S.No. Component / Operation Characteristics Checked Classification Method / Type of Check Acceptance Norm Format of Record Agency 1 2 3 4 5 6 7 8 QUALITY ASSURANCE PLAN ITEM : MOTOR CONTROL CENTER, POWER CONTROL CENTRE , DISTRIBUTION BOARD, AMF PANEL , LT PANEL ETC. 1A MATERIAL INSPECTION MILD STEEL FOR FABRICATION (SHEET STEEL & CHANNEL CRCA '0' GRADE) A) Surface Finish B ) Sheet Metal Thickness C) Dimensions 1B 1C Busbar Support SMC/ DMC BUSBAR Main Busbar (Ver. & Hor.) Al / Cu Control Busbar Al/ Cu 1D 1 Hardware Bolt / Nuts / Plain Washer / Spring Washer A) Type Of Support Major - do - do Major IS:513/1973 Measurement Apprd Drgs IS:513/1973 - do - - do Visual B) Dimensions C) Surface Finish D) H.V. Test A) Size & Cross Section - B) Resistivity / Conductivity C) Tensile Strength - do - A) Dimensional Confirmity do do do do Visual - - do - Major Page 1 of 11 Measurement Visual Electrical Measurement - do Mechanical Measurement Krypton Inspection Record - do - - do - - do - - do - As per Application Drgs Krypton - do - do - do Apprd. Drwgs & Specifications IS : 5082/ 1897 - do - - do - do - do Krypton Inspection Record - do - IS : 1364/3063 Krypton - do - do - Krypton Inspection Record Krypton - do - do - do Krypton Krypton - do - Krypton S.No. Component / Operation Characteristics Checked Classification Method / Type of Check Acceptance Norm Format of Record Agency 1 2 3 4 5 6 7 8 1E 1F Drawout Contact Assembly (Power & Aux. Contacts) Paint 1G Neoprene Rubber Gasket 1H Conductor / Wire B) Plating : Zinc / Cd A) Surface Finish - do - do - Visual B) Rating Size A) Finish (Shade ) Viscosity - do - do - Measurement Visual - do IS : 101/ IS : 5 & Shade no.631 - do Krypton Inspection Record B ) Routine Test C) Tape Test A) Dimensional Confirmity - do - do - do - - do Putting Tape - do - - do - do Internal Std. - do - do Krypton Inspection Record A) Verification of Cross Section make, Colour Code , Grade etc. B) Thickness of Insulation 1I Air Ckt Breaker (ACB) A) Verification of Current rating B) Verification of Voltage Grade C) Mounting Arrangement & Dimensions D) Setting Of Releases Major - do - Major - do - - do - Physical Verification / Measurement Physical Verification / Measurement Visual - do - - do - - do - - do - - do - - do - - do - do - - do Krypton - do - do Krypton - do - - do - IS : 694 - do - - do - Approved Drg - do - - do - - do - - do - - do - - do - Measurement - do - - do - - do - - do - Electrical - do - - do - - do - Page 2 of 11 S.No. Component / Operation Characteristics Checked Classification Method / Type of Check Acceptance Norm Format of Record Agency 1 2 3 4 5 6 7 8 1J 1K Terminal for Power & Control Air Break Switch E) Voltage Rating of Closing Coil / Shunt / Trip / Under Voltage - do - Visual - do - - do - - do - F) Anti Pumping / Trip Free Feature - do - Electrical - do - - do - - do - G) Slow Costing H) Routine / Type Test A) Size / Current rating - do - do - - do Electrical / Mechanical Visual - do As per IS : 2516 Approved Drg. B ) Connecting Arrangement A) Verification Of Voltage Grade B) Current Rating C) Operating & Interlocking Arrangement Major - do Major - do - do - - do Verification - do - do - - do IS : 4064 Approved Drg - do Manufacturer TC Krypton Inspection Record - do Krypton Inspection Record - do - do - - do - do - - do Manufacturer Krypton - do Krypton - do - do - 1L HRC Fuses A) Verification of Make , current rating, rupturing current Major Verification IS : 9224 Krypton Inspection Record Krypton 1M Protective Relays A) Mounting Detail Setting range Aux. Contact Pos. Major Physical verification Approved Drg Krypton Inspection Record Krypton B) Operation Critical Page 3 of 11 Test - do - - do - - do - S.No. Component / Operation Characteristics Checked Classification Method / Type of Check Acceptance Norm Format of Record Agency 1 2 3 4 5 6 7 8 1N Air Break Contactors / Timers / Time switches Approved Drg / IS : 2959 Krypton Inspection Record Krypton 1O 1P 1Q Current Transformer Indicating Instruments(Voltmeter, Ammeter, Frequency, KW, KWH, Meter etc.) Control Switch A) Mounting Detail & Mechanical operation B) Current Rating / Make C) No. Of Contacts A) Mounting Detail & Dimensions Major Physical verification - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - Minor Physical Verification Approved Drg Krypton Inspection Record Krypton Manufacturer TC Manufacturer Manufacturer TC Manufacturer B) CT Ratio , Class Of Accuracy Critical A) Mounting Detail & Dimensions Minor Physical Verification Approved Drg B) Accuracy Class Major Visual Approved drg IS : 1248 IS : 2419 C) Routine / Type Test A) Visual Major Electrical Minor Physical verification Approved drg IS : 6875 Approved Drg Major Visual - do - - do - - do - Functional test - do - - do - - do - B) Contact Rating AC / DC C) Operational Test - do - Page 4 of 11 Test - do - - do - Manufacturer TC Krypton Inspection Record - do - Manufacturer Krypton S.No. Component / Operation Characteristics Checked Classification Method / Type of Check Acceptance Norm Format of Record Agency 1 2 3 4 5 6 7 8 Approved Drg Krypton Inspection Record Krypton 1R 1S Space Heater Indicating Light A) Mounting Detail Minor Visual / Physical inspection B) Verification of Volt / Watt Rating Major TEDT A) Verification Of Voltage Grade Major Verification B) Series Resistance Value / TRF, ratio 1T 1U Voltage Transformer Thermal Overload Relay A) Mounting Detail & Dimensions B) PT Ratio, Class of Accuracy C) Verification of polarity D) Routine / Type test A) Verification of Rating & Contact Arrangement B) Current Setting C) Mounting Arrangement D) Re Setting arrangement - do - Major - do - Measurement - do - Approved Drg / IS : 4795 - do - Manufacturer Std - do - Krypton Inspection Record - do - Krypton Inspection Record - do - Krypton - do - Krypton - do - Visual - do - - do - - do - - do - Electrical - do - - do - - do - - do Major - do Electrical - do Approved drg Manufacturer TC Krypton Inspection Record Manufacturer Krypton - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - Page 5 of 11 S.No. Component / Operation Characteristics Checked Classification Method / Type of Check Acceptance Norm Format of Record Agency 1 2 3 4 5 6 7 8 1V MCB / MCCB A) Verification of rating & Make Major Electrical Approved drg Krypton Inspection Record Krypton 1W Push Button A) Verification of Rating & Contact Arrangement Major Electrical Approved drg Krypton Inspection Record Krypton B) Mounting Arrangement C) Operational / Functional 2A INPROCESS INSPECTION PANEL FABRICATION A) Visual check for weld, dressing, deburing, straightness & dimensional control - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - Minor B) Checking of Frame with Std. Trolley - do - C) Checking of Trollies with standard fixtures - do - D) Dimensions - do - E) Lifting Facilities F) Cable Entry - do - do - Page 6 of 11 Physical Verification Physical Internal Std. Internal Inspection record Krypton - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - - do - Process ( Physical check before assembly) S.No. Component / Operation Characteristics Checked Classification Method / Type of Check Acceptance Norm Format of Record Agency 1 2 3 4 5 6 7 8 2B PRE- TREATMENT / PAINTING G) Waviness H) Gasket Arrangement A) Pre- Treatment of sheet steel B) Final Painting - Paint Thickness - Adhesiveness 2C Assembly - Finish A) Alignment of Panel & Busbar b) Check for Busbar Mounting 1) Tightness of Busbar Joints - do - do Minor - do - do Physical Visual - do - do Internal Std./ IS : 6005 - do - do Krypton Inspection Record - do - do Krypton - do - do - - do Measurement - do - do - - do - do - - do - do - - do - Physical - do - - do - - do - - do Major - do - Visual Physical verification Physical test by Torque Wrench - do IS : 101 Internal Std. - do Internal Inspection record - do Krypton - do - - do - 2) Busbar Mounting on Insulators - do - - do - - do - - do - - do - 3) Busbar jointing Arrangement & Overlapping - do - - do - - do - - do - - do - 4) Busbar bending & Drilling - do - - do - - do - - do - - do - - do - - do - - do - 5) Phase Identification & Clearance Critical Page 7 of 11 Physical S.No. Component / Operation Characteristics Checked Classification Method / Type of Check Acceptance Norm Format of Record Agency 1 2 3 4 5 6 7 8 6) Busbar Sleeving & Colour Bends C) Check for CT Mounting 1) Mounting & Adequate Supports of CT Minor Visual Check - do - - do - - do - Major Physical verification - do - - do - - do - 2) Provision for Shorting link on CT terminal - do - - do - - do - - do - - do - D) Mechanical Interlocking Arrangement - do - Functional check - do - - do - - do - E) Check for Arrangement of Gasketing & Sealing by torch test - do - test - do - - do - - do - F) Arrangement of Components & Terminations - do - Physical Verification - do - - do - - do - G) Check for Interchangeability - do - Functional check - do - - do - - do - H) Check for Smooth Movement of Trolley During Withdrawal / Insertion operation Major Page 8 of 11 Functional Check Internal Std Internal Inspection record Krypton S.No. Component / Operation Characteristics Checked Classification Method / Type of Check Acceptance Norm Format of Record Agency 1 2 3 4 5 6 7 8 I) Check Trollies for isolate test service position 2D Wiring A) Proper Wire Clamping B) Continuity & Ferruling as per wiring diagram C) Proper crimping of lugs / connections tightening at terminals & components 3A Final Inspection A) Verification of Component, Rating, Arrangement as per GA Drg make - do - Minor - do - - do - Major Physical Visual Visual / test - do - Physical Verification - do - - do - - do - Krypton - do - Internal records - do - - do - - do - - do - Internal records Krypton Internal Std Approved Drg IS : 8625/ IS : 4237/ IS : 2127 - do - B) Mounting Arrangement of name plate covers interchangeability of Modules - do - - do - - do - - do - - do - C) Wiring Cubicle & Ckt. Function test , operation of indicating instruments wiring completeness - do - - do - - do - - do - - do - D) Continuity test - do - - do - - do - - do - Page 9 of 11 Routine test S.No. Component / Operation Characteristics Checked Classification Method / Type of Check Acceptance Norm Format of Record Agency 1 2 3 4 5 6 7 8 E) HV / IR Test on both Power / Control Ckt F) Phase Indication Critical Major - do - Visual - do - Approved Drg IS : 8623 / IS : 4237 / IS : 2127 - do - - do - Internal Records Krypton G ) Check for Busbar clearance , Tightness pf electrical / mechanical interlock - do - Visual / Physical verification of torque wrench - do - - do - - do - H ) Degree of protection by insertion of thin paper / light test - do - Test - do - - do - - do - Visual - do Physical Verification - do - - do - do - do - - do - do - do - - do - do - do - - do - - do - - do - I ) Final Painting 1) Shade 2) Surface Finish 3) Thickness 4) Adhesion J) Space Heater 1) Function - do Minor Major - do Major 2) HV / IR test 3) Contact Resistance of D/O Components - do - do - Physical verification Routine test Visual K ) Degree of protection - do - Mechanical Page 10 of 11 Internal Specs - do - do - - do - Inspection Record - do - do - - do - Krypton - do - do - - do - S.No. Component / Operation Characteristics Checked Classification Method / Type of Check Acceptance Norm Format of Record Agency 1 2 3 4 5 6 7 8 L) Temp. Rise Test M) Short Circuit Test - do - Electrical - do - - do - Visual - do - Page 11 of 11 Test Certificate - do - - do - do -
© Copyright 2026 Paperzz