Sector: Client: Value: Duration: Leisure Kelsey Kerridge Sports Centre, Cambridge £44,000 4 weeks We secured this project through a referral from Parkside Pool, which we recently refurbished. Kelsey Kerridge engaged us to modernised these changing and shower facility to create a modern club feel. We presented samples, and worked with centre manager Liane Shadrack to work up a design. The outcome has been very successful as can be seen from the pictures. A special feature of the project being energy saving sensor light fittings, waterless urinals and maintenance free laminate wall panels. The project took 4 weeks to complete.
© Copyright 2026 Paperzz