Spanish City Dome Our Journal of Construction Entry 10: End of week 7, 13/01/17 Main works Works are progressing quickly after the Christmas break, we have a new subcontractor on board and they’re raring to go ! We also have a new piece of kit on site… The BROKK, a remote controlled robot that will carry out the removal of the floor slabs within the building. Van Elle is continuing with their drilling works, this is a large area so patience is required. MTL is back on site and has erected a bird cage in the old shop fronts, this is to allow Thompson’s to start and the remove roof slab on the East elevation, with the original facade still in situ this is delicate work requiring care and attention, therefore, these works will be done by hand. Thompson’s have removed the shop fronts which are to be replaced with new construction, they have also removed the wooden flooring in the west shop front to allow the BROKK breaker in to remove the floor slab. The Shaws team are new on site, they are our masonry specialists. They have set about forming new door openings in some areas and bricking up existing openings in others. Robot Wars – Robertson Style Say hello to the latest member of our team, ‘The BROKK’ No, ‘The BROKK’ is not a cast off from Robot Wars but a very robust clever piece of kit. He enables the safe removal of hard surfaces such as concrete slabs in areas which may otherwise be inaccessible to operatives, all this is done by remote control. He can even travel up and down stairs with his caterpillar treads, Daleks can’t even manage stairs ! The rig hard at work on the West elevation. High level protection & internal birdcage by MTL The shop fronts have been removed, great care was taken to remove some of the original concrete works as they weren’t very secure Shaws have formed new openings and closed old ones off.
© Copyright 2025 Paperzz