S TRAC T LIMIT Exact location of walk unknown Exact location of walk unknown CON WATER TREATMENT PLANT 2.6m 3.5m 3.5m 3.5m 3.1m 3.5m 3.5m 3.5m 2.4m 3.5m 3.5m 3.5m 3.5m 3.3m Asphalt Curbing Asphalt Curbing LINE PAINTING LENGTHS WHITE DASH - 37.3 km WHITE SOLID - 10.0 km CONTRACT LIMITS SOUTH TO CITY LIMITS; APPROXIMATELY 250m SOUTH OF 42nd STREET EAST YELLOW DASH - 22.5 km MARQUIS ROAD RESERVOIR LEGEND YELLOW SOLID - 22.9 km INTERSECTIONS - 13.7 km CITY STREETS TO BE PAINTED CONTRACT LIMITS SOUTH TO CITY LIMITS; APPROXIMATELY 200m SOUTH OF 42nd STREET EAST TOTAL - 106.4 km 5 02/27/16 2016 UPDATES VPJ 4 03/02/15 2015 UPDATES ALK 3 01/24/14 2013 UPDATES EEJ TRAFFIC LINE PAINTING CITY OF PRINCE ALBERT DESIGNED DATE DRAWN DWG. FILE NO. PUBLIC WORKS HORIZ. CHECKED NO. DATE REVISION BY KEY PLAN FINAL PLANS APPROVED SCALE VERT.
© Copyright 2025 Paperzz