Quads 001 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Bunker, Victoria 2008 Phase I Archaeological Survey and Identification of Site ME 1.11. MHPC Document # 1990 Jane Potter, Andrea Green South Berwick Hydroeledtric Project Phase I Archaeological Survey Report. 3777 2615 Burgess, William 2008 Route 236 Bridge Replacement Project (PIN 15609.00). 3762 Eldridge, Stuart A. 2003 Report on Phase I Archaeological Survey of the D. Thompson Pier. 3318 Feighner, Edna 1999 Report on Phase I Archaeological Survey of the Eliot Metering and Regulating Station. 3063 Hamilton, Nathan D. 2005 Report on Phase 0 Archaeological Survey of the Littlebrook Airport Subdivision. 3519 2002 Report on Phase I Archaeological Survey of the Proposed Assisted Care Living Complex, Eliot. 3253 Kellogg, Douglas 1999 Kevin Simons Phase III Data Recovery Excavations at the Neal Garrison Paleoindian Site. 3087 Mack, Karen 2010 Richard Will Results of Phase I/II Precontact Archaeological Survey Public Service Co of New Hampshire's Eliot Substation 3962 Moore, Edward 3212 2001 Rick Will Report on Phase I Archaeological Survey of the Proposed Eliot Natural Gas Compressor Station, York County, Maine. Valimont, Brian 2011 Shorey's Brook Dam Removal and Stream Restoration, South Berwick and Eliot, Phase I Archaeological Survey 4016 3760 2008 Proposed Floating Dock, 4 Cove Landing. 2007 Proposed Pier and Access Ramp, 30 Eventide Road, Eliot. 3723 2006 Report on Phase I Archaeological Survey of the Eliot Business Park. 3520 2006 Report on Phase I Archaeological Survey of Proposed Pier, Ramp and Float, Houde Road, Eliot. 3567 Wheeler, Kathleen 1994 Results from the Spring 1994 Archaeological Investigation at the Hamilton House, South Berwick. 2807 Will, Richard T. 2003 Report on the Phase I Archaeological Survey of the Proposed Three Rivers Substation Expansion, Eliot. 3340 Wilson, Deborah B. 1997 Report on Phase I Archaeological Survey of the River Run Trail, Vaughn Woods State Park. 2954 001, 002 Bouras, Edward 2010 Result of Archaeological Walkovers for the Great Works Regional Land Trust, York County 4118 001,002,004 Kellogg, Douglas 1997 K.Wheeler, R.Kingsley Report on Phase IB Archaeological Survey of the PNGTS Pipeline, New Hampshire and Maine. 2996 001,003,004, John Milner Associates 1993 Granite State Gas Phase IA Archaeological Survey of the Hanesville to Portland Pipeline. 007,008 3662 001,004 2956 Kellogg, Douglas 1997 Report on Phase II Archaeological Evaluation of Prehistoric Sites, Joint Pipeline Project. 001,004,007, Clark, James 2007 Scope of Archaeological Recon Survey for the Maguire Road Project. 008 3663 001,013,033, Feighner, Edna 1999 022 Cultural Resource Management Report-PNGTS. 3064 Elena Lippotis Quads 002 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Baker, Emerson W. 2012 Phase I Test Excavations at 165-175 River Road, York, Maine Bunker, Victoria 2007 Supplemental Phase I Lewis Farm Subdivision. MHPC Document # 4101 3712 1990 Phase I Archaeological Survey of the Bolt Hill to York Harbor Project. Eldridge, Stuart A. 2007 Report on Phase I Archaeological Survey of Craig Briggs' Dock Installation, York. 2606 3735 2006 Report on Phase I Archaeological Survey of a Dock Installation, Al Shair Property, Kittery. 3551 2003 Report on Phase I Archaeological Survey of the Robinson-Anderson Pier, Kittery Point. 3313 Hardlines Design Co. 2010 Integrated Cultural Resources Management Plan, Portsmouth Naval Shipyard Mercer, Henry C. 1897 An exploration of aboriginal shell heaps revealing traces of cannibalism on the York River, Maine. Publications of University of Pennsylvania, Series in Philology,Literature and Archaeology. 6:111-137 Valimont, Brian 2012 Prehistoric Archaeology Report For Quarters N (ME 2.29), Portsmouth Naval Shipward 3969 4055 2010 Archaeological Monitoring Proposed Rock Pile Removal, Mt. Agamenticus, York 3927 2009 Archaeological Phase I, Proposed Pier, Ramp, Float, 35 Major McIntire Rd., York 3902 2009 Archaeological Phase I Survey Proposed Residence, 134 Cider Hill Road, York 3869 2008 Report on Phase I Archaeological Survey of Driveway and House Construction at 6 Schooner Landing. 3775 2007 Report on the Phase I Archaeological Survey of the Proposed Sewer Pump and Valve Replacement. 3670 Wheeler, Kathleen 1995 Richard Will 2871 Archaeology on Clark's Island, Portsmouth Naval Shipyard. Will, Richard T. 1986 Rebecca Cole-Will 2449 A Survey for Prehistoric Archaeological Sites, York,Maine 002, 033, 028 Haugh, Sarah 2013 Three Ring Binder Project, Round 2 Replacement Telephone Pole survey 4139 002,005 Will, Richard T. 1986 A Report of a Preliminary Survey for Prehistoric Archaeological Sites in York County, Maine 2441 002,005,008 003 1995 EmersonBaker,J.Cormier,J.Clark Rachel Carson National Wildlife Refuge Historic and Prehistoric Archaeological Resource Survey. 2862 Bradley, Bruce 2013 The Lord-Collins Site (MAS #3.12): A Late Pleistocene Human use of Southeastern Maine? 4167 Clark, James 2006 Report on Phase I Archaeological Survey of the CMP Section 118 Rebuild. 3608 Eldridge, Stuart A. 2005 Phase II Archaeological Survey Report: Deerfield Estates Subdivision Project, North Berwick, York Co., Maine. 3463 2002 Janelle Lavallee Report on Phase I Archaeological Survey of the Deerfield Estates Subdivision, North Berwick. Hamilton, Nathan D. 2007 Report on Phase I Archaeological Survey of the Al Darraji Residential Subdivision. 3262 3704 Quads 003 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Hamilton, Nathan D. 2006 3569 An Archaeological Phase I Survey of the Proposed James Austin Residential Subdivision off Governor Goodwin Road, North Berwick, Maine. 2006 3581 An Archaeological Phase I Survey of the Proposed Ferguson Brook Residential Subdivision off Old Pine Hill Road and Sullivan Street, Berwick, Maine. 2005 An Archaeological Phase I Survey of the Proposed Veterans Cemetery off Stanley Road, Springvale, Maine. 3631 2003 Report on the Phase I Archaeological Survey of the Italo Lane Subdivision. 3347 Moore, Edward 2013 Phase I Archaeological Resource Survey Section 116 Transmission Line, Berwick Reinforcement (CMP) Project 4111 2013 Phase I Archaeological Resource Survey: Section 185 Transmission Line Reinforcement (CMP), Berwick 4110 2013 Phase II Archaeological Evaluation of Site 3.15, Precontact Archaeological Site, Sanford, within the Berwick Reinforcement Project (CMP) 4108 Mosher, John P. 2012 Phase I Archaeological Survey of the Tibbetts Farm LMF Conservation Easement, Berwick 1992 Nathan D. Hamilton 4098 2724 An Archaeological Phase I Survey of the Proposed Lebanon Sand and Gravel Mineral Extraction Site, Lebanon, Maine. 1990 Rob Florentin & N. D. Hamilton Archaeological Phase I Testing of Monticello Estates Subdivision, Berwick. Shaffer, Gary 2013 Field Assessment for Brian Gibbons, Berwick 2013 Field Assessment for Nancy Sewell's Tract 1723, Berwick and North Berwick 003,004 2579 4136 4134 Tomaso, Matthew S. 1990 R.Florentin,J.Mosher,NHamilton Archaeological Phase II Testing of the Monticello Estates, Berwick. 2612 Valimont, Brian 2009 Proposed Pepin & Sons Gravel Pit, Twombley and Old Mill Roads, Sanford 3897 2009 Proposed Gravel Pit, Sanford, Phase I, II and III Archaeological Investigations 3862 2008 Phase I Archaeological Investigation of the Proposed Gravel Pit, Sanford. 3783 2007 Mill Yard Walk and Community Garden, Sanford: Phase I Archaeological Investigation. 3716 Wilson, Deborah B. 1991 Report on Phase I Archaeological Survey of Hillcrest Nursing Home Site, Sanford. 2663 Bunker, Victoria 1998 Report on the Phase I Archaeological Survey of Noble Hill High School, North Berwick. 3020 1990 Phase I Archaeological Survey Section 112, Inland Corridor Project, Sanford to South Gorham. 2563 003,004,005, Will, Richard T. 1997 Deborah Cox 008 Cultural Resources Investigations, Joint Pipeline Project, Archaeological Survey. 2944 003,004,007, Bunker, Victoria 1990 Jane Potter 008 Phase I Archaeological Survey Section 182-186 Inland Corridor Project, Sanford to South Gorham, ME. 2601 Quads 003,007 004 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Bunker, Victoria 1991 Jane Potter Conclusion to Phase I Archaeological Survey Section 182-186 Inland Corridor Project. MHPC Document # 2641 Mosher, John P. 1991 Nathan Hamilton, Thomas Bennet Phase II Archaeological Testing at Four Prehistoric Sites on Sections 182 and 186 of the Southern Inland Project. 2675 Bibber, Marjorie 1990 Rob Florentine, N.D.Hamilton Archaeological Phase I Testing of Cold Water Farms Subdivision, Kennebunk. 2589 Bouras, Edward Beach Plum Farm Preliminary Walkover. 2008 3758 Bunker, Victoria 1990 A.Green,J.Potter,A.Strauss 2607 Estes Lake Hydro Project Phase I Archaeological Survey. Burgess, William 2005 Arthur Spiess Kennebunkport Greenbelt Initiative Archaeological Survey for LMFB. 2002 Arthur E. Spiess Denet Bridge Replacement (PIN 8943.00) Archaeological Phase II Testing (Site 4.18). Callum, Kathleen 1994 Geoarchaeological Investigations at the Hedden Site. Corey, Richard 2004 3518 3224 2823 Robert Bartone 3427 Report on Phase I/II Archaeological Survey of the Proposed Biddeford-Saco Water Co. Transmission Main. Doucette, Diana PAL 2010 Phase I Archaeological Survey Rachel Carson National Wildlife Refuge Tract 11007c Project Area 3943 Doucette, Dianna 2010 Phase I Survey Rachel Carson National Wildlife Refuge Tract 11007c, Wells 4081 Eldridge, Stuart A. 2005 Sarah M. Haugh 3467 Phase IA and IB Archaeological Survey Report: "The Cornfield" Lot 51 Residential Subdivision Project, Alfred, York Co., Maine. 2004 Report on Phase I Archaeological Survey of the Amirault Lot 33 Access Project. 3413 2001 Phase IA Archeological Survey of the Sanford Gravel Pit. 3186 Feighner, Edna 2000 PNGTS Cultural Resources, Post Construction Monitoring Report: Year Two, Assessment Two. 3144 Hamilton, Nathan D. 2008 Report on the Phase I Archaeological Survey of the Proposed 37 Lot Residential Subdivision, Bragdon Road. 3767 2008 Report on Phase I Archaeological Survey of the Proposed Arundel Seasonal Cottages (Whitten and Porter parcels). 3754 2007 Report on Phase I Archaeological Survey of the Proposed Marshwood Estates Expansion. 3706 2007 3709 An Archaeological Phase I Survey of the Proposed North Country Land Gravel Pit between Route 4 and Bernier Road, Sanford. 2007 Report on Phase I Archaeological Survey of the Cedar Woods Subdivison, Bernier Road. 3718 2006 Report on Phase I Archaeological Survey of the Proposed Summer Village Development-Cole Parcel. 3559 2004 An Archaeological Phase I Survey of the Proposed Genest Concrete Retail Center - Route 109, Sanford, Maine. 3407 Quads 004 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Hamilton, Nathan D. 2004 Report on Phase I Archaeological Survey of the Proposed Kennebunk Pond Road Gravel Pit, Lyman. MHPC Document # 3405 2003 Report on Phase 0 Archaeological Survey of the Arundel Woods Campground. 3367 2000 Report on the Phase I Archaeological Survey of the Proposed Hampton Glen Condominium Development. 3141 2000 Report on the Phase I Archaeological Survey of the Proposed York County Jail Property. 3143 1996 Letter on Phase I Archaeological Survey of the Ocean Breeze Golf Resort, Wells. 2923 1988 Thomas C. Bennett 2514 An Archaeological Phase 1 Survey of the Proposed Sea Road School - SAD 71 Kennebunk, Maine Haugh, Sarah 2008 Report on Phase I Archaeological Survey of the Oakwoods Driveway Expansion. 3769 Hedden, Mark H. 1992 Arthur Spiess Maine Turnpike Exit 2 North Bound Ramp Phase I Archaelolgical Survey Report. 2726 1992 Arthur Spiess & Leon Cranmer 2734 Portland - Boston Rail Study, Wells Station. Hight, Shelley Report on Wells Human Remains 2007 Josephs, Richard 2004 3668 Arthur Spiess Micromorphological Investigations at the Hedden Site (4.10), a Buried Occupation along the Southern Maine Coast Current Research in the Pleistocene 21:53-55 Kellogg, Douglas 1996 Kathleen Wheeler 2893 Report on Phase I Archaeological Survey of Two Proposed Access Roadsfor Proposed Granite State Gas Pipeline, Wells. 1995 2852 Report on the Phase I Archaeological Survey of the Proposed Granite State Transmission Lynfield Natural Gas Facility, Wells. 2878 1995 Wells Maine LNG Facility (Letter). Mack, Karen 2011 Maine Power Reliability Project Kennebunk Plains off right of way road 4042 Mosher, John P. 2005 3455 Report on Phase I Archaeological Survey of the Kennebunk Plains LMFB Purchase in Kennebunk and Sanford, Maine. 1993 Arthur Spiess 2769 1992 Field Season at the Hedden Site. Smith, J. N. Leith 2010 Archaeological Reconnaissance Survey, Oliver Nutter House Site MDOT PIN 16677, Alfred 3925 Sorg, Marcella 2006 Report on Skeletal Remains, Rachel Carson National Wildlife Refuge. 3632 Spiess, Arthur E. 1995 JMosher,K.Callum,N.Asch Sidell Fire on the Plains: Paleoenvironmental Data from the Hedden Site. MAS Bulletin, 35:1:131995 John P. Mosher 2873 The Hedden Site 1994 Season: Progress on Environmental Reconstruction. 1994 John Mosher Fire on the Plains: The Hedden Paleoindian Site Report on the 1993 Field Season. 2830 Quads 004 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Spiess, Arthur E. 1994 John Mosher Hedden: A Paleoindian Site on the Kennebunk Plains. MAS Bulletin, 34:2, 25-54. 1990 Mark Hedden Archaeology on the Kennebunk Plains. MHPC Document # 1979 Cultural Resources Survey: Rachael Carson National Wildlife Refuge Headquarters Parcel. Valimont, Brian 2011 Proposed Boat Launch, Intervale Road, Kennebunk 2610 2772 4023 2010 Phase I Proposed Pier, Ramp and Float, Seagrass Lane, Kennebunk 3951 2009 Proposed Kennebunk cell tower, Webber Hill Road 3848 2009 Proposed Anderson Cell Tower, North Berwick 3851 2009 3849 Proposed Sanford Cell Tower 2008 Proposed Snowmobile Trail Bridge, Southern Maine Sno-goers. 3768 2008 Report on Phase I Archaeological Survey of the Proposed Brackett Hill Road Bridge Repair. 3741 2007 Report on Phase I Archaeological Survey of the Proposed Oaks Residential Subdivision. 3724 2007 Proposed Levee Kennebunk Wasewater Treatment Facililty: Phase I Archaeological Investigation. 3714 Wade, Steve 1992 D.A. Hurd Library Artifact Collection, North Berwick. 2683 Wheeler, Kathleen 1995 T. Crist Report on the Phase II Evaluation of Proposed Granite State Gas Transmission, Inc. LNG Facility, Wells. 2859 Will, Richard T. 2886 1995 James Clark Report on Phase I Archaeological Survey of the Amdiral's Pond Subdivision, Kennebunk. Wilson, Deborah B. 2004 Report on Phase I Archaeological Survey of the Kennebunk Marketplace Shopping Center. 004,005 3375 2003 Report on the Phase I Archaeological Survey of the Taylor Estates Subdivision. 3348 2002 Report on Phase I Archaeological Survey of the Alfred Water District's Proposed Well, Access Road, Pump Station. 3243 2002 Report on Phase I Archaeological Survey of the Keywork Manor Development. 3216 1991 Report on the Phase I Archaeological Survey of the Genest Gravel Pit in Alfred. 2673 1991 Preliminary Phase I Archaeological Survey of the Proposed Marsh Brook Estate Mobile Home Park, Sanford. 2629 1993 Report on the Phase I Archaeological Survey of a Proposed Retail Site in Biddeford. 2765 004,005,007, Mosher, John P. 1992 Springs Island and Bradbury Dams Drawdown on the Saco River in Biddeford - Saco: Phase I Archaeological Canoe 008 Survey. 2727 Quads 004,005,008 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Cranmer, Leon E. 1991 Arthur Spiess Maine Turnpike Wetlands Creation Archaeological Survey Report. Spiess, Arthur E. Turnpike Archaeology. MAS Bulletin, 38:1:1-22. 1998 2677 Mark Hedden, Leon Cranmer 1991 Robert Bradley Responses to Maine Turnpike Widening Question, Army Corps of Engineers. 1990 MHPC Document # Leon Cranmer and Mark Hedden 2973 2562 Maine Turnpike Widening, Archaeological Phase II Study. 1988 L. Cranmer,C.Monahan,E.BakerJr 2516 An Archaeological Phase I Survey of the Maine Turnpike Widening Project in Southern Maine. 004,007,008 Clark, James 2002 Archaeological Survey Report: Maine Power Reliability Program, Segment 24. 004,008 Slater, Lee D. 2000 N.Hamilton,S.Sandberg,M.Jankowski Magnetic Prospecting at a Prehistoric and Historic Settlement in Maine. Archaeological Prospection 7:31-41 (2000). 004,033,049, Gramly, R. Michael 1979 Report on Archaeological Reconnaissance of the Gilead and Bethel 7.5' Quadrangles, Oxford County, Maine 065,081+ 3791 3301 2129 004,12,23,39 Pollock, Stephen G. 1999 N. Hamilton, R. Bonnichsen 3156 ,36,81,+ Chert form the Munsungun Lake Formation (Maine) in Paleoindian Arch. Sites in NE North America: Recognition of its Journal &ofDistribution. Archaeological Science (1999): 26:269-283. Occurrence 004,12,23,39 ,36,81,1 1999 N. Hamilton, R. Bonnichsen Chert from the Munsungun Lake Formation (Maine) in Palaeoamerican Archaeological Sites in NE North Journal of Archaeological Science (1999): 26:269-283. America:Recognition of its Occurrence & Distribution. 004,7,15,27, Sidell, Nancy Asch 1999 Prehistoric Plant Use in Maine:Paleoindian to Contact Period. 53,69,90 Current Northeast Paleoethnobotany, edited by John P. Hart. New York State Museum Bulletin:494:191-223. 005 Burgess, William 2005 John P. Mosher Phase I Archaeological Testing of the LMFB Acquisition at Ferry Beach State Park. 3445 Cole-Will, Rebecca 2006 Archaeological Monitoring of Residence Construction, UNE. 3572 Cowie, Ellen R. 3153 2000 Geraldine Baldwin A Report on the Phase I Archaeological Survey of Parkside by the Falls. Crane, Pamela 2008 Peter Morrison New Float and Dock, Goat Island, Cape Porpoise Harbor. 3784 Fathom Research LLC 2010 Remote Sensing Archaeological Survey, Camp Ellis Beach, Saco 3974 Hamilton, Nathan D. 2004 Report on Phase I Archaeological Survey of the Richardson Brook Subdivision. 3421 1985 James B. Petersen 2169 Archaeological Survey and Testing of the Proposed Biddeford Airport Runway, Extension, York County, Maine Lore, Robert J. 2006 Adaptations in the Edge Environment: Faunal Analysis of an Armouchiquois Indian Village Maine Archaeological Society Bulletin 46(1):1-22 Mack, Karen 2000 Richard Will Results of Phase III Archaeological Testing of the Proposed University of New England's Marine Studies Center, Biddeford. 1999 Richard Will Additional Phase I Archaeological Survey ofthe Proposed University of New England Marine Center. 3095 3056 Quads 005 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Valimont, Brian 2011 Proposed Diamond Match Park, City of Biddeford MHPC Document # 4017 Will, Richard T. 1998 Karen Mack Report on the Phase I Archaeological Survey of the Proposed University of New England's Marine Studies Center. 3016 005,008 Haugh, Sarah 2007 Report on Phase I Archaeological Survey of the Lincoln Street River Access Project, Saco. 3672 006 Corey, Richard 3820 2006 Robert Bartone Archaeological Phase I Survey of the Proposed Moose Pond Subdivision Project, Acton Eldridge, Stuart A. 2009 Sarah Haugh 3889 Phase I Archaeological Report Shapleigh Gravel Pit Project Freedman, Jacob 2006 Richard Will 3623 Results of the Phase I Prehistoric Archaeological Survey of the Limerick Business Pard Subdivision in Limerick, York Co, ME Hamilton, Nathan D. 2005 Phase 0 Archaeological Survey of the Wilderness Acres II Subdivision. 1996 John P. Mosher Report on Phase I Archaeological Survey of the Proposed Woodward Sand and Gravel Pit. 006,007 3492 2903 Shaffer, Gary 2013 Archaeological Assessment of Richard Nass's Tract 1732, Acton, York Co. 4133 Valimont, Brian 2008 Proposed North Shapleigh Cell Tower (#853452) 3816 2008 Report on Phase I Archaeological Survey of the Proposed Limerick East Cell Tower. 3788 Eldridge, Stuart A. 2006 Sarah Haugh Report on Phase I Archaeological Survey of the Lake Arrowhead Water Main Project. 3548 006,036,124, Spiess, Arthur E. 1992 Cranmer, Hedden, Trautman 120,133 Diamond Occidental Purchase Reconnaissance Archaeological Survey. 2681 007 2739 Bartone, Robert N. 1992 James B. Petersen Report on Phase I Archaeological Survey of The Proposed Bonny Eagle Schools Project. Clark, James 2008 Summary Report on 2006 Emergency Archaeological Mitigation, Little Ossipee South Site (Site 7.9), Bonny Eagle Project (FERC No. 2529). 3742 Cowie, Ellen R. 1989 James B. Petersen Archaeological Phase II Survey and Testing of the Bonny Eagle Project (FERC 2529). 2544 1988 James B. Petersen An Archaeological Phase I Survey of the Bonny Eagle Project (FERC 2529), Cumberland and York Counties, Maine. 2479 Crock, John 1992 James B. Petersen An Archaeological Phase IB and Phase II Testing for the Maine Army National Guard Hollis Training Center. 2711 Eldridge, Stuart A. 4170 2013 Lindsey Weeks Phase II CMP Section 172 Transmission Line Rebuild 2012 Phase I Archaeological Report, Geotechnical Soil Borings, CMP Sec 172 Rebuild, 4063 2005 Report on Phase IA Survey of the Lord Road Air-strip Project. 3489 Hamilton, Nathan D. 2006 Report on Phase I Archaeological Survey of the Proposed Josie's Brook Residential Subdivision. 3562 Quads 007 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Hamilton, Nathan D. 2004 Report on Phase I Archaeological Survey of the Proposed Subdivision, Church Hill Road. MHPC Document # 3434 1999 Report on Phase I Archaeological Survey of the Proposed Town House Woods (Phase II) Subdivision, Waterboro. 3034 1996 John P. Mosher Report on Phase I Archaeological Survey of the Proposed Richard's Way Subdivision, Saco. 2906 1994 John Mosher The Boothby Gravel Pit (ME 7.39), East Limington, York County. MAS Bulletin, 34:2, 1-10. 1993 John Mosher 2770 Report on Phase II Archaeological Survey of the Boothby Gravel Pit, East Limington. 1988 Thomas C. Bennett An Archaeological Phase 1 Survey of the Proposed Cohen Subdivision Dayton, Maine Haugh, Sarah 2008 Report on Phase I Archaeological Survey of the Green Court Acres Subdivision Water Line. 2008 Phase I Archaeological Survey of Green Court Acres Subdivision Phase I. Hedden, Mark H. 1994 Arthur Spiess 2513 3771 3789 2797 Route 5 Bridge Approaches to the Saco River in Biddeford (PIN 4626). McPheters, Hutch 2012 Robert Bartone 4086 Lake Arrowhead Community Proposed Water Transmission Maine Moore, Edward 2013 Karen Mack, Richard Will Phase III Mitigation of site 7.48, Bar Mills project (FERC 2914) 2012 Karen Mack, James Clark, Richard Will Archaeological Data Recovery Mitigation Site 7.52, Saco River, Hollis 4161 4080 2011 4114 Results of 2006-2009 Phase III Data Recovery Mitigation at the Little Ossipee South Site (7.9) as part of NextEra Energy Resources Bonny Eagle Project 2011 Alice Kelley 3997 2005 Richard Will 3473 Phase III Data Recovery at Site 7.55, Hollis Phase I and Phase II Archaeological Study of the Maine National Guard Hollis Training Facility, Hollis, York Co. 2003 Rick Will Phase II Investigation of the Bar Mills Project (FERC 2194). 3295 2002 Richard T. Will Report on Phase I Archaeological Survey of the Bar Mills Project (FERC 2194). 3234 Mosher, John P. 2010 Arthur E. Spiess, J. N. Leith Smith Archaeological Phase I Survey and Phase II Test of the Indian Cellar LMF Acquisition, Hollis, Maine 2006 Report on Phase I Archaeological Survey of the the Gannett Tract LMFB Acquisition in Hollis, Maine. 2004 3939 3533 Arthur Spiess A Late Ceramic Period Occupation at Site 7.58, West Buxton, Maine. MAS Bulletin, 44:1:21-29. 1997 Report on Phase I Archaeological Survey of the Brrokside II Subdivision in Dayton. 1994 The Shaker Valley Cranberry Site (7.46): Report of Phase I Archaeology Survey in Waterboro, ME. 2949 2827 Quads 007 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Mosher, John P. 0 Expanding Maine's Wildlife Management Areas: Phase I Arch Survey Crossman LMF Property, Hollis Paquin, Charles 1989 J.B.Petersen, Patricia Baker Archaeological Phase II Testing of the Skelton Project (FERC 2527), York County. 1988 Patricia Baker and JB Petersen An Archaeological Phase I Survey of the Skelton Project, York County, Maine. MHPC Document # 4034 2521 2482 Robinson, Brian S. 1991 Maine Army National Guard Training Sites Phase IA Report. 2653 Shaffer, Gary 2008 Report on Phase I Archaeological Survey of Richard Rudolph's Composting Facility and Drainage Facility. 3764 Smith, J. N. Leith 2010 John Maron, Karen Mack Report on the Archaeological Reconnaissance Survey of Pleasant Point Park, Buxton 3965 Spiess, Arthur 2011 An Isolated Fluted Point from Hollis, Southwestern Maine Maine Archaeological Society Bulletin 51(1):5-12 Spiess, Arthur E. 2003 John P. Mosher Phase II Archaeological Testing of Site 7.58, West Buxton. Valimont, Brian 2008 Proposed Goodall Medical Complex Expansion. 3293 3765 2007 Archaeological Survey of the Proposed Salmon Falls Cell Tower, 202 McKenny Road, Saco. 3732 2007 Report on Phase I Archaeological Survey of the Proposed Pump Station and Water Main, Waterboro. 3646 Weeks, Lindsey 2013 Stuart Eldridge CMP Section 172 Transmission Line Rebuild Project: Phase I Archeological Investigation 4102 Will, Richard T. 1999 Edward Moore, James Clark Limington Rips Site (007.004): Results of Phase III Prehistoric Archaeological Mitigation. 3039 1999 Edward Moore, James Clark 3048 A Report on the Phase III Archaeological Survey of Mitigation of Chartier Field (7.12), Bonny Eagle Project, Standish. 1996 James Clark, Edward Moore 2904 Phase III Archaeological Data Recovery at the Little Ossipee North Site (7.7), Bonny Eagle Project (FERC #2529), Cumberland Co., Maine. Wilson, Deborah B. 2004 Report on Phase I Archaeological Survey of the Spring Brook Subdivision, Gorham. 3376 1992 Report on Phase I Archaeological Survey of Sokokis Estates Partnership Gravel Pit, North Waterboro. 2712 1991 Report on the Preliminary Phase I Archaeological Investigation of Robert's Farm Subdivision, Lyman. 2631 1991 Report on the Phase I Archaeological Survey of the Boothby Gravel Pit in East Limington, ME. 2650 1991 1991 Report on Phase I Archaeological Survey of the Six Oaks Subdivision, Standish. 2617 007, 012, 013 Mack, Karen 007,004 Mosher, John P. 2001 A Report on the Phase I Archaeological Testing of the Route 35 Upgrade (PIN 8546) in Lyman and Dayton. 2012 Edward Moore 4051 Phase I and Phase II Evaluation CMP Section 187, Buxton to Gorham, York and CUmberland Counties 3173 Quads 007,008 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Mack, Karen 2000 Rick Will, James Clark 3131 Report on the Phase I Archaeological Survey of the Proposed ANP 345kv Electrical Transmission Line, South Gorham to Buxton. Wilson, Deborah B. 2002 Report on Phase I Archaeological Survey of the Parson's Pit Expansion and Hancock Ridge Subdivision, Gorham. 3236 007,024,062, Clark, James 2005 Results of Archaeological Site Monitoring--Wyman (FERC 2329), Weston (FERC 2325), Gulf Island/Deer Rips (FERC 069,086 2283) and Bonny Eagle Projects. 3441 007,036,024, 053,117+ 3217 2002 Richard T. Will Descriptions and Data Recovery Plans for Twelve Monitored Erosion Sites at Moosehead, Gulf Island, Bonny Eagle and Oakland. 2002 007,24,36,37 Will, Richard T. ARC, Inc. ,52,69+ Results of Annual Archaeological Site Monitoring,Wyman Project (FERC #2329), Weston Project (FERC #2325), Gulf Island/Deer Rips Project (FERC 2283), Oaklan 3288 007,36,37,52 Clark, James 2002 Monitored Erosion Sites: Wyman, Weston, Gulf Island Deer Rips, Oakland/Automatic and Bonny Eagle. ,53,69,+ 3215 007,8,24,39, 40,14,++ 3530 Rick Will, Jacob Freeman 2006 Phase I Archaeological Survey: Maritimes and Northeast Pipeline, Phase IV. 007? Valimont, Brian 2007 Report on Phase I Archaeological Survey of the Buxton Center Cell Tower. 3676 008 Beale, David W. 3574 2006 Ellen Cowie Archaeological Phase I Survey of the Proposed Castle Estates Subdivision (MHPC #0464-06) Old Orchard Beach, Cumberland County, Maine. Brigham, Michael 2007 Phase II Testing of Site 8.30, Cascades Project. 3691 2007 Ellen Cowie Report on Phase I Archaeological Survey of the Proposed Cascades Development, Saco. 2004 Robert Bartone 3647 3380 Report on Phase I Archaeological Survey of the Thomas Project in Saco, York Co., Maine (MHPC # 0686-04). Burgess, William Deguio Mill Bridge Replacement. 3757 2008 2006 Report on Phase I Archaeological Survey of the Old Orchard Beach Rails to Trails Project. Clark, James 2004 Edward Moore Report on Phase I Archaeological Survey of the Fuller Farm Estates. 1995 Rebecca Cole-Will Report on Phase I Archaeological Survey of the Philip Hall Subdivision, Holmes Rd, Scarborough. Clark, Julia 2000 Richard Will 3544 3416 2880 3117 Phase I Archaeological Survey of the Calpine Electrical Transmission, Gorham to Westbrook. Cole-Will, Rebecca 1998 Karen Mack 3035 Report on Phase I Archaeological Survey of the Watson Woodlands Subdivision, Scarborough. 1995 Richard T. Will Phase I Arcaeological Survey of the Holmes Road Subdivision (Hale Property), Scarborough. Cranmer, Leon E. 1999 William Burgess A Report on the Phase I Archaeological Survey for the Proposed Westbrook Interchange. 2864 3049 Quads 008 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Cranmer, Leon E. 1999 A Report on the Phase I Archaeological Survey of the Highland Lake Dam Project. Eldridge, Stuart A. 2012 Phase IB Prehistoric Survey, CMP Section 105 Saco Bay ADSS Rebuild, Old Orchard Beach MHPC Document # 3086 4071 2009 Phase I Prehistoric Archaeological Investigation Report: Gorham Road Development Project, Scarborough 3868 2007 Report on Phase I Archaeological Survey of Site 8.20, Village at Little Falls Project. 3689 2006 Report on Phase I Archaeological Survey of the Middle Nonesuch River Salt Marsh Restoration. 3535 2004 3417 Sarah Haugh Report on Phase I Archaeological Survey of the Mitchell Heights Subdivision. 2004 Report on Phase I Archaeological Survey of the White Subdivision. 3403 2001 Report on Phase I Archaeological Survey of the Fall Brook Channel Improvement, Portland. 3205 Feighner, Edna 2001 Report on Phase I Archaeological Survey of the Hidden Creek Subdivision, Scarborough. 3197 2000 Report on Phase I-B fo the Proposed Falmouth Community Park Project. 3106 1999 A Report on Phase I Archaeological Survey of the Falmouth Community Park. 3068 1999 A Report on the Phase I Archaeological Survey of Portland Air Freight Project, Scarborough. 3077 Jake Grindle, Robert Bartone, Ellen Cowi Gammon, James G. 2010 3929 Phase I/II Testing of Newly Identified Native American Site 8.31 at Proposed Country Village Mobile Home Park, Saco Grindle, John 2009 Robert Bartone Country Village Mobile Home Park Expansion Project Ph I/II 3880 Hamilton, Nathan D. 2011 Phase I Prehistoric Survey Test Areas A, B, and C, Central Maine Power Saco Bay Reinforcement Project 3968 2008 Report on Phase I Archaeological Survey of the Proposed Elementary School, Stevens Site. 3751 2008 Report on Phase I Archaeological Survey of the Proposed Storage Facility, Running Hill Road, Scarborough. 3759 2006 3634 An Archaeological Phase I Survey of the Proposed Stoudwater Landing Development between Spring and Sroudwater Streets, Westbrook, Maine. 2006 3633 An Archaeological Phase I Survey of the Proposed Subdivision of the South Coast Community Property, 368 Gorham Road (Rt 114), Scarborough, Maine. 2004 An Archaeological Phase I Survey of the Proposed Harrisburg Avenue Subdivision Westbrook, Maine. 3410 2003 An Archaeological Phase I Survey of the Proposed Pheasant Knoll Development Gorham, Maine. 3319 2000 Report on Phase I Archaeological Survey of Presumpscot River Place Phase 3 Subdivision. 3229 1998 Report on Phase II Archaeological Survey of Proposed Industrial Park Expansion Site, Saco. 3009 Quads 008 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Hamilton, Nathan D. 1997 John P. Mosher Archaeological Testing at Falmouth Oaks, Falmouth. 1994 Report on Phase I Archaeological Survey of Proposed Saco Sewer Project. MHPC Document # 2933 2803 1990 Test Excavation of the Walker Site, Presumpscot River Drainage, Falmouth. Maine Archaeological Society Bulletin 30:1-24 1989 2549 An Archaeological Survey and Test Excavation of the Walker Site (008.007), Presumpscot River Drainage, Falmouth. 1988 Thomas C. Bennett,John Mosher 2511 An Archaeological Phase 1 Survey of the Proposed Eaglebrook Commercial/Office Park Scarborough,Maine . 1988 Matthew S. Tomaso Archaeological Phase I Survey of the Proposed Green Trees Subdivision, Gorham 2508 1988 Thomas C. Bennett An Archaeological Phase 1 Survey of the Proposed Gables Development at Clarks Pond South Portland,Maine 2512 1987 John P. Mosher, Dave Carpenter An Archaeological Phase I Survey of the Proposed USM Woodside HousingProject, Gorham. 2471 Haugh, Sarah 2009 Phase I Presumpscot River Trail Expansion Project 3903 2008 Report on Phase I Archaeological Survey of Dragonfly Knoll Subdivision. 3780 2007 Phase I Archaeological Survey of the Portland Jetport Stormwater Treatment Pond Project. 3727 Haugh, Sarah M. 2012 Phase I Prehistoric Report, Cascade Falls Subdivision (formerly Marshview Subdivision), Scarborough 4064 Kellogg, Douglas 1997 Kathleen Wheeler Report on Phase IB Archaeological Survey of the Joint Pipeline Project, Westbrook Lateral. 2963 Maynon, Jeff 2007 Report on Phase I Archaeological Survey of the South Portland Air National Guard Station. 3659 McPheters, Hutch 3542 2006 Robert Bartone Report on Phase I Archaeological Survey of the Ocean Park Property, Old Orchard. 2004 Tim Dinsmore, Rob.Bartone, Ellen Cowie 3378 Archaeological Phase I Survey of the Fuller Farm, Scarborough. Moore, Edward 2002 Rick Will Report on Phase I Archaeological Survey of the Portland International Jetport, South Portland. 3284 Morrison, Peter 2011 4032 Phase I Prehistoric and Historic Archaeological Surveys for a Proposed Public Park on Black Point Road, Scarborough Mosher, John P. 2010 Phase I Archaeological Survey of the Rt 100/26 Bridge Replacement over the Presumpscot River, Falmouth 2006 Leon Cranmer 3916 3622 Report on Phase I Archaeological Survey of the Gorham Bypass (PIN 8151.00), Gorham, Maine. 2003 Report on Phase I Archaeological Survey of the Presumpscot River Preserve. 3303 2000 Leon Cranmer A Report on the Phase 0 Archaeological Survey of the Gorham Bypass (MDOT PIN 81851.00). 3158 1997 Nathan D. Hamilton Report on Phase I Archaeological Survey of Proposed Homer Site Congregate Care Facility, Scarborough. 2959 Quads 008 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Mosher, John P. 1989 N.D. Hamilton & Cynthia Thayer Archaeological Phase I Survey of the Proposed St. James Place, Scarborough. MHPC Document # Putnam, David E. 1996 Report on Phase I Archaeological Survey of the Flaherty Farm, Scarborough for SCS. 2526 3383 Robinson, Brian S. 1985 An Intertidal Archaeological Survey of the Scarborough Marsh 2160 1984 An Intertidal Survey of the Scarborough Marsh Shaffer, Gary 2012 An Irrigation System for Rick Grant, Saco, Phase I Archaeological Survey 2003 Report on Phase I Archaeological Survey of the Rusty Knoll Farm Erosion Control. 4155 3333 2002 3259 Trail Improvements and Stream Protection : Fengler and Scarborough Land Trust Properties, Scarborough, A Phase I Archaeological Survey. Spiess, Arthur 2009 West Branch Piscataqua River Footbridge Archaeological Testing 3856 Spiess, Arthur E. 2006 Archaeological Fieldnotes Summary: Broadturn Road Project. 3589 2005 William Burgess 3447 Archaeological Survey of the Red Brook Mitigation Site, Scarborough (MDOT PIN 10988). 2000 Leon E. Cranmer Archaeological Survey of the Scarborough Beach Tract for the LMFB. Valimont, Brian 2012 Proposed Beachmont Residential Subdivision, Old Orchard Beach, Phase I Archaeological Investigation 3115 4062 2010 Proposed Wetland Mitigation Area, Larrabee Farms Gravel Pit, Scarborough 3933 2009 Proposed Presumpscot Estates Residential Subdivsion, Westbrook 3860 2008 Phase I Survey of the Proposed Ward's Hill Road Water Supply. 3790 2007 Report on Phase I Archaeological Survey of the Proposed Retirement Residences, Elmwood Avenue, Scarborough. 3734 2006 Report on Phase I Archaeological Survey of the Proposed Dunstan Crossing Subdivision. 3566 3626 2006 Affordable Housing Project, Westbrook. 2006 Report on Phase I Archaeological Survey of the Proposed Wood Subdivision, Standish. 3540 2006 Report on Phase I Archaeological Survey of the Stonegate Commons Subdivision, Saco. 3534 Will, Richard T. 2012 Edward Moore 4079 Phase I Assessment of CMP Section 188, Portland and Westbrook 2008 Phase II Archaeological Investigation of Portland International Jetport Improvements. 3786 2003 James Clark 3323 Results of Archaeological Monitoring/Data Recovery, Archaeological Survey Associated with the Removal of Smelt Hill Dam, Falmouth, ME, Request # DACW33-02- Quads 008 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Will, Richard T. 1999 Julia Clark 3085 A Report on the Phase I Archaeological Survey of Proposed Calpine Natural Gas Lateral, Gorham to Westbrook. 1998 Phase I Archaeolgical Survey of the Gorham Energy Project. 3002 1998 3010 Report on the Phase I Archaeological Survey of the Proposed West Falmouth Crossing Project, Cumberland County. 1998 Report on the Phase II Archaeological Survey of Site 8.18, West Falmouth Crossing Project. Wilson, Deborah B. 2007 Preliminary Archaeological Assessment of the R.J. Grondin and Sons Property. 3021 3665 2005 Report on Phase I Archaeological Survey of the Stroudwater Heights Condominium Project. 3446 2005 Report on Phase I Archaeological Survey of Site 8.29, Harding Bridge Farms Subdivision. 3487 2005 Report on Phase II Archaeological Survey of Site 8.29, Harding Bridge Farms Subdivision. 3510 2004 Report on Phase I Archaeological Survey of the Cobb Farm Estates Subdivision, Westbrook. 3382 2003 Report on Phase I Archaeological Survey of the Mill Brook Business Park, Saco. 3336 2003 3310 Report on Phase I Archaeological Survey of R.J. Grondin and Sons' Proposed Commercial Subdivision in Gorham, ME. 2003 3322 Report on Phase I Archaeological Survey Enterprise Business Park, Scarborough, ME, MHPC # 0902-03, US Route 1 and Willowdale Rd. 008, 013 2002 Report on Phase I Archaeological Survey of the State Manufactured Homes Expansion. 3271 2002 Report on Phase I Archaeological Survey of the Proposed Hunter Point Subdivision. 3222 2002 Report on Phase I Archaeological Survey of the Ballantyne Place Phase I. 3256 2001 Report on Phase I Archaeological Survey of a Proposed Industrial Facility in Saco. 3209 2000 Report on Phase I I Archaeological Survey of the Riverwoods Subdivision, Scarborough, Phase II. 3150 1999 A Report on the Phase I Archaeological Survey of Deep Brook Golf Course, Saco. 3076 1998 Report on the Grandwoods Estates Phase II, Scarborough. 2998 1996 Report on Phase I Archaeological Survey of the Broadturn and Holmes Road Subdivision, Scarborough. 2924 1993 Report on Phase I Archaeological Survey of the Proposed Site of New Middle School in Scarborough. 2771 1992 Report on Phase I Archaeological Survey of the UNUM Life Insurance Co. Property in Portland. 2713 1991 Report on Phase I Archaeological Survey of the Portland Water District's New Transmission Main in Westbrook. 2666 Mack, Karen 2012 Edward Moore Phase I Archaeological Precontact Assessment CMP Section 103, Westbrook, and Windham 4057 Quads 008, 013 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Will, Richard T. 2013 Edward Moore 2013 Monitoring of Archaeological Sites and Resources within S. D. Warren Company's Presumpscot River Hydroelectric Projects MHPC Document # 4168 008,009,010, Munn, Henry 1956 The shell heaps of Casco Bay. 014,015 Maine Field Naturalist. 12:34-40. Yesner, David R. 1983 On Explaining Changes in prehistoric coastal economies: the view from Casco Bay, Maine. IN R.Nash ed. The Evolution of Maritime Cultures on the Northeast and the Northwest Coasts of America. 7790.Publ.#11,Dept of Archae. Simon Fraser Uni 1980 Archaeology of Casco Bay: A Preliminary Report. 008,009,012, Doyle, Richard 1984 A Photographic Catalogue of the Richard A. Doyle, Jr. Collection (Through January 1, 1984) 014,015+ 2432 008,012,013 Woodlot Associates 1997 Presumpscot River Erosion Potential Survey. 2982 008,013 Wilson, Deborah B. 2000 Bruce Bourque Phase II Archaeological Survey Report for Five Archaeological Sites on the Presumpscot River. 3102 1999 3043 Phase I Archaeological Survey Report: S.D. Warren Company's Five Hydroelectric Projects on the Presumpscot River. 1998 Report on Phase 0 Archaeological Survey of 5 S.D. Warren Hydroelectric Projects on the Presumpscot River. 008,013,022, Eldridge, Stuart A. John Cross, Leslie Shaw 2000 033 Archaeology Survey Portland Gas Transmission System - Gilead to Westbrook, Line Changes, Cross Roads. 009 Barber, Russel J. 1988 The Use of Land Snails from Prehistoric Sites for Paleoenvironmental Reconstruction. G.P. Nichols, ed. Holocene Human Ecology in Northeastern North America. Brigham, Michael 2009 S. Scharoun, Robert Bartone, Ellen Cowie Archaeological Investigations Proposed Cascades Project, Saco 3005 3097 3857 Eldridge, Stuart A. 2007 Sarah Haugh Report on Phase I Archaeological Survey of Site 9.16, Glickman Family Lots, Great Diamond Island. 3687 Hamilton, Nathan D. 1985 Maritime Adaptation in Western Maine: The Great Diamond Site. 2978 1985 David K. Yesner Early, Middle and Late Woodland Ceramic Assemblages from Great Diamond Island, Casco Bay, Maine In Peterson,J.B. Editor: Ceramic Analysis in the Northeast. Occasional Publications in Northeastern Anthropology 9:3972 Mosher, John P. 2003 Leon Cranmer 3312 Report on Phase I Archaeological Survey of the Robinson Woods Parcel: LMFB Purchase in Cape Elizabeth. 1990 Rob Florentin & N.D.Hamilton Archaeological Phase I Testing of the Proposed Wastewater Treatment and Pump Station, Peaks Island. 2583 Petersen, Anne K. 1977 The Hannaford Cove Site: A Historical and Environmental Study. 2755 Spiess, Arthur 2011 Martin's Point Bridge Project Phase I Archaeological Testing 4008 Valimont, Brian Proposed Cape Elizabeth Cell Tower 3879 2009 2009 Proposed boat pier, ramp and float, Great Harbor Cove, Haskell Island Will, Richard T. 1976 Digging Up Prehistory in Southern Coastal Maine self published 3842 3979 Quads 009 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Will, Richard T. 1972 John Cross Wooley II: A Report of the Excavation of a Coastal Shell Heap in Maine. MHPC Document # 2646 Yesner, David R. 1988 Island biogeography and prehistoric human adaptation on the southern coast of Maine Archaeology of Prehistoric Coastlines, Cambridge Univ Press 009,010,014, Hamilton, Nathan D. 1991 Final Report for Northeast Casco Bay and Casco Bay Intensive Site Survey: 1988 and 1989. 015 4048 009,010,015 2519 009, 014 1988 2670 Casco Bay Survey 009,013,023, Spiess, Arthur E. 1984 A Catalogue of the Androscoggin Historical Society Collection of Prehistoric Artifacts 024,027+ 009,014 Bampton, Matthew 2001 Rosemary Mosher A GIS Driven Regional Database of Archaeological Resources for Research and CRM in Casco Bay, Maine. Stancic, Zoran and Tatjana Veljanovski, Computing Archaeology for Understanding the Past CAA 2000, BAR International Series 931, 28th Conf, Ljubljana. Yesner, David R. 1980 Preliminary Report on 1980 Casco Bay Archaeological Survey 1979 Preliminary Report on 1979 Casco Bay Archaeological Survey 009,014,015 Hamilton, Nathan D. 1989 Northeast Casco Bay Archaeological Survey and Testing Program 1988. 1985 Maritime Adaptation in Western Maine, The Great Diamond Island Site. Ph.D. dissertation, Dept of Anthropology, University of Pittsburgh PA Tomaso, Matthew S. 1990 N. D. Hamilton Casco Bay Intensive Archaeological Survey and Testing Program: Part Two, 1990. 009,014,015, Yesner, David R. 1979 Casco Bay Archaeological Project: 1978 Progress Report and Proposal for Continued 1979 Survey Grant to Historic 017 Preservation Commission 009,014,029, Martin, Scott M. Terrestrial Snails and Slugs of Maine. 030 Northeastern Naturalist, 7:38-88. 009,015 Shaw, Leslie 2429 2156 2155 2550 2447 2598 2154 2000 2004 John Cross 3395 Archaeological Evaluation of Flag Island and Upper Flag Island, Harpswell. Wilson, Deborah B. 1991 Phase I Archaeological Survey of Deerfield Park Subdivision, Brunswick. 009,015,016, Will, Richard T. 1978 David Sanger 017,026+ An Evaluation of Shell Middens on the Coast of Maine 009,015? 2639 2143 1979 Prehistoric Pottery from Two Maine Sites. 010 Haugen, Einar The Rune Stones of Spirit Pond, Maine. Man in the Northeast 4:62-79 Lenik, Edward J. Report on the Spirit Pond shell heap. N.E.A.R.A. 12(1):2-5. 1972 1977 1977 The Spirit Pond Shellheap. The Archaeology of Eastern North America 5:94-107 1976 The Spirit Pond Shellheap. 1975 Excavations at Spirit Pond Man in the Northeast: 9:54-60 3469 Quads 010 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Lenik, Edward J. 1974 The Search for Norse Occupation at Spirit Pond, Maine: 1974 Excavation Report MHPC Document # 1973 Archaeological Survey of Spirit Pond, Campbell Island, Atkins Bay and Parker Head, Phippsburg, Maine. 2172 3468 1973 The Spirit Pond Sod House 010,015 1973 Archaeological Survey of the Morse Mountain, Morse River and Sprague River Areas, Phippsburg, Maine 2134 1973 Archaeological Survey of the Sabino Head, Silver Lake, and Seguin Island Areas, Phippsburg, Maine 2133 3470 1972 Excavations at Spirit Pond. 010,015,037, Willoughby, Charles B. 1980 facsimile edition of his 1892 manuscript 038,117+ Indian Antiquities of the Kennebec Valley. Occassional Publications in Maine Archaeology, Number 1, Maine Historic Preservation Commission, Augusta. 011 Sarah M. Haugh Eldridge, Stuart A. 2004 Phase IA and IB Archaeological Survey Report: MSAD #55 Middle School Project, South Hiram, Oxford Co., Maine. 3464 Hamilton, Nathan D. 1989 John Mosher An Archaeological Phase I Survey Proposal Saco River Estates, Cornish. 2517 Hedden, Mark H. 2967 1997 Arthur E. Spiess Report on Phase I Archaeological Survey of the River Road in Hiram for MEMA. Mosher, John P. 1995 2861 Report on the Phase I Archaeological Survey of Eastern Slopes Regional Airport Runway Expansion Project in Fryeburg. Petersen, James B. 1993 Report on Phase I Archaeological Survey of Upper Kezar Falls Canoe Ramp. 2778 Shaffer, Gary 2012 Field Check, Susan and Mark Faunce, Limington 4058 2006 3578 Barnyard Water Management, a Grassed Waterway, a Waste Storage Facility for Teresa McClare, Brownfield, Oxford County, Maine: A Phase I Archaeological Sur Tomaso, Matthew S. 1989 Nathan D. Hamilton,Karen Hoxie 2551 Archaeological Phase I Survey Report of the Maretta Enterprises Mineral Extraction Project, West Baldwin, ME. 011,021 012 Wilson, Deborah B. 1991 Report on the Phase I Archaeological Survey of Cornish Commons, A Housing Development in Cornish. 2672 Eldridge, Stuart A. 2005 Sarah M. Haugh Phase IA and IB Archaeological Survey Report of the Cold Spring Source Development Project in Fryeburg and Denmark, Oxford County, Maine. 3502 Rombola, William F. 1998 The Ceramic Period in the Upper Saco River Drainage: An Analysis of the Helen Leadbeater Collection. MAS Bulletin,38:2:1-22 Bartone, Robert N. 2006 Report on Phase I Archaeological Survey of the Proposed Wheaton Way Subdivision. Brigham, Michael 2008 Robert Bartone 3629 3755 Report on Phase I Archaeological Survey of the Proposed Moose Landing Marina. 2005 Robert Bartone Report on Phase I Archaeological Survey of the Wildland Subdivision, Standish. Hamilton, Nathan D. 2004 Report on Phase I Archaeological Survey of the Proposed Gravel Pit Site (Jane Cummings) Route 25. 3496 3425 Quads 012 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Hamilton, Nathan D. 1998 Cynthia Thayer Report on Phase I Archaeological Survey of the Steep Falls Water Supply Site. MHPC Document # 2984 1990 John P. Mosher, Cynthia Thayer 2559 Archaeological Phase I Survey of the Proposed Point Sebago Golf Resort Subdivision, Casco, Cumberland County, ME. 1989 John P. Mosher An Archaeological Phase I Survey of the Proposed Naples Subdivision Project, Naples, Cumberland County, ME. 1988 Cynthia Thayer & John P.Mosher 2545 2485 Archaeological Phase II Test Excavations at the Third Beach site (12-11)...Sebago Lake Estates, Naples, Maine. Mosher, John P. Naples Bay Bridge Replacement, PIN 11060 3875 2009 1991 Nathan D. Hamilton Archaeological Phase II Testing at the Point Sebago Paleoindian Site. 2632 Smith, J. N. Leith 2010 John Mosher Phase I/II Survey Route 35 Road Realignment and Bridge Replacement over MCRR MDOT PIN 15107 Standish 3921 Spiess, Arthur E. 2006 John Hudson Cold Rain Pond Water Access Archaeological Assessment. 3527 Wilson, Deborah B. 3145 2000 Bruce Bourque Phase II Archaeological Survey Report, Sites 12.63, Peabody Pond, Bridgeton. 2000 A Report on the Phase I Archaeological Survey of the Land of Moose Cove Lodge Trust II, Peabody Pond. 3126 012, 007 Moore, Edward 2013 CMP Section 170 Maintenance archaeological survey 4120 012, 013 Murch, Dana Natural Water Levels of Sebago Lake 2011 4012 012,013 Doyle, Richard Sebago Area Survey 1980 1980 Nathan Hamilton 2121 Mosher, John P. 1990 Nathan D. Hamilton 2608 Phase I Archaeological Investigation of the Proposed Portland Water District Ozonation Facility, Standish. Wilson, Deborah B. 2002 Report on Phase 0 Archaeological Survey of the Eel Weir Project (FERC 2984). 3230 012,027 Cranmer, Leon E. 1995 Arthur E. Spiess Phase I and II Archaeological Report on PIN 1141.01, Site 12.26, Muddy River Bridge, Naples, Maine. 2849 013 Brigham, Michael 2004 Report on Phase I Archaeological Survey of the Gaia Tech Home Depot Property, North Windham. 3414 Clark, James CMP Pole #47, Section 189 Relocation. 3617 2006 1992 Richard Will Phase I Archaeological Survey of Proposed Expansion of the Windham Gravel Pit, Grondin Property, Windham. Corey, Richard 2004 Robert Bartone 2732 3435 Report on Phase I Archaeological Survey of the Sebago Heights Subdivision. Cowie, Ellen R. 1988 James B. Petersen 2477 An Archaeological Phase I Survey and Phase II Testing of the North Gorham Project, Cumberland County,Maine 1988 James B. Petersen Archaeological Survey and Testing at two sites near the N.Gorham Project Cranmer, Leon E. 1998 Report on the Phase I Archaeological Survey of Route 26 By-Pass, New Gloucester/Poland PIN 3517.20. 2503 2993 Quads 013 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Eldridge, Stuart A. 2007 Sarah Haugh Report on Phase I Archaeological Survey of Loon Run on Notched Pond, Raymond. MHPC Document # 3645 2005 Archaeological Monitoring of Water Main Construction, Pineland Farm. 3443 2004 Report on Phase I Archaeological Survey of the Pineland Farm Water Main Project. 3386 2003 Report on Phase I Archaeological Survey of Vanity Farms Elderly Housing Project. 3339 2002 Report on Phase I Archaeological Survey of the Westbrand Subdivision, Cumberland. 3255 2001 Report on Phase I Archaeological Survey of the Manchester Woods Elder Care Facility. 3195 Feighner, Edna 1999 Unanticipated Discovery at the Outlet Brook Site, Windham, ME, PNGTS. 3047 Hamilton, Nathan D. 1998 Report on the Phase I Archaeological Survey of the Cobb Property, Crystal Lake. 3017 John P. Mosher 1989 Archaeological Phase I Survey of the Proposed Basin View Subdivision, Standish, ME. 1987 John Mosher, David Carpenter 2538 2468 An Archaeological Phase I Survey of the Proposed Highland Lake Subdivision Project, Falmouth. Haugh, Sarah M. 2007 Daniel P. Thomann 3738 Phase I Archaeological Investigation Report: Cliff Corb New House Construction Project, Windham. Hedden, Mark H. 2004 Field Check of Black Brook Preserve, Windham Center for LMFB. 3399 2636 1991 Pleasant River Phase I Survey, Windham, Maine. Kellogg, Douglas 1994 Phase II Excavations of the Great Falls Site (ME 13.34) Windham, Cumberland County. 2835 Mosher, John P. 2001 Report on the Phase 0 Archaeological Survey of the Gray Bypass Project (PIN 8871.00). 3167 1997 Report on Phase I Archaeological Survey of the Proposed Cole Farms Golf Course, Gray. 2966 1992 Nathan Hamilton Report on Phase I Archaeological Survey of the Proposed Woodland Estates Subdivision, Windham. 2725 Putnam, David E. 1998 The Gillespie-Jordan Site (13-39): Probable Late Paleoinidan Lithic Scatter. Shaw, Leslie 2008 Interpreting Human Activities at Small Sites: The Case of the Outlet Brook Site, Windham. MAS, 48:2: 23-45 2000 Stuart Eldridge, John Cross 2999 3162 Phase III Archaeolgical Data Recovery at the Outlet Brook Site. Spiess, Arthur E. 2008 John Mosher 3746 Sabbathday Lake, New Gloucester, Prehistoric Archaeological Survey, Archaeological Assessment for LMFB 2004 A Winged Bannerstone from Maine: Stone and Perishable Archaic Technology. Massachusetts AS; Fall 2004; 42-52. Trautman, Elizabeth A. 1992 Arthur Spiess Report on Archaeological Survey for the Land for Maine's Future Board's Morgan Meadow Property. 2704 Quads 013 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Trautman, Elizabeth A. 1991 Arthur Spiess Archaeological Survey of the Sebago Lake Parcel MHPC Document # Will, Richard T. 2006 Section 189, Gorham-Windham-Raymond Transmission Line Rebuild. 2006 Archaeological Review of the Section 189 Transmission Line. 2671 3590 3568 Wilson, Deborah B. 2003 Report on Phase I Archaeological Survey of the Ledgewood Farms Subdivision, Gray. 3338 2001 Report on Phase I Archaeological Survey of the Gillespie Farm Irrigation Pipeline. 3201 1997 013,008,033, Eldridge, Stuart A. John Cross 034,022 Report on Phase I Archaeological Survey of the Portland Natural Gas Transmission System, Gilead to Westbrook. 2955 013,014,107, Hamilton, Nathan D. 1986 Peabody Foundation for Archaeology,Andover MA. (Description of Collections from Maine) 117,118, 2435 013,033 John Cross, Leslie Shaw 2969 013,14,39,53 Will, Richard T. 1999 Karen Mack, Julia Clark ,56,74,+ Cultural Resources Investigations M & NE Pipeline (Phase II): Supplemental. 3090 Eldridge, Stuart A. 1997 Phase II Survey of 5 Prehistoric Sites for PNGTS. 1998 Cultural Resource Investigations Maritimes and Northeast Pipeline, L.L.C., Phase II Pipeline Project. 014 Backman, Dave 1996 The Lady Slipper Midden Site (14.31). MAS Bulletin, 36:1:1-16. Bennett, Thomas C. 2010 Nathan D. Hamilton An 1868 Lecture on the Shell Midden on Goose Island, Casco Bay, Maine Maine Archaeological Society Bulletin 50(1):9-22 Borstel, Christopher L. 1999 Cultural Resources Survey, U.S. Naval Fuel Depot, Casco Bay, Harpswell. 2991 3089 Ellen Cowie Brigham, Michael 2004 Report on Phase I Archaeological Survey of the Sydney Parcel, Yarmouth. 3381 Clark, James 3415 2004 Edward Moore, Pete Morrison Report on Phase I Archaeological Survey of the River's Edge-16 Lambert Rd Development, Freeport. Cox, Steven L. 1989 Final report Phase I Archaeological Survey of the Lebbe Gravel Pit, Brunswick, ME. 2527 Doyle, Richard 1985 James B. Petersen,other A Late Archaic Shell Midden on Great Moshier Island, Casco Bay, Maine 1985 James B. Petersen, Nathan D. Hamilton A Late Archaic Shell Midden on Great Mosher Island, Casco Bay, Maine Maine Archaeological Society Bulletin 25(1):41-50 Eldridge, Stuart A. 2000 A Report on the Phase I Archaeological Survey of the Durahm River Park Project. Freedman, Jacob 2010 Richard Will 3159 3931 Phase I Prehistoric Archaeological Survey of Littlejohn Island Subdivision, Yarmouth Hamilton, Nathan D. 1986 James B. Petersen,other 2452 Archaeological Phase II Testing of ME 14-108 in the Proposed Pejepscot Water Power Project, Androscoggin,Cumberland and Sagadahoc Counties, Maine. 1985 James B. Petersen,others An Archaeological Phase I Survey of the Proposed Pejepscot Water Power Project, Androscoggin, Cumberland and Sagadahoc Counties, Maine 2181 Quads 014 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Haugh, Sarah 2008 3800 Phase 1A and 1B Archaeological Survey Report , Outdoor Adventure Center Project, Town of Freeport, Cumberland Co. Hedden, Mark H. 1995 An Archaeological Phase I Survey Report on the Route 136 Road Rehab in Durham (PIN 5153). Morse, Edward Sylvester 1868 Evidences of great antiquity in the shell heaps at Goose Island. Boston Society of Natural History Proceedings. 11:301-302. Mosher, John P. 2009 Phase I Archaeological Survey of the Maquoit Bay LMF Purchase, Bunganuc Road, Brunswick 2843 3893 2009 3892 New Century Phase I Archaeological Survey of the Stoddard Family Conservation Easement on Maquoit Bay, Brunswick 2003 Report on the Phase I Archaeological Survey of the Floriday Lake LMFB. 3349 1997 Report on Phase I Archaeological Survey of the Tuttle Road Farm Fence Line. 2961 1996 The Sweetsir Farm Site (ME 14.159):Report on Phase I Archaeological Survey in Yarmouth, Maine. 2910 Pearlman, Stephen The Sandy Point Site. 2950 1997 Shaffer, Gary 2011 John Ackerman, Durham, tree/shrub establishment, forest trail improvements 2004 Report on Phase I Archaeological Survey of the Bell Farm, Pump Pad and Irrigation Line. Shaw, Leslie 2005 Archaeological Phase I Survey on Curtis Cove, Harpswell, Maine. 4014 3396 3484 2005 Report on Phase I Archaeological Survey of the Otter Trace II Housing Project. 3437 Peter Morrison 2004 Archaeological Investigations on Whaleback Island, Harpswell. 3379 Spiess, Arthur E. The Beaver Incisor Knife from Casco Bay. MAS Bulletin, 45:2:23- . 2005 2005 Royal River Estuary Project, LMFB, Report of Survey Results. Swan, Joshua L. 1868 The Shell Deposits on Goose Island. Maine Historical Society Manuscript Collection. Col.110 Box 3c/3 Swan, Rev. Joshua L. 1995 transcribed by Thomas Bennett The Shell Deposits on Goose Island. Trautman, Elizabeth A. 1990 Lisbon Falls Bypass: Archaeological Phase I Testing Arthur E. Spiess Valimont, Brian 2010 Broad Cove Field Proposed Residential Subdivision, Yarmouth 2009 Proposed Maguire Residential Subdivision, Yarmouth 3465 2846 2614 3928 3854 Will, Richard T. 1985 The Harraseeket Archaeological Survey: Final Report 2175 Wilson, Deborah B. 2000 Phase I Archaeological Survey at the Proposed Toddy Brook Golf Course, North Yarmouth. 3119 1997 Report on Phase I Archaeological Survey of a Parcel of Land in North Yarmouth. 2947 Quads 014 014, 024 014, 074 014,015 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Wyman, Jeffries 1868 Recent examination of shell heaps on Goose Island in Casco Bay, Maine. Boston Society of Natural History Proceedings: 11:288-289. Yesner, David R. 1988 Island Biogeography and Prehistoric Human Adaptation on the Southern Coast of Maine (USA). in Archaeology of Prehistoric Coastlines, edited by Geoff Bailey and John Parkington, Cambridge U . Press, 53-63. Spiess, Arthur 2012 4148 Route 136 Durham, MDOT Emergency Rebuild Project Phase I survey notes Betts, Matthew 2012 Susan Blair, David Black Perspectivism, Mortuary Symbolism, and Human-Shark Relationships on the Maritime Peninsula American Antiquity 77(4):621-645 Munn, Henry 1955 Shell Heaps of Casco Bay. Wilson, Deborah B. 1990 Steven L. Cox, Bruce J.Bourque The Topsham Archaeological Project: Report on the 1988 and 1989 Surveys. 3644 2556 014,039,056, Clark, Julia 1999 Karen Mack, Richard T. Will 075 Cultural Resources Investigation: Maritimes and Northeast Pipeline (Phase II). 3044 014,053,074, 091,108 3080 015 1999 Karen Mack, Richard Will Prehistoric and Historic Archaeological Investigations Along Proposed Laterals/MNE Pipeline. Baker, Emerson W. 1995 The 1995 Survey of the Lower Kennebec River. 1985 2875 Robert L. Bradley, A.E.Spiess 2909 Test Excavation on Sagadahoc Island, Georgetown. 1983 The Clarke and Lake Site, 1654-1676: A Place of Trading As Well As Planting. Occassional Publications Gordon, Geoffrey Balogh, James C. 1985 River Terrace Landforms and Soil Morphology at the Hunter Farm Archaeological Site Borstel, Christopher L. 2001 Archaeological Reconnaissance of Brunswick Naval Air Station BEQ. 2000 Martha Bower 3833 3203 3135 Phase IB Archaeological Survey of the Proposed Bachelor Enlisted Quarters, Naval Air Station Brunswick. Bourque, Bruce J. 1992 Deborah Wilson 2684 Report on Phase III Archaeological Investigation of the Indian Spring Site, Brunswick, ME. 1992 Report on Phase I Archaeological Survey of the Mid-Coast Hospital Site, Brunswick. 2722 1991 Deborah B. Wilson Report on the Phase II Archaeological Investigations at Merrymeeting Plaza, a Proposed Retail Development. 2664 1976 Report on an archaeological survey of Merrymeeting Bay. 2597 1973 2105 A Report on Salvage Excavations of Archaeological Material at Sabino Head, Phippsburg, Maine, September 26, 1973 Brain, Jeffrey P. Fort St. George IV. 2000 3065 1998 3032 1997 2985 1995 2876 Fort St. George III. Fort St. George II. Fort St. George. Quads 015 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Brain, Jeffrey P. 0 Fort St. George XIV Brown, Harold E. Animal Remains from the Basin Site MHPC Document # 4035 1982 2600 1960 Field notes for the Basin Site (15.20). Cowie, Ellen R. 2011 Robert Bartone, Stephen Scharoun 3985 Comprehensive Archaeological Identification Survey at NAS Brunswick, Final Report Cox, Steven L. 2003 Art Spiess 3315 Bath 15' Quad Survey Proposal (and Areas Surveyed). 1994 Report on 1993 Investigations at the Rosie-Mugford Sites. 2826 1992 The Topsham Archaeological Project: Report on 1991 Investigations of Sites 15.223 and 15.238. 2685 1991 Deborah B. Wilson 4500 Years on the Lower Androscoggin River: Archaeological Investigations of the Rosie-Mugford Site Complex. 2624 Deborah Wilson 1991 4500 Years on the Lower Androscoggin: Archaeolofical Investigation of the Rosie-Mugford Site Complex. Maine Archaeological Society Bulletin 31(1):15-40 1988 Final Report on Phase I Archaeological Survey of the Sandy Ridge Subdivision, Brunswick, Maine. Mark Hedden, Arthur Spiess Cranmer, Leon E. 1996 Report on Phase I Archaeological Survey of the Brunswick Bikeway and Construction Road to Brunswick Bypass. 1992 2490 2897 E.Trautman, Arthur Spiess 2691 Emerson Baker 2975 Nathan D. Hamilton 2793 Purinton House Phase III Archaeology Report Cross, John R. 2008 The Simpson-Stewart Site in East Brunswick, Maine. MAS Bulletin:48:1:1-18. Dinsmore, Timothy 1993 Topsham Historic Archaeological Survey 1992 Doyle, Richard 1994 Continued Excavation at the Long Island North Site (15.95), Casco Bay. Eldridge, Stuart A. 2003 Report on Phase I Archaeological Survey of the Eagle Ridge Subdivision, Brunswick. 3307 2002 Report on Phase I Archaeological Survey of the Topsham Crossing Development. 3263 Freedman, Jacob 2006 Richard T. Will Harbor Island - Sebasco Estates Archaeological Investigation of Sites 15.269 (ME 348-057) and ME 348-058. 3621 Gramly, R. Michael 1980 Archaeological Survey of the Proposed Brunswick Naval Air Station Clear Zone, Brunswick, Maine 2126 Hamilton, Nathan D. 2007 Report on Phase I Archaeological Survey of the Proposed Sasanoa Shores Subdivision. 3656 1994 Matthew Bampton 2819 Eastern Casco Bay Kayak Survey 1994 John Mosher (Draft) The Basin site and Archaeology of an Evolving Maine Inlet. Hedden, Mark H. 1997 Leon Cranmer, Arthur Spiess Brunswick Bikeway (CMAQ 9927.0) Phase III Archaeological Mitigation. 2829 2935 Quads 015 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Henshaw, Anne 2004 Amy Hodges, Adrienne Heflich Coastal Studies Center Archaeology Project. MHPC Document # 3329 2003 Coastal Studies Center Archaeology Project (Bowdoin). Kerber, Fred Site Report 15.273. 3390 3107 1991 Lane, Gardner 1966 2127 An Archaeological Report on Excavations Carried Out at Sabino Head in Popham Beach, Maine - The Site of Fort St. George - 1607-1608 A.D. Little, Elizabeth 1993 Radiocarbon Age Calibration at Archaeological Sites of Coastal Massachusetts and Vicinity. Journal of Archaoeological Science, 20:457-471. Mathiasson, Kåre 1996 Leon Cranmer, Arthur Spiess 2896 Report on Phase I Archaeological Survey of PIN 1665.20 Topsham-Brunswick Bypass Bay Bridge Wetland Mitigation Site. Moore, Edward 2002 Rick Will Report on Phase I Archaeological Survey of the Proposed Merrymeeting Airfield Project, Bowdoinham. 2002 Ricahrd T. Will 3248 3221 Report on Phase I and Phase II Archaeological Survey and Study of the Maine Natural Gas Midcoast Natural Gas Pipeline Project from Bowdoin to Brunswick. Mosher, John P. 2005 Phase I Archaeological Survey of the Skolfield Farm Shores LMFB Purchase. 3444 2001 Leon E. Cranmer A Report on the Phase I Archaeological Survey of LMFB Land Acquisitions at Thorne Head, Bath. 3177 1999 Richard T. Will Report on Phase I Archaeological Survey of the Proposed New Pole Location , Brunswick-Bath Transmission Line. 3062 Shaw, Leslie 2009 Phase I Archaeological Survey, Brunswick Commerce Center 3863 Smith, J. N. Leith 3853 2009 John Mosher Archaeological Phase I Reconnaissance of The Basin Preserve for the Nature Conservancy Spiess, Arthur E. 1997 Prehistoric Occupations on the Purinton House Property. Maine Archaeological Society Bulletin, 37:1:1-22. 1990 Leon Cranmer, Kåre Mathiasson Brunswick-Topsham Bypass Phase Ib and Phase II Archaeological Studies 1989 Leon Cranmer Brunswick-Topsham by-pass archaeological Phase I survey. Trautman, Elizabeth A. 2003 Arthur E. Spiess Reconnaissance Survey of the Trufant Summerton Long Reach Parcel for LMFB. 2003 Arthur E. Spiess 2572 2522 3343 3342 Reconnaissance Survey for LMFB: Brunswick to the Ocean Trail. Will, Richard T. 1980 Rebecca J. Cole-Will 2153 The Cathance River Archaeological Site Survey Wilson, Deborah B. 2002 Report on Phase I Archaeological Survey of the Taggart Clay Extraction Operation, Bath. 3239 2000 3136 Report on the Phase I Archaeological Survey of The Highlands North Retirement Community Property, Topsham, ME. Quads 015 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Wilson, Deborah B. 1999 Pappilardo, Mike A Report on Phase I Archaeological Survey of the Family Housing Projects, Brunswick. 1997 Final Report 1996 Topsham Archaeological Project. Arthur E. Spiess MHPC Document # 3069 2943 1997 Report on Phase I Archaeological Survey of the William Dodge Property, Blackwater Cove, Bath. 2968 1996 2898 Arthur E. Spiess Report on Reconnaissance Archaeological Survey of the Parcels of Land in Topsham. 1991 Report on Phase I Archaeological Survey, Proposed Retail Development, Cook's Corner, Brunswick. 2638 1990 Final report on the phase I archaeological survey of the Michaud subdivision, Topsham, ME. 2594 015, 016 Sanger, David 1974 Report on Archaeological Survey of Sagadahoc and Lincoln Counties 1974 (for State Planning Office) 015, 025 Bourque, Bruce J. 2006 Steven L. Cox and Robert A. Lewis The Archaic Period of the Merrymeeting Bay Region, south Central Maine. edited by David Sanger and M. A. P. Renouf, The Archaic of the the Far Northeast, University of Maine Press, Orono, 2006. Tomaso, Matthew S. 1990 N. D. Hamilton, John Mosher 2599 015,010 4078 Casco Bay Intensive Archaeological Survey and Testing Program: 1988. 015,010,025, Spiess, Arthur E. 1984 Promise of the River Terraces: 1983 Kennebec Valley Survey for Prehistoric Sites 036,037+ 015,016 2166 Cranmer, Leon E. 2000 3100 A Report on the Phase I and II Archaeological Surveys for the Route 127 Bridge Replacement Projects Georgetown. 015,016,026 2001 John P. Mosher 3165 Wiscasset Route 1 Corridor Srudy: Phase 0. 015,023,025, Bourque, Bruce J. 1977 Report on a Preliminary Archaeological Survey of the Lower Androscoggin and Kennebec Valleys 037,053 2110 015,025 1978 Report on an Archaeological Survey of Merrymeeting Bay 2111 015,025,026, 029,037+ 1976 Report on an Archaeological Survey of the Lower Kennebec Valley and Adjacent Areas 2109 016 Callum, Kathleen 1995 The Geoarchaeolgy of the Nahanada Site (16.90) Pemaquid Beach, Bristol, Maine. 2850 Campbell, Michelle 1997 Indiantown Island Ceramic Analysis. B.A. Thesis Clark, James 2006 Report on Phase I Archaeological Survey of the Bristol Recreational Trail. 3029 Collins, Maxine 1993 Arthur Spiess Two Prehistoric sites Near Pemaquid Harbor: Collections and Notes Analysis. 2756 Cox, Steven 2009 Phase I Archaeological Survey of Proposed Subdivision on Seal Cove, South Bristol 3847 Cox, Steven L. 2008 Report on Phase I Archaeological Survey of the Linekin Bay Resort. 3761 Crotts, Anita L. 1985 An Examination of Amateur Collections from the Boothbay Region, Lincoln County, Maine 2174 DePaoli, Neill 1994 Report on the Archaeological Survey of the Pemaquid River Estuary. 2820 3605 Quads 016 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Dinsmore, Timothy 2010 Phase I Prehistoric Archaeological Survey Proposed Schoolhouse Cove Subdivision, Bristol MHPC Document # Eldridge, Stuart A. 2006 Report on Phase II Archaeological Survey of Site 16.247, Davis Island Townhouses. Kellogg, Douglas 1995 How Has Coastal Erosion Affected the Prehistoric Settlement Pattern of the Boothbay Region of Maine? Geoarchaeolgy 10:65-83. 1994 Why Did They Choose to Live Here? Ceramic Period Settlememt in the Boothbay, Maine Region. Northeast Anthropology 48:25-60. 1982 Environmental Factors in Archeological Site Location for the Boothbay, Maine Region with an Assessment of the Impact of Coastal Erosion on the Archeol 3957 3602 2132 Maher, Michael 1996 Remote Sensing and Stratigraphic Analysis of 16.7, Indiantown. B.A. Thesis Moorehead, Warren K. 1924 The Ancient Remains at Pemaquid, Maine. Old-Time New England. 14:132-141. 1923 Report on the Work at Pemaquid. 3030 Mosher, John P. 2002 Report on Phase I Archaeological Survey of the Crooked Farm Project, LMFB, Bristol. 3226 Nickel, Harry G. Boothbay Region - Site EB 2 3023 1966 1965 The Cameron Point Excavation at Southport Island, Maine Maine Archaeological Society Bulletin 3 Sanger, David 1985 Prehistoric Occupation at Pemaquid. 3022 1983 Robert Bradley,other Nahanada, A 17th Century Site on the Coast of Maine. 1981 Report on 1980 Field Season and Analysis, Boothbay Harbor Project Spiess, Arthur E. 2006 2146 K.Sobolik, D.Crader, J.Mosher,D.Wilson Cod, Clams and Deer: the Food Remains from Indiantown Island. 2003 Frederick Loomis 1909 Excavation Newspaper Account. MAS Newsletter 17:2-6. 2001 Leon Crnamer Native American Occupation at Pemaquid: Review and Results. MAS Bulletin, 41:2:1-26 Leon Cranmer 2000 Native American Occupation at Pemaquid: MHPC Survey Grant Report. 1998 Leon Cranmer 3327 3146 2994 Site 16.237 and Route 27 in Boothbay Archaeological Phase I and IIa Test. 1990 Mark Hedden Archaeology at Dodge Point for the Land for Maine's Future Board. Maine Archaeological Society Bulletin 30:251990 Mark Hedden & Leon Cranmer Archaeological Survey Report on the Dodge Point Parcel, Newcastle. Trautman, Elizabeth A. 1993 Arthur Spiess The Shell Midden at Five Islands: A Remnant Coastal Site in Sheepscot Bay. 2555 2783 Quads 016 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Valimont, Brian 2007 Hunting Island Water and Elecrical Lines. MHPC Document # Wilson, Deborah B. 2004 Report on Phase I Archaeological Survey of a Proposed Pier Location, Hurlbut Property, Pinkham Road, Pemaquid, Maine. 3654 3428 2003 Report on the Phase I Archaeological Survey of the Malcomb Property, Boothbay. 3354 2002 Report on Phase I Archaeological Survey of the Lobster Cove Meadow Property, Boothbay Harbor. 3245 2002 Report on Phase I Archaeological Survey of the McKenney Parcel, Penny Lake Area, Boothbay Harbor. 3244 1998 Arthur E. Spiess 3011 Final Report Boothbay Paleoindian Project. 1998 Neil DePaoli Analysis of Prehistoric Components at HTW and WR Lots, Bristol. 2988 3013 1998 Indiantown Island Archaeological Project. 1997 Arthur E. Spiess 2953 Report on Educational Component 1996 Indiantown Island Archaeological Survey. 1996 Indiantown Island Archaeological Project: Report on the 1995 Investigations. 2905 1995 2860 Report on the Phase 0 Archaeological Survey of Back River Limited Partnership Property Barters Island Rd., Boothbay. 016,026 Young, Arthur H. 1967 The Big Dig at Pemaquid. Yankee Magazine :82-85,170,173. Young, Robert S. 1992 David Belknap, David Sanger Geoarchaeology of Johns Bay, Maine. Archaeology, 7:209-249 Bradley, W. 1957 Radiocarbon age of the Damariscotta shell heaps. American Antiquity 22(3):296 Castner, Harold W. 1950 The prehistoric oyster shell heaps of the Damariscotta River The Boothbay Register(no further date) Goldthwaite, Richard P. 1935 The Damariscotta shell heaps and coastal stability. American Journal of Science. Series 5, Vol. 30. pp 1-13 Meserve, Charles Francis 1928 Shell Heaps at Damariscotta. Clipping from the Bath Daily Times. June 30, 1928. Mary Jo (Elson) Sanger Sanger, David 1986 Boom and Bust on the River: The Story of the Damariscotta Oyster Shell Heaps. AENA 14:65-78 Spiess, Arthur E. 1986 Peabody Museum, Salem: Maine Holdings (E.S.Morse Collection 1926) 2442 Wood, Dr. The Damariscotta shell-heaps. Where were these long shelled oysters taken? Reasons for believing that they were not Peabody Museum, Tozzer Library, Harvard. eatenPamphlet, by Indians. 016,026,074 Carlson, Catherine C. 1986 Maritime Catchment Areas: An Analysis of Prehistoric Fishing Strategies in the Boothbay Region of Maine. M.Sc.Thesis, Institute for Quaternary Studies 2448 Quads 016,029 017 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Chase, Thomas P. 1986 2979 Shell Midden Seasonality Using Multiple Faunal Indicators: Applications to the Archaeology of Boothbay, Maine. Atkins, Carrie 2005 Preliminary Analysis of Charcoal Remains from Allen Island and Olsen Sites. 3498 Cox, Steven L. 2006 3522 Report on Phase I Archaeological Survey of a Parcel of Land on the Pleasant Point Peninsula, Cushing. MHPC #3095-05. 2006 3627 Report on Phase I Archaeological Survey of a Proposed Pier Construction Site in New Harbor, Maine, MHPC# 2642-06. 2004 Report on Phase I and II Archaeological Survey of the Out to Sea LLC Pound, Bradford Pt, Cushing. Downs, Elinor F. 1987 Observations of the Graf Collection of Faunal Remains from the Olsen Site, Cushing. 3402 3207 Eldridge, Stuart A. 2007 Archaeology at the Stanley Site, Monhegan Island, Maine: Implications for Modeling Late Archaic Coastal Adaptations. MAS Bulletin, 47:2:1-20. 2000 3137 Stanley Site, Monhegan. 2907 1996 Monhegan Survey. 1996 The Stanley Site, Monhegan, Maine Escavation 1994, 1995. Gage, Mary 2004 2920 James Gage The Manana Island Petroglyph. MAS Bulletin, 44:1:15-19. Mack, Karen 1996 Archaeological Investigation at the Todd Site (17.11) Muscongus Bay. 2902 Rhodin, Anders 1993 Chelonian Zooarchaeology of Eastern New Englnd: Turtle Bone Remains from Cedar Swamp and other Prehsitoric Sites.Massachusetts Archaeological Society Bulletin, 53:1:21-30. Skinas, David 1987 The Todd Site: A Case Study of Shell Midden Formation. 2474 Sommer, Jeffrey D. 1997 Investigation of the Faunal Remains from the Todd Site (17-11), Muscongous Bay, Maine. 2977 Spiess, Arthur E. Site 17.132 Benner Island Summary 2009 3871 2009 3872 Allen Island Site 17.166 Summary Notes 2007 Checking the DeBarre Chart: Fresh Pond Area Archaeological Testing, Allen Island. 3739 1985 Cushing/ St. George Archaeological Survey, 1985 2674 Stuart Eldridge 1984 Allen's Island, Site 17.76, 1983 Test: Report to Andrew and Betsy Wyeth 017,018,027, Eldridge, Stuart A. 1981 Report on the 1981 St. George River Archaeological Survey 028 1980 Report on the St. George River Archaeological Survey: 1980. Kellogg, Douglas 1985 Implications of Archaeological Deposits for Coastal Stability of the West-Central Maine Coast. 2151 2123 2124 2798 Quads 017,027 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Kellogg, Douglas 1991 Prehistoric Landscapes, Paleoenvironments, and Archaeology of Western Muscongus Bay. MHPC Document # 2781 1985 1984 Survey, Testing, and Shore Studies in Western Muscongus Bay 2445 1984 Site Survey and Settlement Pattern Analysis of the Muscongus/St. George Region of the Maine Coast 2165 Spiess, Arthur E. 1984 Muscongus Bay Survey 1983, Vertebrate Faunal Remains. 3219 Eldridge, Stuart A. 1990 Ceramic Period Occupation of the Central Maine Coast: Hunter-Gatherer Estuarine Adaptations in the St. George River Drainage. 2661 Spiess, Arthur E. David Hill Collection Inventory. 1993 2918 017?,027? Wood, Don An Island Site 1971 018 Shaw, Leslie 2006 Pamela Crane Report on Phase I Archaeological Survey of the Old Woods Farm Subdivision, Tenants Harbor. 3612 018,028,029 Bourque, Bruce J. 1984 Report on Archaeological Survey Activities in the Mussel Ridge Islands, Western Penobscot Bay 2115 021 Cowie, Ellen R. 4067 017,028 2012 Hudgell, Gemma-Jayne Molly Ockett School Expansion, Archaeological Phase I Survey Cox, Steven L. 1994 Report on 1993 Archaeological Investigations in Fryeburg. 2787 1992 Report on the Phase I Archaeological Survey of a Proposed Subdivision in Fryeburg. 2768 1991 Report on the Phase I Archaeological Survey of the Swans Falls Dam Impoundment, Fryeburg. 2717 Cranmer, Leon E. 1994 Arthur E. Spiess Report on Phase I Archaeological Survey of Route 5 Bridge, Fryeburg, Maine (PIN 5889). 2834 Hedden, Mark H. 3309 2003 Arthur Spiess Report on Phase I Archaeological Survey of the Route 302 Visitor's Center, Fryeburg. Leadbeater, Helen M. Iriquoianesque Pottery at Pequawket 1978 Moore, Edward 2013 Phase I CMP Section 92 Pole 273 replacement, Lovell 4129 Mosher, John P. 2012 4096 Archaeological Survey for Eddy Flats and Little Pond Bridges, Rt 302 Highway Improvements, Bridgeton and Fryeburg 2010 Phase I Archaeological Survey Red Iron and Charles River Bridge Removal, (PIN 16702 and 15095), Fryeburg 1991 Thomas Bennett 3934 2642 Phase I Archaeological Survey of the Proposed GWEN Site CGS-8, Fryeburg. Shaffer, Gary 2013 Field Check for Green Thumbs Farm, Fryeburg 4145 2013 4147 2011 4028 Field Check for Elbridge Russell, Fryeburg Field Check, Green Thumb Farms, Fryeburg Quads 021 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Shaffer, Gary 2008 Report on Phase I Archaeological Survey of the Elbridge Russell's Access Roads, Fryeburg. MHPC Document # 2007 3809 3722 Field Check at George Weston's Farm. 021,062,069 021,065,084 022 2007 Report on Phase I Archaeological Survey of Thomas Shaffner's Streambank Erosion Control. 3700 2007 Field Check at George Weston's Farm, Fryeburg. 3675 2005 Nadezha Peterson's Obstruction (Tree) Removal, Stow, Oxford Co, Maine: 3506 2005 Fencing Installation for Andrew Norkin, Denmark and Fryeburg, Oxford Co, Maine: A Phase I Archaeological Study. 3505 Nathan D. Hamilton,Karen Hoxie Tomaso, Matthew S. 1989 Archaeological Phase I Survey Report of the Proposed Landing at Beaver Pond Subdivision, Bridgeton, ME. 2552 Watchman, Alan Dating Kezar Lake Petroglyphs. 2938 1996 Lenik, Edward J. 2002 Picture Rocks: American Indian Rock Art in the Northeast Woodlands. University Press of New England, Hanover and London. Gramly, R. Michael 1981 Report on Archaeological Survey in Western Maine Bartone, Robert N. 2013 Stephens Memorial Hospital Horne Street Parking Lot Phase I survey 2012 Jake Grindle Wetlands Enhancement Moon Valley Project, Archaeological Phase I letter report 2130 4135 4165 Clark, James 1998 Edward Moore, Richard Will Report on the Phase I Archaeological Survey of the Proposed RPA T/L Transmissions Line Project, Oxford Co. 3018 Eldridge, Stuart A. 2004 Report on Phase I Archaeological Survey of the Sanctuary Cove Subdivision. 3409 2001 Report on Phase I Archaeological Survey of the Spectrum Resources Town Project , Oxford. 3190 2000 IA Visual Assessment of KBS Manufacture Housing Plant, South Paris. 3133 1998 John Cross Report on Archaeological Survey of Phase I Extensions PNGTS. 2997 Hamilton, Nathan D. 2004 Report on Phase I Archaeological Survey of the Proposed 14 Acre Commercial Development, Rt 26, Oxford. 3433 Haugh, Sarah 2009 Phase I Archaeological Survey Oakwood Drive Development, Oxford 3873 Mosher, John P. 1996 Report on Phase I Archaeological Survey of the Highland's Point Subdivision. 2913 Mulholland, Mitchell Interim Report, PNGTS. 3006 1998 Norman, Craig 1998 Controlled Surface Collection and Artifact Analysis of the Stevens Brook Site, Presumpscot Watershed. MAS Bulletin, 38:2:23Spiess, Arthur E. 1986 The Kimball Collection from Bear Pond Inlet(Site 22.8) Maine Archaeological Society Bulletin 26:2 p15-36 1984 Mark Hedden A Catalogue of the Kimball Collection from Bear Pond, Waterford, Maine (Site #22.8) 2431 Quads 022 022,023 022,034 023 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Valimont, Brian 2008 Report on Phase I Archaeological Survey of the Proposed Bridgton Cell Tower. MHPC Document # 3787 Will, Richard T. 1995 James Clark Report on Phase I Archaeological Survey of the Pine Ridge Subdivision, South Paris. 2884 Wilson, Deborah B. 1995 Richard Will, Janet Cormier The Nicholas Site: A Late Paleoindian Campsite in Southern Oxford County, Maine. 2883 1993 Report on the Phase I Archaeological Survey of a Parcel of Land on the Little Androscoggin River in Oxford, Maine. 2767 1991 Report on Phase I Archaeological Survey of Proposed Super Shop n' Save, Oxford. 2665 Moore, Edward 2002 Variablilty and Continuity Between Paleoinidan Assemblages in the Northeast: A Technological Approach. M.S. Thesis, U Maine. Hamilton, Nathan D. 2004 Report on Phase I Archaeological Survey of the Proposed Elementary School Development Site, Paris. 3249 Balogh, James C. 1986 Geoffrey Gordon Soil Classification, Genesis, and Morphology at the Michaud Archaeological Site. 2750 Bartone, Robert N. 3419 2012 Gemma-Jayne Hudgell, Steven Scharoun 4074 2010 Michael Brigham, Ellen Cowie, James Gamm 3918 Rangeley Branch Rail Restoration Project Phase III excavations Taxiway site (23.39) and Proposed Parallel Taxiway Auburn-Lewiston Municipal Airport, Auburn 2007 James Gammon and Ellen R. Cowie Report on Phase I Archaeological Survey for the Proposed Parallel Taxi Way for Runway 4-22 and West Terminal Apron of the Auburn-Lewiston Airport. 3652 2007 Ellen Cowie, Jake Grimdall C.L.G. Project Survey: Auburn - Lewiston Municipal Airport. 3697 Belcher, William R. 1989 Phase I archaeological Survey of the Sandy Bottom Pond area, Turner, Maine. 2523 Bourque, Bruce J. 2469 1987 Robert Lewis Littlefield Dam Project (FERC 8158) Report on Archaeological Research Conducted in May, 1987 Brigham, Michael 2009 Robert Bartone, Ellen Cowie 3886 Phase I Survey and Phase II Testing at Newly Identified LaMontagne Site (23.38), Auburn Industrial Park Project 2009 Robert N. Bartone, Ellen Cowie Phase I and II Testing Lamontagne Site (23.38) Auburn Industrial Park Project 3850 2008 Ellen Cowie Report on Phase I Archaeological Survey of the Proposed Tambrands Building Expansioon. 3811 2006 Ellen Cowie Auburn Industrial Park Project, Archaeological Phase II Testing Lamontagne Site 3832 2005 Ellen Cowie 3479 Report on Phase I Archaeological Survey of the Auburn Industrial Park. 2002 Field Inspection of Stump Removal, Auburn Airport. 3286 2002 Report on Phase I Archaeological Survey of the Bath House, Middle Range Pond, Poland. 3265 Clark, James 2012 Edward Moore Results of Phase I/II Precontact Archaeology Survey of Proposed Tambrands/Proctor&Gamble Expansion, Auburn 4052 Quads 023 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Crock, John 1992 James B. Petersen Report on Phase I Archaeological Survey of The Auburn Paper Recycling Plant, Auburn. MHPC Document # 2740 Eldridge, Stuart A. 2006 Sarah Haugh Report on Phase I Archaeological Survey of the Brookdale Village Project. 3609 Gammon, James G. 2007 Robert Bartone Data Recovery Excavation at the Taxiway Site, Auburn-Lewiston Municipal Airport. 3695 2007 Robert Bartone and Ellen Cowie 3664 Archaeological Phase I Survey and Limited Phase II Testing at Paleoindian Site 23.39 ME within the Proposed Parallel Taxiway for Runway 4-22 and Expanded W Haugh, Sarah 37 Foster Road Project, City of Auburn 4025 2011 2010 Phase I Archaeological Survey Auburn Industrial Park Project, City of Auburn 3967 2008 Archaeological Survey Report Mechanic Falls Retail Center 3821 Hedden, Mark H. 1994 Lee Cranmer and Art Spiess Route 26 Rehab at the Little Androscoggin River (PIN 701.10). 1994 Arthur Spiess 2840 2794 Report on Phase I Archaeological Survey of the Auburn Intermodal Transportation Facility, PIN 5643. Moore, Edward 2002 Richard Will 3267 Report on Phase I Archaeological Survey of the Ferland Farm, Poland. 1998 Richard Will Initial Investigation of the Janet Cormier Paleoindian Site (23.25). MAS Bulletin, 38:1:23- . 1997 Richard T. Will Archaeological Investigations at the Janet Cormier site (23.25), Poland. 2965 Mosher, John P. 2002 Report on Phase I Archaeological Survey of the Auburn-Lewistin Intermodal Facility (PIN7903.00). 3285 1997 2960 Nathan D. Hamilton Report on Phase I Archaeological Survey of Proposed Poland Middle and High School Complex. Petersen, James B. 1994 Belinda Cox 2822 Report on the Phase I Archaeological Survey of the Ferland Farm, Poland. 1987 Michael J. Heckenberger An Archaeological Phase I Survey of the Proposed Littlefield Hydroelectric Project, Androscoggin Co.,ME. Quinn, Catherine 1994 Harbour Mitchell, III Report on Phase I Archaeological Survey of the Leo Ferland Project, Androscoggin County. 2457 2832 Spiess, Arthur E. 1989 Wilson, Deborah Paleoindian lithic distribution in the New England-Maritimes Region. in Eastern Paleoindian Lithic Resource Use, Christopher J. Ellis and Jonathan C. Lothrop (eds.), Westview Press, pp 7598. 1985 The Michaud Site (23.12): A New Major Fluted-Point Site in Auburn, Maine Valimont, Brian 2007 Report on Phase I Archaeological Survey of Poland Place Adult Community. 2007 Report on Phase I Archaeolgical Survey of the Proposed Lakeview Heights Subdivison, Poland. 3650 3669 Quads 023 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Weeks, Lindsey 2013 Stuart Eldridge 4105 Town of Oxford, Maine, Waste Water Treatment Facility and Sanitary Collection System: Phase I Archeological Investigation Wilson, Deborah B. 1993 Report on Phase I Archaeogical Survey of the Marcal Hydropower Project. 1988 Steven Cox Phase I Archaeological Survey of the Kittyhawk Subdivision,Auburn 023, 081 Spiess, Arthur 2012 2758 2504 Ellen Cowie and Robert Bartone Geographic Clusters of Fluted Point Sites in the Far Northeast pp. 95-110 in Claude Chapdelaine, ed. Late Pleistocene Archaeology and Ecology in the Far Northeast, Texas A&M Press 023,003,036, Spiess, Arthur E. 1987 Deborah Wilson 037,049+ Michaud:A Paleoindian site in the New England-Maritimes Region. Occasional Publication in Maine Archaeology 6. Maine Historic Preservation Commission. Augusta. 023,081 Curran, Mary Lou 1996 Paleoindians in the Northeast: The Problem of Dating Fluted Point Sites. The Review of Archaeology, 17:1:2-10. (published fall 1997) 024 Bartone, Robert N. 2007 3707 Report on Phase I Archaeological Survey of the Route 196 Gayton Road Commercial Development. Brigham, Michael 2005 Ellen Cowie 3488 Report on Phase I Archaeological Survey of the the Little Andy Park Project. Burgess, William 2003 J. Mosher, A. Spiess 3302 Report on Phase II Archaeological Survey for Lisbon Bridge Improvements (PIN 10189.00). Clark, James 2013 Richard Will, Karen Mack Phase II Evaluation of Site 24.51, CMP Section 255 Lewiston-Auburn Reinforcement Project 4106 2011 Karen Mack Phase I Precontact Survey Central Maine Power Lewiston Loop Project 3991 2008 Summary Report on 2006 Emergency Archaeological Mitigation, Wilson I Site (Site 24.33), Gulf Island/Deer Rips Project (FERC No. 2283). 3744 2006 Report on Phase I Archaeological Survey of the M & N Lewiston Meter Station. 3604 2005 Phase I Archaeological Survey of the Johnson Woods Subdivision, 23 Hatch Road, Lisbon, Androscoggin Co. 3477 Corey, Richard 2006 Ellen Cowie Report on Phase I Archaeological Survey of the Gendron Realty Retail Deveopment, Lisbon. 3521 Cox, Steven L. 1995 Report on Phase I Archaeological Survey of the Lewiston Downtown Development District. 2879 Cranmer, Leon E. 2000 A Report on the Phase I Archaeological Survey of the Sabattus Interchange for the Maine Turnpike Authority. 3114 Crock, John 2736 1992 James B. Petersen Report on Phase I Archaeological Survey of Anderson Gravel Pit, Leeds. 1992 James B. Petersen 2709 (Brief findings report on) Phase I Archaeological Survey of Anderson Gravel Pit in Leeds. Eldridge, Stuart A. 2002 Report on Phase I Archaeological Survey of the R. Belanger and Sons Irrigation Project. 3261 Freedman, Jacob 2007 James Clark and Richard Will Report on Phase I and Phase II Prehistoric Study of the Riverbend Commons Subdivision, Cotton Road, Lewiston, Maine (MHPC #3294-05) 3671 Quads 024 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Hamilton, Nathan D. 1990 M.Bibber,R.Florentin,M.Tomaso 2595 Archaeological phase I testing of the proposed Durham boat landing facility, Durham, Androscoggin County, ME. Mosher, John P. 1994 Archaeological Reconnaissance of the Proposed Joatman Estate Subdivision, Auburn. 2817 Quinn, Catherine 1994 Harbour Mitchell, III Report on Phase I Archaeological Survey of the Steven Keene Farm, Auburn. 2833 Shaffer, Gary Halleluiah Farm Conservation Practices. 2007 3688 Spiess, Arthur 2009 Rt 136 Relocation, Auburn, MDOT PIN 16337.20 3852 Valimont, Brian 2012 Archaeological Resources Assessment proposed Highland Springs Cell Tower, Lewiston 4075 2006 Report on Phase I Archaeological Survey of the Proposed Auburn South Cell Phone Tower. 3616 024, 025, 027, 038 + Clark, James 2009 Karen Mack MPRP Pre-Contact Archaeological Phase II Summary Report 3913 024,025 Valimont, Brian 2006 Report on Phase I Archaeological Survey of the Proposed Grover's Mill Subdivision. 3565 024,036 Cowie, Ellen R. 2484 1988 James B. Petersen An Archaeological Phase II testing of the Gulf Island/Deer Rips Project (FERC No. 2283). 1987 James B. Petersen 2464 An Archaeological Phase I Survey of the Gulf Island/Deer Rips Project. 024,036,048, Baker, Thomas R. 1989 Phase I Archaeological Investigations Conducted Along the Proposed CMP Transmission Tie to the Hydro-Quebec 049,065+ MAS Bulletin, 29:1:13-20. Corridor 024,036,050, Petersen, James B. Thomas Baker 1989 069,081 Preliminary Phase I Archaeological and Historic Structures Survey of the HVDC Tranmission Tie to Hydroquebec 2533 024,36/7,52/ Will, Richard T. 2001 Wyman (FERC 2329), Weston (FERC2325), Gulf Island/Deer Rips (FERC 2283), Oakland and Bonny Eagle (FERC 2529) 3,69,86 Monitored Erosion Sites. 3170 025 2108 Bourque, Bruce J. 1975 Report on an Archaeological Survey on the Lower Kennebec Valley, April-June 1975 Clark, James 2003 3311 Report on Phase I Archaeological Survey of a Proposed Logging Road, Greene Property--Ridge Road, Bowdoinham, ME. Corey, Richard 2006 Robert Barrone An Archaeological Phase I Survey of the Proposed Streamside Estates Subdivision. 3636 Cowie, Ellen R. 2000 Ed Kitson A Report on the Phase I Archaeological Survey of the Cobbossee Campground. 3123 Cranmer, Leon E. 2010 Report on 2009 Archaeological Excavations at Thwings Point, Woolwich, Maine 3946 1995 Upper Kennebec Archaeological Survey Report #12 (Swan Island). Dunn, Gerald C. 1954 A workshop at Lake Tacoma. Massachusetts Archaeological Society Bulletin 15(3):57 . 1950 An Indian campsite on Cobbosseecontee Stream. Massachusetts Archaeological Society Bulletin 12(1):1-8. 2888 Quads 025 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Haugh, Sarah 2013 Summit Natural Gas Pittston Take Station, Phase I Prehistoric Investigation MHPC Document # 4104 Heller, Andrew 2013 Alice Kelley Report of Limited Geophysical Investigations of the Dresden Falls Archaic Site, Dresden 4169 Lenik, Edward J. 1974 A Preliminary Survey of Agry's Point, Pittston, Maine 2135 Mosher, John P. 2011 Phase I Archaeological Survey Lund and Wallentine LMF Acquisitions 3981 2003 Arthur Spiess 3283 Choice View Farm, Dresden, Archaeological Testing for LMFB. Shaffer, Gary 2012 Field Check for Six River Farm, Bowdoinham 4090 2012 Field check, Jim Economou, Woolwich, high tunnel 4066 Shaw, Leslie 2002 Report on Phase I Archaeological Survey of the Proposed Hiatt Farm Road, Dresden. 3266 John Mosher, William Burgess Smith, J. N. Leith 2011 Archaeological Phase I Survey of the Route 197 Bridge Replacement and Road Realignment, MDOT PIN 12674.00 Richmond and Dresden 3983 2006 Leon Cranmer, Arthur Spiess 3591 Archaeological Survey of the Umberhind, Detweiler and Gallant Parcels, Bowdoinham, Maine. Spiess, Arthur 2012 Acquisition and Archaeology of the Dresden Falls Archaic Site Maine Archaeological Society Bulletin 52(1):7-26 2011 Addendum, Prehistoric Material from Fort Richmond, site 25.58, for Phase II Intenstive Survey of Fort Richmond 4033 4156 2010 Houdlette Field Archaeological Test, site 25.45 Wilson, Deborah B. 2005 Report on Phase I Archaeological Survey of the Streamside Estates Subdivision, Gardiner, Maine (MHPC#1987-04) 2000 Report on the Phase I Archaeological Survey, Richmond Utilities District Project. 3475 3142 025, 39, 53, 71 Mack, Karen 025,053 Bradstreet, Theodore E. Agry's Point Archeological Project 025?,054? Dunn, Gerald C. 1964 An Interesting Maine Indian Site as Reported by George Lacome to Gerald C. Dunn 026 Bourque, Bruce J. 1978 2112 An Assessment of the Archaeological Resources of the Damariscotta Mills Portion of the Great Salt Bay Facility Study Area 2009 James Clark, Maureen Smith, Richard Will 3825 Maine Power Reliabitity Report: Pre-Contact Archaeology Survey Report, Segments 3, 9, 10, 14, 15, 27, 29, 35, 39, 40A and Substations 1984 Burgess, William 2008 Belvedere Road Bridge Replacement (PIN 15613.00). Chadbourne, P. 1850 Oyster shell deposit in Damariscotta. Maine Historical Society of Portland Collections 6:pp345-351 Cranmer, Leon E. 1998 Report on Phase I Archaeological Survey for MDOT PIN 5375.01, Alna. 2117 3763 3026 Quads 026 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Cranmer, Leon E. 1996 Arthur E. Spiess 2895 Phase I and II Archaeological Testing for the U.S. Fish and Wildlife Service and Damariscotta River Association. Hamilton, Nathan D. 2007 Phase I Archaeological Survey of the CMP Damariscotta Mills Substation Expansion. 3719 Jackson, Dr. Charles T. 1839 (Whaleback Examination Report) (Maine State Geologic Survey?) Johnson, Frederick 1935 Excavations in the Glidden Shell Heap on the Damariscotta River, Newcastle, Maine. Unpublished manuscript. Department of Archaeology, Phillips Academy,Andover, Massachusetts. Mathiasson, Kåre 1998 Leon Cranmer 3015 3001 Phase I Archaeolgical Survey for MDOT PIN 7416.00-CRDA Project, Newcastle. Moses, T. F. 1878 Shell Heaps on the Coast of Maine. Proceedings, Central OH Scientific Assoc., 1:70-76. Urbana, OH. 1878 Shell Heaps on the Coast of Maine. Proceedings, Central OH Scientific Assoc., 1:70-76. Urbana, OH. Mosher, John P. 2008 Phase II Testing, Wiscasset Transportation Study (PIN 7991.00). 2007 A.E. Spiess 3537 3772 3680 Report on Phase I Archaeological Survey of the Wiscasset Transportatioon Study (PIN 7991.00). 2002 Arthur E. Spiess 3237 Archaeological Testing at the Whaleback Shell Mound for DRA. 2001 Leon Cranmer, Arthur E. Spiess A Report on the Phase II Archaeological Testing of Austin Hill Realignment (PIN 9209). 3172 Myers, Alan C. 1965 The Damariscotta Oyster Shell Heaps: Some Further Considerations. B.A. thesis, Department of Geology, Princeton University. Shaffer, Gary 2013 Field check for Benjamin Marquis, Whitefield 2865 Spiess, Arthur E. 1999 Glidden Midden Collection Harvard Excavation Collection Examinanation Notes. 3112 1997 Mark Hedden 4142 3113 Catalogue of the Penny Collection Materials from the Damariscotta Shell Middens. 1979 Archaeological Location and Impact Study of the Wiscasset Route 1 Bypass Study Corridor 2150 Spiess, Athur E. 1997 Leon Cranmer Whaleback Shell Midden A.T. Gamage Collection, Peabody Museum. 3111 Will, Richard T. 1991 James Clark A Report of Excavation and Analysis in Progress at the Ann(e) Hilton Site. 2678 1989 A Preliminary Report on the Ann Hilton site. Maine Archaeological Society Bulletin, 29:2:1-12. 1988 Rebecca Cole-Will Rebecca Cole-Will 2502 Phase II Archaeological Assessment of Site 26.34, Lake Meadow Subdivision, Newcastle 1988 Rebecca Cole-Will Phase I Archaeological Assessment of the Lake Meadow Farm Subdivision. Willoughby, Charles B. 1910 edited by F.W. Hodge Whaleback Shellheap. IN Handbook of American Indians. Bureau of American Ethnology Bulletin #30 Part 2. p937 2498 Quads 026 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Wilson, Deborah B. 2004 3431 Report on Phase I Prehistoric Archaeological Survey of a Parcel of Land in Wiscassett and Phase II on 26.53 and 26.55. 2001 Finding People: Archaeology, History, and the Damariscotta River Oyster Shell Mounds. 3174 2000 Damariscotta River Oyster Shell Mound Collections. 3110 2000 3124 Features in the Glidden Mound. 026,027 2000 Damariscotta River Association 1999 Field School in Prehistoric Archaeology. 3098 2000 Phase I Archaeological Survey of the Freeman to Attwater Property Transfer, Damariscotta Shell Midden Historic District. 3118 1999 Damariscotta River Association 1998 Field School in Prehsitoric Archaeology. 3055 1999 Damariscotta River Association 1997 Field School in Prehistoric Archaeology. 3054 Wyman, Jeffries 1869 Whale-back shell heap. Peabody Museum Reports, No.2:17-19. Berry, George Stillman 1898 The great shell mounds of Damariscotta. New England Magazine ns. 19:178-188 Wilson, Deborah B. 1996 Bruce Bourque Report on Phase II Archaeological Survey of the Damariscotta Mills Hydropower Project (FERC UL89-34-ME). 1995 T. Dinsmore Report on the Phase I Archaeological Survey of the Damariscotta Mills Hydropower Project (FERC UL89-34-ME). 026,093,094, Kopec, Diane A Summary of the Brown Collection 095,110+ 027 1984 2981 2900 2848 2167 Burgess, William 2011 Phase I Survey Davis Bridge Replacement Project, North Jefferson 3964 Eldridge, Stuart A. St George River Fish Restoriation Project. 3193 2001 Holmes, Raynold 1994 Gerald Hall Site: A single Component Susquehanna Site. MAS Bulletin, 34 (1). Mosher, John P. 2008 Arthur E. Spiess 3814 Phase II Archaeological Testing of Site 27.13 for the Narrows Bridge Replacement (MDOT 12680.00) Damariscotta and Bremen Robinson, Brian S. 1996 The Erkkila Site: Late Archaic and Middle Ceramic Period Cemetaries in Warren. 2930 Shaffer, Gary 2012 Jeffrey Nims, Union, T119, obstruction rock removal 4091 2002 Walkover Archaeological Survey of Allen's Blueberry Land, Waldoboro. 3251 Sidell, Nancy Asch 1993 Archaeobotany of Site 27.59 and 27.60, Warren. 3108 Spiess, Arthur 2011 Walkover Survey of Come Spring Farm, Union 3982 Spiess, Arthur E. 2006 Clary Hill Easement: Archeological Assessment for LMFB. 3598 Quads 027 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Spiess, Arthur E. 2005 Leith Smith Turner Road Bridge Replacement Archaeological Assessment. MHPC Document # 3516 1993 Report on US Route 1 Reconstruction Archaeology in Warren. 2749 1988 Lee Cranmer Route US 1, Waldoboro-Warren Heavy Rehabilitation:Report on Phase 1 Archaeology 2506 Wilson, Deborah B. 2004 Harbour Mitchell, III 3422 Report on Phase I Archaeological Survey of the Sukeforth Pit Access Road. 3264 2003 N.G.C. Lautman Site Report. 027,028,039 Mitchell, Harbour III 2003 St George River Archaeological Survey Survey II: Central Watershed 2002. 3290 027,038 Willoughby, Charles B. Notes: Explorations in Miane. 3200 028 Cox, Steven 2013 Phase I Archeological Survey Proposed Pier Project, Bodin Property, Glen Cove, Rockport 1894 4159 Cox, Steven L. 2006 3596 Report on a Phase I Archaeological Survey of a Proposed Development on Brewster Point, Rockport, Maine: MHPC# 2946-05. Dinsmore, Timothy 2006 Report on Phase II Archaeological Survey of the Knox Meeting House Site. 3552 Eldridge, Stuart A. 2006 Report on Phase II Archaeological Survey of Site 28.69, Cottages at Clam Cove. 3613 2001 Report on Phase I Archaeological Survey of the somerset Golf Course and Condominiums. 3187 2000 Survey Report Phase IB Archaeological Survey of Treasure Landing Subdivision, St. George. 3129 Hamilton, Nathan D. 2006 An Archaeological Phase I Survey of the Samoset Resort, Rockport/Rockland, Maine. 3571 Hedden, Mark H. Burial in Snow's Garden, Site 28.22. 1991 2635 Mitchell, Harbour III 2002 Arthur Spiess Early Bifurcate Base Point Occupation in the St. George River Valley. MAS Bulletin, 42:1:15-34. 2001 28.53: 9000 Years of Occupation on the St. George River. 3180 1997 2941 1995 A Testing Effort in Camden: The Tibbetts Site. 2885 28.53: A Site to Behold. Robinson, Brian S. 1995 The Overlock Site: A Late Moorehead Burial Tradition Site in Warren. 1990 2882 2576 Warren Wastewater Treatment Plant Survey. Shaffer, Gary 2009 Field check for Bobby Caldwell, Rockport (stone circles) 3898 Smith, J. N. Leith 2011 John Mosher, Arthur E. Spiess Archaeological Investigation of Matthew Simmons Property Cave, Beauchamp Point, Rockport 4000 Quads 028 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Sorg, Marcella 1993 Osteology and Odontology of Human Remains from Snow's Garden, Sprucehead Island. MHPC Document # 2751 1992 Osteology and Odontology of Human remains from Spaulding Island, Maine. 2735 Spiess, Arthur E. 2005 John Mosher St. George River Valley Archaeological Survey, 2004 Season Preliminary Report. 3450 1988 Joan Robertson, Mark Hedden The McLaughlin site: A Susquehanna and Woodland Occupation Site on the St. George River MAS Bulletin 28:2 Valimont, Brian 2011 Proposed CMP Section 48 Rebuild, Rockland and Thomaston Wilson, Deborah B. 1999 Report on Phase I Archaeological Survey of Grassy Pond, Rockport. 4084 3067 1994 Report on Phase I Archaeology of the Treasure Point Subdivision, St. George. 2814 1990 Final report on the phase I archaeological survey of the Knox Arboretum Subdivision in Warren, ME. 2593 Steven L. Cox 1989 Report on Phase I Achaeological Survey...Wastewater Treatment Facility, Rockport, ME. 2543 028,29 Bourque, Bruce J. 1993 Fox Islands and Mussel Ridge Surveys: Excavations at site 28.4 029 Barbian, Lenore 1994 2775 Ann Magennis Variability in Late Archaic Burials at Turner Farm, Maine. Northeast Anthropology Bourque, Bruce J. 1996 On Misguided Methodology: A Response to Dincauze The Review of Archaeology, 17:1:50-53. (published fall 1997) 1995 Diversity and Complexity in Prehistoric Maritime Societies: a Gulf of Maine Perspective. Plenum Press, NY 1992 Report on Archaeological Excavations at the Candage Site (29.178), Vinalhaven. 2695 1985 Final Report on the 1984 Underwater Survey in the Fox Islands 2184 1981 Report on Archaeological Survey Activities Conducted by the Maine State Museum in Penobscot Bay, 1980 2113 1980 Arthur E. Spiess Fox Islands Archaeological Project: Analyses of Faunal Remains. Final Report to the National Science Foundation. 2872 1976 Report on the archaeological survey of the Fox Islands, June-August, 1976. 2597 1976 The Turner Farm Site: A Preliminary Report Man in the Northeast, 11:21-30 1975 Comments on the Late Archaic population of Central Maine: the view from the Turner Farm. Arctic Anthropology 12:2:35-45 1975 Report on Archaeological Survey of Bear, Little Spruce Head and Compass Islands, Penobscot Bay, Maine Cross, John 1990 Specialized Production in Non-Stratified Society: An Example from the Late Archaic in the Northeast Ph D. dissertation, U. Mass Cross, John R. 1993 Craft Specialization in Nonstratified Societies. Research in Economic Anthropology, 14:61-84. 2107 3831 Quads 029 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Dincauze, Dena F. 1996 Deconstructing Shell Middens in New England. The Review of Archaeology, 17:1:45-49. (published fall 1997) Doyle, Robert G. 1982 Banded-Spherulitic Rhyolite on Vinalhaven Island, Maine MHPC Document # Haviland, William 2007 Up from the Depths: A stone axe and sea level change 2122 4152 Robinson, Brian S. 1996 Archaic Period Burial Patterning in Northeastern North America. The Review of Archaeology, 17:1:50-53. (published fall 1997) Wilson, Deborah B. 2001 Report on Phase I Archaeological Survey of the slow Sand Filtration Facility, North Haven. 3204 2002 029,016,005, Will, Richard T. Bone Artifacts: Continuity in Technology and Form in Pre-European Archaeological Sites along the Maine Coast. 044 Northeast Anthropology, 64:5-16. 029,030,042 Doyle, Robert G. 2008 Identification of Lithic Artifacts from Central Coastal Maine Archaeological Sites: a Case Study in Regional Lithic Flying Passage Press, Gardiner, ME. Acquistion Strategies. 029,041,042 Bourque, Bruce J. 1982 Report on Archaeological Survey Activities in Penobscot Bay, 1981 029?,030?,04 Varney, Lloyd H. A Blue Hill Bay Coastal Midden Site 1?,042? 030 2114 1971 Belcher, William R. 1994 A Regional Approach to Fish Remains and Seasonality in East Penobscot Bay, Maine. Fish Exploitation in the Past: 7th ICAZ Fish Remains Working Group. Van Neer, W.(ed).Annales du Musee Royal de l'Afrique Centrale, Sciences..,Tervuren 1989 The Archaeology of the Knox Site, East Penobscot Bay, Maine. MAS Bulletin, 29:1:33-46. 1989 Prehistoric Fish Exploitation on East Penobscot Bay, Maine: The Knox Site and Sea-level Rise. Anthropology of Eastern North America, 17: 175-191. 1989 2539 Archaeological Investigations of the Knox Site (30.21), East Penobscot Bay. Bourque, Bruce J. 2004 Report on Phase I Survey of Site 30.276, Fog Island, Knox County, Maine. 1985 Steven L. Cox 3404 3191 Report on 1985 Field Season, Lazygut Island. 1981 Steven L. Cox Maine State Museum Investigation of the Goddard Site, 1979 Carpenter, Edmund 2003 Norse Penny The Roche Foundation, NY. Darrah, William Culp 1951 Powell of the Colorado (Especially Chapter 23: Haven). Princeton University Press, Princeton Hardy, Manly 1880 A shell heap near the south end of Great Deer Isle,Penobscot Bay: A letter to Professor E.W. Putnam. Reports of the Peabody Museum:2 pp 197-98 Haviland, William 2003 Safe Passage to the Sea: An Ancient Canoe Route at Deer Isle, Maine. 3300 Hov, Andrew 2010 Lithic Analysis: Experimentation and Edge Wear 3924 MacKay, Robert G. White Island, ME 30-46 1979 3355 Quads 030 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Mellgren, Guy 1965 The Goddard Site. Eastern States Archaeology Federation Bulletin. 24( ):13 1958 Edward Runge Goddard's. Massachusetts Archaeological Society Bulletin 19:41-43. Rice, Marshall 1979 A Rare Find Sanger, David 1990 MHPC Document # William Belcher 2578 Eastern Penobscot Bay Survey 1989. 1981 Archaeological Investigations at Frazer Point and Duck Harbor, Acadia National Park, Maine 2145 Seaby, Peter 1979 The First Dateable Norse Find from North America? Spiess, Arthur E. 1999 Summer at Naskeag: Faunal Analysis of the Goddard Assemblage 1982 A Skeleton in armor: an unknown chapter in Maine archaeology. Maine Archaeological Society Bulletin 22:1:17-24 Will, Richard T. 2005 Jacob Freedman 3223 3494 Archaeological Survey of the Warren Point Cottages Subdivision, Deer Isle. 030, 042 Hollinger, Eric 2012 4154 Smithsonian Institution Accession Records, Frank H. Cushing work, Brooklin, Maine, Lower Torry Island, Tibbetts Shore 030,031,042 Cox, Steven L. 1981 Report on the 1980 Field Season of the Goddard Archaeological Project. 030,031,042, 043 2554 1983 The Blue Hill Bay Survey 030,031,043, Sanger, David 1974 Archaeological Survey of Acadia National Park 044 Wright, Shannon 2004 M.Mulhollnad,T.Binzen,C.Donta,S.Swihart Archaeological Overview and Assessment of Acadia National Park, Maine. 030,031,043, Kopec, Diane 1990 Survey of Frenchman Bay and Adjacent Areas 1989. 059 2141 3426 2560 030,041,042 Allison, Roland 1951 Digging and searching the shell heaps of Maine,Algonquin Culture,Eggemoggin Reach, Hancock County, Maine. Ohio Archaeologist 1(1):16 030,041,042, Bradley, James W. 1994 Preparing for Repatriation: An Assessment of Human Remains from the Maine Collections of the R. S. Peabody 043,057 Museum. 030,042 Haviland, William 2005 A Safe Passage to the Sea: An Ancient Canoe Route at Deer Isle, Maine. MAS Bulletin, 45:1:25Kellogg, Douglas 1992 David Sanger Survey for Prehistoric Archaeological Sites Along the Shores of Deer Isle, Maine, June 1991. Rice, Marshall Deer Isle Ceramics 2825 2688 1976 1965 Deer Isle Glances 030,042,058 031 Bourque, Bruce J. 1971 Prehistory of Central Maine Coast. Doctoral thesis: Harvard University Abbe Museum 1994 The Indian Shell Heap: Archaeology of the Ruth Moore Site. 3651 Quads 031 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Balser, Andrew 2000 Report on Archaeological Investigation of the Potted Raven Site (31.5), Swan's Island. MHPC Document # 3147 Bruce, Walter G. 1964 A Preliminary Report of Four Season's Work at Swans Island, Maine Claesson, Stefan 2009 Arthur Spiess, Daniel Belknap, Joesph Ke Blue Hill Bay Submerged Prehistoric Landscape Survey 3877 Clark, James Proposed Elliot Pier, Tremont. 3593 2006 Cole-Will, Rebecca 1997 Report on Archaeological Assessment of Site 31.2, Pond Island. Cox, Steven L. 1994 Gary Lowless The Indian Shell Heap: Archaeology of the Ruth Moore Site. Blackberry Books, Nobleboro, ME. 1994 Report on 1993 Investigations at Site 31.5, Swan's Island. 2976 3148 1992 Archaeological Investigation of Site 31.5, Roderick Head, Swans Island. 2687 1992 Robert Abbe Museum's 1992 Archaeological Investigation at the Ruth Moore Site (31.17) Great Gott Island. 2748 1990 Diane Kopec 3308 Abbe Museum's Excavation at Swan's Island. MAS Newsletter:4:2:1-5. Kelley, Joseph 2010 Daniel Belknap, Stefan Claesson Drowned coastal deposits with associated archaeological remains from a sea-level "slowdown": Northwestern Gulf of Geology Maine, USA 38:695-698 Kopec, Diane 1990 Steven L. Cox Survey of the Frenchman's Bay and Adjacent Areas, 1990. 2609 National Park Service NAGPRA Inventory Notice, Pond Island. 3625 2006 Price, Franklin 2007 Blue Hill and Frenchman Bay Fisherman Interview Project. 2007 3720 A.E. Spiess A New Submerged Prehistoric Site and Other Fishermen's Reports Near Mount Desert Island. MAS Bulletin, 47:2:21-35. Sanger, David 1990 Diane Kopec Report on the Abbe Museum Archaeological Investigation of Site 31.45, Swans Island, ME. 2605 Sorg, Marcella 1992 Osteology and Odontology of Human Remains from Orono Island, Maine. 2693 031(?) Bruce, Walter G. Long Cove, A Maine Shell-Deposit Site 1965 031,043 Kopec, Diane 1988 Steven Cox 2509 Survey of Frenchman Bay and adjacent areas - 1988 031,043,044 Prins, Harald 1989 Natives and New Comers: Mount Desert Island in the age of Exploration. in, An Island in Time, Robert Abbe Museum Bulletin 12. 031,043,044, Kopec, Diane 1987 The Abbe Museum's Frenchman Bay Survey--An Historic Perspective. 058,059 Maine Archaeological Society Bulletin 27:1:10-30 031,043,058, 1986 Survey of Frenchman Bay and Adjacent Areas - 1985 059,060+ 2322 Quads 031,043,059 032 032,033 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Cox, Steven L. 1987 Diane Kopec, Tim Kupferschmid Survey of Frenchman Bay and Adjacent Areas-1987 MHPC Document # 2470 Haugh, Sarah 2012 Three Ring Binder Project, Gilead Pole Installations 4087 Potter, Jane 1988 The Steven's Brook Site: A Geologic Interpretation 2499 Wheeler, Kathleen 1995 Findings from the 1994 Archaeological Investigation at the Brickett House, White Mtn. National Forest. 2855 Hedden, Mark H. 3324 2003 Leon Cranmer, Arthur E. Spiess An Archaeological Survey on Route 2 Between Gilead and Bethel, ME (MDOT PIN #9184.00) 033 Bartone, Robert N. 2011 Bethel Water District River Crossing Project-- Phase I Survey 4004 3685 2007 Report on Phase I Archaeological Survey of the Mount Hill Subdivision, Bethel. Brigham, Michael 2008 Ellen Cowie Archaeological Phase I Survey of the Bethel Pathway-Telstat Trail Poject, Bethel, End-of-Field Letter Report. 3798 Ellen Cowie 2006 3585 Archaeological Phase I Survey of the Proposed Bethel Pathway-Angevine Park Extension Project (MHPC # 2979-05) in Bethel, Maine. Corey, Richard 2010 G-J Hudgell, Robert Bartone, Ellen Cowie 3935 Archaeological Phase I Survey and Phase II Testing of the Proposed Mount Will subdivision Project (MHPC 71-07), Bethel. 2007 Ellen Cowie Report on Phase II Archaeological Survey of the Mount Will Subdivision, Bethel. 3699 2004 Robert Bartone Report on Phase I Archaeological Survey of the Merrill Hill Estates. 3424 J. B. Petersen Cox, Belinda 1995 Report on Phase I and II of Proposed Bethel Station Project, Oxford Co., Maine. 1994 2844 2838 James B. Petersen Report on the Phase I Archaeological Survey of the Sunday River Skiway Corporation Proposed Sunday River Project. Crock, John 1993 2842 James B. Petersen Report on Phase IIb Archaeological Testing of ME 33-6 on the Maine Army National Guard Bog Brook Training Site. 1992 James B. Petersen Report on the Phase IB Archaeological Survey for the Maine Army National Guard for the Bog Brook Training Site, Gilead. Feighner, Edna 2001 PNGTS Cultural Resources:, Post Construction Final Monitoring Freedman, Jacob 2006 Rick Will 2716 3166 . 3600 Report on Phase I Archaeological Survey of the Colony Project, Newry. Hamilton, Nathan D. 1991 Chamberlain Development, Phase II Information. 2634 1985 James B. Petersen 2446 An Archaeological Phase I Survey of the Proposed Colonel Dyke Airfield Runway Project, Bethel, Oxford County, Maine Mathiasson, Kåre 2007 Bridge Replacement PIN 15619, Route 2, Gilead. 3730 Quads 033 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title McPheters, Hutch 2007 Robert Bartone Archaeological Monitoring of the Belfast Water District Waterline and Wells. MHPC Document # 3736 Moore, Edward 2005 Richard Will Phase I Archaeological Study of the Maine National Guard Bog Brook Training Facility, Gilead, Oxford Co. 3474 Mosher, John P. 2010 Arthur E. Spiess Four Ponds Timber Sale Prehistoric Archaeological Survey 3917 2005 Report on Phase I Archaeological Survey of the Sunday River Road Upgrade (PIN 11567.00), from Rt2 to Newry, in Bethel, Maine. Mulholland, Mitchell Interim Report, PNGTS. 3461 3007 1998 O'Toole, Daniel 2012 Archaeological Survey for Albany South Timber Harvest, White Mountains National Forest 4072 Potter, Jane 1987 Stevens Brook: A New Androscoggin River Site. 2462 Putnam, David E. 2007 3678 Results of the Phase I Prehistoric Archaeological Survey of the Proposed "Pines at Sunday River" Development LLC, Newry (MHPC # 2829-05). Roenke, Karl 1992 White Mountain National Forest--Crocker Pond. 2730 1992 Report on Phase I Archaeological Survey of Round Pond Timber Sale, White Mountain National Forest. 2699 1992 2701 (addendum to) Report on Phase I Archaeological Survey of Compartment 28 Timber Sale, White Mountain National Forest. 1992 Report on Phase I Archaeological Survey of Compartment 28 Timber Sale, White Mountain National Forest. Shaffer, Gary Ruel Swain, Bethel, stream crossing/ford 2012 Smith, J. N. Leith 2009 2698 4065 John Mosher 4166 Archaeological Phase I and II survey for the Route 2 Realignment and Wild River Bridge Replacement, MDOT #15619, Gilead Spiess, Arthur E Fieldcheck Bear River Bank, Newry, Maine 2009 3864 Spiess, Arthur E. Bear River Rips Water Access. 2003 3292 1994 Leon Cranmer Crocker Pond Area Archaeological Survey, White Mountains National Forest. 2796 Thomas, Peter A. 2006 Archaeological Site Identification Survey for MHPC # 2258-05: Hazard Mitigation Grant Application, Sunday River Erosion Control, Newry, Maine. 3582 Tomaso, Matthew S. 2585 1990 Nathan Hamilton Phase I Survey of the Proposed Newry Gravel Pit Expansion, Newry, Maine 1990 Nathan D. Hamilton Archaeological Phase I Survey of the Proposed Chamberlain Development, Hanover, ME. Valimont, Brian 2010 Proposed Foot Bridge over Androscoggin River to Hastings Island, Bethel Outdoor Adventures 2558 3972 Quads 033 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Wilson, Deborah B. 2005 Report on the Phase I Archaeological Survey of "The Peaks" Subdivision, Newry, Maine, MHPC # 2688-04. MHPC Document # 2001 Report on Phase I Archaeological Survey of the Hodson Farm, West Bethel. 3202 2000 Phase I Archaeological Survey of the Proposed Wilson's Ripps Subdivision, West Bethel. 3128 033,034,035, Kellogg, Douglas 1997 Kathleen Wheeler 49,50,51 Report on Phase IB Archaeological Survey of the PNGTS Rumford-Jay Lateral. 033,048 3482 Mosher, John P. 2005 Art Spiess, Lee Cranmer 2964 3491 Ketchum: A Phase I Archaeological Survey of an Abandoned Western Maine Farming and Logging Community in the Frenchman's Hole LMFB Purchase, Riley Township. 034 Cox, Belinda 1993 J.B. Petersen Report on the Archaeological Survey of Abbott Mills, Rumford Center for Senior Citizens. 2774 Eldridge, Stuart A. 2009 Spruce Mountain Wind Project, Phase 0 Archaeological Reconnaissance 3911 Mosher, John P. 2012 The Kimball's Ferry Site and the Martin Memorial Bridge Replacement at Rumford Point Maine Archeological Society Bulletin 52(2):1-26 Leith Smith 2011 3978 Phase I Archaeological Survey for the Martin Memorial Bridge Replacement at Rumford Point Wilson, Deborah B. 2001 Report on Phase I Archaeological Survey of the Hastings Farm, Bethel. 3208 1998 Report on Phase I Archaeological Survey of a Parcel of Land in Hanover, ME. 2990 1998 Report on Phase I Archaeological Survey of the Leona Kahkonen Property, West Paris. 3031 034, 51, 59 Eldridge, Stuart 2011 Phase I Archaeological Report Three Ring Binder Project GAP 1-7 035 Bartone, Robert N. 2007 Ellen Cowie The Late Paleoinidan Beaver Pond Site, 35.19, ME. MAS Bulletin: 47:1:43-48. 2005 Ellen Cowie 4005 3514 2005 Season at Beaver Pond Site, Bear Pond Village. Beale, David W. 2007 Robert Bartone and Ellen Cowie 3661 Archaeological Phase I Survey and Phase II Testing of the Bear Pond Village Project (MHPC Project # 0709-04), North Turner. 2006 Ellen Cowie Archaeological Phase I Survey of the Proposed New Town Center, Canton, Oxford County, Maine. 3575 Corey, Richard 1996 James B. Petersen Report on Phase I Archaeological Survey of the Maxwell Farm Tract 255, Canton. 2921 Freedman, Jacob 3618 2006 James A. Clark Report on Phase I Archaeological Survey of the Proposed Nezinscot Meadows Real Estate Subdivision in Buckfield, ME. Hamilton, Nathan D. 1988 John P. Mosher 2486 An Archaeological Phase I Survey of the Proposed Pine Shore Development, Hartford. Haugh, Sarah Commercial Development Project, Turner 2009 Stuart Eldridge Hedden, Mark H. 2002 Arthur E. Spiess Report on Phase I Archaeological Survey of the Road Approach to Gilbertville Bridge (PIN 7711.00) 3859 3241 Quads 035 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Hedden, Mark H. 1991 Field Check of Reported Late Archaic Burial Site, Canton. MHPC Document # 2659 Mosher, John P. 2006 Arthur E. Spiess Report on Phase I Archaeological Survey of the Androscoggin River Access Parcel, Canton. 3538 Scharoun, Stephen 2007 Robert Bartone, Ellen Cowie Limited Archaeological Phase I survey of the Canton Floodplain Relocation and Demolition Project. 3721 2005 3493 Robert Bartone, Ellen Cowie Report on Phase I Archaeological Survey of the Canton Floodplain Relocation and Demolition. 035, 050 035,036 Shaffer, Gary 2007 Michael Brann's Conservation Practices, Dixfield. 3690 Will, Richard T. 2004 John Maron, Karen Mack Phase III Data Recovery of the Conant Site (35.15), Riley-Livermore Project (FERC# 2375), Oxford Co., Maine. 3388 Corey, Richard 1996 James B. Petersen Report on Phase I Archaeological Survey of the Maxwell Farm Tracts 248 and 251. 2927 Eldridge, Stuart A. 2011 Phase 0 Archaeological Reconnaissance, Phase I Prehistoric Survey, Canton Mountain Wind Project 4022 Crock, John 2710 1992 James B. Petersen An Archaeological Phase I Survey and Phase IIa Testing for the DeCoster Egg Farms, Turner. 035,050,051 Corey, Richard 1997 J.B.Petersen, Ellen R. Cowie 2957 Archaeological Phase I Survey and Phase II Testing of the Riley-Jay-Livermore (FERC 2375) and Otis (FERC 8277) Projects. 035,051 Moore, Edward 2004 Richard T. Will Phase III Data Recovery of the Big Pine and Shed Sites, Riley-Jay-Livermore Project. 3374 036 Bartone, Robert N. 2001 Report on Phase I Archaeological Survey of the Varney Farm Manure Storage Pit. 3211 James B. Petersen 1994 Report on Phase I Archaeological Survey of the Lovewell Farm. Brigham, Michael 2008 Ellen Cowie 2911 3749 Archaeological Phase I Survey of the Proposed Jordan Ventures, Kingfield Development Project (MHPC 2262-07), Kingfield. 2006 Ellen Cowie Archaeological Phase I Survey of the Proposed Mountain View Acres Project (MHPC #1181-06) in Leeds, Maine. Clark, James 1999 Phase III Mitigation of the Quartz Scraper Site. 3580 Richard Will, Janet Cormier 3038 1995 Richard Will, Janet Cormier Phase III Archaeological Investigation of the C. Varney Site (36.30). 2856 Corey, Richard 1998 Leeds Stumpthumpers Snowmobile Club, Lewiston to Jay Recreational Trail. 3025 Cowie, Ellen R. 1990 Recent Archaeological Investigations on the Southern Androscoggin River valley, Maine. MAS Bulletin, 30: 1: 1-14 Cox, Belinda 1997 James B. Petersen The Varney Farm (36-57 Me): a Late Paleoindian Encampment in Western Maine. MAS Bulletin, 37:2:25-48. 1995 James B. Petersen The Varney Farm Site (36-57): A Late Paleoindian Encampment in Western Maine. 2868 Quads 036 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Hedden, Mark H. 2000 Athur Spiess A Report on the Phase II Archaeological Survey of Site 36.64 at Schoolhouse and River Roads, Livermore. MHPC Document # 1999 Report on Phase I Archaeological Survey of Route 133 Bridge Over Pocasset Lake Outlet in Wayne (PIN 5720.20). 3099 3037 3149 1999 Fieldnotes on Site 36.63. 1993 Report on Phase I Archaeological Survey of Taylor Pond. Mack, Karen 2011 James Clark 2914 3995 Phase III Precontact Data Recovery Big Ram Site Gulf Island/Deer Rips Project (FERC 2283), Turner 2011 James Clark Results of 2008-2010 Phase III Mitigation Wood Island Site (36.37), NextEra Energy Resources 3992 2011 James Clark Phase III Precontact Data Recovery Cape Site, Gulf Island/Deer Rips project (FERC 2283) Turner 3996 Matson, Don 1994 Arthur Spiess The Yindra-Barus Site: An Archaic Indian Camp on Androscoggin Lake. MAS Bulletin, 34:2, 11-24. Mosher, John P. 2011 Leith Smith 3987 Phase I Archaeology for Turner Center Bridge Replacement (PIN 17234.00) in Turner and Greene 2005 Testing the Route 219 Bridge at Dead River, Leeds: Field Notes. 3478 2004 Leon E. Cranmer Report on the Phase I and II Archaeological Survey of the Leeds-Turner Bridge Replacement (PIN 10198.00). 3366 Petersen, James B. 1998 Belinda Cox The Varney Farm Site: Dating the Late Paleoindian Period in Northeastern North America. Current Research in the Pleistocene, 15:57-60. 1986 Ron Newcomb An Aboriginal Ceramic Vessel fromn Androscoggin Lake, Androscoggin County, Maine. MAS Bulletin 26:1 p3-13 Shaffer, Gary 2013 Cattle Yard Improvements for Carlton Pinkham, Fayette, Kennebec County 2007 Report on Phase I Archaeological Survey of Troy Varney's Fencing and Pipeline. Spiess, Arthur E. 2006 William Burgess Parker Pond Headlands Assessment: Archaeological Assessment for the Land for Maine's Future Board. 4122 3705 3525 1991 A Red Paint Effigy from Wayne, Maine. AENA 19:163-170 Will, Richard T. 2008 3745 Preliminary Findings of a Partial Archaeological Data Recovery at the Wood Island Site (Site 36.37), Gulf Island/Deer Rips Project (FERC No. 283). 2001 A Report on the Phase I Archaeological Survey of the Monmouth Water Maine Interconnection. 037 3164 Bourque, Bruce J. 1991 Report on Excavations at Site 37.5 (Cobbosseecontee Dam South) 2667 1990 Report on excavations at site 37.5 (Cobbosseecontee Dam South). 2596 Brigham, Michael 2010 Stephen Scharoun, Robert Bartone Archaeological Phase I Survey of the Proposed Bond Brook CSO Abatement Project 3949 Quads 037 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Cranmer, Leon E. 2001 Arthur E. Spiess A Report on the Phase Iand II Archaeological Survey for the Augusta-Gardiner Bikeway, PIN 6854. MHPC Document # 3176 1999 Kåre Mathiasson A Report on the Phase I Archaeological Survey of the Augusta-Gardiner Bikeway (PIN 6854.00) 3052 1999 A Report on the Phase I Archaeological Survey for the Augusta River Crossing Project (PIN 556.11). 3040 1992 Arthur Spiess 2705 Jamies Pond Reconnaissance Archaeological Survey Kelley, Alice R. Archaeology: Site 37.40. 3363 2003 Mosher, John P. 2004 A.E. Spiess, Alice Kelley Phase II Testing of Site 37.40, Augusta River Crossing Project. 3358 Robinson, Brian S. Horse Point Gravel Pit Survey, Belgrade. 2577 1990 Spiess, Arthur E. 1987 Deborah Brush High on a Hill above the Kennebec:The Shepherd Site Maine Archaeological Society Bulletin 27:2:3-15 Spiess, Athur E. 2006 Mark Hedden 3595 Belgrade Stream, Mt. Vernon, Water Access for LMFB. Valimont, Brian Proposed Sidney Cell Tower. 3703 2007 Will, Richard T. 2013 James Clark Archaeological Evaluation of Preposed Telecommunications Tower, Sidney 037, 052 037, 052, 053 037,038 4144 Clark, James 2009 3829 Results of 2008 Annual Archaeological Sites Monitoring Messalonskee Lake, Oakland/Automatic Project (FERC 2556) 2010 Richard Will Messalonskee Stream Hydro, Messalonskee Lake Monitored Erosion Sites Spiess, Arthur E. 2003 Edwards Dam Removal: 2000 Impoundment Margin Prehistoric Archaeological Survey. MAS Bulletin, 43:1-16. 2001 Edwards Dam Removal: 2000 Impoundment Margin Prehistoric Archaeological Survey. 2000 Leon Cranmer Edwards Dam Removal Initial Archaeological Survey Results. MAS Bulletin 40:2:11-34. Will, Richard T. 1995 James Clark, Janet Cormier Phase II Archaeological Testing of the Augusta Hydroelectric Project (FERC 2389). 3966 3171 2863 037,038,025, Bourque, Bruce J. 1976 Report on the archaeological survey of the lower Kennebec valley and adjacent areas. 026,015+ 2597 037,038,053 Spiess, Arthur E. 2000 Leon Cranmer Edwards Dam Removal, Initial Archaeological Survey Results. 3122 Will, Richard T. 2640 1991 James Clark, Rebecca Cole-Will Phase I Archaeological Survey of the Augusta Hydroelectric Project (FERC 2389). 037,052,053 Clark, James 2008 Annual Archaeological Sites Monitoring, Messalonskee Lake (FERC 2556-ME). 3740 2007 Oakland/Automatic Project, Messalonskee Lake Monitored Erosion Sites. 3660 2005 Results of Archaeological Site Monitoring--Oakland Automatic Project (FERC 2559,2555) 3439 Quads 037,052,053 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Crock, John 1992 James B. Petersen 2697 Supplemental Archaeological Phase II Testing of the Oakland (FERC No. 2559) and Automatic (FERC No. 2555) Projects, Kennebec County, Maine. 1992 Catherine Quinn, J.B. Petersen 2626 Archaeological Phase II Testing of the Oakland Project, Deer Rips Project, Automatic Project and Union Gas Project. Ferreira, Leigh 1990 James B. Petersen Archaeological Phase I Survey of the Oakland...,The Rice Rips...,Automatic...and Union Gas projects. 037,073,090, Knight, James A. 1985 Differential Preservation of Calcined Bone at the Hirundo Site, Alton, Maine 154 038 Sidell, Nancy Asch Site 38.53 Floral Remains. 2001 Spiess, Arthur E. 2004 The Hassen Collection, Otter Creek Points, and the Archaic on the Kennebec River near Augusta. MAS Bulletin, 44:1:1-14. 2000 Leon Cranmer The Dow Site: a Late Ceramic Camp and Historic Mill Complex. 1992 A Hell Gap Point and Late Paleoindian in Maine. MAS Bulletin, 32:2:31-. Trautman, Elizabeth A. 1996 A Gouge, a Scraper, an Adze Lying Amongst the Glads: a Further Look at the Cates Farm Site. MAS Bulletin, 36:2:25-. 1991 Arthur Spiess 2557 2188 3188 3140 2643 The Cates Farm: A Descriptive Report. 039 Wilson, Deborah B. 1999 A Report on the Phase I Archaeological Survey in Weeks Mills. 3061 Cox, Steven L. 1998 Wired: Investigating a High Voltage Paleo-Indian Site in Searsmont, Maine NEAA meeting, March 14, 1998 1994 Bruce Bourque, Richard Corey++ Phase II Investigation of of Site 39.1, Searsmont. 3914 Mitchell, Harbour III 2002 St. George River Archaeological Survey: The Northern Watershed, 2001. 3225 Shaffer, Gary 2011 Patricia Crawford, Searsmont, tree/shrub establishment 4015 2789 039,24,14,36 Clark, James 2008 Karen Mack, Maureen Smith, Rick Will ,37,38,4 Maine Power Reliability Program; Pre-Contact Archaeology Survey Report for Segments 1,4,6,17,18 and 19. 3794 040 3105 Burgess, William 2000 Leon Cranmer Report on Phase I Archaeological Survey of the Ducktrap Property for LMFB. Cranmer, Leon E. 1995 Arthur Spiess 2851 Report on the Phase I and II Archaeological Survey on PIN 1872, Site 40.8, Ducktrap River Bridge, Route 1, Lincolnville, Maine. Mitchell, Harbour III 1992 A Salvage Effort on the Coast of Maine: The Lehmann Site (40-3) MAS Bulletin, 32:2:1-14. 1991 40.3: The Lehmann Site. 2676 Mosher, John P. 2009 Leith Smith Phase I Archaeological Survey of the Appleton Preserve on the St. George River 3840 Shaffer, Gary 2011 Springdale Jerseys, Inc., Waldo, deep tillage (letter report) 3986 Quads 040 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Will, Richard T. 2003 Snowmobile Bridge Repair, Ducktrap River. MHPC Document # 3351 040,041 Bourque, Bruce J. 1975 Report on Archaeological Survey and Salvage at Sears Island and Kidder Point, Searsport, Maine 2106 041 Bock, Paul 2013 Sharon Catus "The Indian Carrying Place": An Initial Investigation of Lowder Brook, Cape Jellison, Stockton Springs 4107 Cox, Steven L. 2007 Report on Phase I Archaeological Survey of a Proposed Pier Construction Site in Brooksville, ME. 3673 2005 Report on Phase I and II Archaeolgical Investigations of a Parcel of Land on Northeast Point, Isleboro, Maine. Cranmer, Leon E. 1996 Arthur E. Spiess Report on Phase I and Phase II Archaeological Survey of Sears Islandand Kidder Point, PIN 99.10. Hedden, Mark H. 1991 A Winged Figure Incised on a Slate Pebble. Maine Archaeological Society Bulletin 31(1):41Mitchell, Harbour III 1997 1000 B.P. in West Penobscot Bay: 41.68 & 41.68A. Maine Archaeological Society Bulletin, 37:1:231996 The Middle and Late Ceramic Period in West Penpbscot Bay: sites 41.68 and 41.68a. 3592 2891 2928 2854 1995 Phase I Testing of the Belfast Bay Site. 2805 1994 41.68a: The Edwin Ames Site, A Preliminary Report. 1993 The Carr Site (41.66): a Middle Ceramic Period site in Northport, Maine. MAS Bulletin 33(2):331993 41.68a: The Edwin Ames Site, A Preliminary Report Morrison, Peter 2005 Report on Phase I/II Archaeological Survey of the New (Water) Facility, Wither Hill, Castine. Petersen, James B. 2004 3460 Malinda Blustain, James W. Bradley Mawooshen Revisited: Two Native American Conact Period Sites on the Central Maine Coast Archaeology of Eastern North America 32: Spiess, Arthur 2010 Fort Point Beach Site 41.54, Stockton Springs, Additional Information Spiess, Arthur E. 1999 Archaeological Test of MBNA's Lincolnville Picnic Area. 1983 2782 3947 3075 Mark H. Hedden Kidder Point and Sears Island in Prehistory 041, 042, 056 041, 42 041,026 Will, Richard T. 2004 Ocean Falls Estates, Lincolnville (Field Visit). 3368 Wilson, Deborah B. 1994 Report on the Phase I Archaeological Survey of the Mosman Park, Searsport, Maine. 2821 Petersen, James 2004 Malinda Blustain, James W. Bradley "Mawooshen" Revisited: Two Native American Contact Period Sites on the Central Maine Coast Archaeology of Eastern North America Petersen, James B. 2004 Malinda Blustain In the Land of Mawooshen: Native American Perishables from Two Contact Period Sites on the Central Maine Coast Perishable Material Culture in the Northeast, ed by Penelope B. Drooker, NYSM Bulletin 500 McDonald, Jerry N. 1987 Susan L. Woodward Indian Mounds of the Atlantic Coast McDonald and Woodward Publishing, Newark, Ohio. Quads 042 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Byers, Douglas S. 1979 The Nevin Shellheap Andover: Phillips Academy Cox, Steven L. 2009 Archaeological Investigations at the Scott's Midden Site, Deer Isle. MHPC Document # 3881 2008 2007 Scott's Midden, Island Heritage Trust, Archaeological Field School. 3770 2007 Preliminary Archaeological Testing of the Scott's Midden Site (42.82). 3726 Crader, Diana 1995 Nathan D. Hamilton, Arthur Spiess 4037 Late Archaic Faunal Remains from Occupation I at the Nevin Site, Blue Hill, Maine Cutten, Deborah 1991 Nathan Hamilton Nevin (42.1) and Richards (42.2) Site Catalogue (4 Volumes). 2637 Dinsmore, Timothy 2010 Phase I Prehistoric and Historic Archaeological Survey Cell Tower Lease 409 North Deer Isle Road 3975 Mack, Karen 1998 Report on the Phase I Archaeological Survey of the Loomis Parcel, Flye Point. 3008 Shaw, Leslie 1988 A biocultural evaluation of the skeletonal population of the Nevin site, Bule Hill,Me. Archaeology of Eastern North America 16:55-77 Smith, J. N. Leith 2006 Arthur E. Spiess 3524 Billings Pond, Blue Hill Water Access Project: Archaeological Assessment for the Land for Maine's Future Board. Snow, Dean R. 1970 A Middle Woodland Site on the Coast of Maine. Van Horn, David M. 2002 Liberty School Test Excavation at the Woodger Site. 3275 Will, Richard T. 2006 Report on Phase II Archaeological Survey of the Herrick Bay Subdivision. 3603 Rebecca Cole-Will 1989 Phase I archaeological assessment of the Littlefied Property, Brooksville, ME. 2529 042,030 Reed, Jessica 2005 Accession Number 29020: Final Collection Report (Smithsonian). 3649 042,043 Cox, Steven L. 1983 Blue Hill Bay Survey: Report on 1982 Field Work 2119 042,074,091 Snow, Dean R. Recollecting Maine Archeology, 1966-1970. 043 Brigham, Michael 2009 Stephen Scharoun, Ellen R. Cowie Phase II Survey of Site 43.38, Proposed Indian Point Road Subdivision Project, Bar Harbor 2006 3890 Carter, Benjamin 2010 3945 Two Sites Downeast: Archaeoloigcal Investigations of the Richmond/Castle and Joy/Flood sites, Drew University Field School Cole-Will, Rebecca 2003 Richard Will 3320 Preliminary Report on Archaeological Testing, Site 43.9, Allen Island. 1997 2945 Examination of Fish Point Shell Midden. 1997 Report on Phase I Archaeological Testing of a Portion of Site 43.75, Fish Point, Great Cranberry Island. 1996 Richard Will A Probable Middle Archaic Cemetary: The Richmond-Castle Site in Surry, Maine. AENA, 24:95-148. 2958 Quads 043 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Cowie, Ellen R. 2006 3573 Report on Phase II Archaeological Survey of Site 43.38 ME Located in the Proposed Indian Point Road Subdivision (MHPC #2313-05), Bar Harbor, Hancock County Freedman, Jacob 2007 Richard T. Will Report on Phase I Archaeological Survey of the Knote Property. 3657 Putnam, David E. 2008 Report on Phase I Archaeological Survey of the Kim Graham Property Development. 3752 Sanger, David 1989 Insights into Native American Life at Fernald Point. in, An Island in Time, Robert Abbe Museum Bulletin 12. 1980 Barbara Johnson,others 2144 Archaeological Salvage and Test Excavations, Fernald Point, Acadia National Park, Maine Spiess, Arthur E. 2008 Abbe Museum Field School 2007: Site 43.18 and Feature 1. MAS Bulletin: 48:1:27-36 2008 Abbe Museum Field School 2007; Site 43.18 Feature 1 Notes. Valimont, Brian Proposed Lamoine Cell Tower 3843 2009 Will, Richard T. 2006 Report on Phase I Archaeological Survey of the Otter Lane Subdivision, Lamoine. 2004 3748 Peter Morrison, James Clark 3529 3377 Reconnaissance Archaeological Survey on LMFB Parcel on Tinker Island, Hancock Co., ME. Wilson, Deborah B. 2005 Report on Phase II Archaeological Survey of Prehistoric Site 43.28, Vicinity of the Proposed Egbert Pier, Tremont, Maine. 043,044 Johnson, B.A. 1977 David Sanger Final Reports,archaeological studies,investigations and excavations, various locations, Acadia National Park. Report submitted to Denver Service Center, National Park Service Kopec, Diane 1985 Mount Desert Island Area Survey: Site Forms and Site Photographs. Mastone, Victor T. 1979 Alan E. Strauss 3462 3091 2137 Archaeological Investigation of a Portion of the Areas to Be Deleted from Acadia National Park 043,044,058, Sanger, David 1973 An Archaeological Survey of a Portion of Hancock County, Maine 059 2140 043,058 Clark, James 2007 Jacob Freedman Report on Phase I Archaeological Survey of the Bangor Hydro Hancock County Rehabilitation Project. 3641 Cole-Will, Rebecca 2000 Survey of Frenchman's Bay - Coastal Hancock County:1999-2000. 3157 044 Berger, Louis, Group 2005 3485 Cultural Resources Survey Report on the Naval Satellite Operations Center, Detachment Alfa, Prospect Harbor, Maine. Cole-Will, Rebecca 2006 Report on Phase I Archaeological Survey of a Pier on the North End of Heron Island. 1994 Evaluation of Prehistoric Archaeological Sites in Frenchman's Bay: Report of 1994 Activities. 3528 2831 1994 2801 1993 2811 Report on Site Visit to Taft Point. Site Visit to Taft Point (44.6). Quads 044 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Cox, Steven L. 2008 3812 Report on Phase I Archaeological Survey of Propsed Developmanet on the Tarasov Property, Schooner Head Road, Bar Harbor. Hadlock, Wendell S. 1943 Bone implements from shell heaps around Frenchman's Bay,Maine. American Antiquity 8:341-53 1941 Three Shell Heaps on Frenchman's Bay Robert Abbe Museum Bulletin 6 1941 Three Shell Heaps on Frenchman's Bay 3915 4125 1941 Three shell heaps on Frenchman's Bay. Robert Abbe Museum Bulletin 6 1939 The Taft's Point Shellmound at West Gouldsboro,Maine. Robert Abbe Museum Bulletin 5 Kimball Kessi Watters 2011 From Earth to Hearth: A Ceramic Analysis of the Ewing-Bragdon Site Collection Maine Archaeological Society Bulletin 51(2):29-51 Moore, Edward 2004 Report on Phase I Archaeological Survey of Stanton Bagley's Pier. 3438 Rowe, John H. 1940 Excavations in the Waterside Shell Heap, Frenchman's Bay, Maine 4046 1940 Excavations in the Waterside Shellheap, Frenchman's Bay, Maine. Papers of the Excavators Club. Sanger, David 1990 Report on Field Examination of Summer Harbor Subdivision for Archaeological Properties. 3042 Smith, Walter B. 1929 The Jones Cove Shell-Heap at West Gouldsboro, Maine. 3653 1929 The Jones Cove Shell-heap at West Gouldsboro, Maine. Robert Abbe Museum Bulletin #1.(Layfayette National Park Museum Bulletin #1). Sorg, Marcella 1994 Osteology and Ondontology of Human Remains from the Taft Point Site, Gouldsboro. 1993 Osteology and Odontolgy of Human Remains from the Taft Point Site, West Gouldsboro. 2604 2802 2810 Valimont, Brian 2009 Proposed Sandpiper Shores Residential Subdivision, Gouldsboro 3846 Will, Richard T. 2003 James Clark Report on the Phase I Archaeological Survey of the Proposed Jones Pond Subdivision, Gouldsboro. 3341 044,045 Borstel, Christopher L. 1999 Louis Berger Assoc. A Report on the Phase 0 Archaeological Survey of Naval Sensitivity Group Activity, Winter Harbor. 3081 045 Cox, Steven L. 1985 Archaeological Investigation of the Atkinson Site Diane Kopec 2180 Freedman, Jacob Rick will 3500 2005 Report on Phase I & II Archaeological Survey of the Dolby Head Estates, Gouldsboro Bay, Steuben. Spiess, Arthur E. Eagle Hill Field Notes, Steuben 045,060,061 2009 Sanger, David 1992 Report on the 1990 Archaeological Survey of Coastal Washington County. 3900 2715 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title 045,062,079, Brockman, Mark E. 2005 Jeffrey Georgiady 080,096 Prehistoric Lithic Resources of the Coastal Volcanic Belt, Wahington Co., Maine. MAS Bulletin, 45:1:5-24. 048 Bartone, Robert N. 2007 Ellen Cowie Report on Phase I Archaeological Survey of the Dead Cambridge River Fish Barrier. Quads MHPC Document # 3692 Moore, Edward 2008 Richard T. Will Prehistoric Archaeological Review of the Record Hill Wind Project. 3813 048,049 Will, Richard T. 1993 Report on Phase I Archaeogical Survey of the Andover Pump Station/Treatment Plant. 2760 048,065 Torrence, Corbett 2553 1989 Jennifer J.Robins, J.Petersen Archaeological Phase II Report of the Middle Dam Project (FERC 4027), Upper and Lower Richardson Lakes Region, Oxford Co., ME. 049 Bartone, Robert N. 2004 Proposed Scotties Well Upgrade Project (MHPC #1942-03), Rumford, ME. Archaeological Phase I Survey. 3393 Hamilton, Nathan D. 2003 Report on the Phase I Archaeological Survey of the Rumford Snowmobile Club House. 3344 2000 John P. Mosher Rumford Falls: a Holocene Cultural Sequence in Northwestern Maine. 1991 J.Mosher,C.Thayer,J.Theberge 3092 2620 Archaeological Phase II Survey of the Rumford Falls Project. Moore, Edward 2009 Phase I Archaeological Survey of the Record Hill Project in Rumford, Mexico, Roxbury, Oxford County 3865 Mosher, John P. 2013 4150 Phase I Archaeological Survey Alignment "F" Martin Memorial Bridge Replacement of the Androscoggin River between Rumford Corner and Rumford Point Putnam, David E. 1989 P.Baker and J.B. Petersen An archaeological Phase I survey of the Rumford Falls Project, Oxford County. 2525 Shaffer, Gary 2013 Field Check for Tammy Hutchinson, Andover 4146 2003 Ted Gotto's Filter Strip, Heavy Use Area Protection, Waste Storage Facility, and Streambank Stabilization in Byron, Oxford Co., ME: A Phase I Report. 3345 Will, Richard T. 1990 James Clark Phase I Archaeological Survey of the Proposed Pump Station and Water Main Across the Ellis River, Rumford, ME. 2573 049,050 Petersen, James B. 1985 Jon T. Oplinger,others An Archaeological Phase I Survey of the Proposed Dixfield Hydroelectric Project, Oxford County, Maine 2186 049,082,102 Gramly, R. Michael 1985 Report on Archaeological Survey, Salvage Excavations and Reconnaissance in Oxford and Franklin Counties, ME. 2176 050 Bartone, Robert N. 2006 Report on Phase I Archaeological Survey of the Proposed Telecommunications Tower. 3628 1992 James B. Petersen 2741 Report on Phase I Archaeological Survey of The Proposed Dixfield Water Treatment Plant Project. Corey, Richard 1996 James B. Petersen Report on Phase I Archaeological Survey of the Maxwell Farm Tract 249, Dixfield. 2922 Eldridge, Stuart A. 2010 Phase 0 Report Saddleback Ridge Wind Project 3976 Quads 050 051 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Gammon, James G. 2007 Ellen Cowie Report on Phase I Archaeological Survey of the ME 145 Stanley Project (Cell Tower) MHPC Document # 3698 McPheters, Hutch 2006 Robert Bartone Report on Phase I Archaeological Survey of the MSAD 21 Elementary School Site, Peru. 3561 Bartone, Robert N. 2008 Ellen Cowie Phase II Archaeological Testing of Whittier Road Development, Site 51.19. 3782 2008 Hutch McPheters 3753 Report on Phase I Archaeological Survey of the Proposed Whittier Road Development letter report. 1994 James B. Petersen 2912 Report on Phase I Archaeological Survey of the McLaughlin Farm. Brigham, Michael 2010 Robert Bartone, Ellen Cowie 3955 Archaeological Phase I and II Testing Newly Identified Native American Site 51.19 Proposed Route 2/4 and Whittier Road Development Project 2004 Report on Phase I Archaeological Survey of the Farmington Heights Apartments. 3397 Corey, Richard 1995 James Petersen Report on Phase I Archaeological Survey of Kineo Water Park Storm Water, Wilton. 2867 Cowie, Ellen R. 2004 Report on Phase I Archaeological Survey of the Access Road to the New UMF Parking Lot. 3387 Cyr, Rosemary A. 3328 2003 Stephen Scharoun, Ellen R. Cowie Farmington Falls Project: Archaeological Phase I Survey. 2003 E. Cowie, S. Scharoun, R. Bartone Farmington Falls Survey Project, Archeological Phase I Survey in Farmington Falls, Farmington and Chesterville, MASCo., Bulletin, Franklin ME. 43:2:17Arthur E. Spiess Hedden, Mark H. 1995 Report on the Phase I Archaeological Survey of a Glacial Stream Deposit Rt.4 and Town Farm Road, Farmington. 2847 Hudgell, Gemma-Jayne 4088 2012 Ellen Cowie Daku Subdivision Archaeological Phase I Survey, Farmington 2011 Robert Bartone 4007 Phase I Survey Proposed George Thomas Road Bypass Project McPheters, Hutch 2004 Bartone, Robert N. Archaeological Phase I Survey of the Proposed Water Pollution Control Outfall Relocation Project, Farmington, Franklin County, Maine. 3394 Mosher, John 2010 Leith Smith Phase I Archaeological Survey Route 156 Highway Improvements (PIN 12774.10) Chesterville and Farmington 3963 Mosher, John P. 2003 Inland Fisheries & Wildlife Sandy River Canoe Put In and Take Out. 3330 2002 Report on Phase I Archaeological Survey of Route 156 (PIN 9180.00), Chesterville. Petersen, James B. 1985 David E. Putnam 3227 2323 Archaeological Phase I Survey and Testing of the Proposed Farmington Airport Project, Franklin County, Maine Shaffer, Gary 2006 Drainage Improvemnts for Melanie Farmer, West Farmington, Franklin Co, ME: A Phase I Archaeological Survey. 3624 2003 3325 Critical Area Seeding and Reclamation of Old Fields for Trudy and Erik Johnson, Farmington, Franklin Co., ME: A Phase I Archaeological Study. Quads 051 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Wilson, Deborah B. 2003 Timothy Dinsmore 3332 Report on Phase I Archaeological Survey of the Farmington Falls Standard Water District River Crossing Project. 051,052,069 Putnam, David E. 1986 2437 The Sandy River Archaeological Survey: A Preliminary Investigation of the Archaeological Potential of the Sandy River Valley from the Town of Farmingt 052 Bartone, Robert N. 2001 Report on Phase I Archaeological Survey of the Whittemore Farm Bank Stabilization. 3206 Brigham, Michael 3937 2010 Belinda Cox, Ellen Cowie Archaeological Phase III Data Recovery Excavations at the Ladd site (52.34), Starks 2006 Report on Phase I Archaeological Survey of the Norridgewock School Project. 3599 Clark, James 2006 Richard T. Will Intersite Comparisons of Archaic Period Stone Artifacts: The Clark I Site and the Gulf of Maine Archaic Tradition. edited by David Sanger and M. A. P. Renouf, The Archaic of the the Far Northeast, University of Maine Press, Orono, 2006. 2000 Richard T. Will, Bonnie Newsome 3192 Clark I Site (52.16): Results of Phase III Prehisitoric Archaeological Resource Investigation, Weston Project. Crock, John 1993 James B. Petersen 2747 An Archaeological Phase I Survey of the Sandy River Project (Docket No. UL89-33-ME), Somerset County, Maine. 1993 J.B. Petersen 2776 Report on Phase II Archaeological Survey of the Sandy River Project (UL89-33-ME). Gammon, James G. 2007 Ellen Cowie Archaeological Phase I Survey of the Proposed Sandy River Road Subdivision Project (MHPC #1278-07) in Mercer, Somerset Co. Oliver Kelly, Richard T. Will Mack, Karen 2001 The Bombazee West Site (52.10), A Small Ceramic Period Site on the Kennebec River. MAS Bulletin, 41:1, 1-24 1999 Alice R. Kelley, Richard Will The Bombazene West Site (52.10): Results of Phase III. Mosher, John P. 2004 Leon Cranmer 3708 3072 3369 Report on Phase I Archaeological Survey of the Kennebec Highlands Land for Maine's Future Board Acquisitons in Rome, Vienna, New Sharon and Mount Vernon. 1991 Mitchell Power, Thomas Bennet Archaeological Phase I Survey of the Norridgewock Wastewater Treatment Facility, Norridgewock. 052,053 2648 Newsome, Bonnie 2001 Richard T. Will A Report on the Phase I Archaeological Survey of the McGrath Pond Municipal Reconstruction Area, Oakland. 3181 Petersen, James B. Oosoola Point, Norridgewock. 1990 2590 Scharoun, Stephen 2005 Report on Phase I/II Archaeological Survey of the Norridgewock Water District Water Main Project. 3483 Shaffer, Gary 2009 David Krebs Proposed Diversion, Lined Waterways, Subsurface Drains, Starks 3858 Bartone, Robert N. 2744 1993 James B. Petersen Archaeological Phase I Survey and Phase II Testing of the CMP Recreational Areas Project, Somerset and Kennebec Counties, Maine. 052,053,069, Cowie, Ellen R. 1992 James B. Petersen 070 Report on Phase II Archaeological Survey of the Weston Project (FERC 2325) Somerset Co., ME. 2694 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title 052,053,069, Torrence, Corbett 1989 M. Heckenberger, J.B.Petersen 070 An Archaeological Phase I Survey of the Weston Project, Somerset County Quads 053 MHPC Document # 2518 Bartone, Robert N. 1992 James B. Petersen 2737 Report on Phase II Archaeological Survey of a Small Portion of the Gleuck Site (ME 53.31) In the Fort Halifax Project. 1990 C. Quinn, J.Petersen, E.Cowie Archaeological Phase I Survey of the Fort Halifax Project (FERC 2552) Kennebec Co. Bradstreet, Theodore E. 1985 E.M. Duffy 2580 2183 Benton Falls Hydro Project Archeological Survey and Testing: Phase II Report 1982 Benton Falls Hydro Project, Archeological Survey and Testing: Phase I Report 2116 Clark, James 2005 Edward Moore Report on Phase I Archaeological Survey of the East Cell Expansion SAPPI Fine Paper Somerset Mill, Skowhegan. 3507 Corey, Richard 2005 Robert Bartone Report on Phase I Archaeological Survey of the Proposed Mill Island Park,Fairfield. 3442 Crane, Pamela 2005 Leslie Shaw Report on Phase I Archaeological Survey of Area E, Waterville Waterfront Rehabilitation. 3499 Cranmer, Leon E. 1992 Report on 1991 Archaeological Excavations at Fort Halifax, Winslow, Me. 2692 1991 Blockhouses and Cellars: The 1989 and 1990 Archaeological Work at Fort Halifax. MAS Bulletin 31(2):1-26. Funk, Thomas 1987 Steven Cox Phase II Archaeological Investigation of Site 53.34, Sebasticook River. Hedden, Mark H. 1995 Report on Phase I Archaeological Survey from Upstream End of Five Mile Rapids...Winslow Pumping Station. 1994 Site 53.38 Waterville Bridge Approach Data Recovery and Archeology 1993 2467 2866 2816 Arthur E. Spiess 2752 Arthur Spiess 2630 Site 53.36 Bridge Pier Archaeological Data Recovery. 1991 A Phase I Archaeological Survey for the Waterville-Winslow Bridge Construction Access Road. Lahti, Eric 2001 Goodwill-Hinckley Archaeological Survey 1996. MAS Bulletin, 41:1, 25-34. 2000 Goodwill-Hinckley Archaeological Survey 1996. 3093 Mack, Karen 2010 Richard Will Results of Phase I Archaeological Survey Shawmut Dam Project, Kennebec Co. for FPL Energy Maine 3958 Moore, Edward 2011 Karen Mack, James Clark Phase I and II Archaeological Investigations of the Fort Halifax Project, Winslow and Benton. 4003 Mosher, John P. 3922 2010 Leith Smith Phase I/II Survey for the Garland Road Bridge Replacement PIN 11048 Winslow 2005 Report on Phase I Archaeological Survey of the Shawmut LMFB Acquisition, Shawmut Village, Farifield, Maine. Petersen, James B. Hinckley Boat Ramp Survey 1990 Robinson, Brian S. 1996 Projectile Points, Other Diagnostic Things and Culture Boundaries in the Gulf of Maine Region. MAS Bulletin 36:2:1-24. 3452 2587 Quads 053 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Robinson, Brian S. 1995 The Waterville Cemetary: Research Progress on a Hathaway Complex Site on the Kennebec River. Shaffer, Gary Field Check for Envirothon, Waterville 2012 . Sorg, Marcella 1992 Osteology and Odontology of Human Remains from Site 53.23, Benton. Spiess, Arthur E. 2000 MHPC Document # 2877 4089 2812 Mark Hedden Susquehanna Tradition Activity Areas at the Waterville-Winslow Bridge. MAS Bulletin, 40:1:23-54. 1999 Mark H. Hedden Late Paleoinidan Occupation at the Waterville-Winslow Bridge. MAS Bulletin, 39:2:43-57. 1999 Deep Testing on the Kennebec: The Waterville-Winslow Bridge. MAS Bulletin, 39:1:131990 Mark Hedden and Joan Robertson Waterville-Winslow Bridge Location Phase II Archaeological Testing 1988 Waterville-Winslow Bridge Project Archaeological Phase I Survey Report. Valimont, Brian 2012 Proposed Expansion of Thomas College, Waterville, ME, Phase I Archaeological Survey 2007 2565 2491 4056 3715 Proposed Skowhegan Cell Tower. 2006 Report on Phase I Archaeological Survey of the Proposed Walking Trail, Thomas College. Watts, Douglas 2009 Evidence for Prehistoric two-weir fish trap at China Lake Stream, Sebasticook River, Winslow 2009 Evidence of a Prehistoric Pottery Kiln, Sebasticook River, Winslow, Maine 3563 3899 3876 Wellman, Alice N. 1984 Lancaster Farm Bifaces and Ground Slate Points: an Exercise in Attribute Analysis Wilson, Deborah B. 2000 A Report on the Phase 0 Archaeological Survey of the Lockwood Project (FERC 2574). 1994 Report on Phase I Archaeology of the Gerald Frontin Farm, Benton. 053, 069, 070, 086 054 3161 2815 Clark, James 2011 Karen Mack 3970 Phase I Precontact Archaeological Resource Survey Central Maine Power Company's Section 241 Transmission Line Project 2002 Report on Phase I Archaeological Survey of the Unity Bike/Pedestrian Trail. 3356 Dunn, Gerald C. 1960 The Eel Bridge Site and Its Relationship to the Sebasticook River Route 1959 2762 2012 4092 Eel Bridge Site Notes Shaffer, Gary Field Check for MOFGA, Unity 2004 Report on Phase I Archaeological Survey of the Stream Crossing for Joe Fortin, Albion. Varney, Lloyd H. Notes on the Eel Bridge Site (M.A.S.) 1958 3384 3121 Quads 054 056 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Wilson, Deborah B. 1999 Bruce J. Bourque 3045 A Report on the Phase II Archaeological Survey of the Heather Jean Read Poperty, Burnham Hydro (FERC 11472). 1994 Richard Will, Jane Cormier Phase II Archaeological Study of Eight Prehistoric Sites Located within the Burnham Project. 2790 1993 Report on Phase I Archaeogical Survey of the Burnham Hydropower Project. 2759 Belcher, William R. 1988 Phase I Prehistorica Archaeological Survey of Bowden Point, Prospect, Maine. 2494 Burgess, William 2009 Archaeological Survey for Lord Bridge #3348 Replacement project, Monroe-Frankfort 3901 Cranmer, Leon E. 2005 3480 Report on Phase I Archaeological Survey at Fort Knox, Prospect, Maine for the Waldo- Hancock Bridge, PIN 7965.40 and for the Bureau of Parks and Lands. 2004 Phase I Archaeological Survey for the Waldo-Hancock Bridge Replacement Project (PIN 7965). 3365 Mack, Karen 2012 Corridor Expansion on Segment 1 (MPRP), Frankfort, at Marsh Stream Crossing 4060 Morrison, Peter 3372 1999 Pamela Crane Archaeological Testing of Fort Knox Park, Prospect. Putnam, David E. 2001 West Winterport Dam Removal Project Archaeological Phase I Survey. 056, 57 Spooner, Emeric 2009 In Search of Maine Archaeology: An Amateur's Guide to Artifact Identification 056,073 Cole-Will, Rebecca 1993 Preliminary Level Survey for Prehistoric Resources, Town of Hampden. 3183 2915 1993 056,073,107, Bourque, Bruce J. Report on the Phase I Archaeological Investigation of the Proposed AT&T Fiber Cable Route from Danforth to 123-125 Winterport. 2764 056,074Clark, James 2004 Edward Moore 076,093-096 Report on Phase I Archaeological Survey of the Bangor Hydro Electric Northeast Reliability Interconnect Project. 3430 057 Blustain, Malinda S. 1999 Margaret Laveque, Brian Robinson Two Fossilized Late Archaic Textiles from Maine: Pyrite Pseudomorphs from the Hartford Cemetery Site. AENA 27:185-196. Bradstreet, Theodore E. 1973 Pollen Influx Diagram and Associated Quaternay Geology from Moulton Pond, Maine. M.S,Thesis, University of Maine at Orono, Institute for Quaternary Studies. Clark, James 1997 Richard T. Will Report on Phase I Archaeological Survey of the Proposed Line 60 Project. Kellogg, Douglas 1987 Lower Patten Pond Development Phase One Survey. Kopec, Diane 1989 2951 2473 Thomas Lowell 2531 Phase I Archaeological Survey, Southfield Development, Lower Patten Pond, Ellsworth. Will, Richard T. 2007 James Clark 3694 Results of the Phase I Precontact Archaeological Survey of the Proposed Cottages Subdivision, Orland, Hancock Co, (MHPC #0873-07). 1998 James Clark, Kathleen Wheeler Reconnaissance-Level Archaeological Survey of the Craig Brook National Fish Hatchery, East Orland. 2989 Quads 057,070 058 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Mosher, John P. 2003 Lee Cranmer Phase 0 Reconnaisance Survey of Skowhegan Transportation Study (PIN 8483.10). MHPC Document # Bourque, Bruce J. 1984 Kopec, Diane R. An Evaluation of the Dam Pool Impact on Sites 58.1 and 58.10, Ellsworth, Maine Byers, Douglas S. 1955 Carbon-14 dates from Ellsworth Falls, Maine. Science 121:735-736 Cowie, Ellen R. 2011 3298 2171 Wendell S. Hadlock Emily Iser 4013 Archaeological Phase I Survey Proposed Nevells Shore Subdivision, Ellsworth Hadlock, Wendell S. 1956 D.S. Byers Radiocarbon Dates from Ellsworth Falls, Maine. American Antiquity, 21:419-20. Rick Will Moore, Edward 2001 Report on Phase I Archaeological Survey of the Bangor Hydro-Electric Co.'s Line 13 Remote. 3184 Mosher, John P. 2009 Phase I Reconnaissance Archaeological Survey of the Rt 180 Rebuild, Ellsworth (PIN 10063.10) 3912 Ian Putnam Putnam, David 2009 Archaeological Phase I Survey Proposed Wastewater Outfall Pipeline, Ellsworth 3861 Will, Richard T. 2007 Report on Phase I Archaeological Survey of the Proposed K & T Subdivision. 3686 2006 Rebecca Cole-Will, Jacob Freedman 3550 Report on Phase I/II Archaeological Survey of the Tinker Hill Subdivision. 2000 Report on the Phase I Archaeological Survey of the Bangor Hydroelectric Proposed Line II Relocation. 3132 2000 Phase I Archaeological Survey of the Bangor Hydro Proposed Line II Relocation, Hancock Co., ME. 3134 058, 059, 060 Clark, James 2010 Phase I Precontact Survey Bangor Hydro Electric Companies Downeast Reliability Project 059 Cox, Steven L. 1988 3941 Diane Kopec An Archaeological Investigation of the Watson site, Frenchman Bay. Maine Archaeological Society Bulletin 28(1):39-45. Cranmer, Leon E. 1994 Arthur Spiess 2839 Tunk/Spring River Lake Purchase - Archaeological Survey for Land for Maine's future Board. Moore, Edward 2005 Jacob Frenchman 3471 Phase I Archaeological Survey of the Proposed Molasses Pond Subdiivison, Eastbrook, Hancock Co, ME (MHPC #245704). Spiess, Arthur E. 2003 Mark Hedden Archaeological Assessment of the Little Pond Parcel for LMFB. 2003 Mark Hedden Archaeological Assessment of the Sullivan Tidal Falls Property, Hancock for LMFB Will, Richard T. 2010 Results of Phase IA Archaeological Survey Proposed Bull Hill Wind Project, Hancock Co. 2003 Archaeological Investigations of the Sno-Drum Subdivision, West Sullivan. 060 Petersen, James B. 1987 Mike Heckenberger Archaeological Phase I Survey and Phase II testing of the Laser Intraferometer Gravity-Wave Observatory (LIGO) Project in Columbia Twp,WashingtonCo.ME 3279 3278 3961 3357 2454 Quads 060 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Shaffer, Gary 2004 Report on Phase I Archaeological Survey of the Cecil Property, Columbia. MHPC Document # 3373 2003 3352 The Planting of a Riparian Forest Buffer for Chester Curtis in Harrington, Washington Co., ME: A Phase I Archaeological Survey. 060,061,062, Burns, Robert L. Mid-Coast Washington County 063 061 1971 Cox, Steven L. 1987 Archaeological Data Recovery at Site 61-20, Jonesport, Maine. 1987 Archaeological Data Recovery at Site 61.20, Jonesport, Maine. Maine Archaeological Society Bulletin 27:2:16-35 Eldridge, Stuart A. 2002 Report on Phase I Archaeological Survey of the Harold Tyler Farm Irrigation Project, Jonesboro. 2456 3272 Hedden, Mark H. 2010 Petroglyphs at 61.72 on Great Spruce Island, Machiasport: A Visionary Tradition of Mi'cmaq Medicine Men? 3944 Hollinger, Eric 2012 Site 61.2, Varney Brook Site, Jonesboro, Smithsonian Institution Accession Records 4153 Kitson, Edward 3289 2003 Pamela Crane, Robert Bartone Report on Phase I Archaeological Survey of the Ivan Hanscom Farm Project. McPheters, Hutch 2005 Ellen Cowie 3503 Report on Phase I Archaeological Survey of the Proposed Machias Valley Airport. 061,062 Thomas Chase Sanger, David 1983 An Introduction to the Archaeology of the Roque Island Group 2568 Shaffer, Gary 2006 Dale Whitney's Firebreaks, Columbia Falls, Washington County, Maine: A Phase I Archaeological Survey. 3546 Steven L. Cox Van Horn, David M. 1984 Cultural Resource Assessment: A 30+/- Acre Parcel Located in Jonesboro, Maine 2162 Sanger, David 1991 National Register Information for Roque Island Locality. 2622 1985 Douglas Kellogg 2179 Leon Cranmer 2974 Preliminary Report, Roque Island Project - 1985 061,062,079 Spiess, Arthur E. Kris Larsen Collection, East Machias, ME. 1997 061,080,096, Sanger, David 2008 Discerning Regional Variation: The Terminal Archaic Period in the Quoddy Region of the Maritime Peninsula. 097 Canadian Journal of Archaeology 32:1-42. 061,111 1983 The 1982 Survey of Washington County 062 2148 Anonymous 1867 3884 Recollections of Mr. Thomas Lincoln of Dennysville as to Inscriptions at Clark's Point, Machiasport, to W. B. Smith, in 1867Maine Historical Society file Clark, James 2006 3570 Results of Phase I Archaeological Survey of the Proposed Birch Point Subdivision, Machiasport, Washington County, Maine. MHPC # 1087-06 Crane, Pamela 2002 Anne Wilder "A Farm for the Support of the Poor" : Historical Archaeology at the Scarborough Town Farm, 1865-1953. MAS Bulletin, 42:17-30. Cranmer, Leon E. 1997 Mark Hedden, Arthur E. Spiess 2939 Phase II Archaeological Survey for MDOT Pin 4914 (658.10), and Phase III Data Recovery 62.30 & 62.31, East Machias. Quads 062 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Cranmer, Leon E. 1994 Interim Report Phase IIa Archaeological Testing at East Machias, ME. MHPC Document # 2804 Enslin, Jacob 1993 Prehistory of the Eastern Maine Coast, Focusing on Holmes Point, Machias Bay. 1993 Prehistory of the Eastern Maine Coast, Focusing on Holmes Point, Machias Bay. 2929 Goodwin, R.Christopher, 2002 Rock Art Study on Department of Defense Property in LANTOPS and NORTHDIV. 3242 Hedden, Mark H. 3844 2009 Robinson, Brian and Donald Soctomah Preliminary Report for Malusihikon Petroglyph Committee on Phase I Field Work at Site 62.1 Birch Point 2008 Significant Features of Petroglyphs on the Maine Ledge at Birch Point. 3766 2008 Brian Robinson, Donald Soctomah Preliminary Report of the Malusihikon Committee Phase I Fieldwork, 62.1, Birch Point. 3807 2004 Passamaquoddy Shamanism and Rock-Art in Machias Bay, Maine. ed: Diaz-Granados, Carol and James R. Duncan, the Rock_Art of Eastern North America: Capturing Images and Insight, 319-343, U of Alabama Press, Tuscal 2004 Passamaquoddy Shamanism and Rock Art in Machias Bay, Maine The Rock Art of Eastern North America, edited by Diaz-Granados and Duncan, pp319-343 2002 Contact Period Petroglyphs in Machias Bay, Maine Archaeology of Eastern North America 30:1-20 2001 Petroglyphs in Machias Bay, Maine: Salt Island. 1989 A New Group of Early Petroglyphs for Machias Bay. Maine Archaeological Society Bulletin, 29:2:17-36. 1987 Petroglyphs on Hog Island, Machias Bay. Maine Archaeological Society Bulletin 27:1:3-9 1986 The Rate of Sea Level Rise and Prehistoric Petroglyphs at Machias Bay Maine Archaeological Society Bulletin 26:2 p3-4 1982 Plans of Petroglyphs, site 62.1, Birch Point, Machiasport NOTE:IN ROLL 3168 3827 Hrynick, M. Gabriel 2012 Brian Robinson Quantifying Gravel from a Ceramic Period Living Surface in Downeast Maine Maine Archaeological Society Bulletin 52(2):27-43 Lahti, Eric 1976 The Machias Petroglyphs Leach, Peter 2009 Archaeological Remote Sensing at the Birch Point, Holmes Point and Holmes Point East Sites 3906 Mosher, John P. 2002 Arthur E. Spiess Combined Phase II Testing and Data Recovery Excavations at the East Machias Weir Site. 3235 2002 Arthur Spiess Archeological Testing for Fish Weir Construction in East Machias. MAS Bulletin, 42:1:1-16. Robinson, Brian S. 2009 Archaeology of the Birch Point Petroglyph Site: Phase I Survey Shaffer, Gary 2011 Gaddis Brothers Co., East Machias, obstruction (rock) removal 3905 4018 Quads 062 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title U.S. Navy 2001 Draft Cultural Resources Survey of Naval Computer and Telecommunications Area, Cutler. MHPC Document # Wilson, Deborah B. 2003 Report on Phase IB Archaeological Survey Report: Administration and HF Areas, Naval Computer and Telecommunications Area....Cutler, ME. 2003 Report on the Phase I Archaeological Survey of the Yoho Head Resort and Country Club. 3185 3297 3350 062, 079 Shaffer, Gary 2006 Arthur Andrew's Firebreak and Obstruction Removal. 3619 062,061 MacKay, Robert G. 1978 Petroglyphs in Maine and Their Relevance to Maine's Critical Areas Program 2136 062,106 Hedden, Mark H. 1984 The Form of the Cosmos in the Body of the Shaman. MAS Bulletin 2011 Report on Norse Pond Markings 063 3988 063,080 Crotts, Anita L. 1984 2980 Pattern and Variation in Prehistoric Lithic Resource Exploitation in the Passamaquoddy Bay Region, Charlotte County, New Brunswick. 064 Bartone, Robert N. 2013 H. McPheters 4140 Alexandra Morse & JB Petersen 2483 Rapid River Development Corp, walkover survey 065 Baker, Patricia 1988 An Archaeological Phase I Survey of the Middle Dam Project, Upper and Lower Richardson Lakes, Oxford County, Maine. Clark, James 2013 Karen Mack, Richard Will 4158 Results of 2011-2012 Investigation of Mosquito Brook Site (65.20) and Crescent Moon Site (65.28), Middle and Upper Dam Project (FERC 11834-000) 2011 Richard Will Middle Dam Project -- Upper Richardson Lake, 2011 Fieldwork Summary, Mosquito Brook Site (65.20) 4094 Will, Richard T. 2008 Update on the Archaeology of the Upper and Middle Dams Project, Richardson Lake. 3743 Wing, Kenny 2009 Walkover Survey, Cooke Aquaculture, Inc., Oquossoc 3878 065,066,082 Will, Richard T. 1997 James Clark, Edward Moore Report on Phase I Archaeological Survey of theMooselookmeguntic Lake, Upper and Middle Dams (FERC UL94-1). 2970 065,082 Moore, Edward 1999 James Clark, Richard Will A Report on the Phase II Archaeological Study of Mooselookmeguntic Lake, Upper and Middle Dams Storage. 3073 066 Brigham, Michael 2008 Hutch McPheters, Stepen Scharoun, Ellen Archaeological Phase I Survey of the Proposed Customs and Border Protection Facility, Rangely, Franklin Co. 3796 2006 Ellen Cowie 3610 Report on Phase I Archaeological Survey of the Proposed Round Pond Project. Hamilton, Nathan D. 1988 Thomas C. Bennett 2515 An Archaeological Phase 1 Survey of the Proposed Hatchery Cove Subdivision Rangeley,Maine 067 Spiess, Arthur E. 2005 John Hudson Sandy River Pond Water Access Archaeological Field Check, Short Report to LMFB. 3448 Cowie, Ellen R. 2002 H. McPheters Report on Phase I Archaeological Survey of the Dana Roberts Farm NRCS Project. 3252 Quads 067 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Cowie, Ellen R. 1999 A Report on the Phase I Archaeological Survey of Mt. Blue Water District Pump Station and Water Main. MHPC Document # Hedden, Mark H. 1998 Leon Cranmer, Arthur Spiess Report on Phase II and III Archaeolgical Survey of ME23-002 and Site 67.1 on Route 4 Rehab in Avon. 1997 Arthur E. Spiess Report on Phase I Archaeological Survey of Route 4 Road Rehab, Avon. Mosher, John P. 2002 Leon Cranmer 3059 3004 2937 3232 Report on Phase I and Phase II Archaeological Survey of the Salem Bridge Replacement (PIN 8973.00) . 068 Shaffer, Gary 2006 Report on Phase I Archaeological Survey of Darren Allen's Streambank. 3549 Brigham, Michael 2009 Robert Bartone, Ellen Cowie Phase I Survey Proposed Jordan Ventures Kingfield Development Project (MHPC 2262-07) 3888 Crock, John 1992 James B. Petersen Report on Phase I Archaeological Survey of the Kingfield Water Improvements. 2690 Eldridge, Stuart A. 2006 Sarah Haugh Phase IA and IB Archaeological Survey Report of the Kingfield Bottle Pland Water Line Project, Kingfield, ME. 3607 2006 Sarah Haugh 3532 Report on Phase I Archaeological Survey of the Kingfield Bottling Plant. 2006 Sarah Haugh 3553 Report on Phase I Archaeological Survey of the Kingfield Bottling Plant. 069 Hedden, Mark H. 1999 Report on Phase I Archaeological Survey of a Section of Route 16, near North New Portland. 3033 Mathiasson, Kåre 2006 Report on Phase I Archaeological Survey of the Bridge Improvement over Gilman Stream on Route 16, North New Portland, PIN 12635.00. 3545 Wilson, Deborah B. 2003 Report on Phase I Archaeological Survey of the New Portland District Proposed Well Site. 3331 Baker, Patricia 2500 1988 Thomas R. Baker Phase I Results, Dennison Hatchery Facility Survey Baldwin, Geraldine 1999 A Report on the Phase I Archaeological Survey of Madison School Project. 3078 Bartone, Robert N. 2002 Testing of Abenaki (2364) and Anson (2365) Projects. 3238 Ellen Cowie Brigham, Michael 2006 Ellen Cowie 3576 Archaeological Phase I Survey for the Proposed Madison Greenhouse and Biomass Cogeneration Project (MHPC #321205) Madison, Somerset County, Maine. Carlson, Suzanne 2005 Big Dig in Bingham: Maine Cairn Field Study. NEARA Jorunal, 38:2:32-42. Clark, James 1998 3459 Richard Will, Edward Moore 3019 Report on the Phase I Archaeological Survey of the Sandy River Portion of Weston Project (FERC 2325). Cowie, Ellen R. 2002 Continuity and Change at Contact-Period Norridgewock. PhD thesis 2000 A Report on the Phase 0 and I Archaeological Survey of the Abenaki Project (FERC 2364). 1999 Robert Bartone, JB Petersen Investigations at the Tracy Farm Site in the Central Kennebec River Drainage. 3391 3154 3071 Quads 069 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Cowie, Ellen R. 1996 James B. Petersen Archaeological Survey and Testing of the Tracy Farm Property. MHPC Document # Cox, Steven L. 1995 The Anson Project (FERC 2365) Report on 1995 Archaeological Phase I and Phase II Surveys. 1984 Anson Project, Archaeological Survey and Testing, Phase I: Final Report Lahti, Eric 1981 A.Spiess,M.Hedden,R.Bradley,A.Faulkner Test Excavations at the Hodgdon Site. Man in the Northeast. 21:19-36 McPheters, Hutch 2003 Robert Bartone, Ellen Cowie 2919 2887 2164 3316 Archaeological Phase II Testing at the Weston Island Site 69.49 and Rod&Gun Site 69.50, in the Anson (FERC # 2365) and Abenaki (FERC # 2364) Project Area 2002 Robert Bartone, Ellen Cowie 3270 Report on Phase II Archaeological Testing of the Weston Island Site and the Rod and Gun Club Site, in the Anson and Abenaki Project Area. Petersen, James B. 2004 John G. Crock, Ellen R. Cowie, Richard A St. Lawrence Iroquoians in Northern New England: Pendergast was "Right" and More in A Passion for the Past: Papers in Honour of James F. Pengergast, Mercury Series Paper 164 2004 Crock,Cowie,Boisvert,Toney,Mandel St.Lawrence Iroquoins in Northern New England: Pendergast was "Right" and More. A Passion for the Past: Papers in Honour of James F. Pendergast. Edited by James V.Wright and Jean-Luc Pilon...Arch.Paper 164, Can.Mus.of Civ.,Quebec 1990 A Preliminary Report on Archaeological Investigations at the Dennsion site (69.22), Somerset County, ME. Prins, Harald 1987 Bruce J. Bourque Norridgewock: Village Translocation on the New England-Acadian Frontier. Man in the Northeast, 33:137-158 Quinn, Catherine 1995 Report on Phase I Archaeological Survey of the the Madison Paper Industries Project. 4039 2602 2889 Shaffer, Gary 2010 Field Check for Sherwood McKenney, Madison 4149 Sorg, Marcella 1992 Osteology and Odontology of Human Remains from Weston (Tracy Farm Site). 2813 Spiess, Arthur 2012 Possible Discard of Significant Archaeological Collections Material, UMF to MSM 4061 Spiess, Arthur E. 1991 Mark Hedden The Evergreens: Archaeology and an Alluvial Landform on the Upper Kennebec River. 2644 1984 Mark Hedden 2430 The John Dolan Collection Catalogue Valimont, Brian 2009 Proposed Madison Cell Tower, Old Point Ave. 069,086 Petersen, James B. 1991 3855 David Putnam 2669 Archaeological Phase II Testing of the Williams Dam Increased Pool Area. (Expanded Version) 1986 David E. Putnam 2444 Archaeological Phase II Testing in the Williams Hydroelectric Dam Flood Pool Area, Somerset County, Maine 1985 Jack A. Wolford,others 2187 An Archaeological Phase I Survey of the Williams Hydroelectric Dam Increased Pool Project, Somerset County, Maine Petersen, James B., edito 1991 Baker,Bartone,Cowie, etc. Archaeological Investigations of the Central Kennebec River Drainage: Phase III at Smith and Smith's Landing Site. 2660 Quads 070 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Brigham, Michael 2008 Ellen Cowie Report on Phase I Archaeological Survey of the Redington Fairfield General Hospital Project. MHPC Document # 3750 Clark, James 2004 Report on Phase I Archaeological Survey of the Skowhegan Armory Reconstruction. 3385 Hedden, Mark H. 1995 An Archaeological Exploration of an Early Middle Archaic Beach Site at Lake George in Canaan. 2931 1994 Arthur Spiess 2795 Site 70.28 at Lake George in Canaan, Phase II Testing for LMFB 1992 Arthur Spiess 2733 An Archeological Phase I Reconnaissance of Lake George Parcels in Canaan for the Land for Maine's Future Board. Kelley, Alice R. 2007 Geology of Sites 70.29 and 70.38, Skowhegan. 3681 Lahti, Eric 2006 Report on Phase I Archaeological Survey of the Grassland Farm Skowhegan, Wetland Mitigation. 3557 Mathiasson, Kåre 2009 Arthur Spiess Skowhegan Route 2 Drainage Improvements Archaeological Monitoring 3830 2003 Arthur Spiess 3299 Reconnaissance Walkover Survey of the Second Lake George Park Phurchase by LMFB, Canaan. Mosher, John P. 2009 Arthur Spiess 3837 Archaeological Phase IE/IID and IF Survey of Option E3E(5) of the Skowhegan Transportation Study 2007 Arthur Spiess Archaeological Phase IIC and IID Survey and Testing for the Skowhegan Bypass (PIN 8483.10) 3667 2006 Arthur E. Spiess Phase IIB Testing of Sites 70.30 and 70.31, Alternate E3E of the Skowhegan Transportation Study (PIN 8483.10), Skowheagan, Maine. 3541 2005 3476 Report on Phase I and Phase IB Archaeological Survey of Alternate Route E3E(1), E3E(2), AND E3E(3) of the Skowhegan Bypass, MDOT PIN 8483.10. 071 Sorg, Marcella 1992 Osteology and Odentology of Human Remains from Oak Island, Maine. 2702 Belknap, Daniel 1994 Geological Stratigraphy at the Sebasticook Lake Fish Weir Site from Core Samples. 3082 Mack, Karen 2012 Archaeological Assessment of CMP Section 5A, Corinna, Penobscot Co. 4059 Miller, Christopher E. 2006 Report of Reconnaissance Scuba Survey, Sebasticook Lake Fish Weir. 3584 Moore, Edward 2013 CMP Powerline Section 5 maintenance Phase I 4121 Petersen, James B. 1994 Robison,Belknap,Stark,Kaplan An Archaic and Woodland Period Fish Weir Complex in Central Maine. AENA, 22:197-222. 1994 Brian Robinson 2799 An Archaic and Woodland Fish Weir Complex in Central Maine. 1993 Brian Robinson An Archaic and Woodland Period Fish Weir Complex in Central Maine. Spiess, Arthur E 2009 Newport Stream Restoration Archaeological Survey and Site ME 71.30 Maine Archaeological Society Bulletin 49(1):23-41 2754 Quads 071 073 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Spiess, Arthur E. 2003 Newport Stream Restoration Archaeological Survey and Site 71.30. MHPC Document # Borstel, Christopher L. 1982 Archaeological Investigations at the Young Site, Alton, Maine. 3291 3643 1982 Archaeological Investigations at the Young Site, Alton, Maine 1978 David Sanger 2104 Completion Report on the 1977 Excavations and Analysis of Hirundo and Young Sites, Alton, Maine: Phase I. Corey, Richard 2007 Robert Bartone and Ellen Cowie 3666 Report on Phase I Archaeological Survey of the Proposed Hawthorne Ridge Subdivision. 2006 Ellen Cowie Report on Phase I Archaeological Survey of the Hawthorne Ridge Subdivision. Cox, Steven L. 2007 Report on Phase I Archaeological Survey of the Proposed Lake Road Development. 2003 Jane C. Clifton Report on the Phase II Archaeological Investigation of the Site 73.21, Riverbend Phase V Property, Glenburn, ME. 2002 Jane Clifton 3523 3683 3346 3269 Report on Phase I Archaeological Survey of the Riverbend Subdivision Phase V. Cranmer, Leon E. 2000 Report on the Phase I Archaeological Survey at the Mill Bridge Site, Route 43, Old Town/Alton. 3109 Haugh, Sarah 2008 Report on Phase I Archaeological Survey of Cedar Brook Subdivision. 3779 Hedden, Mark H. 2004 Kenduskeag Bridge Replacement (PIN 11041). 3436 Putnam, David E. 1995 Report on Phase I Archaeological Survey of Manure Storage Facility, Martin Farm, Corinth. 2869 Sanger, David Kenduskeag Stream Drainage SCS Practice. 2916 1992 1991 Phase 0 Archaeological Report on the Kenduskeag Watershed. 1977 R.D.Davis,others. The Hirundo archaeological project: an interdisciplinary approach to Central Maine prehistory. IN W,Newman and B.Salwan,eds. Annals of the New York Academy of Sciences. 288:457-471. 1973 Robert G. MacKay The Hirundo Archaeological Project - Preliminary Report. Man in the Northeast 6:21-29 Valimont, Brian 2013 Proposed Kenduskeag Cell Tower, Bangor, Phase I 2007 Report on Phase I Archaeological Survey of the Proposed Hermon Cell Tower. Winter, W.C. Artifacts of Pushaw Lake 073, 043 073,074 2809 1965 Sanger, David 2006 Getting Started: Archaeology at Orono in the 1970s. MAS Bulletin, 46:2:21Kelley, Alice R. 2003 David Sanger Postglacial Development of the Penobscot River Valley: Implications for Geoarchaeology. in Geoarchaeology of Landscapes in the Glaciated Northeast, edited by David L.Cremeens and John P. Hart, New York State Museum Bulletin 497:119-133. 4127 3684 Quads 073,074 073,074,091 074 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Sanger, David 2003 Alice R. Kelley, Heather Almquist Geoarchaeological and Cultural Interpretations in the Lower Penobscot Valley, Maine. in Geoarchaeology of Landscapes in the Glaciated Northeast, edited by David L.Cremeens and John P. Hart, New York State Museum Bulletin 497:135-150. Klink, Cynthia 1992 2680 Archaeological Research in the Milford Reservoir: Phase I Addendum. Smith, Walter B. 1926 Indian Remains of the Penobscot Valley and their significance. University of Maine Studies,Second Series. #7 Orono. Belcher, William R. 1994 David Sanger, Bruce Bourque The Bradley Cemetary: A Moorehead Burial Tradition Site in Maine. Canadian Journal of Archaeology, 18:3-28. 1989 David Sanger Phase II report on the archaeology of the Veazie Reservoir. 2520 1988 David Sanger Phase 2 Report on the Archaeology of the Milford Reservoir 2510 1988 David Sanger Phase II Report on the Archaeology of the Basin Mills Project. 2496 1988 David Sanger 1988 Phase I Archaeological Research in the Stillwater and Milford Reservoirs 2507 1988 David Sanger 2480 An assessment of the cultural resources of the Veazie and Orono Headponds:Results of the 1987 Phase I Survey. Chandler, Hugh Known Burial Places Near Bangor 3896 2009 Clark, James 1992 Richard Will Report of Phase I Archaeological Survey of Orono Demolition Debris Landfill Site. 2706 Clark, Julia 2000 K.Mack,J.Mosher,B.Newsome,R.Will 3096 Results of the Phase I and II Archaeological Testing of the Great Works Hydroelectric Project (FERC 2312), Penobscot Co. Corey, Richard 2005 Ellen Cowie 3504 Report on Phase I Archaeological Survey of the Proposed Old Town Airport Improvement. Eldridge, Stuart A. 2005 Sarah Haugh 3490 Report on Phase I Archaeological Survey of the Penobscot Commons Project. Faulkner, Alaric 1991 Historic and Prehistoric Archaeological Research at Fort Hill, Veazie. 2623 Fenton, James P. 1992 Catherine Quinn The 1992 Phase II Excavation at the Bob Site (74.148) Pushaw Stream Locality. 2742 Fox, John W. 1972 Dating Kaolin tobacco pipes of Indian Island. Man in the Northeast. 3:20-35 Furgerson, Kathleen A. 1991 David Sanger 2621 Phase II Report on the Archaeology of Site 74.107, Still Water Reservoir. 1990 David Sanger 2567 Phase I Addendum for the Eddington Bend site (74.8), Penobscot County, Maine. Lagerbom, Charles 1991 A Truckhouse on the Penobscot: Jonathan Lauder's Trading Post... 2679 Mack, Karen 2011 Monopole Replacement Construction on Eddington Bend Site 74.8 4100 Quads 074 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Mack, Karen 2010 James A. Clark 3938 Phase II Precontact Archaeological Investigations of Site 74.172, Milford, Bangor Hydro Line 64 Rebuild Project 2010 James Clark, Richard Will 3948 Results of Phase III Precontact Archaeological Investigations Site 74.8, Eddington Bend, Bangor Hydro Line 64 Rebuild 1998 D.Sanger,C.Quinn,A.Kelley Phase III Archaeolgical Investigations of the Bob Site, Pushaw Stream and Revised 74.136 Phase II Report. Mellgren, Guy 1960 The Bradley site on the Penobscot. Massachusetts Archaeological Society Bulletin. 21(3-4):43-45. Moore, Edward 2002 Richard Will 3000 3273 Report on Phase I Archaeological Survey of the Proposed Wilson Street Realty Trust Project, Brewer. 1998 Richard T. Will Report on Phase I Archaeological Survey of Proposed Castle Bay Energy Gas-Fired Facility. 2986 Mosher 2008 Arthur Spiess Archaeological Phase III Mitigation of Site 74.84 on Pushaw Stream, Old Town, Maine 3817 Mosher, John P. 2007 A.E. Spiess Phase I and II Boom Birch Bridge Replacement Archaeology (PIN 12661.00) in Old Town. 3682 2006 Arthur E. Spiess 3539 Archaeological Phase IIB Testing of Site 74.84, a Susquehanna Tradition Encampment on Pushaw Stream, Old Town, Maine. 2005 Arthur Spiess Report on Phase I/II Survey and Testing of Sites 74.82 and 74.84 for the Irving Bridge Replacement Project (PIN 11043.00) on Pushaw Stream, Old Town, Maine 3453 2005 William Burgess Phase I Archaeological Survey of the Route 9 Connector (PIN 8483.20), Brewer, Holden and Eddington, Maine. 3456 2003 Leon Cranmer Report on Phase 0 Archaeological Survey of the Route 9 Connector (PIN 8483.20) Brewer,Eddington. 3276 Pekrul, Sharon L. 1985 Phase II Archaeological Investigations in the Basin Mills Project Area 2173 Petersen, James B. 2459 1987 David Sanger Archaeological Phase II testing at the Eddington Bend site (74-8), Penobscot County, Maine. 1986 David Sanger Archaeological Phase II Testing at the Eddington Bend Site (ME74-8), Penobscot County, Maine. Robinson, Brian S. Old Town Water District--Indian Island. 2001 1998 Richard Will Old Town Water District: Phase II Archaeolgical Testing and Mitigation Plan. 1996 2450 3194 3024 2908 The Godfrey Cemetary of Old Town. 1989 Report on Remote Sensing of the Sunkhaze Ridge site. Sanger, David 2001 Alice R. Kelley, Henry N Berry, IV Geoarchaeology at Gilman Falls: An Archaic Quarry and Manufacturing Site in Central Miane, USA. Geoarcaheology:An International Journal, Vol 16, No. 6, (633-665). 1996 Gilman Falls Site: Implications for the Early and Middle Archaic of the Maritime Peninsula. Canadian Journal of Archaeology, 20:7-28. 2537 Quads 074 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Sanger, David 1993 W.Belcher, J.Fenton, M.Sweeney Gilman Falls: A Middle Archaic Quarry ad Workshop in Cnetral Maine. MHPC Document # 2784 1992 W.R.Belcher, D.C.Kellogg Early Holocene Occupation at the Blackman Stream Site, Central Maine. Early Holocene Occupation in Northern New England. Eds. Brian Robinson et al., Occassional Publications in Maine Archaeology, Number 9. Sharon Pekrul,other 1986 Archaeology of the Collins Bridge Site, Bradley,Maine Maine Archaeological Society Bulletin 26:2 p5-14 1985 Sharon Pekrul 2168 The Collins Bridge Site, Bradley, Maine 1984 An Evaluation of the Cultural Resources in the Basin Mills Area 2157 1984 An Archaeological Examination of the Eddington Bend Site at the Veazie Dam 2158 1984 An Archaeological Examination of the Penobscot River from the Bangor Dam to the Veazie Dam 2159 Smith, J. N. Leith 2008 John Mosher, Leon Cranmer 3756 Report on the Archaeological Phase I/II Survey of the I-395/Rt 9 Transportation Study Area, Brewer, Eddington and Holden (PIN 8483.20) Smith, Walter B. 1926 A Village and Burial Site on the Penobscot River near Bangor, Maine, Showing Different Periods of Occupation by Man University of Maine Studies,Second Series. 7:58-84 Snow, Dean R. 2009 3895 Report on 1970 Excavations on Penobscot Indian Reservation, Indian Island, Old Town, 2009 Revision 3894 2009 Eddington Bend (74-8) Catalog Guide 1971 Report on the 1970 Excavations on the Penobscot Indian Reservation, Indian Island, Old Town, Maine Sorg, Marcella 1989 Forensic Anthropology Report, Eddington Bend 4141 1989 Forensic Anthropology Report: Eddington Bend. 2761 Valimont, Brian 2009 Proposed Fish Passage Leonard's Mill Dam, Bradley, Maine 2006 Report on Phase I Archaeological Survey of the Proposed Stillwater Cell Tower. Will, Richard T. 2013 Karen Mack Results of Phase II of the Access Road on the Eddington Bend site or Site 74.8 1999 James Clark A Report on the Phase I Archaeological Survey of the Proposed Veazie to Orrington 115kv Line Project. 074, 091, 108 2149 Mack, Karen 2009 James Clark 3874 3606 4124 3053 3882 Results of Phase I Precontact Archaeological Survey Bangor Hydro Electric Line 64 Rebuild Project 074,075,076, Cox, Steven L. 1990 Report on the Phase I Archaeological Survey of the Bangor Hydro-electric Second 345 KV Tie Line Project Route. 093-096 2586 074,091 2682 Fenton, James P. 1992 David Sanger Archaeological Investigations on the Headwaters of the Milford Dam, Penobscot County. 074,091,108- Treat, Joseph 1820 Journal and Plans of Surveys by Joseph Treat, 1820. 9,122,+ 2460 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title 074;023;004; Callum, Kathleen 1995 Archaeology in a Region of Spodosols, Part 2. 016 Pedological Perspectives in Archaeological Research, SSSA Special Publication 44. 075 Kellogg, Douglas 2000 A Report on the Phase I Archaeological Survey of the Dow Pines Recreation Area. Quads 076 MHPC Document # 3152 Cox, Steven L. 1989 Report on Phase I archaeological survey of Ampersand Isand, Lower Sabao Lake, Hancock County. 2524 Cranmer, Leon E. 1994 Phase I Archaeological Survey of PIN 4720, Beddington. 2786 Will, Richard T. 2012 Results of Phase IA survey Hancock Wind Project, Hancock Co. 4164 076,077 Hedden, Mark H. 1999 Arthur E. Spiess Phase I and II Archaeological Survey along Route 9 in Aurora, T30 MD, T24 MD and Osborn Plt. 3036 077 Baldwin, Geraldine 2006 An Archaeological Phase II Survey of Sites 77.7, 77.8 and 77.9, Columbia Falls OTHB-E Radar Station. 3637 Cranmer, Leon E. 1993 Arthur Spiess Report on Phase I Archaeological Survey of PIN 4341.10, Route 9. 2779 Shaffer, Gary 2007 Project SHARE's Replacement of the Crebo Crossing Bridge, T18 MD BPP, A Phase I Archeological Survey. 3679 2003 Report on Phase I Archaeological Survey of the Firebreak for Stanley Foss. 077 078 Clark, James 1997 Richard Will 3314 2948 Report on Phase I Archaeological Survey of the Proposed Cherryfield Cranberry Project. 077,078 Cranmer, Leon E. 1994 Phase I Archaeological Survey of PIN 4031.10, T31 MD. 077,086 Baldwin, Geraldine 2004 William J. Chadwick 3486 Archaeological Phase I Survey for the Columbia Falls and Moscow OHTB-E Radar Stations, Washington and Somerset Counties. 078 Cox, Steven L. 1991 Report on Archaeological Phase I Survey of Proposed Subdivision on First Chain Lake, Washington County. 2655 Trautman, Elizabeth A. 2728 1992 2785 Leon Cranmer, Arthur Spiess Report on the Reconnaissance Level Archaeological Survey of the Wesley/T31 MD BPP, Route 9 Project. 079 Corey, Richard 2006 Ellen Cowie Report on Phase I Archaeological Survey of the Birch Point Subdivision, Cathance Lake. 2005 Ellen Cowie Report on Phase I Archaeological Survey of the Cathance Shores Subdivision. 3509 Hedden, Mark H. 1997 Report on Phase I Archaeological Survey of Rocky Lake, Whiting. 2983 Shaffer, Gary Wallace Hall, Washington Co. rock removal 4027 2011 079,80,95,96 Clark, James 2006 Report on Phase I Archaeological Survey of the Quoddy Bay LNG Project Sendout Pipeline. 080 3554 Byers, Douglas S. 1959 The Eastern Archaic: Some Problems and Hypotheses. American Antiquity, 24:233-256. Cranmer, Leon E. 1996 Arthur E. Spiess Archaeological Survey Report Site 80.44, Edmunds Boat Launch Facility. 1994 Arthur Spiess Horan Head Purchase: Archaeological Survey for the Land for Maine's Future Board. 3635 2894 2792 Quads 080 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Hedden, Mark H. 2003 Arthur Spiess Report on Phase I Archaeological Survey of Site 80.13, Gleason Point, Perry. Kingsbury, I.W. 1951 W.S.Hadlock An early occupation site, Eastport,Maine. Massachusetts Archaeological Society Bulletin 12:22-26 Also Robert Abbe Museum, Notes #5 Rojo, Alfonso 1986 Live Length and Weight of Cod Estimated from Various Skeletal Elements North American Archaeology 7(4):329-351 Mark Hedden Spiess, Arthur E. 2006 MHPC Document # 3304 4082 3577 South Bay Parcel, Pike Lands, Lubec: Archaeological Assessment for the Land for Maine's Future Board. 2006 John Mosher 3531 Mowry Beach, Lubec: Archaeological Assessment for LMFB. 2005 John Hudson Morong Cove Acquisition Archaeological Survey for LMFB. 3457 2004 Eric Lahti Initial Archaeological Reconnaissance of the East Ridge Tract LMFB Acquisition. 3371 Eliz. Trautman & Leon Cranmer 1991 Archaeological Survey of the Tide Mill Farm Property. 2625 1990 Eliz.Trautman, Tim.Kuperschmid 2566 Prehistoric Occupation at Reversing Falls Will, Richard T. 2005 Archaeological Survey of the LNG Transfer Facility Site. 080, 096 3517 Sanger, David 2006 Micah Pawling, Donald Soctomah 4126 Passamaquoddy Homeland and Language: The Importance of Place Cross-Cultural Collaboration: Native Peoples and Archaeology in the Northeastern United States, ed by Jordan Kerber Wheeler, Kathleen 2009 Richard T. Will 3867 Archaeological Background Study, Moosehorn National Wildlife Refuge, Washington County, Maine Will, Richard 2010 Kathleen Wheeler Archaeological Background Study Moosehorn National Wildlife Refuge, Washington Co. 080,023,043, Kopec, Diane 1985 Collections Catalog/Inventory for the Robert Abbe Museum 044,058+ 4083 2170 080,097,CAN McCormick, James S. 1980 Criteria in Archaeological Faunal Analysis: Four Passamaquoddy Bay Cases. Master of Science Dissertation, University of Maine at Orono. 149pp Sanger, David 1985 Sea-Level Rise in Passamaquoddy Bay: Archaeology and Sediment Cores. Open File #85-73, Maine Geological Survey 1985 Cultural Ecology in Passamaquoddy Bay, New Brunswick 1971 Passamaquoddy Bay Prehistory: A Summary 081 Cole-Will, Rebecca 1991 Report on Phase I Archaeological Survey of Black Brook Cove Campground, Aziscohos Lake. Davis, Stephen A. 1992 Two Concentrations of Paleo-Indian Occupation in the Far Northeast. Revista de Arqueologia Americana 3: 31-56 Gramly, R. Michael 2005 Recent Archaeological Fieldwork at the Vail Clovis Habitation and Kill Site. The Amateur Archaeologist:11:2:19-37. 2005 Vail Site Radiocarbon Dates. 2714 3513 Quads 081 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Gramly, R. Michael 2005 D.C. Waldorf, Val Waldorf Fluted Drills and Recycled Fluted Points at the Vail Clovis Site. The Amateur Archaeologist:11:1:47-71. 2005 Paleo-American Small-scale Sites in the Magalloway Valley, Northwestern Highlands, Maine. The Amateur Archaeologist:11:2:67-79. 2005 The Upper/Lower Wheeler Dam Sites: Clovis in the Upper Magalloway River Valley, NW Maine. The Amateur Archaeologist:11:1:25-46. 1995 A Quartz Chrystal Fluted Point from Maine. The Amateur Archaeologist 1(2):65-69. 1995 The Vail Paleo-Indian Site: Fifteen Years after the Excavation. The Amateur Archaeologist 1(2):46-64. 1988 The Adkin Site: A Paleo-Indian Habitation and Associated Stone Structure. Persimmon Press, Buffalo, N.Y. 1985 Recherches archeologiques an site paleoindien de Vail, dans le nord-ouest du Maine, 1980-1983 Recherches Amerindiennes an Quebec 15:1-2: 1984 Kill sites, killing ground and fluted points at the Vail site. Archaeology of Eastern North America 12:110-21 1982 The Vail Site: A Palaeo-Indian Encampment in Maine 1981 MHPC Document # Kerry Rutledge A New Paleo-Indian Site in the State of Maine Puryear, Kristen Ann 1996 3260 The Late Pleistocene/Early Holocene Vegetational History of the Vail Site, a Paleo-Indian Encampment and Associated BA in Thesis, Bates College Kill Site West-Central Maine. Rojo, Alfonso 1987 Excavated Fish Vertebrae as Predictors in Bioarchaeological Research 082 Gramly, R. Michael 1995 The Morss Fluted Point Site, Northwestern Maine. he Amateur Archaeologist, 7:2. Spiess, Arthur E. 2008 William Burgess 4073 3773 Report on Phase I Archaeological Survey of the Cupsuptic Lake Parks Water Access Project. 083 Corey, Richard 1998 Report on Phase I Archaeolgical Survey of the Rangeley Sand and Gravel Project. 3003 1993 083,084,100, Will, Richard T. Report on Phase 0 Archaeogical Survey of New England Wind Energy Station. 101 2757 083,100,084 3701 2007 Report on Phase I Archaeological Survey of the Kibby Wind Power Transmission Line. 083,84,100 Mosher, John P. 2006 Report on Phase I Archaeological Survey of Route 27 Highway Improvements and Lower Pond Boat Launch. 3560 084 Bartone, Robert N. 2001 Report on Phase I Archaeological Survey of the Carrabassett Report on Phase I Archaeological Survey of the Carrabassett Valley Hut Project. 3210 Clark, James Rivers Edge Estates Subdivision, Eustis. 3810 2008 1998 Edward Moore, Richard Will Report on Phase II Archaeological Survey of the Flaggstaff Project (FERC 2612) Gramly, R. Michael 1988 Excavations at the Ken Wing site, an isolated ceramic period encampment in the Stratton Highlands,NW Maine. Man in the Northeast 36:89-99 2995 Quads 084 084,085 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Haugh, Sarah 2011 Eustis Water Department Project, Phase I Prehistoric Archaeological Investigation Report MHPC Document # 4026 Mosher, John P. 2000 Richard T. Will A Report on the Phase III Archaeological Investigations of the Tim Pond Brook Site (84.40), Eustis. 3160 Quinn, Catherine 1990 James B. Petersen Eustis Hydroelectric Project Phase I and Phase II Archaeological Testing. 2611 Clark, James 2899 1996 Richard T. Will, Janet Cormier Phase I Archaeological Resource Assessment of the Flaggstaff Lake Storage Project (FERC 2612), Somerset and Franklin Counties, Maine. Will, Richard T. 1994 James Clark, Janet Cormier 2824 Results and Recommendations of Phase 0 Study of the Flaggstaff Storage Project (FERC 2612) 084,129,134 085 085,086 2002 Edward Moore Recent Late Paleoindian Finds in Maine. MAS Bulletin, 42:1:1-14. Brigham, Michael 2009 Stephen Scharoun, Ellen R. Cowie, Robert Archaeological Phase I Survey Proposed Sugarloaf Regional Airport (replaced 3776) 3870 2008 Ellen Cowie Letter Report on Phase I Archaeological Survey of the Proposed Sugarloaf Regional Airport Safety Areas. 3776 2002 Report on Phase I Archaeological Survey of Hut # 3, Franklin Co. 3254 Hedden, Mark H. 2000 Site 85.4 Route 27 Hammond Field, Carabassett Valley. 3104 Kellogg, Douglas 1987 Phase One Prehistoric Archaeological Survey for the Appalatian National Scenic Trail Relocation. 2472 James B. Petersen Parker, Jeffrey 1988 2478 An Archaeological Phase I Survey and Phase II Testing of the Wyman Project (FERC # 2329), Somerset County, Maine. 086 Birnie, Robert Phase I Survey Bingham Hatchery 1988 Thomas Baker Clark, James 2005 Report on Phase I Archaeological Survey of the Wyman Side Channel Project 2003 Report on Phase I Archaeological Survey of the Wyman Hydro Side Channel Project. 2505 3495 3306 Hedden, Mark H. 2004 Tibbet's Pond Survey for the Land for Maine's Future Board. 3420 Mack, Karen 2011 James Clark 2008 Archaeological Data Recovery Old Road Site, Wyman Project (FERC 2329) 4002 2011 James Clark Report on 2008 Data Recovery Sumac Meadow Site, Wyman Project (FERC 2329) 2009 Edward Moore, James Clark 4001 3826 FPL Maine Hydro Report on 2008 Archaeological Data Recovery Site 86.11 Wyman Hydroelectric Project (FERC 2329) Moore, Edward 2011 Phase III Archaeological Data Recovery Clark Site (86.3B) Wyman Hydroelectic Project (FERC 2329) 3998 2011 Phase III Data Recovery Pleasant Pond Stream Site, Wyman Project 3999 Petersen, James B. 1992 Thomas Baker Report on Phase I Archaeological Survey of Bingham Hatchery. 2731 Quads 086 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Will, Richard T. 2001 Edward Moore, Christopher Dorion The Esker Site: a Late Paleoinidan Site in Caratunk. MHPC Document # 2001 Edward Moore, Chris Dorion The Esker Site (86.12): a 14C Dated Late Paleoindian Campsite. 086,52,69,24 Clark, James 2003 Results of Annual Site Monitoring: Wyman, Weston, Gulf Island, Oakland and Bonny Eagle. ,36,37+ 087 McPheters, Hutch 2005 Ellen Cowie 3175 3196 3360 3497 Report on Phase I Archaeological Survey of the Proposed East Whetstone Ponds Project. 087,088,104 Spiess, Arthur E. 1990 Leon Cranmer 2574 Upper Piscataquis Flood Control Structures 088 089 089,090,106 Clark, James 2006 Report on Phase I Archaeological Survey of the Section 34 Pole Replacement Project. 3564 Corey, Richard 2008 Ellen Cowie Report on Phase I Archaeological Survey of Main Stream Subdivision, Dexter. 3778 Mack, Karen 1997 Report on Phase I Archaeological Survey of the Wasookeaz Snowmobile Club Bridge. 2962 Shaffer, Gary Cleaves Farm, Abbot, irrigation system 4157 2013 2012 Alternative Irrigation System for Cleaves Farms, Abbott, Phase I Archaeological Survey 4093 2003 Cleaves Farm Irrigation System, Phase I Survey. 3294 2013 Field Check for Ernesst W. Van der Mast, Dover Foxcroft 4123 Bartone, Robert N. 1987 James Petersen Archaeological Phase I Survey and Testing of the Proposed Dover-Foxcroft Wastewater Treatment Facility,DoverFoxcroft,Maine 090 1992 James B. Petersen 2451 2746 Archaeological Phase III Data Recovery Excavations at The Brockway Site, Milo. 1988 David Putnam & J.B.Petersen Archaeological Investigations at the Brockway Site, Central Maine. Current Research in the Pleistocene 5:1-3 Brigham, Michael 1999 Letter report--McMullen Property, Milo. 3084 Crisell, Rob 1998 A Northern Exposure: New Acquisition. American Archaeology, 2:4:34 Hechenberger, Michael 1990 James B. Petersen Archaeoloical Data Recovery at the Stratified Sharrow Site (ME 90.2b) in Central Maine: Report on the 1989 Excavation. 2569 Hedden, Mark H. 2836 1994 Arthur Spiess Milo Snowmobile Bridge Phase I Archaeological Survey Report to Bureau of Parks and Recreation. Petersen, James B. 1996 Nancy Ash Sidell Mid-Holocene Evidence of Cucumbita sp. from Central Maine. American Antiquity, 61:685-689. 1989 2540 Archaeological Testing at the Sharrow Site: A Deeply Stratified Early to Late Holocene Cultural Sequence in Central Maine. Quads 090 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Petersen, James B. 1988 Thomas Baker & M.Heckenberger A Stratigraphic Sequence at the Sharrow Site in Central Maine. Current Research in the Pleistocene 5:19-20 1987 Robert N. Bartone 2453 Archaeological Phase I Survey and Phase II Testing of the Proposed Milo Wastewater Treatment Facilities, in the Town of Milo,Piscataquis County,Maine Putnam, David E. 1994 Vertical Accretion of Flood Deposits and Deeply Stratified Archaeological Site Formation in Central Maine, USA. 1994 Vertical Accretion of Flood Deposits and Deeply Stratified Archaeological Site Formation in Central Maine, USA. Geoarchaeology: An International Journal, 9:467-502. Spiess, Arthur E. 2006 William Burgess 2806 3611 Sebec River, Milo, Water Access Archaeological Assessment for LMFB. 090,094,110, Cox, Steven L. 1997 Report on Phase II Archaeological Survey of the West Branch Project (FERC 2618). 111 2971 090,106 Petersen, James B. 1986 2443 Archaeological Investigations in the Piscataquis River Drainage and the Greater Moosehead Lake Region, Maine: 19841985 091 Hadlock, Wendell S. 1948 Theodore Stern Passadumkeag, a Red Paint Cemetary, 35 Years after Moorehead. American Antiquity. 14:98-103 1948 Theodore Stern 3980 Passadumkeag, A Red Paint Cemetery, Thirty Five Years After Moorehead 1948 T. Stern Passadumkeag, a Red Paint Cemetary, Thirty-Five Years after Moorehead. American Antiquity, 14:98-103. Heller, Andrew R. 2012 Phase I Archaeological Survey of Passadumkeag and Greenbush, Maine Public Boat Launches Mosher, John P. 2013 Phase I Archaeology Penobscot River Bridge Replacement between Howland and West Enfield Snow, Dean R. The Passadumkeag Sequence. Arctic Anthropology 12:2:46-59 4054 4143 1975 1969 A Summary of Excavations at the Hathaway Site in Passadumkeag,Maine, 1912,1947 and 1948. Ms. Department of Anthropology, University of Maine, Orono. 1969 A Summary of Excavations at the Hathaway Site in Passadumkeag, Maine, 1912, 1947, 1968 Stern, Theodore 1948 Excavations in the Red Paint burial complex of Passadumkeag,Maine. Eastern States Archaeological Federation Bulletin 7( ):11-12. Wilson, Deborah B. 1991 Phase I Archaeological Survey of the Rock Quarry Site in Alton. 4113 2647 091,108 Van Horn, David M. 1984 Steven L. Cox Cultural Resource Assessment: A 20+/- Acre Parcel Located in West Enfield, Maine 2161 092 Kopec, Diane 2530 1989 Thomas Lowell Phase I Archaeological Survey, Wayne Porter Parcel, Saponic Pond, Grand Falls Plantation 093 Will, Richard T. 2012 Phase IA Archaeological Sensitivity Proposed Passadumkeag Wind Project, Grand Falls and Summit Twp 4099 Bartone, Robert N. 1992 James B. Petersen Report on Phase I Archaeological Survey of Proposed West Lake Subdivision, Hancock County. 2686 Quads 093 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Mosher, John P. 2001 Reconnaissance Archaeological Survey of LMFB Acquisition of Nicatous and West Lakes. MHPC Document # Putnam, David E. 2002 Report on Phase I Archaeological Survey of the West Lake Subdivision. 093,094 3178 3220 Kopec, Diane 1985 The Eddie Brown Collection of the West Grand Lake Area, Maine 093,094,110, Cox, Steven L. 1995 Report on Phase I Archaeological Survey of the West Branch Project (FERC 2618). 111 2881 093,094,111 2439 Putnam, David E. 1986 Arthur E. Spiess,others A Prediction of Prehistoric Archaeological Site Locations from Aerial Photographs of Passamaquoddy Nation Lands in Maine 093,114,115, Cox, Steven L. 1997 Project Nipayon Reconnaissance-Level Archaeological survey on Tribal Land. 128,129 094 2934 Hedden, Mark H. 1989 Petroglyph evidence for a possible 19th century survival of Algonkian (Passamaquoddy) shamanism in eastern Maine. MAS Bulletin, 29:1:21-30. Lahti, Eric 2009 Arthur Spiess 3887 Wabassus Lake Project Archaeological Survey for Downeast Lakes Land Trust 2007 Arthur E. Spiess 3729 Downeast Lakes Land Trust Access Improvements 2007 Archaeological Survey. 2006 West Grand Lake, Pocumcus Lake and Fourth Machias Lake: a Limited Survey for Downeast Lakes Land Trust and LMFB. 094,093 3558 Moore, Edward 2013 Phase I survey proposed boat launch, Sysladobsis Lake 4131 Petersen, James B. 1990 Grand Lake Stream, The Elliott II Site: An Archaeologist's Preliminary Report New England Antiquities Research Association Journal 25 (1&2)3-13 Spiess, Arthur E. 2008 Eric Lahti Third and Fourth Machias Lake Preliminary Archaeological Sufvey: LMFB Machias II Purchase. 4038 Lewis, Robert 2707 1992 Steven Cox 3747 Report of Phase I Archaeological Survey of a Proposed Development on Fourth Machias Lake. 094,095 Cox, Steven L. 1992 Report on Phase I Archaeological Survey of a Proposed Development near Grand Lake Stream, Washington Co. 2700 095 Clark, James 2005 Report on Phase I Archaeological Survey of the Big Lake Subdivision, Washington County. 3512 Cox, Steven L. 1991 Site 95.20 and the Vergennes Phase in Maine. AENA 19:135-162 1990 Site Survey in the Vicinity of Indian Township. 2616 1990 Project Wolaku: Preliminary Report on 1990 Investigations. 1989 Bruce J. Bourque 2613 2541 Phase II Archaeological Investigations of Sites in the Big Lake Region, ME. 1986 The Big Lake Archaeological Project:1986 Survey Feher, Steve Some Big Lake Pottery 1976 Bruce J. Bourque 2458 Quads 095 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Feher, Steve 1974 A Site on Big Lake MHPC Document # 1970 A Preliminary Report on Big Lake Pottery Kelley, Alice R. 1988 Steven Cox Survey of Bank Erosion at Archaeological Sites in the Big Lake Region 3838 Mitchell, Harbour III 2013 95.24 A Late Ceramic Period site on the East Machias River 4151 Mosher, John P. 2010 3930 Phase I Archaeological Survey of the Route 1 Bridge Replacement between Indian Twp and Princeton, Washington Co.` 095,110,111, Cox, Steven L. Report on the 1992 Site 95.18 Survey. 112 096 2753 1993 Baldwin, Geraldine 2009 Belinda Cox Addendum Report Phase I B Archaeology Survey Deep Testing Location 9 Calais LNG Project Pipeline 3910 Bartone, Robert N. 2013 Jessica Stuart Proposed US Cellular Calais Telecommunications Tower Phase I 4117 Brigham, Michael 2005 3472 Archaeological Phase I Survey of Lots 12, 14 and 16 of the Proposed Woodland Commercial Park Project in Baileyville, Washington Co. (MHPC #2753-04). 2005 Cowie, Bartone, Scharoun, Cyr and Reed 3501 The Archaeology of N'tolonapemk (96.02), "Our Ancestors' Place": Phase III Data Recovery at the Eastern Surplus Superfund Site, Meddybemps, Maine. 2001 R. Bartone, J.Reed, E. Cowie Introduction to the Archaeological Phase III Excavations at NTOLONAPEMK, the Eastern Surplus Company Superfund Site, MAS 96.02.Bulletin, 41:2:27Clark, James 2006 Rebecca Cole-Will, Jacob Freeman Phase I Pre-contact Archaeological Survey Report, Downeast LNG Project. 2006 Rebecca Cole-Will 3640 3587 Report on Phase IA and Initial Phase IB Precontact Archaelogical Review, Downeast LNG Project, Maine. Leach, Peter 2009 William Chadwick 3909 Archaeological Deep Testing for the Calais LNG Project, Washington Co. 2008 Assessment of Submerged Prehistoirc Archaeological Site Potential, Calais LNG Project 3834 McPheters, Hutch 2004 S.Sharoun,R.Bartone,M.Brigham,E.Cowie Report on Phase I Archaeological Survey of Three Proposed Firebreak Lines within Tract 100A of the Moosehorn National Wildlife Refuge (Contract # 501813 CO 3429 Moore, Edward 2008 Kathleen Wheeler, Ellen Marlatt Phase 1 Archaeological Survey of the Milltown (Calais) LPOE .21 Acre Lot, Calais, Washington Co. 3805 Mosher, John P. 3228 2002 Leon Cranmer, Arthur Spiess Phase II Testing of Calais International Bridge Project (PIN 8483.30) 2000 Leon Cranmer 3163 Phase 0 and I Archaeological Survey of the Calais Industrial Bridge Project (MDOT PIN 8483.30). Soctomah, Donald 2006 A Visit to Our Ancestors Place: Meddybemps - N'tolonapemk Village. 3630 Waller, Joseph, PAL 2011 Phase I Archaeological Identification Survey Moosehorn National Wildlife Refuge, New Administrative Facility 4043 Quads 096 096, 097 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Will, Richard T. 2000 Phase I Archaeological Survey of Proposed Injection Well Locations, Eastern Surplus Superfund Site. MHPC Document # 3130 2000 J.Clark,K.Mack,J.Mosher,B.Newsome Results of Phase I and II Archaeological Testing of the Eastern Surplus Company Superfund Site, Meddybemps. 3094 1999 Survey of Phase I and II Investigations Conducted at Site 96.02, Meddybemps. 3074 Baldwin, Geraldine 2009 Belinda Cox, T. Kotlensky 3908 Phase 1B Archaeological Survey Twelve Pipeline Route Variations Calais LNG Project 2008 Leach, Peter 3835 Phase I Archaeological Survey of the Calais LNG Project, Washington County, ME 096,113,127 Carlson, Catherine C. 1981 2118 Report on Archaeological Survey of the Georgia-Pacific Corporation Timber Haul Road Along the West Bank of the St. Croix River Between Woodland and Va 097 Baldwin, Geraldine 2009 Kathleen Wheeler, Belinda Cox Phase II Archaeological Testing: Sites 97.11, 97.12, and 97.13, Calais LNG Project Terminal Property 3907 Hadlock, Wendell S. 1954 Recent Excavations at DeMonts' Colony, St. Croix Island, Maine Old-Time New England 44(4): 93-99 Mosher, John P. 2007 Charlotte Mitigation Project (PIN 10008.40) 4097 Pendery, Steven 2002 Archaeological Survey of Red Beach Cove Project Area. 3247 William Brett Robinson, David S. 2006 Phase I Maine Archaeological Survey, Downeast LNG Project. 3620 Sanger, David 1973 The Prehistoric Components on St. Croix Island, Maine. Manuscript, Department of Anthropology, University of Maine at Orono. Spiess, Arthur 2010 St. Croix Island Faunal Remains Final Project Report Spiess, Arthur E. 2005 Leon Cranmer 3696 3960 3449 Devil's Head, Calais, and Site 97.10: Archaeological Survey for LMFB. 100 Wing, Kenny 2007 Poison Pond and the Search for Blue Chert near Route 27. 3725 101 Clark, James 2006 Reconnaissance Survey, Spencer Lake Wetland Restoration Project. 3586 102 Baker, Thomas R. Alder Pond Mining Project 1990 2582 Bartone, Robert N. New Trail "A", Dead River, Inspection. 2008 Gramly, R. Michael Perspective on Maine Archaeology. The Amateur Archaeologist 1(2):39-45. Spiess, Arthur 1995 2009 James B. Petersen 3785 Kenny Wing 3822 Preliminary Archaeological Assessment 2008 Dead River Trail and Conservation Corridor 103 Spiess, Arthur E. 2009 Dead River Trail Archaeological Survey Work Addendum, Dead River Footbridge Testing 3866 Brigham, Michael 2005 Robert Bartone Report on Phase I Archaeological Survey of the Old Camden Road Scenic Byway Trail Development. 3515 Quads 103 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Clark, James 1992 Rebecca Cole-Will,Richard Will Addendum Report on Phase I Archaeological Survey of the Moxie Storage Pond Project. MHPC Document # 2708 Hedden, Mark H. 1999 A Report on the Phase I Archaeological Survey of PIN 6155.10 at The Forks Picnic Area 3051 Will, Richard T. 2007 Elrich, Lorrener Report on Phase I Archaeological Survey of the FPL Energy Hydro Marine Boat Launch, West Forks. 3728 1991 2627 James Clark, Rebecca Cole-Will 1991 Phase I Survey for Prehistoric Archaeologicsal Sites, Moxie Pond Storage (FERC 2613) 103,117 Clark, James 1998 Richard T. Will 2987 Report on the Phase 0 Archaeological Review of Indian Pond Project (FERC 2634). 104 104,105,117, 118,130+ Hamilton, Nathan D. 1991 John Mosher Archaeological Phase I Survey of the Proposed West Cove Point Subdivision Project, Greenville. 1982 James B. Petersen,other Aboriginal Cultural Resource Inventory in the Greater Moosehead Lake Region 104,117,118, Robins, Jennifer 1990 G.Baldwin, J.Petersen 130,131 Archaeological Phase I Survey of the Moosehead Lake Project. Will, Richard T. 2001 Moosehead Lake Storage Project (FERC 2671): Monitored Erosion Sites. 104,117,118, Clark, James 2002 Monitored Erosion Sites: Moosehead Lake Storage (FERC 267). 131 104,118,131 McGuire, J.D. 1908 Ethnological and archaeological notes on Moosehead Lake, Maine. American Anthropologist 10:549-557 Petersen, James B. 1988 David E. Putnam Moosehead Lake Project Archaeological Phase I Scope of Work. 2633 2131 2618 3169 3214 2493 105 Spiess, Arthur 2009 Lahti, Eric Initial Archaeoloigcal Survey 2008 Katahdin Iron Works Phase II Purchase 3845 106 Clark, James 2006 Report on Phase I Archaeological Survey of the Submarine Utility Line, Ebeemee Lake. 3547 Putnam, David E. 2455 1987 James B. Petersen Archaeological Phase I Testing of the Proposed Brownville Junction Wastewater Main and Treatment Plant, Piscataquis County, Maine Shaffer, Gary 2009 Deep Tillage Assistance for Derek Hines, Brownville 3883 2004 Report on Phase I Archaeological Survey of the Ken Dorman Pipeline Project. 3408 2002 Report on Phase I Archaeological Survey of the Wallace Sinclair Property, Back Brownville Road. 3268 Spiess, Arthur E. 2006 Leith Smith 3526 Pleasant River, Williamsburg Township, Water Access: Archaeological Assessment for the Land for Maine's Future Board. 1984 Michael Brigham,other An Accelerator Radiocarbon Date on a Red Paint Feature Wilson, Deborah B. 2002 Report on Phase I Archaeological Survey of the Double D Farms, Brownville. 106,107 Cook, David S. 1981 Arthur Spiess Archaeology of the Piscataquis Ahwagan: Preliminary Results 3213 Quads 106,107 107 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Petersen, James B. 1986 Nathan D. Hamilton, others The Piscataquis Archaeological Project: A Late Pleistocene and Holocene Occupational Sequence in Northern New AENA 14:1-18 England. Haugh, Sarah 2010 Phase I Prehistoric Archaeological Investigation Milo Water District 3940 Lahti, Eric 2011 Arthur Spiess Northwest Pond (T4R9 NWPP) Preliminary Archaeological Survey -- Land for Maine's Future Seboeis Unit Addition 3993 Mack, Karen 3057 1999 Julia Clark A Report on the Phase I Archaeological Survey of the Proposed Realty Trust, Schoodic Lake Subdivision. Petersen, James B. 1988 Robert Bartone 2495 An Archaeological Phase I Survey of the Proposed Little Schoodic Landing Project, Medford, Piscataquis County, Maine. 1988 John Langerak An Archaic Period Incised Artifact from Medford, Piscataquis County, Maine. Maine Archaeological Society Bulletin 28(1):28-37. Putnam, David E. 1999 A Report on the Phase II Archaeological Survey of the Proposed Realty Trust, Schoodic Lake Subdivision. Shaffer, Gary 2011 Arthur E. Spiess A Terminal Archaic Lithic Workshop (ME 107.16) Along the Pleasant River in Milo, Maine Maine Archaeological Society Bulletin 51(1)::29-50 2010 Deep Tillage Proposed for Farm Fields Derek Hines, Milo Maine: An Archaeological Survey Spiess, Arthur E. 2006 Kenny Wing 3060 3971 3615 Seboeis Lake 789 Acre Purchase: Archaeological Assessment for LMFB. 108 Bartone, Robert N. 2012 Gemma-Jayne Hudgell Township T2R8 NWP Gravel Pit expansion Project, Archaeological Phase I Survey 4070 Belcher, William R. Gordon Island Test Report 2481 1988 David Sanger Brigham, Michael 2010 Ellen Cowie Lincoln Regional Airport Obstruction Removal Phase I Survey 3956 Hedden, Mark H. 2780 1993 Arthur Spiess Report on Phase I Archaeological Survey of the Carpenter Ridge Landfill Project. Mack, Karen 1997 Bonnie Newsom 2942 An Assessment of Cultural Resources in the Howland Reservoir. Moore, Edward 1999 Phase II Archaeological Investigations at Site 108.23: Possible Paleoinidan Component. 3088 Mosher, John P. 2004 A.E. Spiess Phase II Archaeological Test of Sites 108.58 and 108.7 for the Route 116 Bridge Repalcement, Mattamiscontis. 3392 Newsome, Bonnie 1998 David Sanger Report on Phase II Archaeological Survey of the Howland Reservoir, Central Maine. 3028 Sanger, David 2000 Middle Archaic in the Lower Piscataquis River, and its Relationship to the Laurentian Tradition in Central Maine. MAS Bulletin, 40:1:1-22. Wilson, Deborah B. 1993 Report on the Phase I Archaeological Survey of the Runway Extension at the Lincoln Municipal Airport. 2766 108, 123, 124, 137, Mack, Karen 2010 James Clark, Richard Will Phase I Precontact Archaeological Survey GenLead LLC Transmission Line, Aroostook and Penobscot Counties 3973 108,122 Will, Richard T. 2002 Report on Phase I Archaeological Survey of the 115kV Chester to Millinocket Tie Line Project. 3258 Quads 109 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Corey, Richard 2007 Ellen Cowie Report on Phase I Archaeological Survey of the Gardner Land Company Subdivision, No.3 Pond. McPheters, Hutch 2008 Letter Report: Bill Green Pond Subdivision. 110 MHPC Document # Steve Scharoun, Ellen Cowie 3693 3774 Will, Richard T. 2008 Results of Phase I Prehistoric Archaeological Review of the Rollins Wind Project; Penobscot Co. 3793 Bartone, Robert N. 3839 2008 Ellen Cowie West Branch Project (FERC 2618) Phase II Testing at Sites 110.111 and 110.112 Cox, Steven L. 2004 Jane C. Clifton 3411 Report on Phase I Archaeological Survey of a Proposed Commercial Camp Development in Lakeville, ME. Gammon, James G. 2008 Ellen Cowie Phase II Archaeological Testing of Site 110-10 and supplememtal Phase I West Branch Project. 2007 Ellen Cowie Phase I Archaeological Survey of the West Branch Project Area, Lakeville. 3781 3731 Putnam, David E. 1986 A.E.Spiess,J.B.Petersen,T.E.EAstler 2440 A Prediction of Prehistoric Archaeological Site Locations from Aerial Photographs of Penobscot Nation Lands in Maine Wilson, Deborah B. 1989 Steven L. Cox 2532 Phase II Archaeological Assessment of the William Shwartz Property on Junior Lake, Maine. 112,113,126, Allen, Patricia 1985 2178 Site Descriptions, Archaeological Importance and Recommendations for Mapping of 25 Campsites Located Along the 127 Shores of Spednik Lake and the St. Croix. 115 116 Mosher, John P. 2004 Leon Cranmer 3370 Report on Phase I Archaeological Survey of the Jackman-Moose River Bridge Replacement (PIN 10106.00), Jackman, ME. Will, Richard T. 1988 Rebecca Cole-Will Phase I Archaeological Assessment of the Birch Island, Attean Pond, Subdivision. 2497 Cowie, Ellen R. 2006 An Archaeological Phase I Survey of the Proposed Plum Creek Development Project, Long Pond. 3638 Grindle, John 3711 2007 Ellen Cowie Archaeological Phase I Survey of the Southeast Shore Development Zone in the Proposed Plum Creek Development on Long Pond, Long Pond Twp, Somerset Co. 116,117,118 Scharoun, Stephen 2007 Ellen Cowie, Robert Bartone Phase 0 Archaeological Survey of the Plumcreek Development, Moosehead Lake Region. 3733 117 Baldwin, Geraldine 2011 Proposed Quarry Brassua Lake (Purington property), Pedestrian Archaeological Reconnaissance 4031 Brigham, Michael 2009 Scharoun, Steve; Robert Bartone; Ellen C Archaeological Phase I Survey and Limited Testing of the Brassua Project (FERC 2615) Somerset County (incl. Wing collection) 3824 Clark, James 2006 Report on Phase I Archaeological Survey of the Blue Ridge Subdivision. 3601 Gammon, James G. 3923 2010 Stephen Scharoun, Robert Bartone, Ellen Archaeological Phase II Testing Select Sites Brassua Hydroelectric Project (FERC 2615), Somerset Co. Maine 2007 Ellen Cowie Archaeological Phase I Testing of the Proposed Rockwood Telecommunications Tower Project Area in Rockwood, Somerset Co. 3710 Quads 117 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Hamilton, Nathan D. 1983 An Archaeological Reconnaissance of the Shoreline of the Brassua Lake Reservoir, Somerset County, Maine MHPC Document # Moore, Edward 2011 Richard Will, Lawrence Elrich Archaeological Data Recovery at Site 117.39, Moosehead Lake Outlet Dams Storage Project (FERC 2671) Will, Richard T. 2012 Site 117.39: A Probable Middle Archaic Chipped Stone Tool Workshop and Cache Location, Rockwood, Maine Maine Archaeological Society Bulletin 52(1):27-56 Willoughby, Charles B. 1901 Prehistoric workshops at Mt. Kineo. American Naturalist 35:218-219 Wing, Kenny R. 2007 Phase I Archaeological Survey of Proposed Camp Sites, Sugar Island and Farm Island, Moosehead. 117, 118 2125 4020 3737 Clark, James 2011 Archaeological Evaluation of Precontact Period Sites at Moosehead Lake 3994 Will, Richard T. 1994 Sarah Staber A Case Study of Archaeological Flake Debitage Assemblages from Moosehead Lake, Maine 4040 117,103 Clark, James 1998 Richard T. Will, Chris Dorion Report on Phase I Archaeological Survey of Indian Pond Project (FERC 2142). 3027 117,118 Bourque, Bruce J. 1991 2656 Report on Phase I Archaeological Survey Brassua Lake, Taunton and Raynam Academy Grants, Somerset County, ME. Will, Richard T. 2003 James Clark 3335 Archaeology and Prehistory of Moosehead Lake, Maine, Phase III Data Recovery. 2001 A Tale of Two Flint Knappers: Implications for Lithic Debitage Studies in Northeastern North America. Lithic Technology 25(2):101-119. 117,118,130, Clark, James 1994 Will,Cole-Will,Cormier,Staber 131 Phase II Archaelolgical Survey of Moosehead Lake Outlet Dams Project (FERC 2671). 1992 Richard Will,Rebecca Cole-Will Report on Phase IIa Archaeological Survey of the Moosehead Lake Outlet Dam Project (FERC 2761). Will, Richard T. 1993 J.Clark,R.Cole-Will,J.Cormier 2808 2696 2763 Partial Phase II Archaeological Survey of Moosehead Lake Outlet Dams Storage Project (FERC 2671). 117,118,130, 131,104 117,118,133 118 2002 ARC, Inc. 3287 Results of Annual Archaeological Site Monitoring, Moosehead Lake Outlet Dams Storage Project (FERC # 2671). 1996 James A. Clark Stone Artifact Movement on Impoundment Shorelines: A Case Study from Maine. American Antiquity, 61:3:499-519. Bonnichsen, Robson 1976 Moosehead Lake Archaeological Survey. 2597 Clark, James 2005 Results of annual Archaeological Site Monitoring -- The Moosehead Lake Outlet Storage Project (FERC 2671) 3440 Crock, John 1991 James B. Petersen Archaeological Phase I Survey of Inland Portions of the Mount Kineo Talus Slope Area. 2628 Hamilton, Nathan D. 1988 An Archaeological Phase I Survey of the Proposed Squaw Bay Project, Little Squaw Township, Somerset County. 2487 1987 Cynthia Thayer 2465 An Archaeological Phase I Survey of the Lily Bay Subdivision, Piscataquis County. Leach, Peter 2005 Search for the Sunken Moosehead Lake Canoes. 3648 Putnam, David E. 2003 Report on Phase II Archaeological Testing of the Lambs Cove Subdivision, Moosehead Lake. 3317 Quads 118 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Robins, Jennifer 1990 James B. Petersen Archaeological Phase I Survey and Testing of the Kineo Development Project, Kineo Township. MHPC Document # 2584 Spiess, Arthur E. 1992 Leon Cranmer Rockwood Boat Launch Ramp: Archaeological Test of Site 118.174. 2703 Will, Richard T. 2007 Jacob Freedman Report on Phase I and II Archaeological Survey of a Proposed Subdivision on Kineo Peninsula. 3655 1996 An Example of Late Middle Ceramic (Woodland) Period Biface Production Technology from Moosehead Lake, Maine. AENA, 24:95-148. 1991 2645 Moosehead West Outlet Dam Project. 118, 130, 131 118,131,130, 117 Clark, James 2013 Results of 2011-2012 monitored archaeological sites, Moosehead Lake Outlet Dams Storage Project (FERC 2671) 4163 2011 Moosehead Lake Outlet Dams Storage Project (FERC 2671) 2011 Fieldwork Summary 4095 2003 Results of Annual Site Monitoring: Moosehead Lake Outlet Dam. 3359 119 Eldridge, Stuart A. 2001 Report on Phase 0 Archaeological Survey of the First Roach Pond Subdivision. 3198 120,121,122 Petersen, James B. 2488 1988 David Putnam and Thomas Baker Phase 0 Cultural Resources Assessment of the Ripogenus Project 120,121,122, Nelson, Stephen 1990 Leigh Ferreira, C. Paquin, JBP 134,135 Archaeoloical Phase I ... II...of the Penobscot Mills Project (FERC 2458). 2570 120,124 Cranmer, Leon E. 1992 Arthur Spiess Diamond Occidental Purchase Reconnaissance Archaeological Survey Completion Report to the LMFB. 2729 121 Freedman, Jacob 2007 Richard T. Will Report on Phase 0 Archaeological Survey of the Proposed Hammond Ridge Development. 3658 Moore, Edward 2004 Results of Phase III Archaeological Data Recovery at Sites 121.52a & 121.52b Located within the Penobscot Mills Project (FERC #2458 ), Piscataquis County, 3364 121,122,134, Hurld, Dan Milinocket Lake Collection Photos. 135 122 3125 2000 Clark, James 1998 Richard Will Report on Phase I Archaeological Survey of Proposed Great Northern Company Intermill Tie Line, Penobscot Co. 3012 Hedden, Mark H. 1995 Arthur E. Spiess Report on Phase I Testing Around the Route 116 Bridge in Medway. 2845 Quinn, Catherine 1991 James B. Petersen Supplemental Archaeological Phase II Testing of the Penobscot Mills Project (FERC No. 2458) Penobscot and Piscataquis Counties, ME. 2651 Sanger, David 2901 1996 Maureen Sweeney, Karen Mack Report on Phase II Archaeological Survey of the Medway Reservoir. Sweeney, Maureen 1994 David Sanger Phase I Archaeological Research in the Medway Reservoir. Will, Richard T. The Corrigan Site. MAS Bulletin, 47:2:36-50 2007 Edward Moore 2837 Quads 123 123,124 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Bourque, Bruce J. 1985 Lanita Collette & Robert Lewis Analysis of archaeological and historical dates on Indian occupation of the Mattawamkeag area. MHPC Document # 2542 Crock, John 1992 James B. Petersen Report on Phase I Archaeological Survey of the Pattagumpus Gravel Pit, Medway. 2689 Putnam, David E. 2006 Report on Phase I Archaeological Survey of the Snowmobile Crossing, Molunkus Stream. 3556 Spiess, Arthur E. Test Excavation at Mattawamkeag 1980 Clark, James 2007 Karen 3702 Report on Phase I Archaeological Survey of the Proposed Stetson Mountain Wind Farm Project Transmission Line. 123,126 Bourque, Bruce J. 1985 Lanita Collette,other Mattawamkeag/Chandler Collection Survey, FY 85: Analysis of Archaeological and Historical Data on Indian Occupation of the Mattawamkeag Area 2182 124 Spiess, Arthur E. 2005 John Hudson Page Farm Acquisition Archaeological Survey for LMFB: Discovery of Site 124.5. 3451 125,126,127 Kopec, Diane 1984 St. Croix River - Spednik Lakes Archaeological Survey, FY 84: Phase I Survey of the Chiputneticook Lakes 2163 125,126,138 Cox, Steven L. 2006 Report on the Phase II Archaeological Survey of Forest City Project Area, with Recommendations. 3588 126 1998 Report on the Phase II Archaeological Survey of Forest City Project Area. 2992 1995 Report on Phase I Archaeological Survey of Forest City Project (FERC 2660). 2870 Bartone, Robert N. 2010 Ellen Cowie, Michael Brigham Post Field Summary Phase III Data Recovery, Forest City Land Port of Entry 3959 Brigham, Michael 2010 Gemma-Jayne Hudgell, Robert Bartone, Ell Archaeological Phase II Testing of Site 126.31 within Forest City Land Port of Entry 3954 Cranmer, Leon E. 3233 2002 Arthur E. Spiess Report on Phase I Archaeological Survey and Testing of Sites 126.2 and 126.19 for LMFB, Birch Islands. 1994 Arthur Spiess 2841 Spednic Lake Acquisition Archaeological Survey for the Land for Maine's Future Board. 1993 Arthur Spiess Forest City Purchase Archaeological Survey For The Land For Maine's Future Board. 2745 Deal, Michael 1985 Final Report on the 1983/1984 Excavations at the Mud Lake Stream Site(BkDw5), Southwestern New Brunswick Manuscripts in Archaeology No. 15, New Brunswick Historical and Cultural Resources. Hudgell, Gemma-Jayne 2013 Michael Brigham, Robert Bartone, Cowie 4112 Archaeological Phase III Data Recovery Locus 1 of Paleoindian Site 126.31, Forest City LPOE, US Customs and Border Protection 2013 Michael Brigham, Robert Bartone, E Cowie The Grand Lake Outlet Site: An Early Paleoindian Encampment on the St. Croix River, Maine/New Brunswick Border Maine Archaeological Society Bulletin 53(1):27-58 Moore, Edward 2008 Kathleen Wheeler, Ellen Marlatt 3803 Phase 1 Archaeological Survey of the Forest City (FOR) LPOE 1.5 Acre Lot, Forest City, Washington Co. Putnam, David E. Site 126.7, Foster Island, Forest City. 2003 3334 Quads 126 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Spiess, Arthur E. 2007 Leon Cranmer Spednik Lake Purchase: 2003 Archaeological Assessment for LMFB. MHPC Document # 3713 Spiess, Athur E. 2006 Lambert Lake Water Access: Archaeological Assessement for the Land for Maine's Future Board. 3594 126, 127 Clark, James 2013 Results of Phase I Survey Spednic Lake, Vanceboro Dam Storage Project (FERC 2492) 4137 126,127 Bourque, Bruce J. 1992 2718 Report on the Phase I Archaeological Investigations of the Proposed AT&T Fiber - Optic Cable Route from Vanceboro to Danforth. 126,127,CAN Hale, H. Louise 1984 Archaeological survey and Testing of the St.Croix River and Spednic and Palfrey Lakes, New Brunswick. 127 Robinson, Brian S. 1994 A Hathaway I Complex Burial Site on the St. Croix River: The Crocker Collection. 2892 2818 129,130,132, Clark, James 1997 Edward Moore, Richard T. Will 2952 142 Interim Report on Phase I Archaeological Survey of the Bowater/GreatNorthern Paper Storage Project (FERC 2634). 129,142,130 131 130 1998 Richard Will, Edward Moore Results of the Phase I Archaeological Survey of the Storage Project (FERC 2634). Will, Richard T. 2005 Report on Phase I Archaeological Survey of the South Branch of the Penobscot River between Canada Falls and Seboomook Lake, Somerset Co., Maine. 2002 Report on Phase II Archaeological Survey of Site 130.16, Seboomook Lake. 3014 3466 3218 130,131,140 Spiess, Arthur E. 2004 West Branch Project: Review of Archaeological Sites. 3423 130,142 Clark, James 1999 Julia Clark, Richard Will A Report on the Phase II Archaeological Testing of the Storage Project (FERC 2634). 3079 131 Bourque, Bruce J. 1991 Report on Phase II Archaeological Research at Site 131-21, Moosehead Lake. 2654 131,151,141 Spiess, Arthur E. 2006 West Branch Purchase: Continued Archaeological Survey 2004 and 2005. 3614 132,133,142, Bartone, Robert N. 1990 J&MPetrsn,CQuinn,TBuchanon,etc 2564 143 Archaeological Phase I Survey and Phase II testing of the Ripogenus Project (FERC 2572), Piscataquis County, ME. 131 new sites. 132,133,143 Petersen, James B. 1988 David Putnam and Thomas Baker Phase 0 Cultural Resources Assessment of the Penobscot Mills Project 2489 133 Cox, Steven L. 1985 Peter Beblowski Report on the 1985 West Branch Archeological Survey 2177 2120 1982 Report on the West Branch Archeological Survey Mathiasson, Kåre 1995 Leon Cranmer, Arthur Spiess 2858 Report on the Phase I Archaeological Survey of Kidney Pond Road Bridge, Baxter State Park. Wing, Kenny R. 2008 First and Second Debsconeag Pond Portage Trail Inspection 3815 134 Petersen, James B. 1990 Georgia Pacific Togue Pond Recreation Area Phase I Survey. 2591 136 Bradstreet, Theodore E. 1988 Report on Phase I Archaeological Survey of the Patten Sewage Plant. 3199 Quads 136 137 138 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Putnam, David E. 1995 Report on Phase I Archaeological Survey of the Fish Stream Esker Gravel Pit, Crystal. Northeast Anthropology, 50:19-30. Spiess, Arthur E. 2006 Mattawamkeag Region Forest Legacy Project: Archeological Assessment for LMFB. Cox, Steven L. 2000 An Early Contact Site on the Upper St. Croix River. MAS Bulletin 40:2:1-10. Moore, Edward 2008 MHPC Document # Kathleen Wheeler, Ellen Marlatt 2890 3597 3802 Phase 1 Archaeological Survey of the Orient (ORI) LPOE 1.03 Acre Lot, Orient, Aroostook Co. 139 Wilson, Deborah B. 1990 Final Report on the Phase I Archaeological Survey of the Longfellow Lake Subdivision in Weston, ME. 2603 McPheters, Hutch 2012 Ellen Cowie St. Aurelie Tactical Tower Line archaeological assessment 4076 140,142,133, Clark, James 2005 Small Pond Walkover Survey, Storage Project. 129 3642 142,143 3353 143 2003 Richard T. Will Results of Phase III Archaeological Data Recovery at Five Sites within the Ripogenus Hydroelectric Project (FERC #2572), Piscataquis Co., ME. Quinn, Catherine 1991 James B. Petersen 2649 Supplemental Archaeological Phase II Testing of the Ripogenus Project (FERC No. 2572), Piscataquis County, ME. 143,144,153, Putnam, David E. 1997 Archaeological Investigation of the Headwaters Lakes Region Allagash Wilderness Waterway. 162 2972 147 Bonnichsen, Robson 1984 Robert Birnie, Dee Hungerford Archaeological Reconnaissance and Testing of the Chase Mountain Tailing Pond Site. 2719 Tratebas, Alice 1984 Archaeological Reconnaissance of the Chase Mountain Mine, Penobscot County, Maine. 2720 148 Cox, Belinda 1993 J.B. Petersen Report on Phase II Archaeological Survey of the Southern Aroostook Solid Waste Landfill Access Road. 2777 149 Belcher, William R. 1989 Phase I Prehistoric Archaeological Survey of Baston Farm Subdivision, Meduxnekeag River, Houlton, ME. 2528 Cranmer, Leon E. 2743 1993 Arthur Spiess Smith Bridge Replacement Project, Houlton, Maine, Archeological Testing of Site 149.2. Putnam, David 2013 Archaeological Phase I Survey B Stream snowmobile pedestrian bridge replacement, Houlton 4128 Putnam, David E. 2007 3674 Phase I Archaeological Survey of the Proposed Aroostook Riders ATV Bridge over the Meduxnekeag River, Houlton, ME. 2006 Report on Phase I Archaeological Survey of the Snowmobile Crossing, Meduxnekeag River. 3555 2002 Report on Phase I Archaeological Survey of the Town of Houlton Riverwalk and Pedestrian Bridge. 3274 1995 Kathleen Wheeler, J.B.Petersen 2857 Meduxnekeag Archaeological Project: Purchasing Assessment of Archaeological Site Potential. Shaffer, Gary 2013 Field Check for Town of Houlton, Rt 2A, at Pearce Brook 2012 Field Check E. W. Nightingale Tract 2067 New Limerick, Irrigation 4103 4085 Quads 149 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Shaffer, Gary 2011 Field Check for Michael Hagan, Houlton, Stream Crossing and Access Road Improvements MHPC Document # 2003 Report on Phase I Archaeological Survey of Sediment Basins for Michael Fitzpatrick, Houlton. 3984 3326 Spiess, Arthur E. 1999 Testing the Gardner Site: Archaeology at Cary's Mills Bridge (MDOT PIN 6743), Houlton. 3041 151,160,161 Putnam, David E. 2003 Reconnaissance Survey of the Upper St. John River: Baker Lake to Ninemile Bridge. 3337 152 Spiess, Arthur E. 2009 A Brief Archaeological Survey of Allagash Lake 3828 153 Bouras, Edward 2012 Garret Evans, Paul Bock 4069 Notes on Munsungun Survey, October 2012 Putnam, David E. 2000 Archaeological Phase I Survey of the Proposed John's Bridge Canoe Access, Allagash Wilderness Waterway. 1997 Dariel McKee Archaeological Survey of the Churchill Dam Impoundment, Allagash Wilderness Waterway. Spiess, Arthur E. 2004 John's Bridge Area, Allagash Waterway: 2003 Prehistoric Archaeological Sites Survey. 3116 2940 3362 3418 2004 Allagash Fieldwork 2004 Narrative. 2003 John's Bridge Area, Allagash Waterway Prehistoric Archaeological Sites: NR Eligibility. 154 2002 Paleoindian Artifacts in the Allagash, Northwestern Maine. MAS Bulletin, 42:1:35Bonnichsen, Robson 1985 Alice M. Tratebar Investigations at Willard Brook Quarry, Munsungan Lake, Maine Victor Konrad,others 1981 Archaeological Research at Munsungan Lake: 1980 Preliminary Technical Report of Activities Ellis, Christopher 1995 154,155 154,155,164 2185 2102 James Payne Estimating Failure Rates in Fluting Based on Archaeological Data. Journal of Field Archaeology Gramly, R. Michael 2010 Evidence of Clovis in North Eastern North America: Windy City 154, 155 3280 3932 Payne, James H. 1987 Windy City (154-16): A Paleoindian Lithic Workshop in Northern Maine. MS.Thesis, University of Maine at Orono. 2475 Wilson, Deborah B. 1999 Chase to Churchill Lakes Paleoindian Survey. 3046 Arthur E. Spiess Pollock, Stephen G. 1994 Nathan D. Hamilton, Richard A. Doyle Geology and Archaeology of Chert in the Munsungun Lake Formation NEICG Field Guide Seeber, Pauleena MacD. 1987 A Comparison of Archaeological Remains from Two Ceramic Period Sites at Munsungun Lake, Me. 4119 Bonnichsen, Robson 1982 Archaeological Research at Munsungan Lake: 1981 Preliminary Technical Report of Activities 2103 154,155,177, Burke, Adrian L. 2000 Lithic Procurement and the Ceramic Period Occupation of the Interior of the Maritime Peninsula. 160 PhD dissertation, SUNY, Albany 155 Bonnichsen, Robson 1985 Alice Tratebar Investigation at Willard Brook Quarry Munsungan Lake, and Munsungan Lake Lithic Sources. 2466 3151 2723 Quads 155 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Bouras, Edward 2006 Garret Evans A New Look at Munsungun: Excavations at the Ray Carter Site Maine Archaeological Society Bulletin 46(1):23-55 2005 Garrett Evans A New Look at Munsungan: Excavations at the Ray Carter Site. MHPC Document # 2005 Garret Evans The 2004 Archaeological Survey of Site 155.80 on Little Munsungan Lake, Piscataquis County, ME. 2004 Paul Bock, Garret Evans 3511 3458 3398 Preliminary Phase I Archaeological Survey of Site 155.80, Little Munsungun Lake. 3412 2004 Survey Report: Munsungun Region. Buchanan, Thomas 1991 James B. Petersen Archaeological Phase II Testing of Millinocket Lake Storage Dam Project (FERC # 2366). 2657 Crowley, Dan 2010 Digging Up a Little History (Munsungun Hunting and Fishing Club) 4024 Ferreira, Leigh 1990 James B Petersen Archaeoloical Phase I Survey of the Millinocket Lake Storage Dam Project (FERC 2366). 2571 Grindle, Jacob 3989 2011 Ellen Cowie Phase I Survey Proposed U. S. Customs and Border Protection Tactical Communications Modernization Project, SM Norway Bluff Hudgell, Gemma-Jayne 2013 Ellen Cowie 4132 Archaeological Assessment of Trail Improvements CBP Radio Communications Tower, Norway Bluff 156 159 Konrad, V.A. 1983 R. Bonnichsen,other Soil chemical identification of 10,000 years of prehistoric human activity at the Munsungen Lake Thoroughfare, Maine. Journal of Archaeological Science. 10(1):13-28 Putnam, David E. 2003 3321 Report on Phase I Archaeological Survey of the Oxbow-Masardis Snowmobile Club Bridge Spanning St. Croix Stream. Wellman, Alice N. 1973 The La Pomkeag Site (156-1) -- A Preliminary Report 2152 Cowie, Ellen R. 2010 Archaeological Phase II Testing Boundary Line Mill Hamlet, ME 055-001 and Native American site 159.1, proposed Land Port of Entry, Bridgewater 3953 Grindle, Jacob 2010 Stephen Scharoun, Robert Bartone, Ellen 3926 Phase I Survey Bridgewater Land Port of Entry Modernization Project, U. S. Customs and Border Protection, Aroostook Co. 2010 Robert Bartone, Ellen Cowie Phase I Monticello Land Port of Entry Modernization Project, US Customs and Border Protection, Aroostook Co. Hudgell, Gemma-Jayne 2012 Robert Bartone, Ellen Cowie Phase I and II Archaeological Testing Bridgewater Bridge Replacement Project MDOT BR 3734 2011 Stephen Scharoun, Ellen R. Cowie 3942 4077 4019 Maine DOT Bridgewater Bridge Replacement Project Archaeological Phase II Testing, End of fieldwork letter 2011 Stephen Scharoun, Ellen R. Cowie 4010 Maine DOT Bridgewater Bridge Replacement Project (BR 3734), Phase I Archaeology, End of Fieldwork Letter Moore, Edward 2008 Kathleen Wheeler, Ellen Marlatt Phase 1 Archaeological Survey of the Bridgewater (BWM) LPOE 1.81 Acre Lot, Bridgewater, ARoostook Co. 3806 Quads 159 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Scharoun, Stephen 2013 Gemma-Jayne Hudgell, Cyr, Bartone, Cowie 4109 Archaeology on the Line: Archaeological Investigations at the Native American Boundary Line Road Site (159.1) and Historic Period Boundary Line Mill Hamlet Shaffer, Gary 2011 Field Check Steve Whited, Riparian Buffer, Bridgewater, Aroostook Co. 4009 16, 29, 44 Will, Richard T. 2002 Bone Artifacts: Continuity in Technology and Form in Pre-European Archaeological Sites along the Maine Coast 4047 161,170,171 Sanger, David 1978 Archaeological Survey in the Dickey-Lincoln School Lakes Area, Northern Maine 2296 161,170,171, 179,180 1977 Cultural Resource Management in the Dickey-Lincoln School Reservoir, Maine 2142 164 Will, Richard T. 1990 Rebecca Cole-Will A Report of the Archeology of Mooseleuk Lake, Piscataquis County. 2561 164,165,166 Nicholas, George P. 1981 James S. Kite Archaeological Survey and Testing in the Bald Mountain Area, Northern Maine 2139 165 Putnam, David E. 2004 Investigation of Site 165.3 Red Ochre Feature, Mouth of McConnell Brook. 3400 166 2006 Radiocarbon Dates from Cultural Features and Wood Samples at ME 166.24. 3543 2002 Report on Phase I Archaeological Survey of the Proposed Snowmobile Bridge Across Little Machias River, Ashland. 3240 Sanger, David 1981 A Preliminary Assessment of Archaeological Resources in the Castle Hill Dam Area, Aroostook County, Maine 2147 Shaffer, Gary 2013 An Irrigation System for Neil Grass, Ashland, Phase I Archaeological Survey 4115 166,167 James B. Petersen Putnam, David E. 1988 An Archaeological Phase I Survey of Squa Pan Lake, Aroostook County,Maine. 2476 166,167,177 Hedden, Mark H. 2001 David Putnam Aroostook Co. Transportation Study (PIN 6462.10), Phase 0. 3182 167 Putnam, David E. 2006 Bernard Jerome Constructing Alliances along the Northern Border: Consultations with Mi'kmaq and Maliseet Nations. edited by Jordan E. Kerber: Cross Culltural Collaboration: Native Peoples and Archaeology in the Norhteastern United States.: 295-313. 2006 3536 Additional Archaeological Testing: Proposed Sewer Outfall Pipeline. 2004 Report on Phase II Archaeological Testing of the Powers Site, Presque Isle. 3432 2004 Report on Phase I Archaeological Survey of the Presque Isle Districts Wastewater Outfall Pipe. 3401 2000 3139 Report on the Phase I Archaeological Survey of the Proposed Snowmobile Bridge over Presque Isle Stream, Chapman. 167, 168 168 1996 Report on Phase I Archaeological Survey of the Proposed I F & W Boat Landing, Presque Isle. 2926 2007 Report on Phase I Archaeological Survey of the Proposed Presque Isle Bypass. 3677 Belcher, William R. 1989 Phase I Archaeological Survey along Prestile Stream, Presque Isle, Aroostook County, Maine. 2534 Quads 168 Date Additional Authors MHPC First Author Document # (followed by citatation ifo if not an MHPC document) Title Eldridge, Stuart A. 2008 3795 Phase IA and IB Archaeological Survey Report for Maine Public Service Transmission Line 6910 Upgrade Project, Mars Hill to Presque Isle, Arrostook Co. Moore, Edward 2008 Kathleen Wheeler, Ellen Marlatt Phase 1 Archaeological Survey of the Easton (EAS) LPOE .64 Acre Lot, Easton, Aroostook Co. 3804 Putnam, David E. 2006 Phase I Archaeological Survey of a Snowmobile Bridge across Prestile Stream, Mars Hill, Maine. 3583 3281 2003 Report on Phase II Archaeological Testing of 168.1. 2003 3361 Reconnaissance Archaeological Survey of the Proposed Wind Power Development of Mars Hill Mountain, Mars Hill, Aroostook Co, ME. 2003 Report on Phase I Archaeological Survey of the Presque Isle Water District Aroostook River Crossing. 3305 2002 Robb Engel, Aaron Putnam Report on Phase I Archaeological Survey of the Presque Isle Water District Higgins Groundwater Site. 3250 1999 3058 A Report on the Phase I Archaeological Survey of the Proposed McCain's Wastewater Pipeline and Treatment Plant. Will, Richard T. 1991 James Clark 2662 Report on Phase I Archaeological Survey of Mars Hill Wastewater Treatment Project. 170,171 Sanger, David 1979 Archaeological Survey in the Upper St. John Valley. 2773 1986 170,171,179, Nicholas, George P. The Archaeology of the Upper St. John River: Overview and Interpretation. 180 in CONTRIBUTIONS TO THE QUATERNARY GEOLOGY OF NORTHERN MAINE AND ADJACENT CANADA ed. by J.Steven Kite,Thomas V. Lowell and Woodrow B. Thompson. Bullet 170,180 1981 James S. Kite,other 2138 Archaeological Survey and Testing of Late Pleistocene-Early Holocene Landforms in the Dickey-Lincoln School Reservoir Area, Northern Maine 171 Hadlock, Wendell S. 1967 A preliminary archaeological survey of Dickey Reservoir area on the Saint John River, Maine. U.S. National Park Service. Putnam, David E. 1997 Dariel McKee 2946 Report on Phase I Archaeological Survey of the Proposed Blanchet Logging Company Bridge Replacement, Allagash River. 174 Belcher, William R. 1988 Report on Phase I Archaeological Survey of St. Froid Lake, Aroostook Co. 2874 176 Hedden, Mark H. 1994 Arthur Spiess Report on Phase I Archaeological Survey of Salmon Brook Lake Bog. 2791 176,177 Cranmer, Leon E. 2007 David Putnam Phase I Archaeological Survey for the Aroostook Bypass, Caribou Segemnt 4. 3717 Petersen, James B. 2853 1995 Belinda Cox, Richard Corey Report on the Phase II Archaeological Survey of the Loring Air Force Base. 1994 Belinda Cox and Richard Corey 2800 Report on Phase I Archaeological Survey of Loring Air Force Base. 177 Brigham, Michael 2008 Scharoun, Stephen, and Ellen Cowie Archaeological Phase I Survey of the Proposed Customs and Border Protection Facility, Fort Fairfield, Aroostook County, Maine 3819 Quads 177 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Buchanan, Thomas 1991 Eliz. Subin, James B. Petersen Archaeological Phase II Testing of the Caribou Project (FERC # 2367), Aroostook County. MHPC Document # 2658 Cowie, Ellen R. 2002 Report on Phase I Archaeological Survey of the Goughan Farm Irrigation Project. 3257 Putnam, David E. 2010 Phase I Archaeological Survey Proposed Leachate Pipeline Crossing Little Madawaska River, Caribou 3950 2005 Jeanie McGowan 3454 An Archaeological Phase I Survey of the Caribou Utilities District Aquifer Test Well Site 3-B and Assoiciated Infrastructure, Aroostook Co, Maine. 3101 1999 Tinker Dam Survey, Fort Fairfield, Notes. Quinn, Catherine 1990 James B. Petersen Archaeoological Phase I Survey of the Caribou Project (FERC 2367), Aroostook Co,, ME. 2575 Shaffer, Gary 2011 Field Check Bruce Flewelling, T 7088, Fort Fairfield, Irrigation Water Conveyance with Fish Screen, Pumping Plant 4029 Will, Richard T. 1997 Edward Moore, James Clark Report on Phase III Archaeological Survey of the Chan Site (177.2) Caribou, Aroostook County, Maine. 2936 1997 Edward Moore, James Clark Excavations and Endscrapers at the Chan Site (177.2). MAS Bulletin, 37:2:1-23. 1996 Edward Moore, James Clark 2932 Phase III Archaeological Study of the Chan Site (177.2), Caribou. 177,178 Shaffer, Gary 2008 Northeastern Blueberry Company's Well, Pumping Plant, and Irrigation Lines, T19 MD BPP, Washington Co., ME: a Phase I Archaeological Survey. 3792 177,185 Clark, James 2004 Edward Moore Report on Phase I Archaeological Survey along a Transmission Line Proposed by Maine Public Service Co. Between Limesotne and Hamlin, Aroostook Co, Maine. 3406 181 Putnam, David E. 3808 2008 Jay Raymond Report on Phase I Archaeological Survey of Groundwater Source Development, St. Francis. 2001 3231 Archaeological Phase I Survey of the Hennewell Island Riverbank Stabilization Project, St. John Plantation, Aroostook Co., Maine 182 Petersen, James B. Fish River Subdivision Project Phase I. 1990 2581 Shaffer, Gary 2011 Field Check Carrol Theriault, Fort Kent, Access Road Improvements. 4006 Bonnichsen, Robson 1976 Cultural Resource Reconnaissance and Survey of the Fort Kent Local 2101 Shaffer, Gary 2008 NRCS Field Checks, Emergency Watershed Protection, Fort Kent. 3799 183 Sanger, David 1992 Cultural Resources in the Long-Cross Watershed. 2917 185 Hudgell, Gemma-Jayne 2011 Ellen Cowie Proposed Van Buren Land Port of Entry, Phase I End of Fieldwork Letter 4011 182,188 Isler, Emily 2009 Robert Bartone, Ellen Cowie 3904 Phase I Survey Expansion of the Hamlin Land Port of Entry Modernization Project, US Customs and Border Protection Quads 185 188 Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Moore, Edward 2008 Kathleen Wheeler, Ellen Marlatt Phase 1 Archaeological Survey of the Van Buren (VNB) LPOE 3.71 Acre Lot, Van Buren, Aroostook Co. MHPC Document # 3801 Will, Richard T. 2005 Addendum to Phase I Survey for Archaeological Resources Along an Electric Transmission Line Proposed by Maine Public Service Co. between Limestone and Haml 3481 Bartone, Robert N. 2004 Report on Phase I Arcaeological Survey of the Proposed Medical Office Building. 3389 Hedden, Mark H. 3246 2002 Arthur E. Spiess Report on Phase I Archaeological Survey of the Fort Kent Wetland Mitigation Project (PIN 5220.44). 189 Bourque, Bruce J. 1991 Report on Phase I Archaeological Survey on the St. John River, Frenchville. 2652 Putnam, David E. 2009 Phase I Archaeological Survey Proposed Boat Landing in Frenchville, Aroostook Co. 3885 2008 3797 Archaeological Investigation of the Madawaska Boat Launch Facility Proposed by Maine Department of Conservation, Madawaska. 189,190 Shaffer, Gary Field Check at the Labrie Farm, Fort Kent 2009 Dickinson, Pamela 1999 3841 Jason Jendreau 3050 Ellen Cowie 3990 Glacial Lake Madawaska Archaeological Survey. 190 Grindle, Jacob 2011 Phase I Archaeological Survey Proposed U. S. Customs and Border Protection Tactical Communications Modernization Project, RVSS Deer Farm, Van Buren CAN Bailey, L.W. 1887 On relics of the stone age in New Brunswick. Bulletin National History Society of New Brunswick, 6 Davis, Stephen A. 1982 A Late Archaic Cache/Burial from New Brunswick Demais, Pierre 1985 Gilles Rousseau Trois sites paleoindiens sur la cote and de l'estuarie du Saint-laurent. Recherches Amerindiennes an Quebec 15:1-2:135-149 Erskine, J.S. 1960 Shell-heap archaeology of Southwestern Nova Scotia. Proceedings of the Nova Scotian Institute of Science 1956/8. 24:4 pp.339-375. Harper, J. Russell 1975 Two Seventeenth Century Micmac `Copper Kettle' Burials. 1975 Two Seventeenth Century Micmac `Copper Kettle' Burials (Part II). Kristmanson, Helen 1993 Michael Deal Identification and Interpretation of Finishing Marks on Prehistoric Nova Scotia Ceramics. Canadian Journal of Archaeology 17. Mathew, G.F. 1884 Discovery of a Village of the Stone Age at Bocabec, New Brunswick. Bulletin,National Historical Society of New Brunswick 10 Sanger, David 1973 Cow Point: an archaic cemetery in New Brunswick. National Museum of Man, Mercury Series Paper #12. 1971 Deadman's Pool. A Tobique Complex site in northern New Brunswick. Man in the Northeast:2:5-22 Smith, Harlan I. 1929 The Archaeology of Merigomish Harbour, Nova Scotia. National Museum of Canada, Bulletin #47 Quads CAN Canada Canadian Site MASS New Hampshire NH Date Additional Authors First Author (followed by citatation ifo if not an MHPC document) Title Smith, Harlan I. 1929 W.J. Wintemberg Some shell heaps in Nova Scotia. National Museum of Canada, Bulletin #47 Wintemberg,W.J. 1929 The Eisenhauer Shell-heap, Mahow Bay, Nova Scotia National Museum of Canada, Bulletin #47 Loewen, Brad 2005 Claude Chapdelaine, Pierre J. H. Richard Holocene Shoreline Occupations and Water-level Changes at Lac Meganic, Quebec. Canadian Journal of Archaeology:29:165-233. Davis, Stephen A. 1978 Teacher's Cove: A Prehistoric Site on Passamaquoddy Bay MHPC Document # Richardson, James B. III 1985 Prehistoric Man on Martha's Vineyard Oceanus 28(1):35-42 Bunker, Victoria 1992 Stratified Components of the Gulf of Maine Archaic Tradition at the Eddy Site, Amoskeag Falls. Early Holocene Occupation in Northern New England. Eds. Brian Robinson et al., Occassional Publications in Maine Archaeology, Number 9. Maymon, Jeffrey H. 1992 Charles E. Bolian The Wadleigh Falls Site: An Early and Middle Archaic Period Site in Southeastern New Hampshire. Early Holocene Occupation in Northern New England. Eds. Brian Robinson et al., Occassional Publications in Maine Archaeology, Number 9. Gramly, R. Michael 1982 Kerry W.F. Rutledge Molls Rock: A Multicomponent Site in Northern New Hampshire Vermont Thomas, Peter A. 1992 The Early and Middle Archaic Periods as Represented in Western Vermont. Early Holocene Occupation in Northern New England. Eds. Brian Robinson et al., Occassional Publications in Maine Archaeology, Number 9.
© Copyright 2026 Paperzz