V-FRAME FOLDING SCAFFOLD TOWER Assembly Instructions BASE UNIT EXTENSION UNIT TOWER UNIT V-FRAME FOLDING SCAFFOLD TOWER Parts List V-FRAME SCAFFOLD SPECIFICATIONS: Safe Working Load: 225kg Width: 740mm Length: 1440mm Material: Aluminium WorkCover NSW approved and registered – AS/NZS 1576 1265mm 600mm BASE UNIT SPECIFICATIONS: 1850mm Scaffold Height: 1.8m Platform or Standing Height: 1.18m Working Height: 3.25m COMPONENTS 900mm 1180mm 1 x End V-Frame Folding Section 1 x Platform with Hatch 1 x Horizontal Brace 4 x 5 inch Castor Wheels 1440mm 740mm EXTENSION UNIT COMPONENTS 2 x Guard Rails – 2 Row 3 x Horizontal Braces 1460mm 1740mm Scaffold Height: 2.8m Platform or Standing Height: 1.74m Working Height: 3.8m 2800mm SPECIFICATIONS: TOWER UNIT SPECIFICATIONS: 2 x 6 Row Ladder Frames 2 x Diagonal Braces 1 x Platform with Hatch 2 x Stabilisers 1700mm x 1100mm 1 x Toe Board 2 x 1.7m Ladders 4 x 6 inch Castor Wheels (optional) WWW.GTPRO.COM.AU 1300 4 GTPRO [email protected] 3140mm 3500mm COMPONENTS 4500mm Scaffold Height: 4.5m Platform or Standing Height: 3.5m Working Height: 5.5m onto the second set ladder frame, & lower end onto the first set ladder frame. with the kes. First set ladder frames Insert Insert Insert the into into into theth th l Lock Lock Lock theth t lock lock lock pins pp Assembly Assembly Ma Assembly AssemblyMan Manu Man Second set ladder frames Assembly Assembly Assembly Manual Manual Manual| V-Frame || V-Frame V-Frame Folding Folding Folding Scaffold Scaffold Scaffold Tower Tower Tower m on the e bottom. ty of BASE BASE UNIT UNIT the the 1. Insert 1. Insert Repeat step 2. Add the platform with hatch on rung of second set Unfold Unfold V-Frame, V-Frame, 2.the 2.third six rung ladder frame lock install install the Insert the&Insert the it. the adjustable adjustable wheels wheels adjustable adjustable wheels wheels into into the legs the legs of of the frame. the frame. LockLock the the wheels wheels withwith the lock the lock pins,pins, and and brakes. brakes. platform platform on the on thethe into into the legslegs of the of the frame. frame. third third rung rung from from Insert Insert the the adjustable adjustable wheels Lock Lock the the wheels wheels withwheels with the the the bottom. the bottom. lock lock pins, pins, and and brakes. brakes. into into the the legs legs of the of the frame. frame. LockLock in the in the Horizontal Horizontal Brace Brace Lock Lock thethe wheels wheels with with thethe at the at back the back of of lock pins, pins, andand brakes. brakes. thelock top the rungs. top rungs. Install Install Install th third third third runrr Inspec Inspect Inspec t set Firstlad the sts theFirst the struc str Insert the adj Second Seco se into the legs o Fir se Lock theFirst whe lock pins, and Assembly AssemblyManualManual-V-Frame V-Fram Inspect Inspect the the stability stability of the of the structure. structure. EXTENSION UNIT UNIT rung frame EXTENSION the guard the guard o the spigot 1. Erect 1. Erect railsrails on top on of topthe of the upplied lock pins. six rung six rung ladder ladder frames frames and and locklock themthem in. Install in. Install the horizontal the horizontal braces. braces. Ass Assembly M Install Install the the platform platform on the on the Erect the guard railsthird ontop offrom thefrom second third rungrung the the bottom. bottom. Move Move the platform the platform six rung2. ladder frames and lock them in. 2. Inspect Inspect the the stability stability of of withwith hatch hatch tobraces. the to the Install the horizontal the the structure structure SecoS top of topthe of first the first set set Locate Locate the adjustable the adjustab s Insert Insert the adjustable the adjustable wheels wheels ladder ladder frame. frame. Fix upper the upper end end of tho Install Install thethe platform platform on on thethe Fix the intointo the legs the legs of the of frame. the frame. ontoonto the second the second set lad se LockLock the wheels the wheels withwith the the third third rung rung from from thethe bottom. bottom. & lower & lower end end ontoonto the fit locklock pins,pins, and and brakes. brakes. frame. frame. Inspect Inspect thethe stability stability of of Install Install Install th Install the pla and lo and and lock lo First set First ladder set ladder frames frames third rung fro below below below us Second Second set ladder set ladder frames frames Insert the adjustable wheels Inspect the st into thethe legs frame. Install Install the next next sixof rung sixthe rung frame frame the structure l braces. UNIT TOWER UNIT Install and and lockthe lock them them intointo thewith the spigot spigot Lock wheels the Install the platform the platform on the on the ces onto the TOWER Repeat Repeat stepstep 2. Add 2. Add the Move the platforms with hatch to below below using using the the supplied supplied lock pins. pins. Remove Remove the guard the guard rails rails Erect Erect the diagonal the diagonal braces. braces. Locate Locate the adjustable the adjustable third third rung rung from from the bottom. the bottom. e second 2. 2. the top of the first setlock 3. pins, 3. and brakes. lock 1. 1. hatch hatch on the on third the third rung ladder frame r frames, s onto the ng. m entirely. thethe structure structure Assembly AssemblyManualManual-V-Fra V-Fr and and horizontal horizontal braces. braces. Inspect Clip Clip diagonal braces the the stabilisers. stabilisers. Fix the Fix upper the upper Inspect the stability thediagonal stability of braces of ontoonto six rung six rung ladder ladder frame fram & Move Move the platform the platform backbackthe structure lowest lowest rungrung of the of second the second setplatform set endrespectively. end of the of stabiliser the stabiliser ontoonto and the second set the structure to the to third the third rung. rung. Install Install six rung sixFit rung ladder ladder frames, frames, clip clip the the the second the second set ladder set ladder frame, frame, toeboards to the upper platform. the next the next six rung six rung frame frame other other endsends ontoonto the opposite the opposite & lower & lower end end on to onthe to first the first and and locklock themthem into into the the frame frame rung. rung. Ensure Ensure to lock to lock set ladder set ladder frame. frame. spigot spigot below below using using the the themthem entirely. entirely. Install Install thethe next next six six rung rung frame frame supplied supplied locklock pins.pins. Erect Erect Erect thet andand locklock them them intointo thethe spigot spigot IMPORTANT: It is the operator’s duty to inspect the com Clip d Clip Clip diag di below below using using the the supplied supplied lock lock pins. pins. Erect Erect the the diagonal diagonal braces. Avoid contact with acidbraces. as this will damge the aluminiu Install the platform on the lowes lowest lowest ru Locate Locate the Clip Clip diagonal diagonal braces braces onto onto the the Install the nex Standard 1576 the operator requires a scaffold ticket tot Insert Insert thethe adjustable adjustable wheels wheels third rung from the bottom. lowest rung rung of the of the second second ErectErect the guard the guard rails rail on Install Install the next the next six rung six rung frame frame lowest set six set set six six ru and lock them Fix Fix the the upp u six setrung six rung ladder ladder frames, frames, six rung ladder ladder frames fram and and lock lock them them intointo the spigot the spigot set into into thethe legs legs of the of the frame. frame. Inspect the stability of six rung clip th clip clip the th o below using t onto onto thethe se Sydney the the other other endsends ontoonto the theInstall Install the horizontal the horizont br below below using using the supplied the supplied locklock pins.clip pins.clip Lock Lock thethe wheels wheels with with the the the structure oppos opposite oppos opposite opposite frame frame rung. rung. & lower & lower en Brisbane lock lock pins, pins, andand brakes. brakes. Ensure Ensure to lock to lock them them entirely. entirely. Ensur Ensure Ensure frame. frame. to Melbourne FirstFirst set ladder set ladder frames frames FirstFirst set ladder set ladder frames frames Erect Erect thethe diagonal diagonal braces. braces. Second Second set ladder set ladder frames frames ClipClip diagonal diagonal braces braces onto onto thethe ErectErect the diagonal the diagonal braces. braces. Clip Clip diagonal diagonal braces braces onto onto the therung lowest lowest rung of the of the second second Move Move the platforms the platform wit Locate the Locate Locate Locate thethe the adjustable adjustable adjustable stabiliser stabilis stabili Fix the up FixFix Fix thethe the upper upper upper end end end of of the of the the stabilis stab stabs onto the onto onto onto thethe the second second second setset set ladder ladder fram frf &ladder lower en & lower &&lower lower end end end onto onto onto thethe the first first first set set se la frame. frame. frame. frame. Insert the adjustable wheels Insert Insert Insert thethe the adjustable adjustable adjustable wheels wheels wheels into the legs the frame. A of typical 3.5m highofV-Frame Folding Scaffold. into into into thethe the legs legs legs of the ofthe the frame. frame. frame. Lock the wheels with the Lock Lock Lock thethe the wheels wheels wheels with with with thethe the lock pins, and brakes. lock lock lock pins, pins, pins, and and and brakes. brakes. brakes. ManualManualV-Frame V-Frame Folding Folding Scaffold Scaffol ManualManual-V-Frame V-Frame Folding Folding Scaffold Scaffold er er Guard Rail Horizontal Brace Assembly Manual- V-Frame Foldi First set ladder frames FirstFirst First set set ladder setladder ladder frames frames frames Second set ladder frames Second setladder ladder frames Second Second set set ladder frames frames IMPORTANT Locate Locate the the adjustable adjustable stabilisers. stabilisers. Fix the Fix the upper upper endend of the of the stabiliser stabiliser Toeboards Locate theladder the adjustable adjustable stabilisers. stabilisers. Install the platform on the onto onto theLocate the second second set set ladder frame, frame, Install the platform on the Install Install thethe platform platform on on thethe &third lower & lower end end onto onto the the first first set ladder set ladder Fix Fix the the upper upper end end of the of the stabiliser stabiliser rung from Diagonal the bottom. third rung from the bottom. third third rung rung from from thethe bottom. bottom. frame. frame. Brace onto onto thethe second second setset ladder ladder frame, frame, It is the operator’s duty to inspect the components for damage before each Repeat ste Repeat step 2.Add Add the platfo Repeat Repeat step step 2. with Add 2. thethe platform platfo use. Avoid contact hatch onVA the typical A typical 3.5m 3.5m high high acid ason thison will damage hatch on the third rung of se hatch hatch the third third rung rung of of seco se Inspect the stability of Inspect the stability of & lower Inspect Inspect thethe stability stability of of six rung la the aluminium beyond 6 Rung Ladder & lower end end onto onto the the first first set set ladder ladder six rung ladder frame lock sixrepair. six rung rung ladder ladder frame frame & lock &&lock it. set Firstladder set ladder frames frames the structure Top Frame In accordancestabilisers. with the structure theFirst the structure structure Locate the adjustable frame. sert the adjustable wheels frame. Australian Standard 1576 Second Second set ladder set ladder frames frames Fix the upper end of thea stabiliser Horizontal the operator requiresHorizontal o the legs of the frame. Platform BraceBrace onto thescaffold second ladder frame, ticketset to erect First First set ladder set ladder frames frames ck the wheels withwith the Hatch abovethe 4 metres & lower scaffold end onto first set ladder ck pins, and brakes. Repeat Repeat stepstep 2. Add 2. Add the the platform platform withwith Adjustable frame. standing height. Second set ladder frames Second set ladder frames hatch hatch on the on the thirdthird rungrung of second of second set set Stabiliser six rung six rung ladder ladder frame frame & lock & lock it. it. First set ladder frames he te adjustable the adjustable stabilisers. stabilisers. A typical 3.5m Toeboards Toeboards he pper upper end end of the of stabiliser the stabiliser high V-Frame D Second set ladder frames second the second set ladder set ladder frame, frame, Repeat Repeat step step 2. Add 2. Add thethe platform platform with with Folding Scaffold wer end end ontoonto the first the first set ladder set ladder hatch hatch on on thethe third third rung rung of second of second setset Ladder omitted for clarity e. A typical A typical 3.5m 3.5m high high V-Frame V-Frame Folding Folding Scaffold. Scaffold. Erect the Install the next six rung frame Frame ame Folding FoldingScaffold Scaffold ly Manual- V-Frame Folding Scaf Foldable Erect Erect Erect thethe the guard guard guard rails rails rails ontop ontop ontop of o th o Install the next six rung frame Install Install thethe next next sixsix rung rung frame frame six six rung rung ladder ladder frame frame & lock & lock it. it. Frame six rung la and lock them into the spigot stall the platform on the sixsix six rung rung rung ladder ladder ladder frames frames frames and and and lock lo lo and lock them into the spigot and and lock lock them them into into thethe spigot spigot Repeat step 2. Add Platform thePlatform platform with Install the belowlock using the supplied lock pins. Locate the adjustable stabilisers. rdbelow rung from the Install Install Install the the the horizontal horizontal horizontal braces. braces. braces. below using the supplied lock pins. below using using thebottom. the supplied supplied lock pins. pins. 6 Rung Ladder GuardGuard Rail Rail Lockable hatch on the third with rung of second set with Hatch Hatch Rung Ladder Horizontal Top Horizontal Frame spect the stability 6Bottom of FixWheel the upper end of the stabiliser BraceBrace six rung ladder frame & lock it. Frame Erect Erect the the guard guard railsrails ontop ontop of the the second second e structure onto theofsecond set ladder frame, six rung six rung ladder ladder frames frames andand locklock them them in. in. tep at step 2. Add 2. Add the platform theRepeat platform with with & lower end onto the first set ladder Install the horizontal horizontal braces. braces. stepInstall 2. Add thethe Erect the guard rails on 4.of second 5. 6. Move the platforms with hatch hthe on third the third rungrung of second set set platform with hatch on the top of the second six to the top of the first set ladder frame. Ladders omitted for clarity. V-Frame -Frame Folding FoldingScaffold Scaffold ung adder ladder frame frame & lock &third lock it. rung it. of second set six rung ladder frame & lock it. First set ladder frames rung ladder frames and frame and the second set lock them in. InstallToeboards theToeboards platform respectively. Fit toe horizontal braces. boards to the upper platform. Diagonal Diagonal BraceBrace Second ladder frames Second setset ladder frames Fol Fra 6 Rung 6 Rung Ladder Ladder Erect guard ontop of the second Erect thethe guard railsrails ontop of the second Top Frame Top Frame Erect the diagonal braces. Erect the diagonal braces. Erect Erect thethe diagonal diagonal braces. braces. rung ladder frames them six six rung ladder frames andand locklock them in. in. 6 Rung 6 Rung Ladder Ladder spect the components for damage before each braces use. Bottom Bottom Frame Frame Clip diagonal braces onto the Clip Clip diagonal diagonal braces braces onto onto thethe Clip diagonal onto the Install the horizontal braces. Install the horizontal braces. Platform Platform e the aluminium beyond repair. In accordance with Australian Move the platforms with hat Move Move thethe platforms platforms with with hatch hat Move the with Hatch with Hatch lowest rung ofthe the second lowest lowest rung rung ofscaffold of the second second ocate Locate the adjustable stabilisers. stabilisers. lowest rung of the second Erect the guard rails ontop of the seco stall the next sixadjustable rung frame affold ticket tothe erect above 4 metres standing height. Repeat step 2. Add the platform with Move Move the the platforms platforms withwith hatch hatch to to the top ofthe the first set ladder thethe toptop of of the first first setset ladder ladder the top fra of the guard rails rails ontop ontop of the of second the second Adjustable Adjustable set six rung ladder frames, set set six six rung rung ladder ladder frames, frames, set six ladder sixsecond rung ladder frames and lock them i dguard lock them into the Fix Fix the the upper upper end end ofspigot the of the stabiliser stabiliser the the top top ofrung the of the first first sethatch ladder setframes, ladder frame framethird rung of on the set Ladders Ladders omitted omitted for clarity. for clari and the second set platform and and the the second second set set platform platform res Stabiliser Stabiliser and the se ung adder ladder frames frames and and locklock them them in. in. and and the the second second set platform set platform respectively. respectively. clip the other ends onto the clip clip the the other other ends ends onto onto the the Install the horizontal braces. low using the supplied lock pins. clip the other ends onto the onto onto thethe second second ladder ladder frame, frame,six rung ladder frame & lock it. FitFit ell horizontal the horizontal braces. braces.setset Fit toeboards tothe the upper p toeboards toeboards to to the upper platf pl Fitupper toeboa Fit toeboards Fit toeboards to the to the upper upper platform. platform. opposite frame rung. opposite opposite frame frame rung. rung. opposite frame rung. &elower & lower endend onto onto the the firstfirst setset ladder ladder Ensure tolock lock them entirely. Ensure Ensure to to lock them them entirely. entirely. Ensure to lock them entirely. rame. frame. A typical A typical 3.5m 3.5m h rne Copyright © 2014 Synergy Integrated Solutions Pty Ltd Foldable Foldable Frame IMPORTANT: IMPORTANT: It is the It isoperator’s the operator’s dutyduty to inspect to Frame inspect the components the components for damage for damage before before eacheach use Avoid Avoid contact contact with4with acid acid as this as will this damge will damge the aluminium the aluminium beyond beyond repair. repair. In IMPORTANT: accordance InIMPORTAN accordance withw IMPORTAN WWW.GTPRO.COM.AU 1300 GTPRO [email protected] 6 Rung 6 Rung Ladder Ladder Lockable Lockable Standard Standard 15761576 the 6operator the requires requires a scaffold a scaffold ticket ticket to erect to erect scaffold scaffold above above 4 metres 4 metres standin sta Rung 6operator Rung Ladder Ladder Avoid Avoid Avoid contac cont con e platforms the platforms withwith hatch hatch to to Bottom Bottom FrameFrame Move Move thethe platforms platforms with with hatch hatch to to Sydney Sydney Wheel Wheel Top Frame Top Frame Horizontal Horizontal Standard Standard Standard 1571 Brace Brace Safety Safety Notes Notes || V-Frame V-Frame Folding Folding Scaffold Scaffold Tower Tower The following safety notes apply to mobile tower frame scaffolding supplied by GTPRO It is recommended that these Safety Notes be available to the users of the scaffold and read in conjunction with: • Assembly instructions for the particular mobile tower frame scaffold system; • Hazard Identification, Risk Assessment and Control Measures for Aluminium Mobile Scaffolding. • Local Statutory Acts and Regulations, as applicable SAFETY NOTES 1. Ensure the scaffold is erected in accordance with the manufacturer’s assembly instructions. Persons erecting, modifying or dismantling the scaffold must hold the applicable certificate of competency if: a) The scaffold is over 4m in height b) The fall height from the scaffold over the edge of a floor or through a penetration is more than 4m in height. c) The scaffold involves a cantilever situation. d) The scaffold is swing stage. 2. Do not use incorrect, incompatible or damaged materials/components. Always inspect the components before use. 3. GTPRO will provide you with a list of components and an assembly manual to assist you in building the tower frame in a safe and approved manner. 4. Ensure that all the components used to erect the scaffold are from the same manufacturer, GTPRO issues no permission to mix and match components from other systems or manufacturers. 5. Ensure that there is a safe working area for the scaffold. The safest manner is to setup a restricted work-zone where the scaffold is erected. 6. Do not erect scaffold closer than 4.0m to electrical power lines. The minimum required distance is state-dependant so check the Statutory Regulations for your state. 7. Ensure the scaffold is erected on structurally adequate, solid, and unobstructed foundation. Use sole boards if necessary. 8. Always wear gloves and a hardhat while erecting the mobile tower system. Assess your work activity and wear the appropriate personal protective equipment. 9. All platforms over 2m in height must have toe boards, guardrails (1m above the deck) and mid rails (500mm above the deck) fitted. 10. Do not climb up the outside rungs of the scaffold. Always climb scaffold from the inside, via ladders. 11. Do not use ladders, steps and boxes, or any equipment on top of the working deck to gain extra height/reach. 12. When erecting and using, ensure the scaffold is level and in contact with the ground, by adjusting the adjustable castors if applicable and outrigger stabilisers. 13. Do not exceed the nominated Safe Working Load of the scaffold, usually 225kg per bay unless otherwise specified by the supplier/ manufacturer. If you are unsure of the SWL please contact GTPRO for details. 14. Do not move the scaffold with persons or materials upon it. Before moving the scaffold assess any overhead obstructions [e.g. powerlines, bridges] & ground obstructions [e.g. pot holes, steps] 15. Protect the scaffold from corrosive chemicals such as potash and hydrochloric acids. These substances are highly corrosive to aluminium and will affect the strength of the equipment. 16. Do not push against the scaffold in use. If you are using the scaffold to drill and you think you may push against the scaffold, tie the tower in prior to use; otherwise the force may cause instability to the free-standing tower. 17. When moving the scaffold only apply force by pushing at the base and ensure the tower remains stable and steady during movement. Be aware of obstructions on the ground around the area. If the tower’s wheels have brakes, do not push the tower while the brakes are applied. 18. Tie the scaffold to a rigid structure in strong wind conditions, do not sheet the scaffold with any materials (Shade cloth, hessian) unless advised by a competent ticketed scaffolder and the scaffold is tied in. 19. Do not cantilever tubes off the scaffold to accommodate gin wheels or pulley system for materials handling, this will destabilise the tower and may cause it to collapse. e 20. Ensure outrigger stabilisers are in position to maintain a height to minimum base width ratio of 3:1. 21. Ensure the scaffold is complete and if the castor wheels have brakes, make sure they are locked before use. 22. Ensure the scaffold is secure against access to unauthorised persons when left unattended. 23. Ensure the scaffold is stable and if the wheels have brakes, they are locked when left unattended. 24. When scaffold is incomplete affix a warning sign: “Scaffold Incomplete Do Not Use”, and block off entry to unauthorised persons. BEFORE ASSEMBLING THE TOWER 1. Inspect the tower components to ensure there is no damage to the components. 2. Read the assembly manual provided with your tower. DURING ASSEMBLY 1. Remain cautious of overhead powerlines, remain clear of powerlines by at least 4.0 metres. 2. Do not leave the scaffold in an unstable condition unattended. TYING IN THE SCAFFOLD MAINTENANCE The tower must be tied in where: 1. The height of the scaffold is to exceed 3 times the smallest base dimensions if used outdoors or indoors. 1. Do not throw the components to the ground as this may damage the parts and render them unserviceable. 2. There is a chance of high winds, typically above 45km/h. This may occur in wind tunnel conditions e.g. in large buildings where both ends are open, or in-between the outdoor corridor of two buildings. 3. You plan on using a gin wheel or hoist pulley to raise materials over the side of the tower. The assembly of the hoisting equipment must be checked and approved by a competent person. 4. The nature of the work involved requires you to apply a horizontal force (e.g. drilling) 5. The tower is left unattended. TOWER HEIGHT LIMIT The tower height is typically a ratio of 3:1. You may build the tower 3 times the minimum base width. Safe Working Loads Wide Tower: 450 kg per tower (Medium Duty) Narrow Tower: 225 kg per tower (Light Duty) H-Frame Tower: 225 kg per tower (Light Duty) V-Frame Tower: 225 kg per tower (Light Duty) Multifunction Tower: 225 kg per tower (Light Duty) WWW.GTPRO.COM.AU 1300 4 GTPRO 2. GTPRO does not give the purchaser permission to modify the components without authorization from the manufacturer 3. Lightly lubricate the castor wheel threads and bolts on the outrigger stabilisers to keep them easy to use. 4. If the component is damaged do not use it. 5. GTPRO components must only be repaired by a qualified person approved by Synergy Access Equipment. It is your duty to read and understand these Safety Notes before assembling and/or using the scaffold. GTPRO does not permit any person to assemble and/ or use the scaffold who does not understand the material in the Safety Notes, Safe Assembly Manual, & Local Statutory Regulations. These Safety Notes are to be read in conjunction with Statutory Regulations & the Safe Assembly Manual. If you require further assistance with understanding the instructions, please contact GTPRO. [email protected] Hazard identification & Risk Assessment ! Please read label carefully before erecting scaffolding. If in doubt ask your supplier. HAZARD IDENTIFICATION RISK ASSESSED POSSIBLE RISK CONTROL Collapse of Scaffold SERIOUS All scaffolds over 4m must be erected by WorkCover approved or authorized personnel. Tower erection procedures must be adhered to. Scaffold must always be erected to Assembly Instructions. Electrocution SERIOUS Scaffold must not be used within 4.6m of overhead electrical wiring. Always look above when moving Scaffold Tower. Falling from Scaffold SERIOUS Hand rails and mid rails must be used on every deck level. Workers must not ride on scaffold when the scaffold is being moved. At no time can a ladder be used on the deck of a scaffold to gain additional height – neither step nor extension. Internal ladders must be fitted to the scaffold for access to the working decks. Do not climb on the outside of the scaffold. Internal ladder access must be used. Material falling from Scaffold SERIOUS Toe boards must be fitted on all working deck levels of a scaffold. Ensure there are no holes or gaps in decks that material can fall through. Sloping Ground SERIOUS If the scaffold has wheels with brakes, they must be applied at all times when the scaffold is in use. Mobile Scaffolds must not be used on sloping surface. Configurations | V-Frame Folding Scaffold Tower ADJUSTS UP TO BASE HEIGHT SCAFFOLD 1.8 m HIGH CONSISTS OF 1x Base Unit pack CODE:132258 PACK CONTAINS 1 x End V-Frame Folding Section 1 x Platform with Hatch 1 x Horizontal Brace 1 x 4 pack of 5 inch Castor Wheels CODE: 132252 CODE: 132259 CODE: 132253 Fold-up frame for safe, fast and easy set-up EXTENSION HEIGHT SCAFFOLD CONSISTS OF ADJUSTS UP TO 2.8 m HIGH 1x Base Unit pack CODE:132258 1x Extension unit pack CODE:133333 PACK CONTAINS 2 x Guard Rails – 2 Row CODE: 132260 3 x Horizontal Braces CODE: 132259 TOWER HEIGHT ADJUSTS UP TO 4.5 m SCAFFOLD HIGH CONSISTS OF 1 x Base Unit pack CODE:132258 1 x Extension Unit pack CODE:133333 1 x Tower Unit Pack CODE: SYVFTWR PACK CONTAINS 2 x 6 Row Ladder Frames 2 x Diagonal Braces 1 x Toe Board CODE: 132237 CODE: 132236 CODE: 132271 2 x Stabilisers 2500mm CODE: 132238 1 x Platform W/Hatch & Ladder CODE: SYVFPHL WWW.GTPRO.COM.AU 1300 4 GTPRO [email protected] Notes WWW.GTPRO.COM.AU 1300 4 GTPRO [email protected] V-FRAME FOLDING SCAFFOLD TOWER WWW.GTPRO.COM.AU 1300 4 GTPRO [email protected]
© Copyright 2026 Paperzz