, Gouldsboro.
3341
044,045
Borstel, Christopher L.
1999
Louis Berger Assoc.
A Report on the Phase 0 Archaeological Survey of Naval Sensitivity Group Activity, Winter Harbor.
3081
045
Cox, Steven L.
1985
Archaeological Investigation of the Atkinson Site
Diane Kopec
2180
Freedman, Jacob
Rick will
3500
2005
Report on Phase I & II Archaeological Survey of the Dolby Head Estates, Gouldsboro Bay, Steuben.
Spiess, Arthur E.
Eagle Hill Field Notes, Steuben
045,060,061
2009
Sanger, David
1992
Report on the 1990 Archaeological Survey of Coastal Washington County.
3900
2715
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
045,062,079, Brockman, Mark E.
2005
Jeffrey Georgiady
080,096
Prehistoric Lithic Resources of the Coastal Volcanic Belt, Wahington Co., Maine.
MAS Bulletin, 45:1:5-24.
048
Bartone, Robert N.
2007
Ellen Cowie
Report on Phase I Archaeological Survey of the Dead Cambridge River Fish Barrier.
Quads
MHPC
Document #
3692
Moore, Edward
2008
Richard T. Will
Prehistoric Archaeological Review of the Record Hill Wind Project.
3813
048,049
Will, Richard T.
1993
Report on Phase I Archaeogical Survey of the Andover Pump Station/Treatment Plant.
2760
048,065
Torrence, Corbett
2553
1989
Jennifer J.Robins, J.Petersen
Archaeological Phase II Report of the Middle Dam Project (FERC 4027), Upper and Lower Richardson Lakes Region,
Oxford Co., ME.
049
Bartone, Robert N.
2004
Proposed Scotties Well Upgrade Project (MHPC #1942-03), Rumford, ME. Archaeological Phase I Survey.
3393
Hamilton, Nathan D.
2003
Report on the Phase I Archaeological Survey of the Rumford Snowmobile Club House.
3344
2000
John P. Mosher
Rumford Falls: a Holocene Cultural Sequence in Northwestern Maine.
1991
J.Mosher,C.Thayer,J.Theberge
3092
2620
Archaeological Phase II Survey of the Rumford Falls Project.
Moore, Edward
2009
Phase I Archaeological Survey of the Record Hill Project in Rumford, Mexico, Roxbury, Oxford County
3865
Mosher, John P.
2013
4150
Phase I Archaeological Survey Alignment "F" Martin Memorial Bridge Replacement of the Androscoggin River between
Rumford Corner and Rumford Point
Putnam, David E.
1989
P.Baker and J.B. Petersen
An archaeological Phase I survey of the Rumford Falls Project, Oxford County.
2525
Shaffer, Gary
2013
Field Check for Tammy Hutchinson, Andover
4146
2003
Ted Gotto's Filter Strip, Heavy Use Area Protection, Waste Storage Facility, and Streambank Stabilization in Byron,
Oxford Co., ME: A Phase I Report.
3345
Will, Richard T.
1990
James Clark
Phase I Archaeological Survey of the Proposed Pump Station and Water Main Across the Ellis River, Rumford, ME.
2573
049,050
Petersen, James B.
1985
Jon T. Oplinger,others
An Archaeological Phase I Survey of the Proposed Dixfield Hydroelectric Project, Oxford County, Maine
2186
049,082,102
Gramly, R. Michael
1985
Report on Archaeological Survey, Salvage Excavations and Reconnaissance in Oxford and Franklin Counties, ME.
2176
050
Bartone, Robert N.
2006
Report on Phase I Archaeological Survey of the Proposed Telecommunications Tower.
3628
1992
James B. Petersen
2741
Report on Phase I Archaeological Survey of The Proposed Dixfield Water Treatment Plant Project.
Corey, Richard
1996
James B. Petersen
Report on Phase I Archaeological Survey of the Maxwell Farm Tract 249, Dixfield.
2922
Eldridge, Stuart A.
2010
Phase 0 Report Saddleback Ridge Wind Project
3976
Quads
050
051
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Gammon, James G.
2007
Ellen Cowie
Report on Phase I Archaeological Survey of the ME 145 Stanley Project (Cell Tower)
MHPC
Document #
3698
McPheters, Hutch
2006
Robert Bartone
Report on Phase I Archaeological Survey of the MSAD 21 Elementary School Site, Peru.
3561
Bartone, Robert N.
2008
Ellen Cowie
Phase II Archaeological Testing of Whittier Road Development, Site 51.19.
3782
2008
Hutch McPheters
3753
Report on Phase I Archaeological Survey of the Proposed Whittier Road Development letter report.
1994
James B. Petersen
2912
Report on Phase I Archaeological Survey of the McLaughlin Farm.
Brigham, Michael
2010
Robert Bartone, Ellen Cowie
3955
Archaeological Phase I and II Testing Newly Identified Native American Site 51.19 Proposed Route 2/4 and Whittier
Road Development Project
2004
Report on Phase I Archaeological Survey of the Farmington Heights Apartments.
3397
Corey, Richard
1995
James Petersen
Report on Phase I Archaeological Survey of Kineo Water Park Storm Water, Wilton.
2867
Cowie, Ellen R.
2004
Report on Phase I Archaeological Survey of the Access Road to the New UMF Parking Lot.
3387
Cyr, Rosemary A.
3328
2003
Stephen Scharoun, Ellen R. Cowie
Farmington Falls Project: Archaeological Phase I Survey.
2003
E. Cowie, S. Scharoun, R. Bartone
Farmington Falls Survey Project, Archeological Phase I Survey in Farmington Falls, Farmington and Chesterville,
MASCo.,
Bulletin,
Franklin
ME. 43:2:17Arthur E. Spiess
Hedden, Mark H.
1995
Report on the Phase I Archaeological Survey of a Glacial Stream Deposit Rt.4 and Town Farm Road, Farmington.
2847
Hudgell, Gemma-Jayne
4088
2012
Ellen Cowie
Daku Subdivision Archaeological Phase I Survey, Farmington
2011
Robert Bartone
4007
Phase I Survey Proposed George Thomas Road Bypass Project
McPheters, Hutch
2004
Bartone, Robert N.
Archaeological Phase I Survey of the Proposed Water Pollution Control Outfall Relocation Project, Farmington,
Franklin County, Maine.
3394
Mosher, John
2010
Leith Smith
Phase I Archaeological Survey Route 156 Highway Improvements (PIN 12774.10) Chesterville and Farmington
3963
Mosher, John P.
2003
Inland Fisheries & Wildlife Sandy River Canoe Put In and Take Out.
3330
2002
Report on Phase I Archaeological Survey of Route 156 (PIN 9180.00), Chesterville.
Petersen, James B.
1985
David E. Putnam
3227
2323
Archaeological Phase I Survey and Testing of the Proposed Farmington Airport Project, Franklin County, Maine
Shaffer, Gary
2006
Drainage Improvemnts for Melanie Farmer, West Farmington, Franklin Co, ME: A Phase I Archaeological Survey.
3624
2003
3325
Critical Area Seeding and Reclamation of Old Fields for Trudy and Erik Johnson, Farmington, Franklin Co., ME: A Phase
I Archaeological Study.
Quads
051
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Wilson, Deborah B.
2003
Timothy Dinsmore
3332
Report on Phase I Archaeological Survey of the Farmington Falls Standard Water District River Crossing Project.
051,052,069
Putnam, David E.
1986
2437
The Sandy River Archaeological Survey: A Preliminary Investigation of the Archaeological Potential of the Sandy River
Valley from the Town of Farmingt
052
Bartone, Robert N.
2001
Report on Phase I Archaeological Survey of the Whittemore Farm Bank Stabilization.
3206
Brigham, Michael
3937
2010
Belinda Cox, Ellen Cowie
Archaeological Phase III Data Recovery Excavations at the Ladd site (52.34), Starks
2006
Report on Phase I Archaeological Survey of the Norridgewock School Project.
3599
Clark, James
2006
Richard T. Will
Intersite Comparisons of Archaic Period Stone Artifacts: The Clark I Site and the Gulf of Maine Archaic Tradition.
edited by David Sanger and M. A. P. Renouf, The Archaic of the the Far Northeast, University of Maine Press, Orono,
2006.
2000
Richard T. Will, Bonnie Newsome
3192
Clark I Site (52.16): Results of Phase III Prehisitoric Archaeological Resource Investigation, Weston Project.
Crock, John
1993
James B. Petersen
2747
An Archaeological Phase I Survey of the Sandy River Project (Docket No. UL89-33-ME), Somerset County, Maine.
1993
J.B. Petersen
2776
Report on Phase II Archaeological Survey of the Sandy River Project (UL89-33-ME).
Gammon, James G.
2007
Ellen Cowie
Archaeological Phase I Survey of the Proposed Sandy River Road Subdivision Project (MHPC #1278-07) in Mercer,
Somerset Co.
Oliver Kelly, Richard T. Will
Mack, Karen
2001
The Bombazee West Site (52.10), A Small Ceramic Period Site on the Kennebec River.
MAS Bulletin, 41:1, 1-24
1999
Alice R. Kelley, Richard Will
The Bombazene West Site (52.10): Results of Phase III.
Mosher, John P.
2004
Leon Cranmer
3708
3072
3369
Report on Phase I Archaeological Survey of the Kennebec Highlands Land for Maine's Future Board Acquisitons in
Rome, Vienna, New Sharon and Mount Vernon.
1991
Mitchell Power, Thomas Bennet
Archaeological Phase I Survey of the Norridgewock Wastewater Treatment Facility, Norridgewock.
052,053
2648
Newsome, Bonnie
2001
Richard T. Will
A Report on the Phase I Archaeological Survey of the McGrath Pond Municipal Reconstruction Area, Oakland.
3181
Petersen, James B.
Oosoola Point, Norridgewock.
1990
2590
Scharoun, Stephen
2005
Report on Phase I/II Archaeological Survey of the Norridgewock Water District Water Main Project.
3483
Shaffer, Gary
2009
David Krebs Proposed Diversion, Lined Waterways, Subsurface Drains, Starks
3858
Bartone, Robert N.
2744
1993
James B. Petersen
Archaeological Phase I Survey and Phase II Testing of the CMP Recreational Areas Project, Somerset and Kennebec
Counties, Maine.
052,053,069, Cowie, Ellen R.
1992
James B. Petersen
070
Report on Phase II Archaeological Survey of the Weston Project (FERC 2325) Somerset Co., ME.
2694
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
052,053,069, Torrence, Corbett
1989
M. Heckenberger, J.B.Petersen
070
An Archaeological Phase I Survey of the Weston Project, Somerset County
Quads
053
MHPC
Document #
2518
Bartone, Robert N.
1992
James B. Petersen
2737
Report on Phase II Archaeological Survey of a Small Portion of the Gleuck Site (ME 53.31) In the Fort Halifax Project.
1990
C. Quinn, J.Petersen, E.Cowie
Archaeological Phase I Survey of the Fort Halifax Project (FERC 2552) Kennebec Co.
Bradstreet, Theodore E.
1985
E.M. Duffy
2580
2183
Benton Falls Hydro Project Archeological Survey and Testing: Phase II Report
1982
Benton Falls Hydro Project, Archeological Survey and Testing: Phase I Report
2116
Clark, James
2005
Edward Moore
Report on Phase I Archaeological Survey of the East Cell Expansion SAPPI Fine Paper Somerset Mill, Skowhegan.
3507
Corey, Richard
2005
Robert Bartone
Report on Phase I Archaeological Survey of the Proposed Mill Island Park,Fairfield.
3442
Crane, Pamela
2005
Leslie Shaw
Report on Phase I Archaeological Survey of Area E, Waterville Waterfront Rehabilitation.
3499
Cranmer, Leon E.
1992
Report on 1991 Archaeological Excavations at Fort Halifax, Winslow, Me.
2692
1991
Blockhouses and Cellars: The 1989 and 1990 Archaeological Work at Fort Halifax.
MAS Bulletin 31(2):1-26.
Funk, Thomas
1987
Steven Cox
Phase II Archaeological Investigation of Site 53.34, Sebasticook River.
Hedden, Mark H.
1995
Report on Phase I Archaeological Survey from Upstream End of Five Mile Rapids...Winslow Pumping Station.
1994
Site 53.38 Waterville Bridge Approach Data Recovery and Archeology
1993
2467
2866
2816
Arthur E. Spiess
2752
Arthur Spiess
2630
Site 53.36 Bridge Pier Archaeological Data Recovery.
1991
A Phase I Archaeological Survey for the Waterville-Winslow Bridge Construction Access Road.
Lahti, Eric
2001
Goodwill-Hinckley Archaeological Survey 1996.
MAS Bulletin, 41:1, 25-34.
2000
Goodwill-Hinckley Archaeological Survey 1996.
3093
Mack, Karen
2010
Richard Will
Results of Phase I Archaeological Survey Shawmut Dam Project, Kennebec Co. for FPL Energy Maine
3958
Moore, Edward
2011
Karen Mack, James Clark
Phase I and II Archaeological Investigations of the Fort Halifax Project, Winslow and Benton.
4003
Mosher, John P.
3922
2010
Leith Smith
Phase I/II Survey for the Garland Road Bridge Replacement PIN 11048 Winslow
2005
Report on Phase I Archaeological Survey of the Shawmut LMFB Acquisition, Shawmut Village, Farifield, Maine.
Petersen, James B.
Hinckley Boat Ramp Survey
1990
Robinson, Brian S.
1996
Projectile Points, Other Diagnostic Things and Culture Boundaries in the Gulf of Maine Region.
MAS Bulletin 36:2:1-24.
3452
2587
Quads
053
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Robinson, Brian S.
1995
The Waterville Cemetary: Research Progress on a Hathaway Complex Site on the Kennebec River.
Shaffer, Gary
Field Check for Envirothon, Waterville
2012
.
Sorg, Marcella
1992
Osteology and Odontology of Human Remains from Site 53.23, Benton.
Spiess, Arthur E.
2000
MHPC
Document #
2877
4089
2812
Mark Hedden
Susquehanna Tradition Activity Areas at the Waterville-Winslow Bridge.
MAS Bulletin, 40:1:23-54.
1999
Mark H. Hedden
Late Paleoinidan Occupation at the Waterville-Winslow Bridge.
MAS Bulletin, 39:2:43-57.
1999
Deep Testing on the Kennebec: The Waterville-Winslow Bridge.
MAS Bulletin, 39:1:131990
Mark Hedden and Joan Robertson
Waterville-Winslow Bridge Location Phase II Archaeological Testing
1988
Waterville-Winslow Bridge Project Archaeological Phase I Survey Report.
Valimont, Brian
2012
Proposed Expansion of Thomas College, Waterville, ME, Phase I Archaeological Survey
2007
2565
2491
4056
3715
Proposed Skowhegan Cell Tower.
2006
Report on Phase I Archaeological Survey of the Proposed Walking Trail, Thomas College.
Watts, Douglas
2009
Evidence for Prehistoric two-weir fish trap at China Lake Stream, Sebasticook River, Winslow
2009
Evidence of a Prehistoric Pottery Kiln, Sebasticook River, Winslow, Maine
3563
3899
3876
Wellman, Alice N.
1984
Lancaster Farm Bifaces and Ground Slate Points: an Exercise in Attribute Analysis
Wilson, Deborah B.
2000
A Report on the Phase 0 Archaeological Survey of the Lockwood Project (FERC 2574).
1994
Report on Phase I Archaeology of the Gerald Frontin Farm, Benton.
053, 069,
070, 086
054
3161
2815
Clark, James
2011
Karen Mack
3970
Phase I Precontact Archaeological Resource Survey Central Maine Power Company's Section 241 Transmission Line
Project
2002
Report on Phase I Archaeological Survey of the Unity Bike/Pedestrian Trail.
3356
Dunn, Gerald C.
1960
The Eel Bridge Site and Its Relationship to the Sebasticook River Route
1959
2762
2012
4092
Eel Bridge Site Notes
Shaffer, Gary
Field Check for MOFGA, Unity
2004
Report on Phase I Archaeological Survey of the Stream Crossing for Joe Fortin, Albion.
Varney, Lloyd H.
Notes on the Eel Bridge Site (M.A.S.)
1958
3384
3121
Quads
054
056
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Wilson, Deborah B.
1999
Bruce J. Bourque
3045
A Report on the Phase II Archaeological Survey of the Heather Jean Read Poperty, Burnham Hydro (FERC 11472).
1994
Richard Will, Jane Cormier
Phase II Archaeological Study of Eight Prehistoric Sites Located within the Burnham Project.
2790
1993
Report on Phase I Archaeogical Survey of the Burnham Hydropower Project.
2759
Belcher, William R.
1988
Phase I Prehistorica Archaeological Survey of Bowden Point, Prospect, Maine.
2494
Burgess, William
2009
Archaeological Survey for Lord Bridge #3348 Replacement project, Monroe-Frankfort
3901
Cranmer, Leon E.
2005
3480
Report on Phase I Archaeological Survey at Fort Knox, Prospect, Maine for the Waldo- Hancock Bridge, PIN 7965.40
and for the Bureau of Parks and Lands.
2004
Phase I Archaeological Survey for the Waldo-Hancock Bridge Replacement Project (PIN 7965).
3365
Mack, Karen
2012
Corridor Expansion on Segment 1 (MPRP), Frankfort, at Marsh Stream Crossing
4060
Morrison, Peter
3372
1999
Pamela Crane
Archaeological Testing of Fort Knox Park, Prospect.
Putnam, David E.
2001
West Winterport Dam Removal Project Archaeological Phase I Survey.
056, 57
Spooner, Emeric
2009
In Search of Maine Archaeology: An Amateur's Guide to Artifact Identification
056,073
Cole-Will, Rebecca
1993
Preliminary Level Survey for Prehistoric Resources, Town of Hampden.
3183
2915
1993
056,073,107, Bourque, Bruce J.
Report on the Phase I Archaeological Investigation of the Proposed AT&T Fiber Cable Route from Danforth to
123-125
Winterport.
2764
056,074Clark, James
2004
Edward Moore
076,093-096
Report on Phase I Archaeological Survey of the Bangor Hydro Electric Northeast Reliability Interconnect Project.
3430
057
Blustain, Malinda S.
1999
Margaret Laveque, Brian Robinson
Two Fossilized Late Archaic Textiles from Maine: Pyrite Pseudomorphs from the Hartford Cemetery Site.
AENA 27:185-196.
Bradstreet, Theodore E.
1973
Pollen Influx Diagram and Associated Quaternay Geology from Moulton Pond, Maine.
M.S,Thesis, University of Maine at Orono, Institute for Quaternary Studies.
Clark, James
1997
Richard T. Will
Report on Phase I Archaeological Survey of the Proposed Line 60 Project.
Kellogg, Douglas
1987
Lower Patten Pond Development Phase One Survey.
Kopec, Diane
1989
2951
2473
Thomas Lowell
2531
Phase I Archaeological Survey, Southfield Development, Lower Patten Pond, Ellsworth.
Will, Richard T.
2007
James Clark
3694
Results of the Phase I Precontact Archaeological Survey of the Proposed Cottages Subdivision, Orland, Hancock Co,
(MHPC #0873-07).
1998
James Clark, Kathleen Wheeler
Reconnaissance-Level Archaeological Survey of the Craig Brook National Fish Hatchery, East Orland.
2989
Quads
057,070
058
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Mosher, John P.
2003
Lee Cranmer
Phase 0 Reconnaisance Survey of Skowhegan Transportation Study (PIN 8483.10).
MHPC
Document #
Bourque, Bruce J.
1984
Kopec, Diane R.
An Evaluation of the Dam Pool Impact on Sites 58.1 and 58.10, Ellsworth, Maine
Byers, Douglas S.
1955
Carbon-14 dates from Ellsworth Falls, Maine.
Science 121:735-736
Cowie, Ellen R.
2011
3298
2171
Wendell S. Hadlock
Emily Iser
4013
Archaeological Phase I Survey Proposed Nevells Shore Subdivision, Ellsworth
Hadlock, Wendell S.
1956
D.S. Byers
Radiocarbon Dates from Ellsworth Falls, Maine.
American Antiquity, 21:419-20.
Rick Will
Moore, Edward
2001
Report on Phase I Archaeological Survey of the Bangor Hydro-Electric Co.'s Line 13 Remote.
3184
Mosher, John P.
2009
Phase I Reconnaissance Archaeological Survey of the Rt 180 Rebuild, Ellsworth (PIN 10063.10)
3912
Ian Putnam
Putnam, David
2009
Archaeological Phase I Survey Proposed Wastewater Outfall Pipeline, Ellsworth
3861
Will, Richard T.
2007
Report on Phase I Archaeological Survey of the Proposed K & T Subdivision.
3686
2006
Rebecca Cole-Will, Jacob Freedman
3550
Report on Phase I/II Archaeological Survey of the Tinker Hill Subdivision.
2000
Report on the Phase I Archaeological Survey of the Bangor Hydroelectric Proposed Line II Relocation.
3132
2000
Phase I Archaeological Survey of the Bangor Hydro Proposed Line II Relocation, Hancock Co., ME.
3134
058, 059,
060
Clark, James
2010
Phase I Precontact Survey Bangor Hydro Electric Companies Downeast Reliability Project
059
Cox, Steven L.
1988
3941
Diane Kopec
An Archaeological Investigation of the Watson site, Frenchman Bay.
Maine Archaeological Society Bulletin 28(1):39-45.
Cranmer, Leon E.
1994
Arthur Spiess
2839
Tunk/Spring River Lake Purchase - Archaeological Survey for Land for Maine's future Board.
Moore, Edward
2005
Jacob Frenchman
3471
Phase I Archaeological Survey of the Proposed Molasses Pond Subdiivison, Eastbrook, Hancock Co, ME (MHPC #245704).
Spiess, Arthur E.
2003
Mark Hedden
Archaeological Assessment of the Little Pond Parcel for LMFB.
2003
Mark Hedden
Archaeological Assessment of the Sullivan Tidal Falls Property, Hancock for LMFB
Will, Richard T.
2010
Results of Phase IA Archaeological Survey Proposed Bull Hill Wind Project, Hancock Co.
2003
Archaeological Investigations of the Sno-Drum Subdivision, West Sullivan.
060
Petersen, James B.
1987
Mike Heckenberger
Archaeological Phase I Survey and Phase II testing of the Laser Intraferometer Gravity-Wave Observatory (LIGO)
Project in Columbia Twp,WashingtonCo.ME
3279
3278
3961
3357
2454
Quads
060
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Shaffer, Gary
2004
Report on Phase I Archaeological Survey of the Cecil Property, Columbia.
MHPC
Document #
3373
2003
3352
The Planting of a Riparian Forest Buffer for Chester Curtis in Harrington, Washington Co., ME: A Phase I Archaeological
Survey.
060,061,062, Burns, Robert L.
Mid-Coast Washington County
063
061
1971
Cox, Steven L.
1987
Archaeological Data Recovery at Site 61-20, Jonesport, Maine.
1987
Archaeological Data Recovery at Site 61.20, Jonesport, Maine.
Maine Archaeological Society Bulletin 27:2:16-35
Eldridge, Stuart A.
2002
Report on Phase I Archaeological Survey of the Harold Tyler Farm Irrigation Project, Jonesboro.
2456
3272
Hedden, Mark H.
2010
Petroglyphs at 61.72 on Great Spruce Island, Machiasport: A Visionary Tradition of Mi'cmaq Medicine Men?
3944
Hollinger, Eric
2012
Site 61.2, Varney Brook Site, Jonesboro, Smithsonian Institution Accession Records
4153
Kitson, Edward
3289
2003
Pamela Crane, Robert Bartone
Report on Phase I Archaeological Survey of the Ivan Hanscom Farm Project.
McPheters, Hutch
2005
Ellen Cowie
3503
Report on Phase I Archaeological Survey of the Proposed Machias Valley Airport.
061,062
Thomas Chase
Sanger, David
1983
An Introduction to the Archaeology of the Roque Island Group
2568
Shaffer, Gary
2006
Dale Whitney's Firebreaks, Columbia Falls, Washington County, Maine: A Phase I Archaeological Survey.
3546
Steven L. Cox
Van Horn, David M.
1984
Cultural Resource Assessment: A 30+/- Acre Parcel Located in Jonesboro, Maine
2162
Sanger, David
1991
National Register Information for Roque Island Locality.
2622
1985
Douglas Kellogg
2179
Leon Cranmer
2974
Preliminary Report, Roque Island Project - 1985
061,062,079
Spiess, Arthur E.
Kris Larsen Collection, East Machias, ME.
1997
061,080,096, Sanger, David
2008
Discerning Regional Variation: The Terminal Archaic Period in the Quoddy Region of the Maritime Peninsula.
097
Canadian Journal of Archaeology 32:1-42.
061,111
1983
The 1982 Survey of Washington County
062
2148
Anonymous
1867
3884
Recollections of Mr. Thomas Lincoln of Dennysville as to Inscriptions at Clark's Point, Machiasport, to W. B. Smith, in
1867Maine Historical Society file
Clark, James
2006
3570
Results of Phase I Archaeological Survey of the Proposed Birch Point Subdivision, Machiasport, Washington County,
Maine. MHPC # 1087-06
Crane, Pamela
2002
Anne Wilder
"A Farm for the Support of the Poor" : Historical Archaeology at the Scarborough Town Farm, 1865-1953.
MAS Bulletin, 42:17-30.
Cranmer, Leon E.
1997
Mark Hedden, Arthur E. Spiess
2939
Phase II Archaeological Survey for MDOT Pin 4914 (658.10), and Phase III Data Recovery 62.30 & 62.31, East Machias.
Quads
062
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Cranmer, Leon E.
1994
Interim Report Phase IIa Archaeological Testing at East Machias, ME.
MHPC
Document #
2804
Enslin, Jacob
1993
Prehistory of the Eastern Maine Coast, Focusing on Holmes Point, Machias Bay.
1993
Prehistory of the Eastern Maine Coast, Focusing on Holmes Point, Machias Bay.
2929
Goodwin, R.Christopher,
2002
Rock Art Study on Department of Defense Property in LANTOPS and NORTHDIV.
3242
Hedden, Mark H.
3844
2009
Robinson, Brian and Donald Soctomah
Preliminary Report for Malusihikon Petroglyph Committee on Phase I Field Work at Site 62.1 Birch Point
2008
Significant Features of Petroglyphs on the Maine Ledge at Birch Point.
3766
2008
Brian Robinson, Donald Soctomah
Preliminary Report of the Malusihikon Committee Phase I Fieldwork, 62.1, Birch Point.
3807
2004
Passamaquoddy Shamanism and Rock-Art in Machias Bay, Maine.
ed: Diaz-Granados, Carol and James R. Duncan, the Rock_Art of Eastern North America: Capturing Images and
Insight, 319-343, U of Alabama Press, Tuscal
2004
Passamaquoddy Shamanism and Rock Art in Machias Bay, Maine
The Rock Art of Eastern North America, edited by Diaz-Granados and Duncan, pp319-343
2002
Contact Period Petroglyphs in Machias Bay, Maine
Archaeology of Eastern North America 30:1-20
2001
Petroglyphs in Machias Bay, Maine: Salt Island.
1989
A New Group of Early Petroglyphs for Machias Bay.
Maine Archaeological Society Bulletin, 29:2:17-36.
1987
Petroglyphs on Hog Island, Machias Bay.
Maine Archaeological Society Bulletin 27:1:3-9
1986
The Rate of Sea Level Rise and Prehistoric Petroglyphs at Machias Bay
Maine Archaeological Society Bulletin 26:2 p3-4
1982
Plans of Petroglyphs, site 62.1, Birch Point, Machiasport
NOTE:IN ROLL
3168
3827
Hrynick, M. Gabriel
2012
Brian Robinson
Quantifying Gravel from a Ceramic Period Living Surface in Downeast Maine
Maine Archaeological Society Bulletin 52(2):27-43
Lahti, Eric
1976
The Machias Petroglyphs
Leach, Peter
2009
Archaeological Remote Sensing at the Birch Point, Holmes Point and Holmes Point East Sites
3906
Mosher, John P.
2002
Arthur E. Spiess
Combined Phase II Testing and Data Recovery Excavations at the East Machias Weir Site.
3235
2002
Arthur Spiess
Archeological Testing for Fish Weir Construction in East Machias.
MAS Bulletin, 42:1:1-16.
Robinson, Brian S.
2009
Archaeology of the Birch Point Petroglyph Site: Phase I Survey
Shaffer, Gary
2011
Gaddis Brothers Co., East Machias, obstruction (rock) removal
3905
4018
Quads
062
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
U.S. Navy
2001
Draft Cultural Resources Survey of Naval Computer and Telecommunications Area, Cutler.
MHPC
Document #
Wilson, Deborah B.
2003
Report on Phase IB Archaeological Survey Report: Administration and HF Areas, Naval Computer and
Telecommunications Area....Cutler, ME.
2003
Report on the Phase I Archaeological Survey of the Yoho Head Resort and Country Club.
3185
3297
3350
062, 079
Shaffer, Gary
2006
Arthur Andrew's Firebreak and Obstruction Removal.
3619
062,061
MacKay, Robert G.
1978
Petroglyphs in Maine and Their Relevance to Maine's Critical Areas Program
2136
062,106
Hedden, Mark H.
1984
The Form of the Cosmos in the Body of the Shaman.
MAS Bulletin
2011
Report on Norse Pond Markings
063
3988
063,080
Crotts, Anita L.
1984
2980
Pattern and Variation in Prehistoric Lithic Resource Exploitation in the Passamaquoddy Bay Region, Charlotte County,
New Brunswick.
064
Bartone, Robert N.
2013
H. McPheters
4140
Alexandra Morse & JB Petersen
2483
Rapid River Development Corp, walkover survey
065
Baker, Patricia
1988
An Archaeological Phase I Survey of the Middle Dam Project, Upper and Lower Richardson Lakes, Oxford County,
Maine.
Clark, James
2013
Karen Mack, Richard Will
4158
Results of 2011-2012 Investigation of Mosquito Brook Site (65.20) and Crescent Moon Site (65.28), Middle and Upper
Dam Project (FERC 11834-000)
2011
Richard Will
Middle Dam Project -- Upper Richardson Lake, 2011 Fieldwork Summary, Mosquito Brook Site (65.20)
4094
Will, Richard T.
2008
Update on the Archaeology of the Upper and Middle Dams Project, Richardson Lake.
3743
Wing, Kenny
2009
Walkover Survey, Cooke Aquaculture, Inc., Oquossoc
3878
065,066,082
Will, Richard T.
1997
James Clark, Edward Moore
Report on Phase I Archaeological Survey of theMooselookmeguntic Lake, Upper and Middle Dams (FERC UL94-1).
2970
065,082
Moore, Edward
1999
James Clark, Richard Will
A Report on the Phase II Archaeological Study of Mooselookmeguntic Lake, Upper and Middle Dams Storage.
3073
066
Brigham, Michael
2008
Hutch McPheters, Stepen Scharoun, Ellen
Archaeological Phase I Survey of the Proposed Customs and Border Protection Facility, Rangely, Franklin Co.
3796
2006
Ellen Cowie
3610
Report on Phase I Archaeological Survey of the Proposed Round Pond Project.
Hamilton, Nathan D.
1988
Thomas C. Bennett
2515
An Archaeological Phase 1 Survey of the Proposed Hatchery Cove Subdivision Rangeley,Maine
067
Spiess, Arthur E.
2005
John Hudson
Sandy River Pond Water Access Archaeological Field Check, Short Report to LMFB.
3448
Cowie, Ellen R.
2002
H. McPheters
Report on Phase I Archaeological Survey of the Dana Roberts Farm NRCS Project.
3252
Quads
067
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Cowie, Ellen R.
1999
A Report on the Phase I Archaeological Survey of Mt. Blue Water District Pump Station and Water Main.
MHPC
Document #
Hedden, Mark H.
1998
Leon Cranmer, Arthur Spiess
Report on Phase II and III Archaeolgical Survey of ME23-002 and Site 67.1 on Route 4 Rehab in Avon.
1997
Arthur E. Spiess
Report on Phase I Archaeological Survey of Route 4 Road Rehab, Avon.
Mosher, John P.
2002
Leon Cranmer
3059
3004
2937
3232
Report on Phase I and Phase II Archaeological Survey of the Salem Bridge Replacement (PIN 8973.00) .
068
Shaffer, Gary
2006
Report on Phase I Archaeological Survey of Darren Allen's Streambank.
3549
Brigham, Michael
2009
Robert Bartone, Ellen Cowie
Phase I Survey Proposed Jordan Ventures Kingfield Development Project (MHPC 2262-07)
3888
Crock, John
1992
James B. Petersen
Report on Phase I Archaeological Survey of the Kingfield Water Improvements.
2690
Eldridge, Stuart A.
2006
Sarah Haugh
Phase IA and IB Archaeological Survey Report of the Kingfield Bottle Pland Water Line Project, Kingfield, ME.
3607
2006
Sarah Haugh
3532
Report on Phase I Archaeological Survey of the Kingfield Bottling Plant.
2006
Sarah Haugh
3553
Report on Phase I Archaeological Survey of the Kingfield Bottling Plant.
069
Hedden, Mark H.
1999
Report on Phase I Archaeological Survey of a Section of Route 16, near North New Portland.
3033
Mathiasson, Kåre
2006
Report on Phase I Archaeological Survey of the Bridge Improvement over Gilman Stream on Route 16, North New
Portland, PIN 12635.00.
3545
Wilson, Deborah B.
2003
Report on Phase I Archaeological Survey of the New Portland District Proposed Well Site.
3331
Baker, Patricia
2500
1988
Thomas R. Baker
Phase I Results, Dennison Hatchery Facility Survey
Baldwin, Geraldine
1999
A Report on the Phase I Archaeological Survey of Madison School Project.
3078
Bartone, Robert N.
2002
Testing of Abenaki (2364) and Anson (2365) Projects.
3238
Ellen Cowie
Brigham, Michael
2006
Ellen Cowie
3576
Archaeological Phase I Survey for the Proposed Madison Greenhouse and Biomass Cogeneration Project (MHPC #321205) Madison, Somerset County, Maine.
Carlson, Suzanne
2005
Big Dig in Bingham: Maine Cairn Field Study.
NEARA Jorunal, 38:2:32-42.
Clark, James
1998
3459
Richard Will, Edward Moore
3019
Report on the Phase I Archaeological Survey of the Sandy River Portion of Weston Project (FERC 2325).
Cowie, Ellen R.
2002
Continuity and Change at Contact-Period Norridgewock.
PhD thesis
2000
A Report on the Phase 0 and I Archaeological Survey of the Abenaki Project (FERC 2364).
1999
Robert Bartone, JB Petersen
Investigations at the Tracy Farm Site in the Central Kennebec River Drainage.
3391
3154
3071
Quads
069
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Cowie, Ellen R.
1996
James B. Petersen
Archaeological Survey and Testing of the Tracy Farm Property.
MHPC
Document #
Cox, Steven L.
1995
The Anson Project (FERC 2365) Report on 1995 Archaeological Phase I and Phase II Surveys.
1984
Anson Project, Archaeological Survey and Testing, Phase I: Final Report
Lahti, Eric
1981
A.Spiess,M.Hedden,R.Bradley,A.Faulkner
Test Excavations at the Hodgdon Site.
Man in the Northeast. 21:19-36
McPheters, Hutch
2003
Robert Bartone, Ellen Cowie
2919
2887
2164
3316
Archaeological Phase II Testing at the Weston Island Site 69.49 and Rod&Gun Site 69.50, in the Anson (FERC # 2365)
and Abenaki (FERC # 2364) Project Area
2002
Robert Bartone, Ellen Cowie
3270
Report on Phase II Archaeological Testing of the Weston Island Site and the Rod and Gun Club Site, in the Anson and
Abenaki Project Area.
Petersen, James B.
2004
John G. Crock, Ellen R. Cowie, Richard A
St. Lawrence Iroquoians in Northern New England: Pendergast was "Right" and More
in A Passion for the Past: Papers in Honour of James F. Pengergast, Mercury Series Paper 164
2004
Crock,Cowie,Boisvert,Toney,Mandel
St.Lawrence Iroquoins in Northern New England: Pendergast was "Right" and More.
A Passion for the Past: Papers in Honour of James F. Pendergast. Edited by James V.Wright and Jean-Luc
Pilon...Arch.Paper 164, Can.Mus.of Civ.,Quebec
1990
A Preliminary Report on Archaeological Investigations at the Dennsion site (69.22), Somerset County, ME.
Prins, Harald
1987
Bruce J. Bourque
Norridgewock: Village Translocation on the New England-Acadian Frontier.
Man in the Northeast, 33:137-158
Quinn, Catherine
1995
Report on Phase I Archaeological Survey of the the Madison Paper Industries Project.
4039
2602
2889
Shaffer, Gary
2010
Field Check for Sherwood McKenney, Madison
4149
Sorg, Marcella
1992
Osteology and Odontology of Human Remains from Weston (Tracy Farm Site).
2813
Spiess, Arthur
2012
Possible Discard of Significant Archaeological Collections Material, UMF to MSM
4061
Spiess, Arthur E.
1991
Mark Hedden
The Evergreens: Archaeology and an Alluvial Landform on the Upper Kennebec River.
2644
1984
Mark Hedden
2430
The John Dolan Collection Catalogue
Valimont, Brian
2009
Proposed Madison Cell Tower, Old Point Ave.
069,086
Petersen, James B.
1991
3855
David Putnam
2669
Archaeological Phase II Testing of the Williams Dam Increased Pool Area. (Expanded Version)
1986
David E. Putnam
2444
Archaeological Phase II Testing in the Williams Hydroelectric Dam Flood Pool Area, Somerset County, Maine
1985
Jack A. Wolford,others
2187
An Archaeological Phase I Survey of the Williams Hydroelectric Dam Increased Pool Project, Somerset County, Maine
Petersen, James B., edito
1991
Baker,Bartone,Cowie, etc.
Archaeological Investigations of the Central Kennebec River Drainage: Phase III at Smith and Smith's Landing Site.
2660
Quads
070
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Brigham, Michael
2008
Ellen Cowie
Report on Phase I Archaeological Survey of the Redington Fairfield General Hospital Project.
MHPC
Document #
3750
Clark, James
2004
Report on Phase I Archaeological Survey of the Skowhegan Armory Reconstruction.
3385
Hedden, Mark H.
1995
An Archaeological Exploration of an Early Middle Archaic Beach Site at Lake George in Canaan.
2931
1994
Arthur Spiess
2795
Site 70.28 at Lake George in Canaan, Phase II Testing for LMFB
1992
Arthur Spiess
2733
An Archeological Phase I Reconnaissance of Lake George Parcels in Canaan for the Land for Maine's Future Board.
Kelley, Alice R.
2007
Geology of Sites 70.29 and 70.38, Skowhegan.
3681
Lahti, Eric
2006
Report on Phase I Archaeological Survey of the Grassland Farm Skowhegan, Wetland Mitigation.
3557
Mathiasson, Kåre
2009
Arthur Spiess
Skowhegan Route 2 Drainage Improvements Archaeological Monitoring
3830
2003
Arthur Spiess
3299
Reconnaissance Walkover Survey of the Second Lake George Park Phurchase by LMFB, Canaan.
Mosher, John P.
2009
Arthur Spiess
3837
Archaeological Phase IE/IID and IF Survey of Option E3E(5) of the Skowhegan Transportation Study
2007
Arthur Spiess
Archaeological Phase IIC and IID Survey and Testing for the Skowhegan Bypass (PIN 8483.10)
3667
2006
Arthur E. Spiess
Phase IIB Testing of Sites 70.30 and 70.31, Alternate E3E of the Skowhegan Transportation Study (PIN 8483.10),
Skowheagan, Maine.
3541
2005
3476
Report on Phase I and Phase IB Archaeological Survey of Alternate Route E3E(1), E3E(2), AND E3E(3) of the Skowhegan
Bypass, MDOT PIN 8483.10.
071
Sorg, Marcella
1992
Osteology and Odentology of Human Remains from Oak Island, Maine.
2702
Belknap, Daniel
1994
Geological Stratigraphy at the Sebasticook Lake Fish Weir Site from Core Samples.
3082
Mack, Karen
2012
Archaeological Assessment of CMP Section 5A, Corinna, Penobscot Co.
4059
Miller, Christopher E.
2006
Report of Reconnaissance Scuba Survey, Sebasticook Lake Fish Weir.
3584
Moore, Edward
2013
CMP Powerline Section 5 maintenance Phase I
4121
Petersen, James B.
1994
Robison,Belknap,Stark,Kaplan
An Archaic and Woodland Period Fish Weir Complex in Central Maine.
AENA, 22:197-222.
1994
Brian Robinson
2799
An Archaic and Woodland Fish Weir Complex in Central Maine.
1993
Brian Robinson
An Archaic and Woodland Period Fish Weir Complex in Central Maine.
Spiess, Arthur E
2009
Newport Stream Restoration Archaeological Survey and Site ME 71.30
Maine Archaeological Society Bulletin 49(1):23-41
2754
Quads
071
073
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Spiess, Arthur E.
2003
Newport Stream Restoration Archaeological Survey and Site 71.30.
MHPC
Document #
Borstel, Christopher L.
1982
Archaeological Investigations at the Young Site, Alton, Maine.
3291
3643
1982
Archaeological Investigations at the Young Site, Alton, Maine
1978
David Sanger
2104
Completion Report on the 1977 Excavations and Analysis of Hirundo and Young Sites, Alton, Maine: Phase I.
Corey, Richard
2007
Robert Bartone and Ellen Cowie
3666
Report on Phase I Archaeological Survey of the Proposed Hawthorne Ridge Subdivision.
2006
Ellen Cowie
Report on Phase I Archaeological Survey of the Hawthorne Ridge Subdivision.
Cox, Steven L.
2007
Report on Phase I Archaeological Survey of the Proposed Lake Road Development.
2003
Jane C. Clifton
Report on the Phase II Archaeological Investigation of the Site 73.21, Riverbend Phase V Property, Glenburn, ME.
2002
Jane Clifton
3523
3683
3346
3269
Report on Phase I Archaeological Survey of the Riverbend Subdivision Phase V.
Cranmer, Leon E.
2000
Report on the Phase I Archaeological Survey at the Mill Bridge Site, Route 43, Old Town/Alton.
3109
Haugh, Sarah
2008
Report on Phase I Archaeological Survey of Cedar Brook Subdivision.
3779
Hedden, Mark H.
2004
Kenduskeag Bridge Replacement (PIN 11041).
3436
Putnam, David E.
1995
Report on Phase I Archaeological Survey of Manure Storage Facility, Martin Farm, Corinth.
2869
Sanger, David
Kenduskeag Stream Drainage SCS Practice.
2916
1992
1991
Phase 0 Archaeological Report on the Kenduskeag Watershed.
1977
R.D.Davis,others.
The Hirundo archaeological project: an interdisciplinary approach to Central Maine prehistory.
IN W,Newman and B.Salwan,eds. Annals of the New York Academy of Sciences. 288:457-471.
1973
Robert G. MacKay
The Hirundo Archaeological Project - Preliminary Report.
Man in the Northeast 6:21-29
Valimont, Brian
2013
Proposed Kenduskeag Cell Tower, Bangor, Phase I
2007
Report on Phase I Archaeological Survey of the Proposed Hermon Cell Tower.
Winter, W.C.
Artifacts of Pushaw Lake
073, 043
073,074
2809
1965
Sanger, David
2006
Getting Started: Archaeology at Orono in the 1970s.
MAS Bulletin, 46:2:21Kelley, Alice R.
2003
David Sanger
Postglacial Development of the Penobscot River Valley: Implications for Geoarchaeology.
in Geoarchaeology of Landscapes in the Glaciated Northeast, edited by David L.Cremeens and John P. Hart, New
York State Museum Bulletin 497:119-133.
4127
3684
Quads
073,074
073,074,091
074
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Sanger, David
2003
Alice R. Kelley, Heather Almquist
Geoarchaeological and Cultural Interpretations in the Lower Penobscot Valley, Maine.
in Geoarchaeology of Landscapes in the Glaciated Northeast, edited by David L.Cremeens and John P. Hart, New
York State Museum Bulletin 497:135-150.
Klink, Cynthia
1992
2680
Archaeological Research in the Milford Reservoir: Phase I Addendum.
Smith, Walter B.
1926
Indian Remains of the Penobscot Valley and their significance.
University of Maine Studies,Second Series. #7
Orono.
Belcher, William R.
1994
David Sanger, Bruce Bourque
The Bradley Cemetary: A Moorehead Burial Tradition Site in Maine.
Canadian Journal of Archaeology, 18:3-28.
1989
David Sanger
Phase II report on the archaeology of the Veazie Reservoir.
2520
1988
David Sanger
Phase 2 Report on the Archaeology of the Milford Reservoir
2510
1988
David Sanger
Phase II Report on the Archaeology of the Basin Mills Project.
2496
1988
David Sanger
1988 Phase I Archaeological Research in the Stillwater and Milford Reservoirs
2507
1988
David Sanger
2480
An assessment of the cultural resources of the Veazie and Orono Headponds:Results of the 1987 Phase I Survey.
Chandler, Hugh
Known Burial Places Near Bangor
3896
2009
Clark, James
1992
Richard Will
Report of Phase I Archaeological Survey of Orono Demolition Debris Landfill Site.
2706
Clark, Julia
2000
K.Mack,J.Mosher,B.Newsome,R.Will
3096
Results of the Phase I and II Archaeological Testing of the Great Works Hydroelectric Project (FERC 2312), Penobscot
Co.
Corey, Richard
2005
Ellen Cowie
3504
Report on Phase I Archaeological Survey of the Proposed Old Town Airport Improvement.
Eldridge, Stuart A.
2005
Sarah Haugh
3490
Report on Phase I Archaeological Survey of the Penobscot Commons Project.
Faulkner, Alaric
1991
Historic and Prehistoric Archaeological Research at Fort Hill, Veazie.
2623
Fenton, James P.
1992
Catherine Quinn
The 1992 Phase II Excavation at the Bob Site (74.148) Pushaw Stream Locality.
2742
Fox, John W.
1972
Dating Kaolin tobacco pipes of Indian Island.
Man in the Northeast. 3:20-35
Furgerson, Kathleen A.
1991
David Sanger
2621
Phase II Report on the Archaeology of Site 74.107, Still Water Reservoir.
1990
David Sanger
2567
Phase I Addendum for the Eddington Bend site (74.8), Penobscot County, Maine.
Lagerbom, Charles
1991
A Truckhouse on the Penobscot: Jonathan Lauder's Trading Post...
2679
Mack, Karen
2011
Monopole Replacement Construction on Eddington Bend Site 74.8
4100
Quads
074
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Mack, Karen
2010
James A. Clark
3938
Phase II Precontact Archaeological Investigations of Site 74.172, Milford, Bangor Hydro Line 64 Rebuild Project
2010
James Clark, Richard Will
3948
Results of Phase III Precontact Archaeological Investigations Site 74.8, Eddington Bend, Bangor Hydro Line 64 Rebuild
1998
D.Sanger,C.Quinn,A.Kelley
Phase III Archaeolgical Investigations of the Bob Site, Pushaw Stream and Revised 74.136 Phase II Report.
Mellgren, Guy
1960
The Bradley site on the Penobscot.
Massachusetts Archaeological Society Bulletin. 21(3-4):43-45.
Moore, Edward
2002
Richard Will
3000
3273
Report on Phase I Archaeological Survey of the Proposed Wilson Street Realty Trust Project, Brewer.
1998
Richard T. Will
Report on Phase I Archaeological Survey of Proposed Castle Bay Energy Gas-Fired Facility.
2986
Mosher
2008
Arthur Spiess
Archaeological Phase III Mitigation of Site 74.84 on Pushaw Stream, Old Town, Maine
3817
Mosher, John P.
2007
A.E. Spiess
Phase I and II Boom Birch Bridge Replacement Archaeology (PIN 12661.00) in Old Town.
3682
2006
Arthur E. Spiess
3539
Archaeological Phase IIB Testing of Site 74.84, a Susquehanna Tradition Encampment on Pushaw Stream, Old Town,
Maine.
2005
Arthur Spiess
Report on Phase I/II Survey and Testing of Sites 74.82 and 74.84 for the Irving Bridge Replacement Project (PIN
11043.00) on Pushaw Stream, Old Town, Maine
3453
2005
William Burgess
Phase I Archaeological Survey of the Route 9 Connector (PIN 8483.20), Brewer, Holden and Eddington, Maine.
3456
2003
Leon Cranmer
Report on Phase 0 Archaeological Survey of the Route 9 Connector (PIN 8483.20) Brewer,Eddington.
3276
Pekrul, Sharon L.
1985
Phase II Archaeological Investigations in the Basin Mills Project Area
2173
Petersen, James B.
2459
1987
David Sanger
Archaeological Phase II testing at the Eddington Bend site (74-8), Penobscot County, Maine.
1986
David Sanger
Archaeological Phase II Testing at the Eddington Bend Site (ME74-8), Penobscot County, Maine.
Robinson, Brian S.
Old Town Water District--Indian Island.
2001
1998
Richard Will
Old Town Water District: Phase II Archaeolgical Testing and Mitigation Plan.
1996
2450
3194
3024
2908
The Godfrey Cemetary of Old Town.
1989
Report on Remote Sensing of the Sunkhaze Ridge site.
Sanger, David
2001
Alice R. Kelley, Henry N Berry, IV
Geoarchaeology at Gilman Falls: An Archaic Quarry and Manufacturing Site in Central Miane, USA.
Geoarcaheology:An International Journal, Vol 16, No. 6, (633-665).
1996
Gilman Falls Site: Implications for the Early and Middle Archaic of the Maritime Peninsula.
Canadian Journal of Archaeology, 20:7-28.
2537
Quads
074
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Sanger, David
1993
W.Belcher, J.Fenton, M.Sweeney
Gilman Falls: A Middle Archaic Quarry ad Workshop in Cnetral Maine.
MHPC
Document #
2784
1992
W.R.Belcher, D.C.Kellogg
Early Holocene Occupation at the Blackman Stream Site, Central Maine.
Early Holocene Occupation in Northern New England. Eds. Brian Robinson et al., Occassional Publications in Maine
Archaeology, Number 9.
Sharon Pekrul,other
1986
Archaeology of the Collins Bridge Site, Bradley,Maine
Maine Archaeological Society Bulletin 26:2 p5-14
1985
Sharon Pekrul
2168
The Collins Bridge Site, Bradley, Maine
1984
An Evaluation of the Cultural Resources in the Basin Mills Area
2157
1984
An Archaeological Examination of the Eddington Bend Site at the Veazie Dam
2158
1984
An Archaeological Examination of the Penobscot River from the Bangor Dam to the Veazie Dam
2159
Smith, J. N. Leith
2008
John Mosher, Leon Cranmer
3756
Report on the Archaeological Phase I/II Survey of the I-395/Rt 9 Transportation Study Area, Brewer, Eddington and
Holden (PIN 8483.20)
Smith, Walter B.
1926
A Village and Burial Site on the Penobscot River near Bangor, Maine, Showing Different Periods of Occupation by Man
University of Maine Studies,Second Series. 7:58-84
Snow, Dean R.
2009
3895
Report on 1970 Excavations on Penobscot Indian Reservation, Indian Island, Old Town, 2009 Revision
3894
2009
Eddington Bend (74-8) Catalog Guide
1971
Report on the 1970 Excavations on the Penobscot Indian Reservation, Indian Island, Old Town, Maine
Sorg, Marcella
1989
Forensic Anthropology Report, Eddington Bend
4141
1989
Forensic Anthropology Report: Eddington Bend.
2761
Valimont, Brian
2009
Proposed Fish Passage Leonard's Mill Dam, Bradley, Maine
2006
Report on Phase I Archaeological Survey of the Proposed Stillwater Cell Tower.
Will, Richard T.
2013
Karen Mack
Results of Phase II of the Access Road on the Eddington Bend site or Site 74.8
1999
James Clark
A Report on the Phase I Archaeological Survey of the Proposed Veazie to Orrington 115kv Line Project.
074, 091,
108
2149
Mack, Karen
2009
James Clark
3874
3606
4124
3053
3882
Results of Phase I Precontact Archaeological Survey Bangor Hydro Electric Line 64 Rebuild Project
074,075,076, Cox, Steven L.
1990
Report on the Phase I Archaeological Survey of the Bangor Hydro-electric Second 345 KV Tie Line Project Route.
093-096
2586
074,091
2682
Fenton, James P.
1992
David Sanger
Archaeological Investigations on the Headwaters of the Milford Dam, Penobscot County.
074,091,108- Treat, Joseph
1820
Journal and Plans of Surveys by Joseph Treat, 1820.
9,122,+
2460
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
074;023;004; Callum, Kathleen
1995
Archaeology in a Region of Spodosols, Part 2.
016
Pedological Perspectives in Archaeological Research, SSSA Special Publication 44.
075
Kellogg, Douglas
2000
A Report on the Phase I Archaeological Survey of the Dow Pines Recreation Area.
Quads
076
MHPC
Document #
3152
Cox, Steven L.
1989
Report on Phase I archaeological survey of Ampersand Isand, Lower Sabao Lake, Hancock County.
2524
Cranmer, Leon E.
1994
Phase I Archaeological Survey of PIN 4720, Beddington.
2786
Will, Richard T.
2012
Results of Phase IA survey Hancock Wind Project, Hancock Co.
4164
076,077
Hedden, Mark H.
1999
Arthur E. Spiess
Phase I and II Archaeological Survey along Route 9 in Aurora, T30 MD, T24 MD and Osborn Plt.
3036
077
Baldwin, Geraldine
2006
An Archaeological Phase II Survey of Sites 77.7, 77.8 and 77.9, Columbia Falls OTHB-E Radar Station.
3637
Cranmer, Leon E.
1993
Arthur Spiess
Report on Phase I Archaeological Survey of PIN 4341.10, Route 9.
2779
Shaffer, Gary
2007
Project SHARE's Replacement of the Crebo Crossing Bridge, T18 MD BPP, A Phase I Archeological Survey.
3679
2003
Report on Phase I Archaeological Survey of the Firebreak for Stanley Foss.
077 078
Clark, James
1997
Richard Will
3314
2948
Report on Phase I Archaeological Survey of the Proposed Cherryfield Cranberry Project.
077,078
Cranmer, Leon E.
1994
Phase I Archaeological Survey of PIN 4031.10, T31 MD.
077,086
Baldwin, Geraldine
2004
William J. Chadwick
3486
Archaeological Phase I Survey for the Columbia Falls and Moscow OHTB-E Radar Stations, Washington and Somerset
Counties.
078
Cox, Steven L.
1991
Report on Archaeological Phase I Survey of Proposed Subdivision on First Chain Lake, Washington County.
2655
Trautman, Elizabeth A.
2728
1992
2785
Leon Cranmer, Arthur Spiess
Report on the Reconnaissance Level Archaeological Survey of the Wesley/T31 MD BPP, Route 9 Project.
079
Corey, Richard
2006
Ellen Cowie
Report on Phase I Archaeological Survey of the Birch Point Subdivision, Cathance Lake.
2005
Ellen Cowie
Report on Phase I Archaeological Survey of the Cathance Shores Subdivision.
3509
Hedden, Mark H.
1997
Report on Phase I Archaeological Survey of Rocky Lake, Whiting.
2983
Shaffer, Gary
Wallace Hall, Washington Co. rock removal
4027
2011
079,80,95,96 Clark, James
2006
Report on Phase I Archaeological Survey of the Quoddy Bay LNG Project Sendout Pipeline.
080
3554
Byers, Douglas S.
1959
The Eastern Archaic: Some Problems and Hypotheses.
American Antiquity, 24:233-256.
Cranmer, Leon E.
1996
Arthur E. Spiess
Archaeological Survey Report Site 80.44, Edmunds Boat Launch Facility.
1994
Arthur Spiess
Horan Head Purchase: Archaeological Survey for the Land for Maine's Future Board.
3635
2894
2792
Quads
080
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Hedden, Mark H.
2003
Arthur Spiess
Report on Phase I Archaeological Survey of Site 80.13, Gleason Point, Perry.
Kingsbury, I.W.
1951
W.S.Hadlock
An early occupation site, Eastport,Maine.
Massachusetts Archaeological Society Bulletin 12:22-26 Also Robert Abbe Museum, Notes #5
Rojo, Alfonso
1986
Live Length and Weight of Cod Estimated from Various Skeletal Elements
North American Archaeology 7(4):329-351
Mark Hedden
Spiess, Arthur E.
2006
MHPC
Document #
3304
4082
3577
South Bay Parcel, Pike Lands, Lubec: Archaeological Assessment for the Land for Maine's Future Board.
2006
John Mosher
3531
Mowry Beach, Lubec: Archaeological Assessment for LMFB.
2005
John Hudson
Morong Cove Acquisition Archaeological Survey for LMFB.
3457
2004
Eric Lahti
Initial Archaeological Reconnaissance of the East Ridge Tract LMFB Acquisition.
3371
Eliz. Trautman & Leon Cranmer
1991
Archaeological Survey of the Tide Mill Farm Property.
2625
1990
Eliz.Trautman, Tim.Kuperschmid
2566
Prehistoric Occupation at Reversing Falls
Will, Richard T.
2005
Archaeological Survey of the LNG Transfer Facility Site.
080, 096
3517
Sanger, David
2006
Micah Pawling, Donald Soctomah
4126
Passamaquoddy Homeland and Language: The Importance of Place
Cross-Cultural Collaboration: Native Peoples and Archaeology in the Northeastern United States, ed by Jordan Kerber
Wheeler, Kathleen
2009
Richard T. Will
3867
Archaeological Background Study, Moosehorn National Wildlife Refuge, Washington County, Maine
Will, Richard
2010
Kathleen Wheeler
Archaeological Background Study Moosehorn National Wildlife Refuge, Washington Co.
080,023,043, Kopec, Diane
1985
Collections Catalog/Inventory for the Robert Abbe Museum
044,058+
4083
2170
080,097,CAN McCormick, James S.
1980
Criteria in Archaeological Faunal Analysis: Four Passamaquoddy Bay Cases.
Master of Science Dissertation, University of Maine at Orono. 149pp
Sanger, David
1985
Sea-Level Rise in Passamaquoddy Bay: Archaeology and Sediment Cores.
Open File #85-73, Maine Geological Survey
1985
Cultural Ecology in Passamaquoddy Bay, New Brunswick
1971
Passamaquoddy Bay Prehistory: A Summary
081
Cole-Will, Rebecca
1991
Report on Phase I Archaeological Survey of Black Brook Cove Campground, Aziscohos Lake.
Davis, Stephen A.
1992
Two Concentrations of Paleo-Indian Occupation in the Far Northeast.
Revista de Arqueologia Americana 3: 31-56
Gramly, R. Michael
2005
Recent Archaeological Fieldwork at the Vail Clovis Habitation and Kill Site.
The Amateur Archaeologist:11:2:19-37.
2005
Vail Site Radiocarbon Dates.
2714
3513
Quads
081
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Gramly, R. Michael
2005
D.C. Waldorf, Val Waldorf
Fluted Drills and Recycled Fluted Points at the Vail Clovis Site.
The Amateur Archaeologist:11:1:47-71.
2005
Paleo-American Small-scale Sites in the Magalloway Valley, Northwestern Highlands, Maine.
The Amateur Archaeologist:11:2:67-79.
2005
The Upper/Lower Wheeler Dam Sites: Clovis in the Upper Magalloway River Valley, NW Maine.
The Amateur Archaeologist:11:1:25-46.
1995
A Quartz Chrystal Fluted Point from Maine.
The Amateur Archaeologist 1(2):65-69.
1995
The Vail Paleo-Indian Site: Fifteen Years after the Excavation.
The Amateur Archaeologist 1(2):46-64.
1988
The Adkin Site: A Paleo-Indian Habitation and Associated Stone Structure.
Persimmon Press, Buffalo, N.Y.
1985
Recherches archeologiques an site paleoindien de Vail, dans le nord-ouest du Maine, 1980-1983
Recherches Amerindiennes an Quebec 15:1-2:
1984
Kill sites, killing ground and fluted points at the Vail site.
Archaeology of Eastern North America 12:110-21
1982
The Vail Site: A Palaeo-Indian Encampment in Maine
1981
MHPC
Document #
Kerry Rutledge
A New Paleo-Indian Site in the State of Maine
Puryear, Kristen Ann
1996
3260
The Late Pleistocene/Early Holocene Vegetational History of the Vail Site, a Paleo-Indian Encampment and Associated
BA in
Thesis,
Bates College
Kill Site
West-Central
Maine.
Rojo, Alfonso
1987
Excavated Fish Vertebrae as Predictors in Bioarchaeological Research
082
Gramly, R. Michael
1995
The Morss Fluted Point Site, Northwestern Maine.
he Amateur Archaeologist, 7:2.
Spiess, Arthur E.
2008
William Burgess
4073
3773
Report on Phase I Archaeological Survey of the Cupsuptic Lake Parks Water Access Project.
083
Corey, Richard
1998
Report on Phase I Archaeolgical Survey of the Rangeley Sand and Gravel Project.
3003
1993
083,084,100, Will, Richard T.
Report on Phase 0 Archaeogical Survey of New England Wind Energy Station.
101
2757
083,100,084
3701
2007
Report on Phase I Archaeological Survey of the Kibby Wind Power Transmission Line.
083,84,100
Mosher, John P.
2006
Report on Phase I Archaeological Survey of Route 27 Highway Improvements and Lower Pond Boat Launch.
3560
084
Bartone, Robert N.
2001
Report on Phase I Archaeological Survey of the Carrabassett Report on Phase I Archaeological Survey of the
Carrabassett Valley Hut Project.
3210
Clark, James
Rivers Edge Estates Subdivision, Eustis.
3810
2008
1998
Edward Moore, Richard Will
Report on Phase II Archaeological Survey of the Flaggstaff Project (FERC 2612)
Gramly, R. Michael
1988
Excavations at the Ken Wing site, an isolated ceramic period encampment in the Stratton Highlands,NW Maine.
Man in the Northeast 36:89-99
2995
Quads
084
084,085
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Haugh, Sarah
2011
Eustis Water Department Project, Phase I Prehistoric Archaeological Investigation Report
MHPC
Document #
4026
Mosher, John P.
2000
Richard T. Will
A Report on the Phase III Archaeological Investigations of the Tim Pond Brook Site (84.40), Eustis.
3160
Quinn, Catherine
1990
James B. Petersen
Eustis Hydroelectric Project Phase I and Phase II Archaeological Testing.
2611
Clark, James
2899
1996
Richard T. Will, Janet Cormier
Phase I Archaeological Resource Assessment of the Flaggstaff Lake Storage Project (FERC 2612), Somerset and Franklin
Counties, Maine.
Will, Richard T.
1994
James Clark, Janet Cormier
2824
Results and Recommendations of Phase 0 Study of the Flaggstaff Storage Project (FERC 2612)
084,129,134
085
085,086
2002
Edward Moore
Recent Late Paleoindian Finds in Maine.
MAS Bulletin, 42:1:1-14.
Brigham, Michael
2009
Stephen Scharoun, Ellen R. Cowie, Robert
Archaeological Phase I Survey Proposed Sugarloaf Regional Airport (replaced 3776)
3870
2008
Ellen Cowie
Letter Report on Phase I Archaeological Survey of the Proposed Sugarloaf Regional Airport Safety Areas.
3776
2002
Report on Phase I Archaeological Survey of Hut # 3, Franklin Co.
3254
Hedden, Mark H.
2000
Site 85.4 Route 27 Hammond Field, Carabassett Valley.
3104
Kellogg, Douglas
1987
Phase One Prehistoric Archaeological Survey for the Appalatian National Scenic Trail Relocation.
2472
James B. Petersen
Parker, Jeffrey
1988
2478
An Archaeological Phase I Survey and Phase II Testing of the Wyman Project (FERC # 2329), Somerset County, Maine.
086
Birnie, Robert
Phase I Survey Bingham Hatchery
1988
Thomas Baker
Clark, James
2005
Report on Phase I Archaeological Survey of the Wyman Side Channel Project
2003
Report on Phase I Archaeological Survey of the Wyman Hydro Side Channel Project.
2505
3495
3306
Hedden, Mark H.
2004
Tibbet's Pond Survey for the Land for Maine's Future Board.
3420
Mack, Karen
2011
James Clark
2008 Archaeological Data Recovery Old Road Site, Wyman Project (FERC 2329)
4002
2011
James Clark
Report on 2008 Data Recovery Sumac Meadow Site, Wyman Project (FERC 2329)
2009
Edward Moore, James Clark
4001
3826
FPL Maine Hydro Report on 2008 Archaeological Data Recovery Site 86.11 Wyman Hydroelectric Project (FERC 2329)
Moore, Edward
2011
Phase III Archaeological Data Recovery Clark Site (86.3B) Wyman Hydroelectic Project (FERC 2329)
3998
2011
Phase III Data Recovery Pleasant Pond Stream Site, Wyman Project
3999
Petersen, James B.
1992
Thomas Baker
Report on Phase I Archaeological Survey of Bingham Hatchery.
2731
Quads
086
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Will, Richard T.
2001
Edward Moore, Christopher Dorion
The Esker Site: a Late Paleoinidan Site in Caratunk.
MHPC
Document #
2001
Edward Moore, Chris Dorion
The Esker Site (86.12): a 14C Dated Late Paleoindian Campsite.
086,52,69,24 Clark, James
2003
Results of Annual Site Monitoring: Wyman, Weston, Gulf Island, Oakland and Bonny Eagle.
,36,37+
087
McPheters, Hutch
2005
Ellen Cowie
3175
3196
3360
3497
Report on Phase I Archaeological Survey of the Proposed East Whetstone Ponds Project.
087,088,104
Spiess, Arthur E.
1990
Leon Cranmer
2574
Upper Piscataquis Flood Control Structures
088
089
089,090,106
Clark, James
2006
Report on Phase I Archaeological Survey of the Section 34 Pole Replacement Project.
3564
Corey, Richard
2008
Ellen Cowie
Report on Phase I Archaeological Survey of Main Stream Subdivision, Dexter.
3778
Mack, Karen
1997
Report on Phase I Archaeological Survey of the Wasookeaz Snowmobile Club Bridge.
2962
Shaffer, Gary
Cleaves Farm, Abbot, irrigation system
4157
2013
2012
Alternative Irrigation System for Cleaves Farms, Abbott, Phase I Archaeological Survey
4093
2003
Cleaves Farm Irrigation System, Phase I Survey.
3294
2013
Field Check for Ernesst W. Van der Mast, Dover Foxcroft
4123
Bartone, Robert N.
1987
James Petersen
Archaeological Phase I Survey and Testing of the Proposed Dover-Foxcroft Wastewater Treatment Facility,DoverFoxcroft,Maine
090
1992
James B. Petersen
2451
2746
Archaeological Phase III Data Recovery Excavations at The Brockway Site, Milo.
1988
David Putnam & J.B.Petersen
Archaeological Investigations at the Brockway Site, Central Maine.
Current Research in the Pleistocene 5:1-3
Brigham, Michael
1999
Letter report--McMullen Property, Milo.
3084
Crisell, Rob
1998
A Northern Exposure: New Acquisition.
American Archaeology, 2:4:34
Hechenberger, Michael
1990
James B. Petersen
Archaeoloical Data Recovery at the Stratified Sharrow Site (ME 90.2b) in Central Maine: Report on the 1989
Excavation.
2569
Hedden, Mark H.
2836
1994
Arthur Spiess
Milo Snowmobile Bridge Phase I Archaeological Survey Report to Bureau of Parks and Recreation.
Petersen, James B.
1996
Nancy Ash Sidell
Mid-Holocene Evidence of Cucumbita sp. from Central Maine.
American Antiquity, 61:685-689.
1989
2540
Archaeological Testing at the Sharrow Site: A Deeply Stratified Early to Late Holocene Cultural Sequence in Central
Maine.
Quads
090
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Petersen, James B.
1988
Thomas Baker & M.Heckenberger
A Stratigraphic Sequence at the Sharrow Site in Central Maine.
Current Research in the Pleistocene 5:19-20
1987
Robert N. Bartone
2453
Archaeological Phase I Survey and Phase II Testing of the Proposed Milo Wastewater Treatment Facilities, in the Town
of Milo,Piscataquis County,Maine
Putnam, David E.
1994
Vertical Accretion of Flood Deposits and Deeply Stratified Archaeological Site Formation in Central Maine, USA.
1994
Vertical Accretion of Flood Deposits and Deeply Stratified Archaeological Site Formation in Central Maine, USA.
Geoarchaeology: An International Journal, 9:467-502.
Spiess, Arthur E.
2006
William Burgess
2806
3611
Sebec River, Milo, Water Access Archaeological Assessment for LMFB.
090,094,110, Cox, Steven L.
1997
Report on Phase II Archaeological Survey of the West Branch Project (FERC 2618).
111
2971
090,106
Petersen, James B.
1986
2443
Archaeological Investigations in the Piscataquis River Drainage and the Greater Moosehead Lake Region, Maine: 19841985
091
Hadlock, Wendell S.
1948
Theodore Stern
Passadumkeag, a Red Paint Cemetary, 35 Years after Moorehead.
American Antiquity. 14:98-103
1948
Theodore Stern
3980
Passadumkeag, A Red Paint Cemetery, Thirty Five Years After Moorehead
1948
T. Stern
Passadumkeag, a Red Paint Cemetary, Thirty-Five Years after Moorehead.
American Antiquity, 14:98-103.
Heller, Andrew R.
2012
Phase I Archaeological Survey of Passadumkeag and Greenbush, Maine Public Boat Launches
Mosher, John P.
2013
Phase I Archaeology Penobscot River Bridge Replacement between Howland and West Enfield
Snow, Dean R.
The Passadumkeag Sequence.
Arctic Anthropology 12:2:46-59
4054
4143
1975
1969
A Summary of Excavations at the Hathaway Site in Passadumkeag,Maine, 1912,1947 and 1948.
Ms. Department of Anthropology, University of Maine, Orono.
1969
A Summary of Excavations at the Hathaway Site in Passadumkeag, Maine, 1912, 1947, 1968
Stern, Theodore
1948
Excavations in the Red Paint burial complex of Passadumkeag,Maine.
Eastern States Archaeological Federation Bulletin 7( ):11-12.
Wilson, Deborah B.
1991
Phase I Archaeological Survey of the Rock Quarry Site in Alton.
4113
2647
091,108
Van Horn, David M.
1984
Steven L. Cox
Cultural Resource Assessment: A 20+/- Acre Parcel Located in West Enfield, Maine
2161
092
Kopec, Diane
2530
1989
Thomas Lowell
Phase I Archaeological Survey, Wayne Porter Parcel, Saponic Pond, Grand Falls Plantation
093
Will, Richard T.
2012
Phase IA Archaeological Sensitivity Proposed Passadumkeag Wind Project, Grand Falls and Summit Twp
4099
Bartone, Robert N.
1992
James B. Petersen
Report on Phase I Archaeological Survey of Proposed West Lake Subdivision, Hancock County.
2686
Quads
093
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Mosher, John P.
2001
Reconnaissance Archaeological Survey of LMFB Acquisition of Nicatous and West Lakes.
MHPC
Document #
Putnam, David E.
2002
Report on Phase I Archaeological Survey of the West Lake Subdivision.
093,094
3178
3220
Kopec, Diane
1985
The Eddie Brown Collection of the West Grand Lake Area, Maine
093,094,110, Cox, Steven L.
1995
Report on Phase I Archaeological Survey of the West Branch Project (FERC 2618).
111
2881
093,094,111
2439
Putnam, David E.
1986
Arthur E. Spiess,others
A Prediction of Prehistoric Archaeological Site Locations from Aerial Photographs of Passamaquoddy Nation Lands in
Maine
093,114,115, Cox, Steven L.
1997
Project Nipayon Reconnaissance-Level Archaeological survey on Tribal Land.
128,129
094
2934
Hedden, Mark H.
1989
Petroglyph evidence for a possible 19th century survival of Algonkian (Passamaquoddy) shamanism in eastern Maine.
MAS Bulletin, 29:1:21-30.
Lahti, Eric
2009
Arthur Spiess
3887
Wabassus Lake Project Archaeological Survey for Downeast Lakes Land Trust
2007
Arthur E. Spiess
3729
Downeast Lakes Land Trust Access Improvements 2007 Archaeological Survey.
2006
West Grand Lake, Pocumcus Lake and Fourth Machias Lake: a Limited Survey for Downeast Lakes Land Trust and
LMFB.
094,093
3558
Moore, Edward
2013
Phase I survey proposed boat launch, Sysladobsis Lake
4131
Petersen, James B.
1990
Grand Lake Stream, The Elliott II Site: An Archaeologist's Preliminary Report
New England Antiquities Research Association Journal 25 (1&2)3-13
Spiess, Arthur E.
2008
Eric Lahti
Third and Fourth Machias Lake Preliminary Archaeological Sufvey: LMFB Machias II Purchase.
4038
Lewis, Robert
2707
1992
Steven Cox
3747
Report of Phase I Archaeological Survey of a Proposed Development on Fourth Machias Lake.
094,095
Cox, Steven L.
1992
Report on Phase I Archaeological Survey of a Proposed Development near Grand Lake Stream, Washington Co.
2700
095
Clark, James
2005
Report on Phase I Archaeological Survey of the Big Lake Subdivision, Washington County.
3512
Cox, Steven L.
1991
Site 95.20 and the Vergennes Phase in Maine.
AENA 19:135-162
1990
Site Survey in the Vicinity of Indian Township.
2616
1990
Project Wolaku: Preliminary Report on 1990 Investigations.
1989
Bruce J. Bourque
2613
2541
Phase II Archaeological Investigations of Sites in the Big Lake Region, ME.
1986
The Big Lake Archaeological Project:1986 Survey
Feher, Steve
Some Big Lake Pottery
1976
Bruce J. Bourque
2458
Quads
095
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Feher, Steve
1974
A Site on Big Lake
MHPC
Document #
1970
A Preliminary Report on Big Lake Pottery
Kelley, Alice R.
1988
Steven Cox
Survey of Bank Erosion at Archaeological Sites in the Big Lake Region
3838
Mitchell, Harbour III
2013
95.24 A Late Ceramic Period site on the East Machias River
4151
Mosher, John P.
2010
3930
Phase I Archaeological Survey of the Route 1 Bridge Replacement between Indian Twp and Princeton, Washington Co.`
095,110,111, Cox, Steven L.
Report on the 1992 Site 95.18 Survey.
112
096
2753
1993
Baldwin, Geraldine
2009
Belinda Cox
Addendum Report Phase I B Archaeology Survey Deep Testing Location 9 Calais LNG Project Pipeline
3910
Bartone, Robert N.
2013
Jessica Stuart
Proposed US Cellular Calais Telecommunications Tower Phase I
4117
Brigham, Michael
2005
3472
Archaeological Phase I Survey of Lots 12, 14 and 16 of the Proposed Woodland Commercial Park Project in Baileyville,
Washington Co. (MHPC #2753-04).
2005
Cowie, Bartone, Scharoun, Cyr and Reed
3501
The Archaeology of N'tolonapemk (96.02), "Our Ancestors' Place": Phase III Data Recovery at the Eastern Surplus
Superfund Site, Meddybemps, Maine.
2001
R. Bartone, J.Reed, E. Cowie
Introduction to the Archaeological Phase III Excavations at NTOLONAPEMK, the Eastern Surplus Company Superfund
Site, MAS
96.02.Bulletin, 41:2:27Clark, James
2006
Rebecca Cole-Will, Jacob Freeman
Phase I Pre-contact Archaeological Survey Report, Downeast LNG Project.
2006
Rebecca Cole-Will
3640
3587
Report on Phase IA and Initial Phase IB Precontact Archaelogical Review, Downeast LNG Project, Maine.
Leach, Peter
2009
William Chadwick
3909
Archaeological Deep Testing for the Calais LNG Project, Washington Co.
2008
Assessment of Submerged Prehistoirc Archaeological Site Potential, Calais LNG Project
3834
McPheters, Hutch
2004
S.Sharoun,R.Bartone,M.Brigham,E.Cowie
Report on Phase I Archaeological Survey of Three Proposed Firebreak Lines within Tract 100A of the Moosehorn
National Wildlife Refuge (Contract # 501813 CO
3429
Moore, Edward
2008
Kathleen Wheeler, Ellen Marlatt
Phase 1 Archaeological Survey of the Milltown (Calais) LPOE .21 Acre Lot, Calais, Washington Co.
3805
Mosher, John P.
3228
2002
Leon Cranmer, Arthur Spiess
Phase II Testing of Calais International Bridge Project (PIN 8483.30)
2000
Leon Cranmer
3163
Phase 0 and I Archaeological Survey of the Calais Industrial Bridge Project (MDOT PIN 8483.30).
Soctomah, Donald
2006
A Visit to Our Ancestors Place: Meddybemps - N'tolonapemk Village.
3630
Waller, Joseph, PAL
2011
Phase I Archaeological Identification Survey Moosehorn National Wildlife Refuge, New Administrative Facility
4043
Quads
096
096, 097
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Will, Richard T.
2000
Phase I Archaeological Survey of Proposed Injection Well Locations, Eastern Surplus Superfund Site.
MHPC
Document #
3130
2000
J.Clark,K.Mack,J.Mosher,B.Newsome
Results of Phase I and II Archaeological Testing of the Eastern Surplus Company Superfund Site, Meddybemps.
3094
1999
Survey of Phase I and II Investigations Conducted at Site 96.02, Meddybemps.
3074
Baldwin, Geraldine
2009
Belinda Cox, T. Kotlensky
3908
Phase 1B Archaeological Survey Twelve Pipeline Route Variations Calais LNG Project
2008
Leach, Peter
3835
Phase I Archaeological Survey of the Calais LNG Project, Washington County, ME
096,113,127
Carlson, Catherine C.
1981
2118
Report on Archaeological Survey of the Georgia-Pacific Corporation Timber Haul Road Along the West Bank of the St.
Croix River Between Woodland and Va
097
Baldwin, Geraldine
2009
Kathleen Wheeler, Belinda Cox
Phase II Archaeological Testing: Sites 97.11, 97.12, and 97.13, Calais LNG Project Terminal Property
3907
Hadlock, Wendell S.
1954
Recent Excavations at DeMonts' Colony, St. Croix Island, Maine
Old-Time New England 44(4): 93-99
Mosher, John P.
2007
Charlotte Mitigation Project (PIN 10008.40)
4097
Pendery, Steven
2002
Archaeological Survey of Red Beach Cove Project Area.
3247
William Brett
Robinson, David S.
2006
Phase I Maine Archaeological Survey, Downeast LNG Project.
3620
Sanger, David
1973
The Prehistoric Components on St. Croix Island, Maine.
Manuscript, Department of Anthropology, University of Maine at Orono.
Spiess, Arthur
2010
St. Croix Island Faunal Remains Final Project Report
Spiess, Arthur E.
2005
Leon Cranmer
3696
3960
3449
Devil's Head, Calais, and Site 97.10: Archaeological Survey for LMFB.
100
Wing, Kenny
2007
Poison Pond and the Search for Blue Chert near Route 27.
3725
101
Clark, James
2006
Reconnaissance Survey, Spencer Lake Wetland Restoration Project.
3586
102
Baker, Thomas R.
Alder Pond Mining Project
1990
2582
Bartone, Robert N.
New Trail "A", Dead River, Inspection.
2008
Gramly, R. Michael
Perspective on Maine Archaeology.
The Amateur Archaeologist 1(2):39-45.
Spiess, Arthur
1995
2009
James B. Petersen
3785
Kenny Wing
3822
Preliminary Archaeological Assessment 2008 Dead River Trail and Conservation Corridor
103
Spiess, Arthur E.
2009
Dead River Trail Archaeological Survey Work Addendum, Dead River Footbridge Testing
3866
Brigham, Michael
2005
Robert Bartone
Report on Phase I Archaeological Survey of the Old Camden Road Scenic Byway Trail Development.
3515
Quads
103
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Clark, James
1992
Rebecca Cole-Will,Richard Will
Addendum Report on Phase I Archaeological Survey of the Moxie Storage Pond Project.
MHPC
Document #
2708
Hedden, Mark H.
1999
A Report on the Phase I Archaeological Survey of PIN 6155.10 at The Forks Picnic Area
3051
Will, Richard T.
2007
Elrich, Lorrener
Report on Phase I Archaeological Survey of the FPL Energy Hydro Marine Boat Launch, West Forks.
3728
1991
2627
James Clark, Rebecca Cole-Will
1991 Phase I Survey for Prehistoric Archaeologicsal Sites, Moxie Pond Storage (FERC 2613)
103,117
Clark, James
1998
Richard T. Will
2987
Report on the Phase 0 Archaeological Review of Indian Pond Project (FERC 2634).
104
104,105,117,
118,130+
Hamilton, Nathan D.
1991
John Mosher
Archaeological Phase I Survey of the Proposed West Cove Point Subdivision Project, Greenville.
1982
James B. Petersen,other
Aboriginal Cultural Resource Inventory in the Greater Moosehead Lake Region
104,117,118, Robins, Jennifer
1990
G.Baldwin, J.Petersen
130,131
Archaeological Phase I Survey of the Moosehead Lake Project.
Will, Richard T.
2001
Moosehead Lake Storage Project (FERC 2671): Monitored Erosion Sites.
104,117,118, Clark, James
2002
Monitored Erosion Sites: Moosehead Lake Storage (FERC 267).
131
104,118,131
McGuire, J.D.
1908
Ethnological and archaeological notes on Moosehead Lake, Maine.
American Anthropologist 10:549-557
Petersen, James B.
1988
David E. Putnam
Moosehead Lake Project Archaeological Phase I Scope of Work.
2633
2131
2618
3169
3214
2493
105
Spiess, Arthur
2009
Lahti, Eric
Initial Archaeoloigcal Survey 2008 Katahdin Iron Works Phase II Purchase
3845
106
Clark, James
2006
Report on Phase I Archaeological Survey of the Submarine Utility Line, Ebeemee Lake.
3547
Putnam, David E.
2455
1987
James B. Petersen
Archaeological Phase I Testing of the Proposed Brownville Junction Wastewater Main and Treatment Plant,
Piscataquis County, Maine
Shaffer, Gary
2009
Deep Tillage Assistance for Derek Hines, Brownville
3883
2004
Report on Phase I Archaeological Survey of the Ken Dorman Pipeline Project.
3408
2002
Report on Phase I Archaeological Survey of the Wallace Sinclair Property, Back Brownville Road.
3268
Spiess, Arthur E.
2006
Leith Smith
3526
Pleasant River, Williamsburg Township, Water Access: Archaeological Assessment for the Land for Maine's Future
Board.
1984
Michael Brigham,other
An Accelerator Radiocarbon Date on a Red Paint Feature
Wilson, Deborah B.
2002
Report on Phase I Archaeological Survey of the Double D Farms, Brownville.
106,107
Cook, David S.
1981
Arthur Spiess
Archaeology of the Piscataquis Ahwagan: Preliminary Results
3213
Quads
106,107
107
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Petersen, James B.
1986
Nathan D. Hamilton, others
The Piscataquis Archaeological Project: A Late Pleistocene and Holocene Occupational Sequence in Northern New
AENA 14:1-18
England.
Haugh, Sarah
2010
Phase I Prehistoric Archaeological Investigation Milo Water District
3940
Lahti, Eric
2011
Arthur Spiess
Northwest Pond (T4R9 NWPP) Preliminary Archaeological Survey -- Land for Maine's Future Seboeis Unit Addition
3993
Mack, Karen
3057
1999
Julia Clark
A Report on the Phase I Archaeological Survey of the Proposed Realty Trust, Schoodic Lake Subdivision.
Petersen, James B.
1988
Robert Bartone
2495
An Archaeological Phase I Survey of the Proposed Little Schoodic Landing Project, Medford, Piscataquis County, Maine.
1988
John Langerak
An Archaic Period Incised Artifact from Medford, Piscataquis County, Maine.
Maine Archaeological Society Bulletin 28(1):28-37.
Putnam, David E.
1999
A Report on the Phase II Archaeological Survey of the Proposed Realty Trust, Schoodic Lake Subdivision.
Shaffer, Gary
2011
Arthur E. Spiess
A Terminal Archaic Lithic Workshop (ME 107.16) Along the Pleasant River in Milo, Maine
Maine Archaeological Society Bulletin 51(1)::29-50
2010
Deep Tillage Proposed for Farm Fields Derek Hines, Milo Maine: An Archaeological Survey
Spiess, Arthur E.
2006
Kenny Wing
3060
3971
3615
Seboeis Lake 789 Acre Purchase: Archaeological Assessment for LMFB.
108
Bartone, Robert N.
2012
Gemma-Jayne Hudgell
Township T2R8 NWP Gravel Pit expansion Project, Archaeological Phase I Survey
4070
Belcher, William R.
Gordon Island Test Report
2481
1988
David Sanger
Brigham, Michael
2010
Ellen Cowie
Lincoln Regional Airport Obstruction Removal Phase I Survey
3956
Hedden, Mark H.
2780
1993
Arthur Spiess
Report on Phase I Archaeological Survey of the Carpenter Ridge Landfill Project.
Mack, Karen
1997
Bonnie Newsom
2942
An Assessment of Cultural Resources in the Howland Reservoir.
Moore, Edward
1999
Phase II Archaeological Investigations at Site 108.23: Possible Paleoinidan Component.
3088
Mosher, John P.
2004
A.E. Spiess
Phase II Archaeological Test of Sites 108.58 and 108.7 for the Route 116 Bridge Repalcement, Mattamiscontis.
3392
Newsome, Bonnie
1998
David Sanger
Report on Phase II Archaeological Survey of the Howland Reservoir, Central Maine.
3028
Sanger, David
2000
Middle Archaic in the Lower Piscataquis River, and its Relationship to the Laurentian Tradition in Central Maine.
MAS Bulletin, 40:1:1-22.
Wilson, Deborah B.
1993
Report on the Phase I Archaeological Survey of the Runway Extension at the Lincoln Municipal Airport.
2766
108, 123,
124, 137,
Mack, Karen
2010
James Clark, Richard Will
Phase I Precontact Archaeological Survey GenLead LLC Transmission Line, Aroostook and Penobscot Counties
3973
108,122
Will, Richard T.
2002
Report on Phase I Archaeological Survey of the 115kV Chester to Millinocket Tie Line Project.
3258
Quads
109
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Corey, Richard
2007
Ellen Cowie
Report on Phase I Archaeological Survey of the Gardner Land Company Subdivision, No.3 Pond.
McPheters, Hutch
2008
Letter Report: Bill Green Pond Subdivision.
110
MHPC
Document #
Steve Scharoun, Ellen Cowie
3693
3774
Will, Richard T.
2008
Results of Phase I Prehistoric Archaeological Review of the Rollins Wind Project; Penobscot Co.
3793
Bartone, Robert N.
3839
2008
Ellen Cowie
West Branch Project (FERC 2618) Phase II Testing at Sites 110.111 and 110.112
Cox, Steven L.
2004
Jane C. Clifton
3411
Report on Phase I Archaeological Survey of a Proposed Commercial Camp Development in Lakeville, ME.
Gammon, James G.
2008
Ellen Cowie
Phase II Archaeological Testing of Site 110-10 and supplememtal Phase I West Branch Project.
2007
Ellen Cowie
Phase I Archaeological Survey of the West Branch Project Area, Lakeville.
3781
3731
Putnam, David E.
1986
A.E.Spiess,J.B.Petersen,T.E.EAstler
2440
A Prediction of Prehistoric Archaeological Site Locations from Aerial Photographs of Penobscot Nation Lands in Maine
Wilson, Deborah B.
1989
Steven L. Cox
2532
Phase II Archaeological Assessment of the William Shwartz Property on Junior Lake, Maine.
112,113,126, Allen, Patricia
1985
2178
Site Descriptions, Archaeological Importance and Recommendations for Mapping of 25 Campsites Located Along the
127
Shores of Spednik Lake and the St. Croix.
115
116
Mosher, John P.
2004
Leon Cranmer
3370
Report on Phase I Archaeological Survey of the Jackman-Moose River Bridge Replacement (PIN 10106.00), Jackman,
ME.
Will, Richard T.
1988
Rebecca Cole-Will
Phase I Archaeological Assessment of the Birch Island, Attean Pond, Subdivision.
2497
Cowie, Ellen R.
2006
An Archaeological Phase I Survey of the Proposed Plum Creek Development Project, Long Pond.
3638
Grindle, John
3711
2007
Ellen Cowie
Archaeological Phase I Survey of the Southeast Shore Development Zone in the Proposed Plum Creek Development on
Long Pond, Long Pond Twp, Somerset Co.
116,117,118
Scharoun, Stephen
2007
Ellen Cowie, Robert Bartone
Phase 0 Archaeological Survey of the Plumcreek Development, Moosehead Lake Region.
3733
117
Baldwin, Geraldine
2011
Proposed Quarry Brassua Lake (Purington property), Pedestrian Archaeological Reconnaissance
4031
Brigham, Michael
2009
Scharoun, Steve; Robert Bartone; Ellen C
Archaeological Phase I Survey and Limited Testing of the Brassua Project (FERC 2615) Somerset County (incl. Wing
collection)
3824
Clark, James
2006
Report on Phase I Archaeological Survey of the Blue Ridge Subdivision.
3601
Gammon, James G.
3923
2010
Stephen Scharoun, Robert Bartone, Ellen
Archaeological Phase II Testing Select Sites Brassua Hydroelectric Project (FERC 2615), Somerset Co. Maine
2007
Ellen Cowie
Archaeological Phase I Testing of the Proposed Rockwood Telecommunications Tower Project Area in Rockwood,
Somerset Co.
3710
Quads
117
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Hamilton, Nathan D.
1983
An Archaeological Reconnaissance of the Shoreline of the Brassua Lake Reservoir, Somerset County, Maine
MHPC
Document #
Moore, Edward
2011
Richard Will, Lawrence Elrich
Archaeological Data Recovery at Site 117.39, Moosehead Lake Outlet Dams Storage Project (FERC 2671)
Will, Richard T.
2012
Site 117.39: A Probable Middle Archaic Chipped Stone Tool Workshop and Cache Location, Rockwood, Maine
Maine Archaeological Society Bulletin 52(1):27-56
Willoughby, Charles B.
1901
Prehistoric workshops at Mt. Kineo.
American Naturalist 35:218-219
Wing, Kenny R.
2007
Phase I Archaeological Survey of Proposed Camp Sites, Sugar Island and Farm Island, Moosehead.
117, 118
2125
4020
3737
Clark, James
2011
Archaeological Evaluation of Precontact Period Sites at Moosehead Lake
3994
Will, Richard T.
1994
Sarah Staber
A Case Study of Archaeological Flake Debitage Assemblages from Moosehead Lake, Maine
4040
117,103
Clark, James
1998
Richard T. Will, Chris Dorion
Report on Phase I Archaeological Survey of Indian Pond Project (FERC 2142).
3027
117,118
Bourque, Bruce J.
1991
2656
Report on Phase I Archaeological Survey Brassua Lake, Taunton and Raynam Academy Grants, Somerset County, ME.
Will, Richard T.
2003
James Clark
3335
Archaeology and Prehistory of Moosehead Lake, Maine, Phase III Data Recovery.
2001
A Tale of Two Flint Knappers: Implications for Lithic Debitage Studies in Northeastern North America.
Lithic Technology 25(2):101-119.
117,118,130, Clark, James
1994
Will,Cole-Will,Cormier,Staber
131
Phase II Archaelolgical Survey of Moosehead Lake Outlet Dams Project (FERC 2671).
1992
Richard Will,Rebecca Cole-Will
Report on Phase IIa Archaeological Survey of the Moosehead Lake Outlet Dam Project (FERC 2761).
Will, Richard T.
1993
J.Clark,R.Cole-Will,J.Cormier
2808
2696
2763
Partial Phase II Archaeological Survey of Moosehead Lake Outlet Dams Storage Project (FERC 2671).
117,118,130,
131,104
117,118,133
118
2002
ARC, Inc.
3287
Results of Annual Archaeological Site Monitoring, Moosehead Lake Outlet Dams Storage Project (FERC # 2671).
1996
James A. Clark
Stone Artifact Movement on Impoundment Shorelines: A Case Study from Maine.
American Antiquity, 61:3:499-519.
Bonnichsen, Robson
1976
Moosehead Lake Archaeological Survey.
2597
Clark, James
2005
Results of annual Archaeological Site Monitoring -- The Moosehead Lake Outlet Storage Project (FERC 2671)
3440
Crock, John
1991
James B. Petersen
Archaeological Phase I Survey of Inland Portions of the Mount Kineo Talus Slope Area.
2628
Hamilton, Nathan D.
1988
An Archaeological Phase I Survey of the Proposed Squaw Bay Project, Little Squaw Township, Somerset County.
2487
1987
Cynthia Thayer
2465
An Archaeological Phase I Survey of the Lily Bay Subdivision, Piscataquis County.
Leach, Peter
2005
Search for the Sunken Moosehead Lake Canoes.
3648
Putnam, David E.
2003
Report on Phase II Archaeological Testing of the Lambs Cove Subdivision, Moosehead Lake.
3317
Quads
118
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Robins, Jennifer
1990
James B. Petersen
Archaeological Phase I Survey and Testing of the Kineo Development Project, Kineo Township.
MHPC
Document #
2584
Spiess, Arthur E.
1992
Leon Cranmer
Rockwood Boat Launch Ramp: Archaeological Test of Site 118.174.
2703
Will, Richard T.
2007
Jacob Freedman
Report on Phase I and II Archaeological Survey of a Proposed Subdivision on Kineo Peninsula.
3655
1996
An Example of Late Middle Ceramic (Woodland) Period Biface Production Technology from Moosehead Lake, Maine.
AENA, 24:95-148.
1991
2645
Moosehead West Outlet Dam Project.
118, 130,
131
118,131,130,
117
Clark, James
2013
Results of 2011-2012 monitored archaeological sites, Moosehead Lake Outlet Dams Storage Project (FERC 2671)
4163
2011
Moosehead Lake Outlet Dams Storage Project (FERC 2671) 2011 Fieldwork Summary
4095
2003
Results of Annual Site Monitoring: Moosehead Lake Outlet Dam.
3359
119
Eldridge, Stuart A.
2001
Report on Phase 0 Archaeological Survey of the First Roach Pond Subdivision.
3198
120,121,122
Petersen, James B.
2488
1988
David Putnam and Thomas Baker
Phase 0 Cultural Resources Assessment of the Ripogenus Project
120,121,122, Nelson, Stephen
1990
Leigh Ferreira, C. Paquin, JBP
134,135
Archaeoloical Phase I ... II...of the Penobscot Mills Project (FERC 2458).
2570
120,124
Cranmer, Leon E.
1992
Arthur Spiess
Diamond Occidental Purchase Reconnaissance Archaeological Survey Completion Report to the LMFB.
2729
121
Freedman, Jacob
2007
Richard T. Will
Report on Phase 0 Archaeological Survey of the Proposed Hammond Ridge Development.
3658
Moore, Edward
2004
Results of Phase III Archaeological Data Recovery at Sites 121.52a & 121.52b Located within the Penobscot Mills
Project (FERC #2458 ), Piscataquis County,
3364
121,122,134, Hurld, Dan
Milinocket Lake Collection Photos.
135
122
3125
2000
Clark, James
1998
Richard Will
Report on Phase I Archaeological Survey of Proposed Great Northern Company Intermill Tie Line, Penobscot Co.
3012
Hedden, Mark H.
1995
Arthur E. Spiess
Report on Phase I Testing Around the Route 116 Bridge in Medway.
2845
Quinn, Catherine
1991
James B. Petersen
Supplemental Archaeological Phase II Testing of the Penobscot Mills Project (FERC No. 2458) Penobscot and
Piscataquis Counties, ME.
2651
Sanger, David
2901
1996
Maureen Sweeney, Karen Mack
Report on Phase II Archaeological Survey of the Medway Reservoir.
Sweeney, Maureen
1994
David Sanger
Phase I Archaeological Research in the Medway Reservoir.
Will, Richard T.
The Corrigan Site.
MAS Bulletin, 47:2:36-50
2007
Edward Moore
2837
Quads
123
123,124
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Bourque, Bruce J.
1985
Lanita Collette & Robert Lewis
Analysis of archaeological and historical dates on Indian occupation of the Mattawamkeag area.
MHPC
Document #
2542
Crock, John
1992
James B. Petersen
Report on Phase I Archaeological Survey of the Pattagumpus Gravel Pit, Medway.
2689
Putnam, David E.
2006
Report on Phase I Archaeological Survey of the Snowmobile Crossing, Molunkus Stream.
3556
Spiess, Arthur E.
Test Excavation at Mattawamkeag
1980
Clark, James
2007
Karen
3702
Report on Phase I Archaeological Survey of the Proposed Stetson Mountain Wind Farm Project Transmission Line.
123,126
Bourque, Bruce J.
1985
Lanita Collette,other
Mattawamkeag/Chandler Collection Survey, FY 85: Analysis of Archaeological and Historical Data on Indian
Occupation of the Mattawamkeag Area
2182
124
Spiess, Arthur E.
2005
John Hudson
Page Farm Acquisition Archaeological Survey for LMFB: Discovery of Site 124.5.
3451
125,126,127
Kopec, Diane
1984
St. Croix River - Spednik Lakes Archaeological Survey, FY 84: Phase I Survey of the Chiputneticook Lakes
2163
125,126,138
Cox, Steven L.
2006
Report on the Phase II Archaeological Survey of Forest City Project Area, with Recommendations.
3588
126
1998
Report on the Phase II Archaeological Survey of Forest City Project Area.
2992
1995
Report on Phase I Archaeological Survey of Forest City Project (FERC 2660).
2870
Bartone, Robert N.
2010
Ellen Cowie, Michael Brigham
Post Field Summary Phase III Data Recovery, Forest City Land Port of Entry
3959
Brigham, Michael
2010
Gemma-Jayne Hudgell, Robert Bartone, Ell
Archaeological Phase II Testing of Site 126.31 within Forest City Land Port of Entry
3954
Cranmer, Leon E.
3233
2002
Arthur E. Spiess
Report on Phase I Archaeological Survey and Testing of Sites 126.2 and 126.19 for LMFB, Birch Islands.
1994
Arthur Spiess
2841
Spednic Lake Acquisition Archaeological Survey for the Land for Maine's Future Board.
1993
Arthur Spiess
Forest City Purchase Archaeological Survey For The Land For Maine's Future Board.
2745
Deal, Michael
1985
Final Report on the 1983/1984 Excavations at the Mud Lake Stream Site(BkDw5), Southwestern New Brunswick
Manuscripts in Archaeology No. 15, New Brunswick Historical and Cultural Resources.
Hudgell, Gemma-Jayne
2013
Michael Brigham, Robert Bartone, Cowie
4112
Archaeological Phase III Data Recovery Locus 1 of Paleoindian Site 126.31, Forest City LPOE, US Customs and Border
Protection
2013
Michael Brigham, Robert Bartone, E Cowie
The Grand Lake Outlet Site: An Early Paleoindian Encampment on the St. Croix River, Maine/New Brunswick Border
Maine Archaeological Society Bulletin 53(1):27-58
Moore, Edward
2008
Kathleen Wheeler, Ellen Marlatt
3803
Phase 1 Archaeological Survey of the Forest City (FOR) LPOE 1.5 Acre Lot, Forest City, Washington Co.
Putnam, David E.
Site 126.7, Foster Island, Forest City.
2003
3334
Quads
126
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Spiess, Arthur E.
2007
Leon Cranmer
Spednik Lake Purchase: 2003 Archaeological Assessment for LMFB.
MHPC
Document #
3713
Spiess, Athur E.
2006
Lambert Lake Water Access: Archaeological Assessement for the Land for Maine's Future Board.
3594
126, 127
Clark, James
2013
Results of Phase I Survey Spednic Lake, Vanceboro Dam Storage Project (FERC 2492)
4137
126,127
Bourque, Bruce J.
1992
2718
Report on the Phase I Archaeological Investigations of the Proposed AT&T Fiber - Optic Cable Route from Vanceboro
to Danforth.
126,127,CAN Hale, H. Louise
1984
Archaeological survey and Testing of the St.Croix River and Spednic and Palfrey Lakes, New Brunswick.
127
Robinson, Brian S.
1994
A Hathaway I Complex Burial Site on the St. Croix River: The Crocker Collection.
2892
2818
129,130,132, Clark, James
1997
Edward Moore, Richard T. Will
2952
142
Interim Report on Phase I Archaeological Survey of the Bowater/GreatNorthern Paper Storage Project (FERC 2634).
129,142,130
131
130
1998
Richard Will, Edward Moore
Results of the Phase I Archaeological Survey of the Storage Project (FERC 2634).
Will, Richard T.
2005
Report on Phase I Archaeological Survey of the South Branch of the Penobscot River between Canada Falls and
Seboomook Lake, Somerset Co., Maine.
2002
Report on Phase II Archaeological Survey of Site 130.16, Seboomook Lake.
3014
3466
3218
130,131,140
Spiess, Arthur E.
2004
West Branch Project: Review of Archaeological Sites.
3423
130,142
Clark, James
1999
Julia Clark, Richard Will
A Report on the Phase II Archaeological Testing of the Storage Project (FERC 2634).
3079
131
Bourque, Bruce J.
1991
Report on Phase II Archaeological Research at Site 131-21, Moosehead Lake.
2654
131,151,141
Spiess, Arthur E.
2006
West Branch Purchase: Continued Archaeological Survey 2004 and 2005.
3614
132,133,142, Bartone, Robert N.
1990
J&MPetrsn,CQuinn,TBuchanon,etc
2564
143
Archaeological Phase I Survey and Phase II testing of the Ripogenus Project (FERC 2572), Piscataquis County, ME. 131
new sites.
132,133,143
Petersen, James B.
1988
David Putnam and Thomas Baker
Phase 0 Cultural Resources Assessment of the Penobscot Mills Project
2489
133
Cox, Steven L.
1985
Peter Beblowski
Report on the 1985 West Branch Archeological Survey
2177
2120
1982
Report on the West Branch Archeological Survey
Mathiasson, Kåre
1995
Leon Cranmer, Arthur Spiess
2858
Report on the Phase I Archaeological Survey of Kidney Pond Road Bridge, Baxter State Park.
Wing, Kenny R.
2008
First and Second Debsconeag Pond Portage Trail Inspection
3815
134
Petersen, James B.
1990
Georgia Pacific Togue Pond Recreation Area Phase I Survey.
2591
136
Bradstreet, Theodore E.
1988
Report on Phase I Archaeological Survey of the Patten Sewage Plant.
3199
Quads
136
137
138
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Putnam, David E.
1995
Report on Phase I Archaeological Survey of the Fish Stream Esker Gravel Pit, Crystal.
Northeast Anthropology, 50:19-30.
Spiess, Arthur E.
2006
Mattawamkeag Region Forest Legacy Project: Archeological Assessment for LMFB.
Cox, Steven L.
2000
An Early Contact Site on the Upper St. Croix River.
MAS Bulletin 40:2:1-10.
Moore, Edward
2008
MHPC
Document #
Kathleen Wheeler, Ellen Marlatt
2890
3597
3802
Phase 1 Archaeological Survey of the Orient (ORI) LPOE 1.03 Acre Lot, Orient, Aroostook Co.
139
Wilson, Deborah B.
1990
Final Report on the Phase I Archaeological Survey of the Longfellow Lake Subdivision in Weston, ME.
2603
McPheters, Hutch
2012
Ellen Cowie
St. Aurelie Tactical Tower Line archaeological assessment
4076
140,142,133, Clark, James
2005
Small Pond Walkover Survey, Storage Project.
129
3642
142,143
3353
143
2003
Richard T. Will
Results of Phase III Archaeological Data Recovery at Five Sites within the Ripogenus Hydroelectric Project (FERC
#2572), Piscataquis Co., ME.
Quinn, Catherine
1991
James B. Petersen
2649
Supplemental Archaeological Phase II Testing of the Ripogenus Project (FERC No. 2572), Piscataquis County, ME.
143,144,153, Putnam, David E.
1997
Archaeological Investigation of the Headwaters Lakes Region Allagash Wilderness Waterway.
162
2972
147
Bonnichsen, Robson
1984
Robert Birnie, Dee Hungerford
Archaeological Reconnaissance and Testing of the Chase Mountain Tailing Pond Site.
2719
Tratebas, Alice
1984
Archaeological Reconnaissance of the Chase Mountain Mine, Penobscot County, Maine.
2720
148
Cox, Belinda
1993
J.B. Petersen
Report on Phase II Archaeological Survey of the Southern Aroostook Solid Waste Landfill Access Road.
2777
149
Belcher, William R.
1989
Phase I Prehistoric Archaeological Survey of Baston Farm Subdivision, Meduxnekeag River, Houlton, ME.
2528
Cranmer, Leon E.
2743
1993
Arthur Spiess
Smith Bridge Replacement Project, Houlton, Maine, Archeological Testing of Site 149.2.
Putnam, David
2013
Archaeological Phase I Survey B Stream snowmobile pedestrian bridge replacement, Houlton
4128
Putnam, David E.
2007
3674
Phase I Archaeological Survey of the Proposed Aroostook Riders ATV Bridge over the Meduxnekeag River, Houlton,
ME.
2006
Report on Phase I Archaeological Survey of the Snowmobile Crossing, Meduxnekeag River.
3555
2002
Report on Phase I Archaeological Survey of the Town of Houlton Riverwalk and Pedestrian Bridge.
3274
1995
Kathleen Wheeler, J.B.Petersen
2857
Meduxnekeag Archaeological Project: Purchasing Assessment of Archaeological Site Potential.
Shaffer, Gary
2013
Field Check for Town of Houlton, Rt 2A, at Pearce Brook
2012
Field Check E. W. Nightingale Tract 2067 New Limerick, Irrigation
4103
4085
Quads
149
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Shaffer, Gary
2011
Field Check for Michael Hagan, Houlton, Stream Crossing and Access Road Improvements
MHPC
Document #
2003
Report on Phase I Archaeological Survey of Sediment Basins for Michael Fitzpatrick, Houlton.
3984
3326
Spiess, Arthur E.
1999
Testing the Gardner Site: Archaeology at Cary's Mills Bridge (MDOT PIN 6743), Houlton.
3041
151,160,161
Putnam, David E.
2003
Reconnaissance Survey of the Upper St. John River: Baker Lake to Ninemile Bridge.
3337
152
Spiess, Arthur E.
2009
A Brief Archaeological Survey of Allagash Lake
3828
153
Bouras, Edward
2012
Garret Evans, Paul Bock
4069
Notes on Munsungun Survey, October 2012
Putnam, David E.
2000
Archaeological Phase I Survey of the Proposed John's Bridge Canoe Access, Allagash Wilderness Waterway.
1997
Dariel McKee
Archaeological Survey of the Churchill Dam Impoundment, Allagash Wilderness Waterway.
Spiess, Arthur E.
2004
John's Bridge Area, Allagash Waterway: 2003 Prehistoric Archaeological Sites Survey.
3116
2940
3362
3418
2004
Allagash Fieldwork 2004 Narrative.
2003
John's Bridge Area, Allagash Waterway Prehistoric Archaeological Sites: NR Eligibility.
154
2002
Paleoindian Artifacts in the Allagash, Northwestern Maine.
MAS Bulletin, 42:1:35Bonnichsen, Robson
1985
Alice M. Tratebar
Investigations at Willard Brook Quarry, Munsungan Lake, Maine
Victor Konrad,others
1981
Archaeological Research at Munsungan Lake: 1980 Preliminary Technical Report of Activities
Ellis, Christopher
1995
154,155
154,155,164
2185
2102
James Payne
Estimating Failure Rates in Fluting Based on Archaeological Data.
Journal of Field Archaeology
Gramly, R. Michael
2010
Evidence of Clovis in North Eastern North America: Windy City
154, 155
3280
3932
Payne, James H.
1987
Windy City (154-16): A Paleoindian Lithic Workshop in Northern Maine. MS.Thesis, University of Maine at Orono.
2475
Wilson, Deborah B.
1999
Chase to Churchill Lakes Paleoindian Survey.
3046
Arthur E. Spiess
Pollock, Stephen G.
1994
Nathan D. Hamilton, Richard A. Doyle
Geology and Archaeology of Chert in the Munsungun Lake Formation
NEICG Field Guide
Seeber, Pauleena MacD.
1987
A Comparison of Archaeological Remains from Two Ceramic Period Sites at Munsungun Lake, Me.
4119
Bonnichsen, Robson
1982
Archaeological Research at Munsungan Lake: 1981 Preliminary Technical Report of Activities
2103
154,155,177, Burke, Adrian L.
2000
Lithic Procurement and the Ceramic Period Occupation of the Interior of the Maritime Peninsula.
160
PhD dissertation, SUNY, Albany
155
Bonnichsen, Robson
1985
Alice Tratebar
Investigation at Willard Brook Quarry Munsungan Lake, and Munsungan Lake Lithic Sources.
2466
3151
2723
Quads
155
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Bouras, Edward
2006
Garret Evans
A New Look at Munsungun: Excavations at the Ray Carter Site
Maine Archaeological Society Bulletin 46(1):23-55
2005
Garrett Evans
A New Look at Munsungan: Excavations at the Ray Carter Site.
MHPC
Document #
2005
Garret Evans
The 2004 Archaeological Survey of Site 155.80 on Little Munsungan Lake, Piscataquis County, ME.
2004
Paul Bock, Garret Evans
3511
3458
3398
Preliminary Phase I Archaeological Survey of Site 155.80, Little Munsungun Lake.
3412
2004
Survey Report: Munsungun Region.
Buchanan, Thomas
1991
James B. Petersen
Archaeological Phase II Testing of Millinocket Lake Storage Dam Project (FERC # 2366).
2657
Crowley, Dan
2010
Digging Up a Little History (Munsungun Hunting and Fishing Club)
4024
Ferreira, Leigh
1990
James B Petersen
Archaeoloical Phase I Survey of the Millinocket Lake Storage Dam Project (FERC 2366).
2571
Grindle, Jacob
3989
2011
Ellen Cowie
Phase I Survey Proposed U. S. Customs and Border Protection Tactical Communications Modernization Project, SM
Norway Bluff
Hudgell, Gemma-Jayne
2013
Ellen Cowie
4132
Archaeological Assessment of Trail Improvements CBP Radio Communications Tower, Norway Bluff
156
159
Konrad, V.A.
1983
R. Bonnichsen,other
Soil chemical identification of 10,000 years of prehistoric human activity at the Munsungen Lake Thoroughfare, Maine.
Journal of Archaeological Science. 10(1):13-28
Putnam, David E.
2003
3321
Report on Phase I Archaeological Survey of the Oxbow-Masardis Snowmobile Club Bridge Spanning St. Croix Stream.
Wellman, Alice N.
1973
The La Pomkeag Site (156-1) -- A Preliminary Report
2152
Cowie, Ellen R.
2010
Archaeological Phase II Testing Boundary Line Mill Hamlet, ME 055-001 and Native American site 159.1, proposed
Land Port of Entry, Bridgewater
3953
Grindle, Jacob
2010
Stephen Scharoun, Robert Bartone, Ellen
3926
Phase I Survey Bridgewater Land Port of Entry Modernization Project, U. S. Customs and Border Protection, Aroostook
Co.
2010
Robert Bartone, Ellen Cowie
Phase I Monticello Land Port of Entry Modernization Project, US Customs and Border Protection, Aroostook Co.
Hudgell, Gemma-Jayne
2012
Robert Bartone, Ellen Cowie
Phase I and II Archaeological Testing Bridgewater Bridge Replacement Project MDOT BR 3734
2011
Stephen Scharoun, Ellen R. Cowie
3942
4077
4019
Maine DOT Bridgewater Bridge Replacement Project Archaeological Phase II Testing, End of fieldwork letter
2011
Stephen Scharoun, Ellen R. Cowie
4010
Maine DOT Bridgewater Bridge Replacement Project (BR 3734), Phase I Archaeology, End of Fieldwork Letter
Moore, Edward
2008
Kathleen Wheeler, Ellen Marlatt
Phase 1 Archaeological Survey of the Bridgewater (BWM) LPOE 1.81 Acre Lot, Bridgewater, ARoostook Co.
3806
Quads
159
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Scharoun, Stephen
2013
Gemma-Jayne Hudgell, Cyr, Bartone, Cowie
4109
Archaeology on the Line: Archaeological Investigations at the Native American Boundary Line Road Site (159.1) and
Historic Period Boundary Line Mill Hamlet
Shaffer, Gary
2011
Field Check Steve Whited, Riparian Buffer, Bridgewater, Aroostook Co.
4009
16, 29, 44
Will, Richard T.
2002
Bone Artifacts: Continuity in Technology and Form in Pre-European Archaeological Sites along the Maine Coast
4047
161,170,171
Sanger, David
1978
Archaeological Survey in the Dickey-Lincoln School Lakes Area, Northern Maine
2296
161,170,171,
179,180
1977
Cultural Resource Management in the Dickey-Lincoln School Reservoir, Maine
2142
164
Will, Richard T.
1990
Rebecca Cole-Will
A Report of the Archeology of Mooseleuk Lake, Piscataquis County.
2561
164,165,166
Nicholas, George P.
1981
James S. Kite
Archaeological Survey and Testing in the Bald Mountain Area, Northern Maine
2139
165
Putnam, David E.
2004
Investigation of Site 165.3 Red Ochre Feature, Mouth of McConnell Brook.
3400
166
2006
Radiocarbon Dates from Cultural Features and Wood Samples at ME 166.24.
3543
2002
Report on Phase I Archaeological Survey of the Proposed Snowmobile Bridge Across Little Machias River, Ashland.
3240
Sanger, David
1981
A Preliminary Assessment of Archaeological Resources in the Castle Hill Dam Area, Aroostook County, Maine
2147
Shaffer, Gary
2013
An Irrigation System for Neil Grass, Ashland, Phase I Archaeological Survey
4115
166,167
James B. Petersen
Putnam, David E.
1988
An Archaeological Phase I Survey of Squa Pan Lake, Aroostook County,Maine.
2476
166,167,177
Hedden, Mark H.
2001
David Putnam
Aroostook Co. Transportation Study (PIN 6462.10), Phase 0.
3182
167
Putnam, David E.
2006
Bernard Jerome
Constructing Alliances along the Northern Border: Consultations with Mi'kmaq and Maliseet Nations.
edited by Jordan E. Kerber: Cross Culltural Collaboration: Native Peoples and Archaeology in the Norhteastern United
States.: 295-313.
2006
3536
Additional Archaeological Testing: Proposed Sewer Outfall Pipeline.
2004
Report on Phase II Archaeological Testing of the Powers Site, Presque Isle.
3432
2004
Report on Phase I Archaeological Survey of the Presque Isle Districts Wastewater Outfall Pipe.
3401
2000
3139
Report on the Phase I Archaeological Survey of the Proposed Snowmobile Bridge over Presque Isle Stream, Chapman.
167, 168
168
1996
Report on Phase I Archaeological Survey of the Proposed I F & W Boat Landing, Presque Isle.
2926
2007
Report on Phase I Archaeological Survey of the Proposed Presque Isle Bypass.
3677
Belcher, William R.
1989
Phase I Archaeological Survey along Prestile Stream, Presque Isle, Aroostook County, Maine.
2534
Quads
168
Date
Additional Authors
MHPC
First Author
Document #
(followed by citatation ifo if not an MHPC document)
Title
Eldridge, Stuart A.
2008
3795
Phase IA and IB Archaeological Survey Report for Maine Public Service Transmission Line 6910 Upgrade Project, Mars
Hill to Presque Isle, Arrostook Co.
Moore, Edward
2008
Kathleen Wheeler, Ellen Marlatt
Phase 1 Archaeological Survey of the Easton (EAS) LPOE .64 Acre Lot, Easton, Aroostook Co.
3804
Putnam, David E.
2006
Phase I Archaeological Survey of a Snowmobile Bridge across Prestile Stream, Mars Hill, Maine.
3583
3281
2003
Report on Phase II Archaeological Testing of 168.1.
2003
3361
Reconnaissance Archaeological Survey of the Proposed Wind Power Development of Mars Hill Mountain, Mars Hill,
Aroostook Co, ME.
2003
Report on Phase I Archaeological Survey of the Presque Isle Water District Aroostook River Crossing.
3305
2002
Robb Engel, Aaron Putnam
Report on Phase I Archaeological Survey of the Presque Isle Water District Higgins Groundwater Site.
3250
1999
3058
A Report on the Phase I Archaeological Survey of the Proposed McCain's Wastewater Pipeline and Treatment Plant.
Will, Richard T.
1991
James Clark
2662
Report on Phase I Archaeological Survey of Mars Hill Wastewater Treatment Project.
170,171
Sanger, David
1979
Archaeological Survey in the Upper St. John Valley.
2773
1986
170,171,179, Nicholas, George P.
The Archaeology of the Upper St. John River: Overview and Interpretation.
180
in CONTRIBUTIONS TO THE QUATERNARY GEOLOGY OF NORTHERN MAINE AND ADJACENT CANADA ed. by J.Steven
Kite,Thomas V. Lowell and Woodrow B. Thompson. Bullet
170,180
1981
James S. Kite,other
2138
Archaeological Survey and Testing of Late Pleistocene-Early Holocene Landforms in the Dickey-Lincoln School
Reservoir Area, Northern Maine
171
Hadlock, Wendell S.
1967
A preliminary archaeological survey of Dickey Reservoir area on the Saint John River, Maine.
U.S. National Park Service.
Putnam, David E.
1997
Dariel McKee
2946
Report on Phase I Archaeological Survey of the Proposed Blanchet Logging Company Bridge Replacement, Allagash
River.
174
Belcher, William R.
1988
Report on Phase I Archaeological Survey of St. Froid Lake, Aroostook Co.
2874
176
Hedden, Mark H.
1994
Arthur Spiess
Report on Phase I Archaeological Survey of Salmon Brook Lake Bog.
2791
176,177
Cranmer, Leon E.
2007
David Putnam
Phase I Archaeological Survey for the Aroostook Bypass, Caribou Segemnt 4.
3717
Petersen, James B.
2853
1995
Belinda Cox, Richard Corey
Report on the Phase II Archaeological Survey of the Loring Air Force Base.
1994
Belinda Cox and Richard Corey
2800
Report on Phase I Archaeological Survey of Loring Air Force Base.
177
Brigham, Michael
2008
Scharoun, Stephen, and Ellen Cowie
Archaeological Phase I Survey of the Proposed Customs and Border Protection Facility, Fort Fairfield, Aroostook
County, Maine
3819
Quads
177
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Buchanan, Thomas
1991
Eliz. Subin, James B. Petersen
Archaeological Phase II Testing of the Caribou Project (FERC # 2367), Aroostook County.
MHPC
Document #
2658
Cowie, Ellen R.
2002
Report on Phase I Archaeological Survey of the Goughan Farm Irrigation Project.
3257
Putnam, David E.
2010
Phase I Archaeological Survey Proposed Leachate Pipeline Crossing Little Madawaska River, Caribou
3950
2005
Jeanie McGowan
3454
An Archaeological Phase I Survey of the Caribou Utilities District Aquifer Test Well Site 3-B and Assoiciated
Infrastructure, Aroostook Co, Maine.
3101
1999
Tinker Dam Survey, Fort Fairfield, Notes.
Quinn, Catherine
1990
James B. Petersen
Archaeoological Phase I Survey of the Caribou Project (FERC 2367), Aroostook Co,, ME.
2575
Shaffer, Gary
2011
Field Check Bruce Flewelling, T 7088, Fort Fairfield, Irrigation Water Conveyance with Fish Screen, Pumping Plant
4029
Will, Richard T.
1997
Edward Moore, James Clark
Report on Phase III Archaeological Survey of the Chan Site (177.2) Caribou, Aroostook County, Maine.
2936
1997
Edward Moore, James Clark
Excavations and Endscrapers at the Chan Site (177.2).
MAS Bulletin, 37:2:1-23.
1996
Edward Moore, James Clark
2932
Phase III Archaeological Study of the Chan Site (177.2), Caribou.
177,178
Shaffer, Gary
2008
Northeastern Blueberry Company's Well, Pumping Plant, and Irrigation Lines, T19 MD BPP, Washington Co., ME: a
Phase I Archaeological Survey.
3792
177,185
Clark, James
2004
Edward Moore
Report on Phase I Archaeological Survey along a Transmission Line Proposed by Maine Public Service Co. Between
Limesotne and Hamlin, Aroostook Co, Maine.
3406
181
Putnam, David E.
3808
2008
Jay Raymond
Report on Phase I Archaeological Survey of Groundwater Source Development, St. Francis.
2001
3231
Archaeological Phase I Survey of the Hennewell Island Riverbank Stabilization Project, St. John Plantation, Aroostook
Co., Maine
182
Petersen, James B.
Fish River Subdivision Project Phase I.
1990
2581
Shaffer, Gary
2011
Field Check Carrol Theriault, Fort Kent, Access Road Improvements.
4006
Bonnichsen, Robson
1976
Cultural Resource Reconnaissance and Survey of the Fort Kent Local
2101
Shaffer, Gary
2008
NRCS Field Checks, Emergency Watershed Protection, Fort Kent.
3799
183
Sanger, David
1992
Cultural Resources in the Long-Cross Watershed.
2917
185
Hudgell, Gemma-Jayne
2011
Ellen Cowie
Proposed Van Buren Land Port of Entry, Phase I End of Fieldwork Letter
4011
182,188
Isler, Emily
2009
Robert Bartone, Ellen Cowie
3904
Phase I Survey Expansion of the Hamlin Land Port of Entry Modernization Project, US Customs and Border Protection
Quads
185
188
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Moore, Edward
2008
Kathleen Wheeler, Ellen Marlatt
Phase 1 Archaeological Survey of the Van Buren (VNB) LPOE 3.71 Acre Lot, Van Buren, Aroostook Co.
MHPC
Document #
3801
Will, Richard T.
2005
Addendum to Phase I Survey for Archaeological Resources Along an Electric Transmission Line Proposed by Maine
Public Service Co. between Limestone and Haml
3481
Bartone, Robert N.
2004
Report on Phase I Arcaeological Survey of the Proposed Medical Office Building.
3389
Hedden, Mark H.
3246
2002
Arthur E. Spiess
Report on Phase I Archaeological Survey of the Fort Kent Wetland Mitigation Project (PIN 5220.44).
189
Bourque, Bruce J.
1991
Report on Phase I Archaeological Survey on the St. John River, Frenchville.
2652
Putnam, David E.
2009
Phase I Archaeological Survey Proposed Boat Landing in Frenchville, Aroostook Co.
3885
2008
3797
Archaeological Investigation of the Madawaska Boat Launch Facility Proposed by Maine Department of Conservation,
Madawaska.
189,190
Shaffer, Gary
Field Check at the Labrie Farm, Fort Kent
2009
Dickinson, Pamela
1999
3841
Jason Jendreau
3050
Ellen Cowie
3990
Glacial Lake Madawaska Archaeological Survey.
190
Grindle, Jacob
2011
Phase I Archaeological Survey Proposed U. S. Customs and Border Protection Tactical Communications Modernization
Project, RVSS Deer Farm, Van Buren
CAN
Bailey, L.W.
1887
On relics of the stone age in New Brunswick.
Bulletin National History Society of New Brunswick, 6
Davis, Stephen A.
1982
A Late Archaic Cache/Burial from New Brunswick
Demais, Pierre
1985
Gilles Rousseau
Trois sites paleoindiens sur la cote and de l'estuarie du Saint-laurent.
Recherches Amerindiennes an Quebec 15:1-2:135-149
Erskine, J.S.
1960
Shell-heap archaeology of Southwestern Nova Scotia.
Proceedings of the Nova Scotian Institute of Science 1956/8. 24:4 pp.339-375.
Harper, J. Russell
1975
Two Seventeenth Century Micmac `Copper Kettle' Burials.
1975
Two Seventeenth Century Micmac `Copper Kettle' Burials (Part II).
Kristmanson, Helen
1993
Michael Deal
Identification and Interpretation of Finishing Marks on Prehistoric Nova Scotia Ceramics.
Canadian Journal of Archaeology 17.
Mathew, G.F.
1884
Discovery of a Village of the Stone Age at Bocabec, New Brunswick.
Bulletin,National Historical Society of New Brunswick 10
Sanger, David
1973
Cow Point: an archaic cemetery in New Brunswick.
National Museum of Man, Mercury Series Paper #12.
1971
Deadman's Pool. A Tobique Complex site in northern New Brunswick.
Man in the Northeast:2:5-22
Smith, Harlan I.
1929
The Archaeology of Merigomish Harbour, Nova Scotia.
National Museum of Canada, Bulletin #47
Quads
CAN
Canada
Canadian
Site
MASS
New
Hampshire
NH
Date
Additional Authors
First Author
(followed by citatation ifo if not an MHPC document)
Title
Smith, Harlan I.
1929
W.J. Wintemberg
Some shell heaps in Nova Scotia.
National Museum of Canada, Bulletin #47
Wintemberg,W.J.
1929
The Eisenhauer Shell-heap, Mahow Bay, Nova Scotia
National Museum of Canada, Bulletin #47
Loewen, Brad
2005
Claude Chapdelaine, Pierre J. H. Richard
Holocene Shoreline Occupations and Water-level Changes at Lac Meganic, Quebec.
Canadian Journal of Archaeology:29:165-233.
Davis, Stephen A.
1978
Teacher's Cove: A Prehistoric Site on Passamaquoddy Bay
MHPC
Document #
Richardson, James B. III
1985
Prehistoric Man on Martha's Vineyard
Oceanus 28(1):35-42
Bunker, Victoria
1992
Stratified Components of the Gulf of Maine Archaic Tradition at the Eddy Site, Amoskeag Falls.
Early Holocene Occupation in Northern New England. Eds. Brian Robinson et al., Occassional Publications in Maine
Archaeology, Number 9.
Maymon, Jeffrey H.
1992
Charles E. Bolian
The Wadleigh Falls Site: An Early and Middle Archaic Period Site in Southeastern New Hampshire.
Early Holocene Occupation in Northern New England. Eds. Brian Robinson et al., Occassional Publications in Maine
Archaeology, Number 9.
Gramly, R. Michael
1982
Kerry W.F. Rutledge
Molls Rock: A Multicomponent Site in Northern New Hampshire
Vermont
Thomas, Peter A.
1992
The Early and Middle Archaic Periods as Represented in Western Vermont.
Early Holocene Occupation in Northern New England. Eds. Brian Robinson et al., Occassional Publications in Maine
Archaeology, Number 9.