V-FRAME FOLDING SCAFFOLD TOWER

V-FRAME FOLDING
SCAFFOLD TOWER
Assembly Instructions
BASE UNIT
EXTENSION UNIT
TOWER UNIT
V-FRAME FOLDING
SCAFFOLD TOWER
Parts List
V-FRAME SCAFFOLD SPECIFICATIONS:
Safe Working Load: 225kg
Width: 740mm
Length: 1440mm
Material: Aluminium
WorkCover NSW approved and registered – AS/NZS 1576
1265mm
600mm
BASE UNIT
SPECIFICATIONS:
1850mm
Scaffold Height: 1.8m
Platform or Standing Height: 1.18m
Working Height: 3.25m
COMPONENTS
900mm
1180mm
1 x End V-Frame Folding Section
1 x Platform with Hatch
1 x Horizontal Brace
4 x 5 inch Castor Wheels
1440mm
740mm
EXTENSION UNIT
COMPONENTS
2 x Guard Rails – 2 Row
3 x Horizontal Braces
1460mm
1740mm
Scaffold Height: 2.8m
Platform or Standing Height: 1.74m
Working Height: 3.8m
2800mm
SPECIFICATIONS:
TOWER UNIT
SPECIFICATIONS:
2 x 6 Row Ladder Frames
2 x Diagonal Braces
1 x Platform with Hatch
2 x Stabilisers 1700mm x 1100mm
1 x Toe Board
2 x 1.7m Ladders
4 x 6 inch Castor Wheels (optional)
WWW.GTPRO.COM.AU
1300 4 GTPRO
[email protected]
3140mm
3500mm
COMPONENTS
4500mm
Scaffold Height: 4.5m
Platform or Standing Height: 3.5m
Working Height: 5.5m
onto the second set ladder frame,
& lower end onto the first set ladder
frame.
with the
kes.
First set ladder frames
Insert
Insert
Insert
the
into
into
into
theth
th
l
Lock
Lock
Lock
theth
t
lock
lock
lock
pins
pp
Assembly
Assembly
Ma
Assembly
AssemblyMan
Manu
Man
Second set ladder frames
Assembly
Assembly
Assembly
Manual
Manual
Manual| V-Frame
|| V-Frame
V-Frame
Folding
Folding
Folding
Scaffold
Scaffold
Scaffold
Tower
Tower
Tower
m on the
e bottom.
ty of
BASE
BASE
UNIT
UNIT
the the
1. Insert
1. Insert
Repeat step 2. Add the platform with
hatch on
rung
of second set
Unfold
Unfold
V-Frame,
V-Frame,
2.the
2.third
six rung ladder
frame
lock
install
install
the Insert
the&Insert
the it.
the
adjustable
adjustable
wheels
wheels
adjustable
adjustable
wheels
wheels
into into
the legs
the legs
of of
the frame.
the frame.
LockLock
the the
wheels
wheels
withwith
the lock
the lock
pins,pins,
and and
brakes.
brakes.
platform
platform
on
the
on
thethe
into
into
the
legslegs
of the
of the
frame.
frame.
third
third
rung
rung
from
from
Insert
Insert
the
the
adjustable
adjustable
wheels
Lock
Lock
the
the
wheels
wheels
withwheels
with
the the
the bottom.
the bottom.
lock
lock
pins,
pins,
and
and
brakes.
brakes.
into
into
the
the
legs
legs
of
the
of
the
frame.
frame.
LockLock
in the
in the
Horizontal
Horizontal
Brace
Brace
Lock
Lock
thethe
wheels
wheels
with
with
thethe
at the
at back
the back
of of
lock
pins,
pins,
andand
brakes.
brakes.
thelock
top
the
rungs.
top
rungs.
Install
Install
Install
th
third
third
third
runrr
Inspec
Inspect
Inspec
t
set
Firstlad
the
sts
theFirst
the
struc
str
Insert the adj
Second
Seco
se
into the legs o
Fir
se
Lock theFirst
whe
lock pins, and
Assembly
AssemblyManualManual-V-Frame
V-Fram
Inspect
Inspect
the the
stability
stability
of the
of the
structure.
structure.
EXTENSION
UNIT
UNIT
rung frame EXTENSION
the guard
the guard
o the spigot 1. Erect
1. Erect
railsrails
on top
on of
topthe
of the
upplied lock pins.
six rung
six rung
ladder
ladder
frames
frames
and and
locklock
themthem
in. Install
in. Install
the horizontal
the horizontal
braces.
braces.
Ass
Assembly M
Install
Install
the the
platform
platform
on the
on the
Erect the guard railsthird
ontop
offrom
thefrom
second
third
rungrung
the the
bottom.
bottom.
Move
Move
the platform
the platform
six rung2.
ladder
frames
and
lock
them
in.
2.
Inspect
Inspect
the the
stability
stability
of of
withwith
hatch
hatch
tobraces.
the
to the
Install the horizontal
the
the
structure
structure
SecoS
top of
topthe
of first
the first
set set
Locate
Locate
the adjustable
the adjustab
s
Insert
Insert
the adjustable
the adjustable
wheels
wheels
ladder
ladder
frame.
frame.
Fix upper
the upper
end end
of tho
Install
Install
thethe
platform
platform
on on
thethe Fix the
intointo
the legs
the legs
of the
of frame.
the frame.
ontoonto
the second
the second
set lad
se
LockLock
the wheels
the wheels
withwith
the
the
third
third
rung
rung
from
from
thethe
bottom.
bottom. & lower
& lower
end end
ontoonto
the fit
locklock
pins,pins,
and and
brakes.
brakes.
frame.
frame.
Inspect
Inspect
thethe
stability
stability
of of
Install
Install
Install
th
Install
the
pla
and
lo
and
and
lock
lo
First set
First
ladder
set ladder
frames
frames
third
rung
fro
below
below
below
us
Second
Second
set ladder
set ladder
frames
frames
Insert the
adjustable
wheels
Inspect the st
into
thethe
legs
frame.
Install
Install
the
next
next
sixof
rung
sixthe
rung
frame
frame the structure
l braces.
UNIT
TOWER
UNIT Install
and
and
lockthe
lock
them
them
intointo
thewith
the
spigot
spigot
Lock
wheels
the
Install
the platform
the platform
on the
on the
ces onto the TOWER
Repeat
Repeat
stepstep
2. Add
2. Add
the
Move
the
platforms
with
hatch
to
below
below
using
using
the
the
supplied
supplied
lock
pins.
pins.
Remove
Remove
the
guard
the
guard
rails
rails
Erect
Erect
the
diagonal
the
diagonal
braces.
braces.
Locate
Locate
the
adjustable
the
adjustable
third
third
rung
rung
from
from
the
bottom.
the
bottom.
e second
2. 2. the top of the first setlock
3. pins,
3. and brakes. lock
1. 1.
hatch
hatch
on the
on third
the third
rung
ladder frame
r frames,
s onto the
ng.
m entirely.
thethe
structure
structure
Assembly
AssemblyManualManual-V-Fra
V-Fr
and and
horizontal
horizontal
braces.
braces. Inspect
Clip
Clip
diagonal
braces
the the stabilisers.
stabilisers.
Fix the
Fix upper
the upper
Inspect
the
stability
thediagonal
stability
of braces
of ontoonto
six rung
six rung
ladder
ladder
frame
fram
&
Move
Move
the platform
the platform
backbackthe structure
lowest
lowest
rungrung
of the
of
second
the second
setplatform
set endrespectively.
end
of the
of stabiliser
the stabiliser
ontoonto
and
the
second
set
the
structure
to the
to third
the third
rung.
rung.
Install
Install
six rung
sixFit
rung
ladder
ladder
frames,
frames,
clip
clip
the
the
the
second
the
second
set
ladder
set
ladder
frame,
frame,
toeboards to the upper platform.
the next
the next
six rung
six rung
frame
frame
other
other
endsends
ontoonto
the opposite
the opposite & lower
& lower
end end
on to
onthe
to first
the first
and and
locklock
themthem
into into
the the
frame
frame
rung.
rung.
Ensure
Ensure
to lock
to lock
set ladder
set ladder
frame.
frame.
spigot
spigot
below
below
using
using
the the
themthem
entirely.
entirely.
Install
Install
thethe
next
next
six six
rung
rung
frame
frame
supplied
supplied
locklock
pins.pins.
Erect
Erect
Erect
thet
andand
locklock
them
them
intointo
thethe
spigot
spigot
IMPORTANT: It is the operator’s duty to inspect
the
com
Clip
d
Clip
Clip
diag
di
below
below
using
using
the
the
supplied
supplied
lock
lock
pins.
pins.
Erect
Erect
the
the
diagonal
diagonal
braces.
Avoid
contact
with
acidbraces.
as this
will
damge the aluminiu
Install
the
platform
on
the
lowes
lowest
lowest
ru
Locate
Locate
the
Clip
Clip
diagonal
diagonal
braces
braces
onto
onto
the
the
Install
the
nex
Standard 1576 the operator requires a scaffold ticket tot
Insert
Insert
thethe
adjustable
adjustable
wheels
wheels
third
rung
from
the
bottom.
lowest
rung
rung
of the
of the
second
second
ErectErect
the
guard
the
guard
rails
rail
on
Install
Install
the next
the next
six rung
six rung
frame
frame lowest
set
six
set
set
six
six
ru
and
lock
them
Fix
Fix
the
the
upp
u
six
setrung
six rung
ladder
ladder
frames,
frames,
six rung
ladder
ladder
frames
fram
and
and
lock
lock
them
them
intointo
the spigot
the spigot set
into
into
thethe
legs
legs
of the
of the
frame.
frame.
Inspect
the
stability
of six rung
clip
th
clip
clip
the
th
o
below
using
t
onto
onto
thethe
se
Sydney
the the
other
other
endsends
ontoonto
the
theInstall
Install
the
horizontal
the
horizont
br
below
below
using
using
the supplied
the supplied
locklock
pins.clip
pins.clip
Lock
Lock
thethe
wheels
wheels
with
with
the
the
the
structure
oppos
opposite
oppos
opposite
opposite
frame
frame
rung.
rung.
& lower
& lower
en
Brisbane
lock
lock
pins,
pins,
andand
brakes.
brakes.
Ensure
Ensure
to lock
to lock
them
them
entirely.
entirely.
Ensur
Ensure
Ensure
frame.
frame. to
Melbourne
FirstFirst
set ladder
set ladder
frames
frames
FirstFirst
set ladder
set ladder
frames
frames
Erect
Erect
thethe
diagonal
diagonal
braces.
braces.
Second
Second
set
ladder
set ladder
frames
frames
ClipClip
diagonal
diagonal
braces
braces
onto
onto
thethe
ErectErect
the diagonal
the diagonal
braces.
braces.
Clip Clip
diagonal
diagonal
braces
braces
onto
onto
the
therung
lowest
lowest
rung
of the
of the
second
second Move
Move
the platforms
the platform
wit
Locate the
Locate
Locate
Locate
thethe
the
adjustable
adjustable
adjustable
stabiliser
stabilis
stabili
Fix
the
up
FixFix
Fix
thethe
the
upper
upper
upper
end
end
end
of of
the
of
the
the
stabilis
stab
stabs
onto the
onto
onto
onto
thethe
the
second
second
second
setset
set
ladder
ladder
fram
frf
&ladder
lower
en
& lower
&&lower
lower
end
end
end
onto
onto
onto
thethe
the
first
first
first
set
set
se
la
frame.
frame.
frame.
frame.
Insert the adjustable wheels
Insert
Insert
Insert
thethe
the
adjustable
adjustable
adjustable
wheels
wheels
wheels
into
the legs
the frame.
A of
typical
3.5m
highofV-Frame
Folding Scaffold.
into
into
into
thethe
the
legs
legs
legs
of
the
ofthe
the
frame.
frame.
frame.
Lock the wheels with the
Lock
Lock
Lock
thethe
the
wheels
wheels
wheels
with
with
with
thethe
the
lock
pins, and brakes.
lock
lock
lock
pins,
pins,
pins,
and
and
and
brakes.
brakes.
brakes.
ManualManualV-Frame
V-Frame
Folding
Folding
Scaffold
Scaffol
ManualManual-V-Frame
V-Frame
Folding
Folding
Scaffold
Scaffold
er
er
Guard Rail
Horizontal
Brace
Assembly Manual- V-Frame Foldi
First set ladder frames
FirstFirst
First
set set
ladder
setladder
ladder
frames
frames
frames
Second set ladder frames
Second
setladder
ladder
frames
Second
Second
set set
ladder
frames
frames
IMPORTANT
Locate
Locate
the the
adjustable
adjustable
stabilisers.
stabilisers.
Fix the
Fix the
upper
upper
endend
of the
of the
stabiliser
stabiliser
Toeboards
Locate
theladder
the
adjustable
adjustable
stabilisers.
stabilisers.
Install
the
platform
on
the
onto
onto
theLocate
the
second
second
set
set
ladder
frame,
frame,
Install
the
platform
on
the
Install
Install
thethe
platform
platform
on
on
thethe
&third
lower
& lower
end
end
onto
onto
the
the
first
first
set
ladder
set
ladder
Fix
Fix
the
the
upper
upper
end
end
of
the
of
the
stabiliser
stabiliser
rung from Diagonal
the bottom.
third
rung
from
the
bottom.
third
third
rung
rung
from
from
thethe
bottom.
bottom.
frame.
frame.
Brace
onto
onto
thethe
second
second
setset
ladder
ladder
frame,
frame,
It is the operator’s duty to
inspect the components
for damage before each
Repeat ste
Repeat
step
2.Add
Add
the
platfo
Repeat
Repeat
step
step
2. with
Add
2.
thethe
platform
platfo
use.
Avoid
contact
hatch
onVA the
typical
A
typical
3.5m
3.5m
high
high
acid
ason
thison
will
damage
hatch
on
the
third
rung
of
se
hatch
hatch
the
third
third
rung
rung
of
of
seco
se
Inspect the stability of
Inspect
the
stability
of & lower
Inspect
Inspect
thethe
stability
stability
of of
six
rung
la
the
aluminium
beyond
6
Rung
Ladder
&
lower
end
end
onto
onto
the
the
first
first
set
set
ladder
ladder
six
rung
ladder
frame
lock
sixrepair.
six
rung
rung
ladder
ladder
frame
frame
& lock
&&lock
it.
set
Firstladder
set ladder
frames
frames the structure
Top Frame
In accordancestabilisers.
with
the
structure
theFirst
the
structure
structure
Locate
the
adjustable
frame.
sert the adjustable wheels frame.
Australian Standard 1576
Second
Second
set ladder
set ladder
frames
frames
Fix the upper
end of thea stabiliser
Horizontal
the operator requiresHorizontal
o the legs of the frame.
Platform
BraceBrace
onto thescaffold
second
ladder
frame,
ticketset
to erect
First
First
set
ladder
set
ladder
frames
frames
ck the wheels withwith
the
Hatch
abovethe
4 metres
& lower scaffold
end onto
first set ladder
ck pins, and brakes. Repeat
Repeat
stepstep
2. Add
2. Add
the the
platform
platform
withwith
Adjustable
frame. standing height.
Second
set ladder
frames
Second
set ladder
frames
hatch
hatch
on the
on the
thirdthird
rungrung
of second
of second
set set
Stabiliser
six rung
six rung
ladder
ladder
frame
frame
& lock
& lock
it. it.
First set ladder frames
he
te adjustable
the adjustable
stabilisers.
stabilisers.
A typical 3.5m
Toeboards
Toeboards
he
pper
upper
end end
of the
of stabiliser
the stabiliser
high V-Frame
D
Second
set
ladder
frames
second
the second
set ladder
set ladder
frame,
frame,
Repeat
Repeat
step
step
2. Add
2. Add
thethe
platform
platform
with
with
Folding Scaffold
wer
end end
ontoonto
the first
the first
set ladder
set ladder
hatch
hatch
on on
thethe
third
third
rung
rung
of second
of second
setset Ladder omitted
for clarity
e.
A typical
A typical
3.5m
3.5m
high
high
V-Frame
V-Frame
Folding
Folding
Scaffold.
Scaffold.
Erect the
Install the next six rung frame
Frame
ame Folding
FoldingScaffold
Scaffold
ly Manual- V-Frame Folding Scaf
Foldable
Erect
Erect
Erect
thethe
the
guard
guard
guard
rails
rails
rails
ontop
ontop
ontop
of o
th
o
Install
the
next
six
rung
frame
Install
Install
thethe
next
next
sixsix
rung
rung
frame
frame
six
six
rung
rung
ladder
ladder
frame
frame
& lock
& lock
it. it.
Frame
six
rung
la
and
lock
them
into
the
spigot
stall
the
platform
on
the
sixsix
six
rung
rung
rung
ladder
ladder
ladder
frames
frames
frames
and
and
and
lock
lo
lo
and
lock
them
into
the
spigot
and
and
lock
lock
them
them
into
into
thethe
spigot
spigot
Repeat step 2. Add Platform
thePlatform
platform
with
Install
the
belowlock
using
the
supplied
lock
pins.
Locate
the
adjustable
stabilisers.
rdbelow
rung
from
the
Install
Install
Install
the
the
the
horizontal
horizontal
horizontal
braces.
braces.
braces.
below
using
the
supplied
lock
pins.
below
using
using
thebottom.
the
supplied
supplied
lock
pins.
pins.
6
Rung
Ladder
GuardGuard
Rail
Rail
Lockable
hatch on the third with
rung
of
second
set
with
Hatch
Hatch
Rung Ladder
Horizontal
Top Horizontal
Frame
spect the stability 6Bottom
of
FixWheel
the upper end
of the stabiliser
BraceBrace six rung ladder frame & lock it.
Frame
Erect
Erect
the the
guard
guard
railsrails
ontop
ontop
of the
the
second
second
e structure
onto
theofsecond
set ladder frame,
six rung
six rung
ladder
ladder
frames
frames
andand
locklock
them
them
in. in.
tep
at step
2. Add
2. Add
the platform
theRepeat
platform
with
with
&
lower
end
onto
the first set
ladder
Install
the
horizontal
horizontal
braces.
braces.
stepInstall
2. Add
thethe
Erect
the guard rails on
4.of second
5.
6. Move the platforms with hatch
hthe
on third
the third
rungrung
of
second
set
set
platform
with
hatch
on
the
top
of
the
second
six
to
the
top of the first set ladder
frame.
Ladders omitted for clarity.
V-Frame
-Frame Folding
FoldingScaffold
Scaffold
ung
adder
ladder
frame
frame
& lock
&third
lock
it. rung
it. of second set six
rung ladder frame & lock it.
First set ladder frames
rung ladder frames and
frame and the second set
lock them in. InstallToeboards
theToeboards platform respectively. Fit toe
horizontal braces.
boards to the upper platform.
Diagonal
Diagonal
BraceBrace
Second
ladder
frames
Second
setset
ladder
frames
Fol
Fra
6 Rung
6 Rung
Ladder
Ladder
Erect
guard
ontop
of the
second
Erect
thethe
guard
railsrails
ontop
of the
second
Top Frame
Top Frame
Erect
the
diagonal
braces.
Erect
the
diagonal
braces.
Erect
Erect
thethe
diagonal
diagonal
braces.
braces.
rung
ladder
frames
them
six six
rung
ladder
frames
andand
locklock
them
in. in.
6 Rung
6 Rung
Ladder
Ladder
spect
the
components
for
damage
before
each braces
use.
Bottom
Bottom
Frame
Frame
Clip
diagonal
braces
onto
the
Clip
Clip
diagonal
diagonal
braces
braces
onto
onto
thethe
Clip
diagonal
onto the
Install
the
horizontal
braces.
Install
the
horizontal
braces.
Platform
Platform
e the aluminium beyond repair. In accordance with Australian
Move
the
platforms
with
hat
Move
Move
thethe
platforms
platforms
with
with
hatch
hat
Move
the
with
Hatch
with
Hatch
lowest
rung
ofthe
the
second
lowest
lowest
rung
rung
ofscaffold
of
the
second
second
ocate
Locate
the
adjustable
stabilisers.
stabilisers.
lowest
rung
of
the
second
Erect
the
guard
rails
ontop
of
the
seco
stall
the
next
sixadjustable
rung
frame
affold
ticket
tothe
erect
above
4
metres
standing
height.
Repeat
step
2.
Add
the
platform
with
Move
Move
the the
platforms
platforms
withwith
hatch
hatch
to to
the
top
ofthe
the
first
set
ladder
thethe
toptop
of of
the
first
first
setset
ladder
ladder
the
top fra
of
the
guard
rails
rails
ontop
ontop
of
the
of
second
the
second
Adjustable
Adjustable
set
six
rung
ladder
frames,
set
set
six
six
rung
rung
ladder
ladder
frames,
frames,
set
six
ladder
sixsecond
rung ladder
frames
and
lock
them
i
dguard
lock
them
into
the
Fix
Fix
the
the
upper
upper
end
end
ofspigot
the
of
the
stabiliser
stabiliser
the
the
top
top
ofrung
the
of the
first
first
sethatch
ladder
setframes,
ladder
frame
framethird rung of
on
the
set
Ladders
Ladders
omitted
omitted
for
clarity.
for
clari
and
the
second
set
platform
and
and
the
the
second
second
set
set
platform
platform
res
Stabiliser
Stabiliser
and
the
se
ung
adder
ladder
frames
frames
and and
locklock
them
them
in. in.
and
and
the
the
second
second
set
platform
set
platform
respectively.
respectively.
clip
the
other
ends
onto
the
clip
clip
the
the
other
other
ends
ends
onto
onto
the
the
Install
the
horizontal
braces.
low
using
the
supplied
lock
pins.
clip
the
other
ends
onto
the
onto
onto
thethe
second
second
ladder
ladder
frame,
frame,six rung ladder frame & lock it. FitFit
ell horizontal
the
horizontal
braces.
braces.setset
Fit
toeboards
tothe
the
upper
p
toeboards
toeboards
to to
the
upper
platf
pl
Fitupper
toeboa
Fit
toeboards
Fit toeboards
to the
to the
upper
upper
platform.
platform.
opposite
frame
rung.
opposite
opposite
frame
frame
rung.
rung.
opposite
frame
rung.
&elower
& lower
endend
onto
onto
the
the
firstfirst
setset
ladder
ladder
Ensure
tolock
lock
them
entirely.
Ensure
Ensure
to to
lock
them
them
entirely.
entirely.
Ensure
to lock them entirely.
rame.
frame.
A typical
A typical
3.5m
3.5m
h
rne
Copyright © 2014 Synergy Integrated Solutions Pty Ltd
Foldable
Foldable
Frame
IMPORTANT:
IMPORTANT:
It is the
It isoperator’s
the operator’s
dutyduty
to inspect
to Frame
inspect
the
components
the components
for damage
for damage
before
before
eacheach
use
Avoid
Avoid
contact
contact
with4with
acid
acid
as this
as will
this damge
will
damge
the aluminium
the aluminium
beyond
beyond
repair.
repair.
In IMPORTANT:
accordance
InIMPORTAN
accordance
withw
IMPORTAN
WWW.GTPRO.COM.AU
1300
GTPRO
[email protected]
6 Rung
6 Rung
Ladder
Ladder
Lockable
Lockable
Standard
Standard
15761576
the 6operator
the
requires
requires
a scaffold
a scaffold
ticket
ticket
to erect
to erect
scaffold
scaffold
above
above
4 metres
4 metres
standin
sta
Rung
6operator
Rung
Ladder
Ladder
Avoid
Avoid
Avoid
contac
cont
con
e platforms
the platforms
withwith
hatch
hatch
to to
Bottom
Bottom
FrameFrame
Move
Move
thethe
platforms
platforms
with
with
hatch
hatch
to to
Sydney
Sydney
Wheel
Wheel
Top Frame
Top Frame
Horizontal
Horizontal
Standard
Standard
Standard
1571
Brace
Brace
Safety
Safety Notes
Notes || V-Frame
V-Frame Folding
Folding Scaffold
Scaffold Tower
Tower
The following safety notes apply to mobile tower frame scaffolding supplied by GTPRO
It is recommended that these Safety Notes be available to the users of the scaffold and read in conjunction with:
• Assembly instructions for the particular mobile tower frame scaffold system;
• Hazard Identification, Risk Assessment and Control Measures for Aluminium Mobile Scaffolding.
• Local Statutory Acts and Regulations, as applicable
SAFETY NOTES
1. Ensure the scaffold is erected
in accordance with the manufacturer’s assembly instructions. Persons
erecting, modifying or dismantling
the scaffold must hold the applicable certificate of competency if:
a) The scaffold is over 4m in height
b) The fall height from the scaffold
over the edge of a floor or through
a penetration is more than 4m in
height.
c) The scaffold involves a cantilever
situation.
d) The scaffold is swing stage.
2. Do not use incorrect, incompatible or damaged materials/components. Always inspect the components before use.
3. GTPRO will provide you with a
list of components and an assembly manual to assist you in building the tower frame in a safe and
approved manner.
4. Ensure that all the components
used to erect the scaffold are from
the same manufacturer, GTPRO
issues no permission to mix and
match components from other
systems or manufacturers.
5. Ensure that there is a safe working area for the scaffold. The safest
manner is to setup a restricted
work-zone where the scaffold is
erected.
6. Do not erect scaffold closer
than 4.0m to electrical power lines.
The minimum required distance is
state-dependant so check the Statutory Regulations for your state.
7. Ensure the scaffold is erected
on structurally adequate, solid,
and unobstructed foundation.
Use sole boards if necessary.
8. Always wear gloves and a
hardhat while erecting the mobile
tower system. Assess your work
activity and wear the appropriate
personal protective equipment.
9. All platforms over 2m in height
must have toe boards, guardrails
(1m above the deck) and mid rails
(500mm above the deck) fitted.
10. Do not climb up the outside
rungs of the scaffold. Always climb
scaffold from the inside, via ladders.
11. Do not use ladders, steps and
boxes, or any equipment on top of
the working deck to gain extra
height/reach.
12. When erecting and using,
ensure the scaffold is level and in
contact with the ground, by adjusting the adjustable castors if applicable and outrigger stabilisers.
13. Do not exceed the nominated
Safe Working Load of the scaffold, usually 225kg per bay unless
otherwise specified by the supplier/
manufacturer. If you are unsure of
the SWL please contact GTPRO for
details.
14. Do not move the scaffold
with persons or materials upon it.
Before moving the scaffold assess
any overhead obstructions [e.g.
powerlines, bridges] & ground obstructions [e.g. pot holes, steps]
15. Protect the scaffold from
corrosive chemicals such as potash and hydrochloric acids. These
substances are highly corrosive
to aluminium and will affect the
strength of the equipment.
16. Do not push against the scaffold in use. If you are using the
scaffold to drill and you think you
may push against the scaffold, tie
the tower in prior to use; otherwise
the force may cause instability to
the free-standing tower.
17. When moving the scaffold
only apply force by pushing at the
base and ensure the tower remains
stable and steady during movement. Be aware of obstructions on
the ground around the area. If the
tower’s wheels have brakes, do not
push the tower while the brakes are
applied.
18. Tie the scaffold to a rigid
structure in strong wind conditions,
do not sheet the scaffold with any
materials (Shade cloth, hessian)
unless advised by a competent
ticketed scaffolder and the scaffold
is tied in.
19. Do not cantilever tubes off
the scaffold to accommodate gin
wheels or pulley system for
materials handling, this will destabilise the tower and may cause it to
collapse.
e
20. Ensure outrigger stabilisers are
in position to maintain a height to
minimum base width ratio of 3:1.
21. Ensure the scaffold is complete and if the castor wheels have
brakes, make sure they are locked
before use.
22. Ensure the scaffold is secure
against access to unauthorised
persons when left unattended.
23. Ensure the scaffold is stable
and if the wheels have brakes, they
are locked when left unattended.
24. When scaffold is incomplete
affix a warning sign: “Scaffold
Incomplete Do Not Use”, and block
off entry to unauthorised persons.
BEFORE ASSEMBLING
THE TOWER
1. Inspect the tower components
to ensure there is no damage to
the components.
2. Read the assembly manual
provided with your tower.
DURING ASSEMBLY
1. Remain cautious of overhead
powerlines, remain clear of
powerlines by at least 4.0 metres.
2. Do not leave the scaffold in an
unstable condition unattended.
TYING IN THE SCAFFOLD
MAINTENANCE
The tower must be tied in where:
1. The height of the scaffold is to
exceed 3 times the smallest base
dimensions if used outdoors or
indoors.
1. Do not throw the components to
the ground as this may damage the
parts and render them unserviceable.
2. There is a chance of high winds,
typically above 45km/h. This may
occur in wind tunnel conditions
e.g. in large buildings where both
ends are open, or in-between the
outdoor corridor of two buildings.
3. You plan on using a gin wheel or
hoist pulley to raise materials over
the side of the tower. The assembly
of the hoisting equipment must be
checked and approved by a competent person.
4. The nature of the work involved
requires you to apply a horizontal
force (e.g. drilling)
5. The tower is left unattended.
TOWER HEIGHT LIMIT
The tower height is typically a ratio
of 3:1. You may build the tower 3
times the minimum base width.
Safe Working Loads
Wide Tower: 450 kg per tower
(Medium Duty)
Narrow Tower: 225 kg per tower
(Light Duty)
H-Frame Tower: 225 kg per tower
(Light Duty)
V-Frame Tower: 225 kg per tower
(Light Duty)
Multifunction Tower: 225 kg per
tower (Light Duty)
WWW.GTPRO.COM.AU
1300 4 GTPRO
2. GTPRO does not give the
purchaser permission to modify the
components without authorization
from the manufacturer
3. Lightly lubricate the castor wheel
threads and bolts on the outrigger
stabilisers to keep them
easy to use.
4. If the component is damaged do
not use it.
5. GTPRO components must only
be repaired by a qualified person
approved by Synergy Access
Equipment.
It is your duty to read and understand these Safety Notes before
assembling and/or using the scaffold. GTPRO does not permit any
person to assemble and/ or use
the scaffold who does not understand the material in the Safety
Notes, Safe Assembly Manual, &
Local Statutory Regulations. These
Safety Notes are to be read in conjunction with Statutory Regulations
& the Safe Assembly Manual. If
you require further assistance with
understanding the instructions,
please contact GTPRO.
[email protected]
Hazard identification
& Risk Assessment
!
Please read label carefully before erecting scaffolding. If in doubt ask your supplier.
HAZARD IDENTIFICATION
RISK ASSESSED
POSSIBLE RISK CONTROL
Collapse of Scaffold
SERIOUS
All scaffolds over 4m must be erected by
WorkCover approved or authorized
personnel. Tower erection procedures
must be adhered to. Scaffold must always
be erected to Assembly Instructions.
Electrocution
SERIOUS
Scaffold must not be used within 4.6m of
overhead electrical wiring. Always look
above when moving Scaffold Tower.
Falling from Scaffold
SERIOUS
Hand rails and mid rails must be used on
every deck level. Workers must not ride on
scaffold when the scaffold is being moved.
At no time can a ladder be used on the
deck of a scaffold to gain additional height
– neither step nor extension.
Internal ladders must be fitted to the
scaffold for access to the working decks.
Do not climb on the outside of the
scaffold. Internal ladder access must be
used.
Material falling from Scaffold
SERIOUS
Toe boards must be fitted on all working
deck levels of a scaffold. Ensure there are
no holes or gaps in decks that material
can fall through.
Sloping Ground
SERIOUS
If the scaffold has wheels with brakes,
they must be applied at all times when the
scaffold is in use.
Mobile Scaffolds must not be used on sloping
surface.
Configurations | V-Frame Folding Scaffold Tower
ADJUSTS
UP TO
BASE HEIGHT SCAFFOLD
1.8
m
HIGH
CONSISTS OF
1x Base Unit pack
CODE:132258
PACK CONTAINS
1 x End V-Frame Folding Section
1 x Platform with Hatch
1 x Horizontal Brace
1 x 4 pack of 5 inch Castor Wheels
CODE: 132252
CODE: 132259
CODE: 132253
Fold-up frame for safe,
fast and easy set-up
EXTENSION
HEIGHT
SCAFFOLD
CONSISTS OF
ADJUSTS
UP TO
2.8
m
HIGH
1x Base Unit pack
CODE:132258
1x Extension unit pack
CODE:133333
PACK CONTAINS
2 x Guard Rails
– 2 Row
CODE: 132260
3 x Horizontal Braces CODE: 132259
TOWER HEIGHT ADJUSTS
UP TO
4.5
m
SCAFFOLD
HIGH
CONSISTS OF
1 x Base Unit pack
CODE:132258
1 x Extension Unit pack
CODE:133333
1 x Tower Unit Pack
CODE: SYVFTWR
PACK CONTAINS
2 x 6 Row Ladder
Frames
2 x Diagonal Braces
1 x Toe Board
CODE: 132237
CODE: 132236
CODE: 132271
2 x Stabilisers 2500mm CODE: 132238
1 x Platform
W/Hatch & Ladder
CODE: SYVFPHL
WWW.GTPRO.COM.AU
1300 4 GTPRO
[email protected]
Notes
WWW.GTPRO.COM.AU
1300 4 GTPRO
[email protected]