APPENDIX 2 Environmental Monitoring Synopsis – Whio-1 Exploratory Wellsite 3 June 2014 Whio-1 Impact Assessment - Submission Version 03062014.docx Environmental Monitoring Programme (EMP) [revised] Synopsis for Whio exploratory well site, OMV New Zealand Ltd – October 2013 Synopsis summary [revised version] Maritime New Zealand (MNZ) is being supplied with a synopsis of the Environmental Monitoring Plan (EMP) for the proposed ‘Whio’ exploratory well site baseline (pre-drill) benthic ecological survey, from OMV New Zealand Ltd (OMV). The pre-drill sampling is scheduled for October 2013*. This synopsis covers the general approach and methodology (as derived from the draft ‘Offshore Taranaki Environmental Monitoring Protocol’; OTEMP 2012) for the EMP, including station locations, frequency of sampling, and general reporting framework. Detailed specifications are described in OTEMP. Operator - OMV NZ Ltd. Facility - ‘Whio’ proposed exploration well site Field Schedule - Pre-drill survey: October 2013* Post-drill survey: October 2014 Methodology - Benthic macrofauna, sediment characteristics and chemistry, epibenthic biota. Chemical tracers will be as per OTEMP, e.g. standard metal/metalloids, total petroleum hydrocarbons (TPH) and poly aromatic hydrocarbons (PAH). Archiving samples - All sediment samples will be retained for 6 months postsampling. Client will be contacted before disposal of samples. Note: sediment characteristics and metals/ metalloid samples are considered viable for 6mths. Semivolatiles & volatile organic compounds (PAHs & TPHs) are viable for 1-2 weeks (USEPA guidelines). If additional analyses are required to determine organic compound concentrations, then it is likely that these particular analytes would need to be resampled. Sampling Stations - Benthic: 20 at proposed drill site + 3 from each control station (NCc and SCb) (Figure 1). Each station will be sampled with 3 replicates. These are allocated based on the flow modelling (Figure 2) as recommended in OTEMP. Epibenthic videos: 6 at the proposed drill site + 2 at the Control sites. Control sites - Northern Control site (NCc) located 67 km northeast from Whio. Southern Control site (SCb) located 26 km worthwest from Whio. Sampling Frequency - Pre-drill October 2013*; Post-drill October 2014, or annually until drilling activities cease (if longer than a year). Results reviewed per-survey to determine ecological recovery. Environmental Monitoring Programme (EMP) [revised] Synopsis for Whio exploratory well site, OMV New Zealand Ltd – October 2013 Reporting Frequency - Per survey (all parameters) within 6 months of all field effort being completed**. Subsequent reports will include analyses from previous sampling efforts and be to a standard appropriate for external peer review. All raw data can be included in the report(s) if necessary. Discharge quantities can be related to monitoring results, in the postdrilling reports if supplied by OMV. *Due to bad weather conditions, the field work for the control locations was unable to be completed in October. Sampling of these sites will be completed at the earliest opportunity (November/December 2013). **Six month reporting timeframe will commence after the sampling of control locations is complete (i.e. after the remaining field component is complete). Monitoring Hypotheses of Environmental Monitoring Programme for Whio exploratory drilling: H0.1. There will be no effects to the physical sediment characteristics (grain-size & AFDW), as a result of the drilling activity. H0.2. Project discharges will not result in sediment chemistry concentrations to exceed ISQG-Low guideline values (where applicable) or be significantly higher than background or control concentrations. H0.3. Project discharges will not cause adverse biological effects. H0.4. Incidental observations of project related debris will not be observed. H0.5. Chemical tracers (metals/metalloids, total petroleum hydrocarbons and poly aromatic hydrocarbons; as per OTEMP) will not detect the depositional footprint of drilling discharges as far as the 4000 m station. Environmental Monitoring Programme (EMP) [revised] Synopsis for Whio exploratory well site, OMV New Zealand Ltd – October 2013 Figure 1. Whio benthic sampling station locations. Control sites NCc and SCb are also shown in the larger scale map. Note that the well site close proximity sampling station, although included, has no label in the figure. Environmental Monitoring Programme (EMP) [revised] Synopsis for Whio exploratory well site, OMV New Zealand Ltd – October 2013 Figure 2. Annual depositional footprint modelling plot1 (top) and current rose diagram (bottom) at the Maari facility, but applicable (pers comm. Govier, D, REM Ltd) to the Whio proposed well site. This document can be cited as: EMPS 2013. EMP Synopsis [revised version] for Whio exploratory well site. Prepared for OMV New Zealand Ltd. by Cawthron Institute, October 2013. Eds. Elvines, D. & O. Johnston. 1 MetOcean Solutions Ltd. 2012. Dispersal of Drill Cuttings: Numerical modelling of the dispersal and deposition of cuttings discharged to the sea from proposed wells at Maari and Matuku-1. Prepared for OMV New Zealand Ltd. MetOcean Solutions Ltd. Report P0091-03.
© Copyright 2026 Paperzz