WHOLE HOUSE ELECTRICAL GENERATOR Lewis Thompson – W5IFQ 3 July 2012 Previous Emergency Power Sources 200 AH, 12 VDC Storage Batteries 2 KW AC Generator First “Whole-House” Generator 20 Hours of fuel Manual Residential Transfer Switch 10 KW Tri-fuel Generator 10KW Tri-Fuel Generator Engine – Briggs & Stratton (Daihatsu) Vanguard V-Twin 16 HP OHV w/12 Alternator Electric starter Generator – Hercules, brushless, 100% power factor rated Residential Transfer Switch – Manual, 60 A, with Hubble Connector Power Cable – 50 ft. 6-3 with 220 VAC matching connectors Original House Wiring Outside Breaker Box AC 30A AC 30A 220V Mains Inside Breaker Box 20 – 120V Breakers Wall plugs Appliances Lights Gas Furnace Blowers 125A Oven 30A (Neutral not shown) Drier 30A House 60A Total Power – 60A at 220V Or 13.2 KW Original House Wiring Outside Breaker Box AC (Neutral not shown) 30A AC 30A 220V Mains Inside Breaker Box 20 – 120V Breakers Wall plugs Appliances Lights Gas Furnace Blowers 125A Oven 30A Note: No AC No Electric Oven But have central heat Drier Generator Input 30A Xfer Switch House 60A Total Power – 60A at 220V Or 13.2 KW Manual Residential Transfer Switch (60 A – Break before Make) Fuel Consumption (10 KW Load) • Gasoline – 1.25 gal/hr – Limited storage life (1 year with Sta-Bil) • Propane – 2.2 gal/hr – Can obtain permit from AFD – Best option if no natural gas service – Tank can be buried (250 gal standard) • Natural Gas – 150 cu ft/hr – Probably will need 2nd service line Natural Gas Service Problem Gas Piping in house Insufficient to power 10 KW generator. New pipe from meter Needs about 250 ft Of 1” line. This pipe needs to run either under patio or driveway. Decision to just run on gasoline until Propane tank installed Gas Service Electrical Utility input 20 KW Whole-House Generator • Decision Process – Most probable time to lose utility power would be summer (hurricane, tornado, utility failure, rolling blackouts). – House very uncomfortable without air conditioning (not designed for cross ventilation) – Installed new AC units with 40% reduction in current (EER = 20). Whole house consumption measured at less than 20KW. (13.4 KW) – Increased confidence in natural gas source (Texas Gas Company). Natural Gas Solution (Austin Generator Service) Texas Gas Company wants to sell you gas! Only cost to me was ditching from sidewalk to meter ($778). street, curb, sidewalk excavation and repaving was paid by Gas Co. Existing Gas Service New Gas Service I pay about $13/mo more for meter minimum plus gas used during weekly generator exercising. Electrical Utility input 20 KW Whole-House Generator Installation Events • Selected Generator and Automatic Transfer Switch • Proposal from Austin Generator Co. – 9/9/2011, total $9026.60 including electrical installation, natural gas plumbing, startup and testing. New gas line and meter not included. • Removed manual transfer switch, reconditioned 10 KW generator and sold all components. • Ordered new “yard line” – 55 ft of ¾” plastic gas pipe $788.70 from Texas Gas Service. • Completion – 12/27/2011 • Total Cost - $9815.30 Motor-Generator • Generac – Guardian model 5875 – Engine • • • • 2 cylinder, OHV, 999 cc, 36 HP Air cooled, 3600 rpm Sound Output – 66 dB(A) at 23 ft. Fuel Consumption (full load) – NG – 294 cu. ft./hr. – LP – 2.9 gal/hr. • Aluminum Enclosure • Maintenance Interval – 200 hr. – Generator • • • • 240 VAC at 83.3 A (LP), 75 A (NG) 20 KW (LP), 18KW (NG), Harmonic distortion - <5% Regulation - +/- 1% Transfer Switch & Controller • • • • • • • • • • Transfer switch – 200 A Automatic transfer with utility interrupt delay (10-30 sec) Utility setpoints, 60% dropout, 80% pickup (240 VAC) Generator auto start with 5 second delay before load transfer. Monitor of generator output voltage and frequency. Programmable load sequencing (if needed). Engine cool down of 1 minute before shutdown. Weekly exercise for 12 minutes (programmable) Smart battery charger NMEA enclosure NG Line Installation Generator Placement Transfer Switch Wiring Outside Breaker Box AC 30A XFER Switch AC Utility Meter 30A 220V Mains 125A Oven 30A Ctrl Drier 30A (Neutral not shown) House Generator 60A Transfer Box Installation Transfer Switch to Generator City Inspection Required NG Plumbing City Inspection Required System Startup & Testing Installation Completion QUESTIONS? Lewis Thompson W5IFQ, AAA6TX [email protected] [email protected] [email protected] [email protected] Cell (512) 587-9944 Home (512) 892-8815
© Copyright 2025 Paperzz