Working In Partnership Cabinet Members Brief 31st March 2011 Events Premier League Football Guide - Fixtures are subject to change 15.00hrs Saturday 2nd April 2011 Birmingham v Bolton nd Saturday 2 April 2011 West Brom v Liverpool 15.00hrs Sunday 10th April 2011 Aston Villa v Newcastle 16.00hrs th Saturday 16 April 2011 Birmingham v Sunderland 15.00hrs Saturday 16th April 2011 West Brom v Chelsea 15.00hrs rd Saturday 23 April 2011 Aston Villa v Stoke 15.00hrs Saturday 30th April 2011 West Brom v Aston Villa 15.00hrs Home Home Home Home Home Home Home Farmers Market – Various locations in City Centre – 1st & 3rd Wednesday of each month AVIVA Birmingham Sports Grand Prix – Alexander Sports Stadium – 29th – 31st March 2011 1 Major Schemes Selly Oak New Road Phase 2 The Scheme includes for the Construction of a new road to relieve A38 Bristol Rd as it runs through the Selly Oak Centre. It will run between the end of Selly Oak New Rd-Phase 1A (off Harborne Ln) and the junction of Bristol Rd/ Edgbaston Park Rd. Programmed Works from Saturday 2 April 2011 until Friday 8 April 2011 Railway and Canal Structures Earth moving operations under the new railway bridge and aqueduct will continue this week together with removal of old tyre bales. Carriageway between Aqueduct and Grange Road Commence laying of 16 No. ducts for future development on Victoria Halls development land. A38 works On going temporary right turn ban from University South Gate into Bristol Road to allow construction works on Bristol Road. Bournbrook Road to remain closed until end of April 2011 for vehicular traffic. Pedestrian and cyclist access will be maintained at all times and a signed diversion is in place. The crossing point at South Gate is in operation for pedestrians and cyclists. From 4 April to 8 April surfacing works to be carried out at night between 2000hrs and 0600hrs near South Gate and Bournbrook Road junctions. During this night time working the signals at South Gate will be switched off. On going partial closure of Arley Road to enable the road works to take place. Access to frontages will be maintained. On going street lighting and signal ducts installation throughout Bristol Road On going brickwork to the walls between Grange Road and Bristol Road. Continue to lay tactile paving on cycleway/footway and lay kerbs/edging kerbs. Statutory Undertakers BT to carry out minor duct laying within the confines of the site near Tesco Express. Emergency Contact details for Birse:Martin Keaney: 07967 578474 John Daft: 07976 539853 Head Office: 01453 824561 Emergency Contact details for Statutory Undertakers:Eon Chris Smith 07989 701634 Alastair Winch 07500 781924 2 STW Garry Shore Marston 0121 722 4000 Mike Smith 07794 816659 BT Kevin Poultney 0121 351 7450 24hr (Carillion) 0800 526015 Steve Cunningham (Carillion) 07764 834903 National Grid Steve Bilson 07980 708830 BSkyB Stephen Dicken 07740 451632 HTM (Traffic Management) 0121 326 9143 If you require further information on the above, please contact either Surinder Mann on 07766 924 041 or Vic Prosser on 07766 923 289. Aston Brewery Street - Coach and Lorry Park The Scheme is to provide a secure Coach and Lorry Park for 32 vehicles and includes welfare facilities fro the drivers. Works include installation of new lamp columns, new road markings, traffic signs, welfare facility building and CCTV. Planned works Complete Edging to Footpaths within site. Sub Base and Surfacing to footpaths within the site. Preparation work for Ticket Machines at entrance. Emergency Contact Telephone numbers for Barhale are: 24 hr. contractor contact - 01922 707700 Contracts Manager – Ahmed Mubarak, 01922 726715 Site Supervisor – Colin Jukes, 07903 9800939 If you require further information on the above, please contact either; Surinder Mann on 0121 303 7629, or Dennis Fletcher on 07766 924320. 3 Hall Green A34 Stratford Road – 03rd September 2010 – May 2011 The Scheme includes for provision of dedicated ‘right turn’ lanes from A34 Stratford Road into School Road and Cole Bank Road. Works include new traffic signals with pedestrian phases, installation of new lamp columns, new road markings, traffic signs and diversion of Statutory Undertaker’s apparatus. Weekend T. M. 1st-3rd April Temporary Traffic Lights to be set up from 19.00hrs Friday 1st April until 18.00hrs Sunday 3rd April for Central Networks to pull cables through the ducts previously laid across Stratford Road and joint the new cable to the existing cable. D Lewis C. E. Ltd Complete any outstanding work to the Final Connections on the 700mm dia watermain. Withdraw the steel sheet piles and hydraulic steel frames from both Cofferdams and backfill and reinstate the footpaths. Backfill and reinstate all other excavations on the 125mm & 700mm dia watermains. Relay P C Kerbs and open the footpaths to the Public. B. T. Jointers on site to complete the cable diversion works on Stratford Road. Central Networks Lang O’Rourke & Central Networks Labour on site during the weekend of 1st-3rd April. Emergency Contact Telephone numbers for Fitzgerald are: 24 hr. call out number – 0121 326 0402 Contracts Manager – Steven Jones – 07970 454 184 Site Supervisor - Dave Godrey – 07977 935 189 If you require further information on the above, please contact either; Tim Embrey on 0121 472 2986, Mobile 07967221205, Vic Prosser - 07766 923289 4 Ladywood A38 Great Charles Street – 29th September 2010 until March 2011 updated Works continue on Great Charles Street. The new bridge is to accommodate the Metro and provide a pedestrian link across Great Charles Street via Metro Station and lift. The road closure is to allow the demolition of the existing bridge and the installation of the new deck. Works will be carried out at weekends and out of normal hours to minimise disruption. The closures will be between St Chads Circus and Livery Street. (TMS) The above works require the closure of Great Charles Street Queensway Northbound and Southbound tunnels and slip roads and the previously agreed traffic management will be implemented. Balfour Beatty are working to a strict time table and have specific target times to achieve during the possession periods due to the railway possession. If target times can not be achieved the lifts will be aborted. This will ensure no road closure over run occurs. The carriageway is not affected directly while the lifts take place and the roads are only being closed on safety grounds. The crane will be brought on site and removed from site at times to avoid disruption to traffic. As agreed with the Police and Other Emergency Service, in the case of an incident taking place in the City during the crane lift the carriageway can be reopening within minutes. The Snowhill development access road will also be closed from 7am to 1pm. This will not require a South Bound slip road closure, the entrance will be coned off and diversion signs used. Contact – Balfour Beaty David Hough 07786 111173 Traffic Management – HTM Marcus Casey 0121 326 9143 Duchess Road Multi-storey Car Park updated The Scheme is to refurbish the multi-storey car park at Duchess Road. Works include installation of new lamp columns, new line markings, CCTV, repairs to the structure and waterproofing of decking. The Contractor is Makers Construction. Planned works Cutting out and repairing of concrete on soffit and columns on ground floor. Planning and repair of upper floor deck. Emergency Contact Telephone numbers for Makers are: 24 hr. contractor contact - 07525 907390 07525 907396 Contracts Manager – D Wootton, 01543 480676 Site Supervisor – R Mundon, 07525 907396 If you require further information on the above, please contact either; Surinder Mann on 0121 303 7629 or Dennis Fletcher on 07766 924320. 5 Longbridge Longbridge Lane at Bristol Road South – 24th August until November 2011 The scheme involves the widening of Longbridge Lane and improvements to the junction with Bristol Road South. The main contractor is Sisk. The works are split into seven phases. The works are due to finish in November 2011. Progress Longbridge Lane • Completion of new traffic island at junction with A38 A38 Bristol Road South • Preparation of new footway Services • Commencement of service diversions to east of A38 and to north of Longbridge Lane Culvert • Existing culvert being prepared for new culvert connection Planned tasks W/C 28-03-11 - W/E 08-04-11 Longbridge Lane • Complete final traffic swop over at A38 junction • Commence site clearance A38 north at junction, commence installing new services and new road buildup • Continuation of road crossing from layby A38 Bristol Road South • Complete service diversions, kerbing and surfacing preparations to central section • Commence site clearance of old footpath, A38 west • Install new public lights and remove existing Services • Continue with new electric duct installation Longbridge Lane • Commence installation of new services in carriageway Longbridge Lane • Substantial completion of remaining services diversions • Commencement of gas main in A38 • Commencement of BT manhole on A38 verge, A38 west, including partial lane closures • Partial lane closures on A38 inbound to allow location of water main and connection (subject to TM) Culvert • Connection of new culvert to existing approx. April 15th Contact details:BCC - Rachael Kingsley – Lead Officer – 0121 303 7097 Halcrow Yolles – Dave Woolley – Resident Engineer – 07739 190990 Principal contact Sisk Colin Llewellyn - 07971 865826 Man Security Chris Smith - 0121 733 8484 and 07901 848620 HTM (cones and signs) Marcus Casey - 0121 326 9143 and 07739 592265 Site Engineer Wes Gardner - 07840 238199 6 Quinton updated Hagley Road/ Wolverhampton Road Junction – 05th January – October 2011 (Bus Priority Scheme-Phase 3B) Initially the contractor Dew Construction PLC will be setting up the site compound and carrying out site investigations. This work will all be carried out off the highway. The works are located along the A456 Hagley Road at its junction with A4123 Wolverhampton Rd The works involve the following: Widening each of the four arms to accommodate revised traffic flows and improved traffic dispersal. Improving street lighting. Improving traffic signals and timings. Improving drainage. Providing pedestrian crossing facilities. Installation of new traffic signs. Resurfacing of the whole of the junction and approaches. Works Programme: South Staffs have commenced works to the north east side of the junction, however they will require TM which has yet to be submitted. B.T. works are on-going; the first stage of their works is the installation of chambers/boxes which are now completed BT has applied for lane closures on the Hagley Road A456 West arm, the 2 existing chambers have been surveyed and as a result there is not a requirement for 2 new chambers as the existing chambers are suitable, however there will be an increased volume of trenching. BT worked the weekend of 26th and 27th March and as a result duct installation on the North East side of the junction is expected to be complete by the 1st April 2011 National Grids works on the North side of the junction were completed on the 21st March 2011. The works to the south side of the junction are due to start in mid April 2011. Central Networks TM submission for the inbound Hagley Road has been approved and works are due to commence on the 30th March 2011, road crossing works to the outbound carriageway have been completed and duct installation is continuing on the outbound verge. Duct installation is also on-going to the North West side of the junction. All works by Central Networks are expected to be completed by the middle of April. Emergency Contact Telephone numbers for are: 24 hr. call out number – Simon Clarke Site Agent, 07786126980 Contracts Manager – Piers Myatt 07776163449 South Staffs Water – Shayne Lainton 07711934133 National Grid – Graham Smith 07831528310 TSM Traffic Management (DCOL TM Sub-Contractor) – Leigh Turbill 07973988551 If you require further information on the above, please contact either; Tim Embrey - 0121 303 7629 Mobile 07967221205 Colin Pearce - 07766923286. BCC 24hr Emergency number - 0121 303 4149 7 Shard End Cole Hall Lane – 06th December 2010 until July 2011 updated Cole Hall Lane will have a road closure in place to enable the replacement of the existing bridge with a new bridge that can accommodate two way traffic. Week Commencing - 04th April 2011 Work will involve the construction of bridge supports on each side of the River Cole. This will include: Completing the construction of the reinforced concrete bridge abutment wall on the south bank of the river; Waterproofing and constructing back of wall drainage to the north abutment. Cole Hall Lane will be closed for the duration of the construction period which is anticipated to last until July 2011. A pedestrian route will be maintained at all times and suitable vehicular traffic diversions will be in operation. Contact details: Tim Embrey on 0121 472 2986, Mobile 07967221205 Mark Grego – 07803 258 853 Colin Pearce – 07766 923 286 BCC 24hr emergency number – 0121 303 4149 Emergency contacts:Barhale Construction 24hr emergency line – 01922 707 700 Site Manager – Paul Handley – 07908 065 915 Contracts Manager – Ahmed Mubarak – 07903 992 009 South Yardley A4040 Church Road – January 2011 until September 2011 updated The Scheme comprises the realignment of the A4040 Church Road between the Swan Island and Harvey Road to facilitate the new Tesco Superstore. The realigned Church Road will rejoin the original carriageway at the northern end of the site at Harvey Road, where a new roundabout will be constructed, from which will be the main vehicular site entrance. Part of the existing Church Road carriageway south of this junction will be retained to serve residential properties fronting Church Road. WEEK COMMENCING – 04th April 2011 Lane closures: Church Road (outside school) – reduced to 1 lane in each direction to allow for the carriageway construction in the central reservation and the National Grid jointing works on Church Rd near the Harvey Rd junction. New Link Road construction (west of Church Rd) – delivery lorries entering/exiting site opposite Milton Crescent Emergency Contact Telephone numbers for Fitzgerald are: 24 hr. call out number – 0121 326 0402 Contracts Manager – Steven Jones 07970454184 Site Agent - Karl Mann 07815759895 If you require further information on the above, please contact either; Tim Embrey - 0121 472 2986 Mobile 07967221205 Colin Pearce - 07766923286 8 Constituency Information Acocks Green Warwick Road – 06th December until 31st March 2011 Warwick Road will have lane restrictions and temporary traffic signals in place to enable the installation of refuges with tactile crossing points, the installation and removal of build outs for additional car parking spaces, coordinated surfacing and lining works with Amey and installation of new signage. The work elements included in this first phase are:Installation of pedestrian refuge at Seeleys Road Construction of build out at Weston Lane/Battery Road toucan crossing Installation of two refuges at Warwick Road/Knights Road junction and the prohibition of the right turn from Warwick Road into Tyseley Hill Road Removal of existing build-out opposite Tyseley Working Men’s Club For further information contact:Parade – Gary Boucher – 07973 138 197 or 0121 765 4698 James Boucher – 07973 419 063 or 0121 765 4698 BCC Resident Engineer – Tim Embrey – 07967 221 205 or 0121 472 2986 BCC Clerk of Works – Vic Proser – 07766 923 289 or 0121 460 5850 24hr BCC control room contact – 0121 303 4149 Aston new entry Aston Expressway – 02nd – 03rd April 2011 Aston Expressway from Lancaster Circus to Park Circus will have lane closures in place to enable gully cleansing to be undertaken in safety. (TMS) Start time – 05.00hrs Finish time – 10.00hrs Contact – Amey – John Hastilow – 0121 212 5413 Traffic Management and Out of hours – Traffix – 0121 643 0400 new entry Constitution Hill – 06th – 09th April 2011 Constitution Hill from Great Hampton Row to Bond Street will have four way traffic lights in operation whilst anti skid treatment is applied to the carriageway. (TMS) Start time – 20.00hrs Finish time – 06.00hrs Contact – Amey – Lynn Taylor – 0121 212 5420 Traffic Management and Out of hours – Traffix – 0121 643 0400 Lancaster Street – until 01st May 2011 Lancaster Street will have a lane closure with traffic management to provide a safety zone for installing heating pipes for the new student accommodation on Bagot Street. (TMS) Start time – 07.00hrs Finish time – 19.00hrs Contact – Cofely District Energy – 01293 549 944 Traffic Management and Out of hours – R&C Williams – 0121 326 9696 9 Bordesley Green St Benedicts Road – 28th March – 04th April 2011 updated St Benedicts Road Safer Routes to School - this scheme will deliver dropped kerbs, tactile paving, improved signing, lining and bollards to prevent cars parking on the footway on St Benedicts Road and Somerville Road. Planned Works 28th March – 3rd April For the footway works, no traffic management is required. On Saturday 2nd April, a road closure for through traffic on St Benedicts Road has been approved to allow work on the carriageway as there is insufficient width for traffic management. Access to properties will be maintained at all times during the road closure. Hours of work are 07:30 – 17:00 Monday to Friday and 8am to 4pm on Saturday. All works associated with this scheme – dropped crossings, tactile paving, resurfacing of build outs, installation of bollards, installation of signs and line and traffic hump ramp resurfacing – are expected to be carried out during this week. Main Contractor – Colas Ltd Contact – Martin Law – 07850 496012 or 01527 458088 Darrell Fleming – 07800 603571 or 01527 458088 BCC Resident Engineer – Surinder Mann – 07766 924041 or 0121 303 7629 BCC Clerk of Works – Gavin Maciel – 0121 675 4332 24hr BCC Control Room – 0121 303 4149 Bournville Cartland Road – 19th March – 03rd April 2011 Cartland Road Pedestrian Refuge - this scheme will deliver a new pedestrian refuge and associated road marking on Cartland Road near the junction with Priory Road. The scheme commenced on site on 19th March 2011 and the footway tactile paving and ducting for the pedestrian refuge electrical equipment have been installed. Planned Works 28th March – 3rd April Temporary traffic signals will be set up and be in operation between 09:30 and 15:00 to avoid school traffic. The central refuge and electrical equipment will be installed. Road marking alterations are to be carried out. Works are planned to be complete on Wednesday 30th March 2011. Contact – BCC Projects – G Maciel – 0121 675 4332 Traffic Management – RW Services – James Freeman – 0121 352 1212 or 07968 616002 or Pete Dennis – 0121 352 1212 or 07793 325 338 BCC Resident Engineer - Surinder Mann – 0121 303 7629 or 07968 616 014 24hr BCC Control Room – 0121 303 4149 10 Pershore Road – 03rd April 2011 new entry Pershore Road from Watford Road to Lifford Lane will have two and three way traffic lights in operation whilst anti skid treatment is applied to the carriageway. (TMS) Start time – 14.00hrs Finish time – 20.00hrs Contact – Amey – Lynn Taylor – 0121 212 5420 Traffic Management and Out of hours – Traffix – 0121 643 0400 Pershore Road South – 03rd April 2011 new entry Pershore Road South from roundabout at Middleton Hall Road to railway bridge will have two way traffic lights operation and a lane closure in place whilst anti skid treatment is applied to the carriageway. (TMS) Start time – 14.00hrs Finish time – 20.00hrs Contact – Amey – Lynn Taylor – 0121 212 5420 Traffic Management and Out of hours – Traffix – 0121 643 0400 new entry Watford Road – 10th April 2011 Watford Road from Pershore Road to Rowheath Road and from Woodfall Avenue to o/s 75 will have temporary traffic lights in operation whilst anti skid treatment is applied to the carriageway. (TMS) Start time – 14.00hrs Finish time – 20.00hrs Contact – Amey – Lynn Taylor – 0121 212 5420 Traffic Management and Out of hours – Traffix – 0121 643 0400 Brandwood Alcester Road South – 28th March – 07th April 2011 Alcester Road South from Woodthorpe Road to Broad Lane will have a road closure in place for carriageway surfacing works. (TMS) Start time – 19.00hrs Finish time – 06.00hrs Contact – Amey – R Mullinex – 0121 212 7227 Traffic Management – HTM – 0121 326 9143 new entry Alcester Road South – 08th – 16th April 2011 Alcester Road South from start of duel carriageway to Broad Lane will have a road closure in place whilst carriageway surfacing works are carried out. (TMS) Start time – 19.00hrs Finish time – 06.00hrs Contact – Amey – R Mullinex – 0121 212 7227 Traffic Management – HTM – 0121 326 9143 Howard Road – 31st March – 29th April 2011 Howard Road o/s Colmore School will have carriageway restrictions in place for the construction of a temporary vehicle dropped crossing. (TMS) Start time – 09.30hrs Finish time – 15.30hrs Contact – MV Kelly – 0121 708 5018 11 Warstock Lane – 01st March – 21st May 2011 Warstock Lane between May Lane and Stanbury Road will have a road closure in place whilst bridge strengthening works are carried out in safety. (TMS) For further information contact – Amey – Dave Forsyth – 0121 212 7233 Traffic Management and Out of hours – Traffix – 0121 643 0400 Edgbaston new entry Belgrave Middleway – 06th & 07th April 2011 Belgrave Middleway underpass will have a closure in place whilst jetting of grids and gully cleaning is carried out in safety. (TMS) Start time – 00.00hrs Finish time – 06.00hrs Contact – Amey – John Hastilow – 0121 212 5413 Traffic Management and Out of hours – Traffix – 0121 643 0400 Bristol Road (A38) – until 02nd April 2011 Bristol Road junction Bournbrook Road will have lane restrictions in place to provide a safe working zone whilst works are carried out to install centre refuges and splitter islands. (TMS) Start time – 09.30hrs Finish time – 16.00hrs Contact – BCC Projects – Vic Prosser – 07766 923 289 Traffic Management and Out of hours – HTM – 0121 326 9143 new entry Calthorpe Road – 09th – 10th April 2011 Calthorpe Road junction Highfield Road will have a lane closure in place for sewer connections works. (TMS) Start time – 07.30hrs Finish time – 18.00hrs Contact – Shaylor Construction – 07827 890904 or 01922 741 570 Traffic Management – HTM – 0121 326 9143 Edgbaston Road – 02nd April 2011 Edgbaston Road between Pershore Road and Cannon Hill Road adjacent Warwickshire County Cricket Club will have ‘Stop & Go’ traffic management in place for the removal of temporary concrete barriers adjacent to contractor’s site hoarding on Edgbaston Road. (TMS) Start time – 06.30hrs Finish time – 09.00hrs Contact – Traffic Safety & Management Ltd – 01564 700241 Hall Green Stratford Road/School Road/Cole Bank Road – 21st March – 04th April 2011 Stratford Road/School Road/Cole Bank Road opposite exchange offices will have a 24hr lane closure in place for the connection of a water main. (TMS) Contact – BCC Projects – Vic Prosser – 07766 923 289 Traffic Management – Fitzgerald - 07970 454 184 Out of hours – 0121 326 0402 12 Handsworth Wood Church Lane – 06th – 09th April 2011 new entry Church Lane from Grove Lane to Rosedene Drive will have two way traffic lights in operation whilst anti skid treatment is applied to the carriageway. (TMS) Start time – 19.00hrs Finish time – 06.00hrs Contact – Amey – Lynn Taylor – 0121 212 5420 Traffic Management and Out of hours – Traffix – 0121 643 0400 Harborne Poole Crescent – 18th – 22nd April 2011 Poole Crescent will be closed between its junctions with Quinton Road to allow carriageway joint repairs. (TMS) Start time 08:00hrs Finish time 18:00hrs Contact – Amey – R J Mullinex 0121 212 7227 Traffic Management – HTM Ltd 0121 326 9143 Kingstanding Witton Lodge Road – 01st April 2011 Witton Lodge Road junction Hastins Road will have three way traffic lights in operation to enable footway reconstruction works to be carried out in safety. Start time – 08.00hrs Finish time – 16.00hrs Contact – Amey – Steve Turner – 07766697686 Traffic Management – Traffix – 0121 643 0400 (TMS) new entry Witton Lodge Road – 04th – 08th April 2011 Witton Lodge Road junction College Road and Perry Common Road will have a one way road closure on the double junction for the reconstruction of the footways adjacent to the junction, the main carriageway will remain open. (TMS) Start time – 08.00hrs Finish time – 18.00hrs Contact – Amey – C Beards – 0121 212 7227 Traffic Management – HTM – 0121 326 9143 Out of hours – 07740 081 216 Kings Norton The Green – 09th April 2011 14th May 2011 11th June 2011 The Green north west section between entrance and exit of service road will have one day road closures to accommodate the Kings Norton Farmers Market. (TMS) Start time – 07.00hrs Finish time – 16.00hrs For more information contact – Kings Norton Farmers Market – Peter Charnley – 0121 458 5268 13 Sovereign Road – 08th – 12th April 2011 new entry Sovereign Road from Melchett Road to junction Sovereign Road will have a road closure in place whilst carriageway resurfacing works are carried out. (TMS) Start time – 19.00hrs Finish time – 06.00hrs Contact – Amey – R Mullinex – 0121 212 7227 Traffic Management - HTM – 0121 326 9143 Ladywood new entry Albert Street – 04th April – 19th May 2011 Albert Street junction Moor Street Queensway to Dale End will have 24hr lane restrictions in place for gas main replacement works. (TMS) Contact – West Midland Gas Alliance – Brian Wilkins – 01902 826106 Traffic Management – Traffix – 0121 643 0400 Cambridge Street – traffic restrictions until 04th February 2013 Cambridge Street will have a one way system in place due to the library development, between Brindley Drive and King Edwards Road Roundabout. Diversion is in operation via King Edwards Road, Summer Hill Street, Sandpits, Parade Circus Queensway. Corporation Street – until 15th April 2011 Corporation Street from Priory Queensway to Newton Street will have a one way closure in place to enable gas main replacement works to be carried out. For further information contact – Morgan Sindall – 01902 826106 new entry Five Ways Underpass (A456) – 04th – 05th April 2011 Five Ways underpass from Broad Street to Hagley Road will have a full closure and lane closure on the slip roads in place to enable structural inspections to be carried out in safety. (TMS) Start time – 22.00hrs Finish time – 05.00hrs Contact – Amey – Erica Williams – 0121 212 5105 Traffic Management and Out of hours – Traffix – 0121 643 0400 new entry Key Hill Circus Roundabout Improvements – 03rd April 2011 This scheme will provide road markings on Key Hill Circus roundabout which includes left filter lane from Icknield Street to Heaton Street and amendments to the lane markings on the approach to and exits from the roundabout. The scheme is programmed to take 1 day for full completion. Planned Works 3rd April 2011 Traffic Management setup Removal of existing road markings Lay new road markings Clear and tidy site Main Contractor – Aggregate Industries Emergency Contact Telephone numbers - Martin Jones – 07738 134 589 or 0113 271 9330 14 BCC Resident Engineer – Surinder Mann – 07766 924 041 or 0121 303 7629 BCC Clerk of Works – Sajeda Mahmud – 0121 675 4401 24hr BCC Control Room Contact – 0121 303 4149 Hill Street – until 31st December 2011 Hill Street will have a footpath closure in place to enable BGP works to install the Navigation Street footbridge in safety. (TMS) Start time – 22.00hrs Finish time – 07.00hrs Contact – Network Rail – 07816 604 649 Traffic Management and Out of hours – HTM – 0121 326 9143 Jewellery Quarter Pedestrian Crossing – 28th March – 22nd April 2011 updated This scheme will deliver a new zebra crossing on Vyse Street, outside the Railway Station. Planned Works Traffic management for the first week will involve the narrowing of the carriageway with cones to allow for safe working zones and pedestrian diversions. Two way traffic flows will be maintained as the road is sufficiently wide. Hours of work are 07:30 – 17:00 Parking bays within the construction zone to be officially suspended. Footways to be lowered and tactile paving and footway ducts to be installed. Main Contractor – Fitzgerald Contractors Ltd – Bev Mullins – 07970 454188 Contact – Dereck Carlin – 07811 339027 or 0121 326 0402 Bev Mullins – 07970 454188 or 0121 326 0402 BCC Resident Engineer – Surinder Mann – 07766 924041 or 0121 303 7629 BCC Clerk of Works – Dennis Fletcher – 07766 924320 24hr BCC Control Room - 0121 303 4149 new entry New Street/Cannon Street – 04th – 18th April 2011 New Street/Cannon Street will have signing and guarding in place whilst a shop front is redecorated in safety. (TMS) Start time – 08.00hrs Finish time – 18.00hrs Further information contact – Esprit UK – 07811 111427 or 0121 580 0021 updated Northbrook Street/Dudley Street – until 01st April 2011 Northbrook Street junction Dudley Road will have lane restrictions in place for kerb works and the installation of pedestrian refuge Island with associated tactile paving. (TMS) Planned Works 28th March – 1st April Finish the construction of the new splitter island. Carriageway widening works on east side of junction. Northbrook Street east footway paving and kerbing works. Carriageway resurfacing. Lay new road markings. Clear and tidy site. 15 Contact Information Main Contractor – Fitzgerald - Steve Jones – 07970 454 184 or Dave Godfrey - 07977935189 BCC Transportation Projects – Surinder Mann – 07766924041 or 0121 303 7629 24hr BCC Control Room – 0121 303 4149 Northwood Street – 28th March – 08th April 2011 Northwood Street will have one side closed for its entire length to allow the excavation of the highway and installation of a power connection. Parking bays will be suspended. (TMS) Start time 07:00hrs Finish time 19:00hrs Contact – A-Star Road Services Ltd 0121 707 7730 or 07717 895977 Pinfold Street – 07th March – 30th July 2011 Pinfold Street will have carriageway narrowing and pedestrian restrictions in place to enable deliveries and personnel access for New Street Station – Birmingham Gateway. (TMS) Start time – 19.00hrs Finish time – 07.00hrs For further information contact Network Rail – 07816 604 649 Warstone Lane/Carver Street – 21st February – 01st April 2011 Warstone Lane will have a footway closure near the Morris Homes Development with a temporary pedestrian walkway in the carriageway. Carver Street will have a road closure in place to enable footway reinstatement works. (TMS) Start time – 07.30hrs Finish time – 16.30hrs Contact – M Lambe Construction – M Lambe or D Mee – 0121 554 2108 Traffic Management – Midland Traffic Management – 0121 550 3445 Out of hours – 07817 068 479 Longbridge Frankley Beeches Road – 28th March – 02nd April 2011 Frankley Beeches Road from Egghill Lane to Hollymoor Way will have a road closure in place for carriageway surfacing works. (TMS) Start time – 08.00hrs Finish time – 18.00hrs Contact – Amey – R Mullinex – 0121 212 7227 Traffic Management – HTM – 0121 326 9143 Gorsymead Grove – 01st December 2010 until 01st June 2012 Gorsymead Grove will have a road closure in place to enable housing redevelopment works to be carried out in safety. (TMS) Contact – Kier Partnership Homes Ltd – Rob Sheldon – 01922 747 700 Traffic Management – McMahons (Contractors Services) – 01789 720 836 16 Moseley and Kings Heath Alcester Road – 10th April 2011 new entry Alcester Road o/s 213 will have three way traffic lights in operation to enable a gas main to be connected to the new development. (TMS) Start time – 09.30hrs Finish time – 18.30hrs Contact – Fulcrum – Andrew Jena – 07768 104 271 Traffic Management and Out of hours – DTM – 0121 520 7474 Moseley Road – 04th – 11th April 2011 new entry Moseley Road from Trafalgar Road to Louise Lorne Road will have a lane closure in place whilst anti skid treatment is applied to the carriageway. (TMS) Start time – 19.00hrs Finish time – 06.00hrs Contact – Amey – Lynn Taylor – 0121 212 5420 Traffic Management and Out of hours – Traffix – 0121 643 0400 Wake Green Road – until 13th April 2011 Wake Green Road between junction Church Road and Swanhurst Lane will have signing and guarding in place whilst arboriculture work are carried out. TMS) Start time – 09.30hrs Finish time – 15.30hrs Contact – Acorn Environmental Management Group – Mark Cattell – 07525911136 Traffic Management – 0800 093 3898 Out of hours – 07912 083658 Nechells new entry Allison Street – 02nd – 03rd April 2011 Allison Street at the railway bridge will have a lane closure in place to enable drainage works to be carried out in safety. (TMS) Start time – 23.00hrs Finish time – 08.00hrs Further information contact – Torrent Trackside – 01543 421907 Out of hours – 0845 769 7168 Bradford Street Environmental Improvements – April 2011 The work consists of the reconstruction of the footway including associated kerb works from Lombard Street approximately 100m east of Alcester Street. Where works are being carried out it is intended to suspend road side parking and utilise this lane to carry out the work. It is intended to carry out the work whilst maintaining two way traffic along Bradford Street. Work will be completed on the north side first, when complete, works will then be carried out on the south side. It is intended to close the footway on one side of the road only and when it is complete the other footway will be closed. Any access required for both vehicles and pedestrians will be maintained. All advance signing will be in accordance with Chapter 8 with Men at Work signs also deployed on Alcester Street indicating road works to the left or right. Additionally a Men at Work sign will be positioned on Lombard Street indicating works to the right. The majority of the vehicle accesses are unaffected by the works and the majority that are do not currently serve any businesses. 17 The reconstruction of the footway at the entrance to the Church car park will be carried out during restricted working hours but the majority of the work will be done weekdays 7.30am to 5.00pm. All works areas will be fenced off in barrier and this will be surrounded with cones if deployed in the carriageway. When the work to the footways is being carried out near the traffic signal junction a minimum 3.5m running lane will be maintained on each leg and the excavation will be confined to the footway with a 1m buffer zone in the carriageway. No lorries will be allowed to obscure the traffic signal heads or park near the junction and smaller plant, if required, will be deployed to carry out the work near the junction. Programme of works for week commencing Monday 4th April 2011. Excavation and replace granite kerbs to the north side from the junction of Alcester Street to Lombard Street. Excavation of the footway and lay blue brick paving to the north side, adjacent to Alcester Street to Lombard Street. Contractor is Colas (subcontractor carrying out the works are Klebec Civils, Contact details Darrell Fleming 07800603571 Rod Cockette 07831499948 main office no 01527 458 088) BCC Resident Engineer is Surinder Mann contact 0121 303 7629. Bristol Street – 21st March – 01st April 2011 Bristol Street from No 80 to junction Wrentham Street will have 24hr lane restrictions in place whilst gas main replacement works are carried out. (TMS) Contact – Enterprise (on behalf of National Grid) – 0121 333 2664 Traffic Management and Out of hours – Traffix – 0121 643 0400 Cardigan Street – Attenuation Tank – 22nd March – 29th April 2011 Location – junction Curzon Street Contractor – T Maguires & Sons Ltd Works – Installation of Attenuation tank and associated storm drainage Contact details:Fitzgeralds – 0121 326 0402 – Lynton Bradley – 07977 442 638 BCC Resident Engineer – Tim Embrey – 0121 749 3019 Mobile – 07967 221 205 BCC Clerk of Works – Colin Pearce – 0121 749 3019 Mobile – 07766 923 288 BCC 24hf Control Room – 0121 303 4149 new entry Heath Mill Lane – 04th – 08th April 2011 Heath Mill Lane from High Street Deritend to Liverpool Street will have a road closure and diversion in place to enable carriageway resurfacing works to be carried out in safety. (TMS) Start time – 19.00hrs Finish time – 06.00hrs Contact – Amey – C Beards – 0121 212 7227 Traffic Management – HTM – 0121 326 9143 Out of hours – 07740 081 216 18 Lombard Street/Moseley Street – until 10th April 2011 new entry Lombard Street/Moseley Street will have a road closure in place to enable the construction of sewers as part of a larger scheme to construct a new chamber with associated pipe work. Diversion signs in place. (TMS) Contact – Severn Trent Water – Joe Laird – 07799 071 943 Traffic Management and Out of hours – HTM – Marcus Casey – 0121 326 9143 Moor Street Queensway – 11th February – 11th April 2011 Moor Street Queensway between Carrs Lane and Albert Street will have a 24hr lane closure out of City to enable the replacement of gas mains. (TMS) Contact – West Midlands Gas Alliance – Brian Wilkins – 01902 826 106 Traffic Management and Out of hours – Traffix – 0121 643 0400 Park Street and Albert Street – until 12th February 2012 Park Street and Albert Street between Moor Street Queensway and Masshouse Lane will have traffic barriers for short periods whilst hoarding is erected for the construction of a new hotel. (TMS) Start time – 07.00hrs Finish time – 18.00hrs Contact – Galliford Try Construction – Ian McGreene – 01455 222 777 Out of hours – 07879 424 568 Oscott Aldridge Road – until 11th April 2011 Local Safety Scheme works are in progress on Aldridge Road between Dyas Road and Shady Lane. Temporary traffic signals will be in place between Shady Lane and Malthouse Lane. (Projects) Contact – BCC – Tim Embrey – 0121 472 2986 or 07967 221 205 or Colin Pearce – 07866 721 513 Emergency contact numbers for Parade Civils are: - 24hr call out – 0121 707 1797 Contracts Manager – James Boucher – 07973 419 063 Perry Barr new entry Old Walsall Road – 03rd – 05th April 2011 Old Walsall Road opp 48 will have two way traffic lights in operation to enable Severn Trent repair a leak in safety. (TMS) Contact – Severn Trent – 02476478040 Traffic Management – Lux Traffic Control & Management – 0166822000 Out of hours – 0845 6033285 Quinton Hagley Road West (A456) – 28th March – 15th April 2011 Hagley Road West from Birch Road to Gateley Road will have a lane closure in place to enable E-on install a power connection in safety. (TMS) For further information contact – A-Star – Roy Newton – 0121 707 7730 Out of hours – 07717 895 977 19 Hagley Road West (A456) – 08th – 10th April 2011 new entry Hagley Road West junction Wolverhampton Road will have a lane closure in place to enable E-on install a power connection in safety. (TMS) Start time – 09.30hrs Finish time – 15.30hrs Contact – A-Star – Roy Newton – 0121 707 7730 Out of hours – 07717 895 977 new entry Ridgacre Road – 03rd – 04th April 2011 Ridgacre Road from the roundabout at Quinton Road to 386 Ridgacre Road will have a road closure in place for the relining of a structurally deficient sewer. (TMS) Start time – 18.30hrs Finish time – 06.00hrs Contact – Severn Trent Water – Andrew Crockett – 07545 114 497 Traffic Management – 0121 505 1010 Selly Oak Bournbrook Road – 01st – 31st March 2011 Bournbrook Road junction Bristol Road (A38) will have a 24hr road closure in place for completion of the carriageway construction over the Bourn Brook culvert structure. (TMS) Contact – BCC Projects – Laurent Bouissonnade – 07766 923 293 Traffic Management and Out of hours – HTM – 0121 326 9143 Shard End new entry Mackadown Lane – 02nd – 03rd April 2011 Mackadown Lane between junction Tile Cross Road and St Giles Road will have 24hr two way traffic lights in operation and manual control during peak times whilst various tarmac remedial work is carried out to defective areas. (TMS) Contact – Morgan Sindall – Pete Sutcliffe – 07794212955 Traffic Management and Out of hours – Traffix – 0121 643 0400 Tile Cross Road – 05th – 19th April 2011 new entry Tile Cross Road junction Bosworth Drive will have 24hr three way traffic lights in operation with manual control at peak times whilst gas main replacement works are carried out. (TMS) Contact – Morgan Est – Lee Allsop – 01902 826 106 Traffic Management and Out of hours – Traffix – 0121 643 0400 Soho new entry City Road – 03rd April 2011 City Road o/s 41 will have two way traffic lights in operation whilst a manhole cover and frame is replaced in safety. (TMS) Start time – 09.00hrs Finish time – 14.00hrs Contact – Severn Trent Water – 0121 313 4665 Traffic Management and Out of hours – DMN – 0121 474 4344 20 Whitmore Street – 31st March – 03rd April 2011 Whimore Street will have restrictions in force between No.36 and junction Ford Street to allow Severn Trent to carry out sewer relining works. There will be 3 way signals in operation. (TMS) Start time – 07:30hrs Finish time 17:30hrs (24hr) Contact Severn Trent – Andrew Crockett 07545114497 Traffic Management – Forkers Ltd – Tony Dudley 0121 505 1010 South Yardley Church Road – 21st February – 17th April 2011 Church Road o/s Yardley Primary School/113 – 127 will have lane restrictions in place to enable gas works to be carried out in safety. (TMS) Start time – 08.00hrs Finish time – 17.00hrs For further information contact – Fitzgerald – 0121 326 0402 Out of hours – 07970 454 184 Church Road – 27th March and 03rd April 2011 Church Road between Swan Island and Milton Crescent will have two way traffic lights in operation whilst ducting is laid across the carriageway for statutory undertaker’s diversion works. (TMS) Start time – 07.30hrs Finish time – 16.00hrs Contact – BCC Projects – Colin Pearce – 07766 923 286 Traffic Management and Out of hours – Traffix – 0121 643 0400 Church Road – 28th March – 01st April 2011 Church Road between Swan Island and Milton Crescent will have a footway closure in place with cones in the channel to provide a safety zone for pedestrians using the subway and controlled crossing points to gain access to opposing footway to traverse works. (TMS) Start time – 07.30hrs Finish time – 17.00hrs Contact – BCC Projects – Colin Pearce – 07766 923 286 Traffic Management – Fitzgerald – 0121 326 0402 Out of hours – 07970 454 184 Sparkbrook new entry Moseley Road – 04th April – 11th April 2011 Moseley Road from Edgbaston Road East to Cromer Road into City will have a lane closure in place whilst anti skid treatment is applied to the carriageway. (TMS) Contact – Amey – Lynn Taylor – 0121 212 5420 Traffic Management and Out of hours – Traffix – 0121 643 0400 Springfield Oakwood Road – 28th March – 04th April 2011 Oakwood Road from Stratford Road to Park Road will have a 24hr road closure and diversion in place to enable gas main replacement works. (TMS) Contact – Morgan Sindall – Lee Alsop – 01902 826 106 or 07977 105 504 Traffic Management & Out of hours – Traffix – 0121 643 0400 21 Warwick Road – 28th March – 04th April 2011 Warwick Road o/s 261 will have a 24hr footpath closure and road narrowing for pedestrians to walk on to the road with barriers and cones whilst fascias on the service station garage are changed in safety. (TMS) Contact – DRB UK – Allan McGhee – 0141 646 3160 Traffic Management – ATM Traffic Solutions – 01246 858 633 Out of hours – 07702 710 137 Yardley Wood Road – 18th March – 08th April 2011 Yardley Wood Road junction Brook Lane to Belle Walk will have signing and guarding in place whilst various arboriculture works are carried out in safety. (TMS) Start time – 09.30hrs Finish time – 15.30hrs Contact – Acorn Environmental Management Group – Mark Cattell – 07525911136 Traffic Management – Acorn Environmental Management Group – 0800 093 3898 Out of hours – 07912 083 658 Stockland Green new entry Gravelly Hill – 03rd April 2011 Gravelly Hill o/s 21 will have ‘Stop & Go’ boards in place whilst arboricultural works and tree cutting is carried out in safety. (TMS) Start time – 07.00hrs Finish time – 16.00hrs Further information contact – DMN Road Services – 0121 474 4344 Perry Common Road – 02nd April 2011 new entry Perry Common Road o/s 69 will have two way traffic lights in operation to enable the replacement of a manhole cover and frame. (TMS) Start time – 09.00hrs Finish time – 14.00hrs Contact – Severn Trent Water – 0121 313 4665 Traffic Management and Out of hours – DMN – 0121 474 4344 Sutton Four Oaks Hill Village Road – 30th – 31st March 2011 Hill Village Road o/s 34 will have 24hr two way traffic lights in operation to enable footway excavations. (TMS) For further information contact – Laing O’Rourke – 0121 544 9885 Sutton Trinity new entry Barnard Road – 04th – 15th April 2011 Barnard Road from o/s 24 to o/s 36 will have a road closure in place for the replacement of a structurally deficient sewer. (TMS) Start time – 07.30hrs Finish time – 17.30hrs Contact – Severn Trent Water/Enterprise – 07545114497 Traffic Management – Forkers – Tony Dudley – 0121 505 1010 22 updated Lichfield Road/Tamworth Road/Anchorage Road – 30th March – 01st April 2011 This scheme will provide wider pedestrian refuge facilities on both approaches to Lichfield Road of the junction. Tactile paving will be provided on Anchorage Road and both Lichfield Road approaches to the junction. All reflective bollards at the junction will replace the existing internally illuminated bollards. Planned Works 30th March – 1st April Site preparation and Traffic Management setup. Install tactile paving on both sides of Anchorage Road. Install tactile paving and kerbing works on both sides of Lichfield Road north. Install tactile paving and kerbing works on both sides of Lichfield Road south. Refuge removal and construct new, Lichfield Road south. Refuge construct only, Lichfield Road north. Main Contractor – Colas Ltd Contact – Darrel Fleming – 07800603571 BCC Resident Engineer – Surinder Mann – 07766924041 or 0121 303 7629 BCC Clerk of Works – Sajeda Mahmud – 0121 675 4401 24hr BCC Control Room – 0121 303 4149 Sutton Vesey Boldmere Road Footway Reconstruction w/c 28th March 2011 Contractor: Colas Location of works: between Redacre Road and Jockey Road. Works Programme Reinstatement of carriageway haunch works to west and east sides Install guard railing Remove site compound and Traffic Management. Contact - Vic Prosser - 07766923289. Weoley Somerford Road – 04th – 08th April 2011 new entry Somerford Road from Shenley Lane to Gregory Avenue will have a road closure in place to enable carriageway resurfacing works to be carried out in safety. (TMS) Start time – 08.00hrs Finish time – 18.00hrs Contact – Amey – R Mullinex – 0121 212 7227 Traffic Management – HTM – 0121 326 9143 23 Planned Maintenance updated ROAD NAME NIGHTS - 4/4/11 -FOR 5 NIGHTS - 1900HRS TO 0600HRS NIGHTWORKING Heath Mill Lane Liverpool Street Alcester Road South Castle Road NORMAL DAYTIME WORKING Elmdale Crescent Fox Hill Ackleton Grove Sommerford Road Roseleigh Road Wychall Road Denville Crescent Mintern Road Greenend Road Elmfield Crescent Croydon Road Shirley Road (path) Hawkesyard Road Knutsford Street Samuels Road Beswick Grove Lyndhurst Road Heybarnes Road Dettonford Road Curdale Road Templeton Road Witton Lodge Road Birchwood Road Melbourne Ave Milstead Road Sleaford Road & Grove Parliament Street Cartland Road Warren Farm Road Pickwick Grove Park Hill Cobs Fields Dovebridge Close Baldwins Lane Hawkesyard Road Knutsford Street Samuels Road Beswick Grove Jaffray Road Woodlands Farm Road WARD Nechells/City Centre Nechells/City Centre Brandwood Weoley Weoley Weoley Weoley Weoley Longbridge Northfield Hodge Hill Yardley Hall Green Hall Green Erdington Yardley Erdington Hall Green Edgbaston Hodge Hill Erdington Hodge Hill Bartley Green Bartley Green Oscott Erdington Sparkbrook Aston Stechford & Yardley N Hall Green Ladywood Hall Green Erdington Hall Green Hall Green Selly Oak Sutton Trinity Hall Green Erdington Hall Green Edgbaston Hodge Hill Stockland Green Tyburn 24 Utility Works - All utility works are subject to change Site Name Site Location ADMINGTON ROAD ALBERT STREET ALCESTER ROAD ALMA STREET ALUM ROCK ROAD ASH ROAD ASTON CHURCH ROAD BALDWINS LANE BASIL ROAD BELL LANE BERKELEY ROAD EAST BISHOPS WAY BOLDMERE ROAD BRADFORD STREET BRISTOL ROAD SOUTH BULL STREET CAROLINE STREET CARTLAND ROAD CASTLE ROAD CHAD ROAD CHERRY STREET CHESTON ROAD CHURCH HILL ROAD CHURCH ROAD CHURCH STREET COCKSHUT HILL COLE BANK ROAD COLE HALL LANE COLES LANE COLESHILL STREET CORNWALL STREET CORPORATION STREET COTYSMORE ROAD COVENTRY ROAD CURDALE ROAD DADS LANE DETTONFORD ROAD EAST VIEW ROAD EDMUND STREET ELMDALE CRESCENT FAIRFAX ROAD FARQUHAR ROAD FLAXLEY ROAD FRANKLEY BEECHES ROAD GARRETTS GREEN LANE GEORGE FREDERICK ROAD GIBSON ROAD Yardley City Centre Strategic Routes Ladywood Hodge Hill Strategic Routes Hodge Hill Hall Green Northfield Hodge Hill Yardley Sutton Sutton City Centre Strategic Routes City Centre City Centre Selly Oak Northfield Strategic Routes City Centre Ladywood Perry Barr Strategic Routes City Centre Yardley Hall Green Hodge Hill Sutton Sutton City Centre City Centre Sutton Strategic Routes Edgbaston Hall Green Edgbaston Sutton City Centre Northfield Northfield Edgbaston Hodge Hill Strategic Routes Strategic Routes Sutton Perry Barr 25 updated GILLSCROFT ROAD GRANBY AVENUE GREEN LANE GRIFFINS BROOK LANE HAGLEY ROAD WEST HEATH MILL LANE HEATH ROAD SOUTH HEYBARNES ROAD HIGH STREET HIGHFIELD ROAD HILL HOOK ROAD HOB MOOR ROAD HOLBORN HILL HOLLAND ROAD HONEYBORNE ROAD LAWSON STREET LIONEL STREET LISTOWEL ROAD LODGE ROAD LONGBRIDGE LANE LYNDHURST ROAD MAAS ROAD MERRITTS BROOK LANE MIDDLE PARK ROAD MILLHOUSE ROAD MOOR STREET QUEENSWAY NEWDIGATE ROAD NEWHALL STREET NEWTON STREET NORTHBROOK STREET OAKWOOD ROAD PERRY COMMON ROAD PYPE HAYES ROAD RILSTONE ROAD ROUGH ROAD SALISBURY ROAD SANDY LANE SCHOOL ROAD SELLY OAK ROAD SEVERNE ROAD SHADY LANE SHARD END CRESCENT SHEAF LANE SHENLEY FIELDS ROAD SHOOTERS HILL SHUSTOKE ROAD SLEAFORD ROAD SOMERFORD ROAD SOUTHGATE ROAD Hodge Hill Yardley Hodge Hill Selly Oak Strategic Routes City Centre Northfield Hodge Hill Erdington Strategic Routes Sutton Yardley Ladywood Sutton Sutton City Centre City Centre Selly Oak Ladywood Strategic Routes Erdington Northfield Northfield Northfield Yardley Strategic Routes Sutton City Centre City Centre Ladywood Hall Green Erdington Erdington Edgbaston Erdington Strategic Routes Perry Barr Hall Green Selly Oak Yardley Perry Barr Hodge Hill Strategic Routes Northfield Sutton Hodge Hill Hall Green Northfield Perry Barr 26 ST BENEDICTS ROAD ST CHADS QUEENSWAY ST MARYS ROW STATION ROAD STECHFORD ROAD STRATFORD ROAD SWANSHURST LANE THE BROADWAY THE FAIRWAY THE RADLEYS TILE CROSS ROAD TRESCOTT ROAD UPPER HOLLAND ROAD VAUGHTON STREET SOUTH VYSE STREET WARREN FARM ROAD WARSTOCK ROAD WARSTONE LANE WEST HEATH ROAD WESTBOURNE ROAD WHITECROFT ROAD WITTON LODGE ROAD WORCESTER LANE YARDLEY GREEN ROAD YARDLEY ROAD YARDLEY WOOD ROAD YARNINGALE ROAD Hodge Hill Strategic Routes Strategic Routes Northfield Hodge Hill Strategic Routes Strategic Routes Ladywood Northfield Yardley Hodge Hill Northfield Sutton City Centre City Centre Erdington Selly Oak City Centre Northfield Strategic Routes Yardley Erdington Sutton Yardley Strategic Routes Strategic Routes Selly Oak For further information contact Amey – Fiona Kane 0121 212 5397 Drainage Planned Works updated R&C Williams – Team 1 Team 2 Contact: Paul Williams - 07803285922 Stirchley, Longbridge & Selly Oak Aston & Handsworth Erris - Team 1 Team 2 Contact: Anthony Gilleran - 07973919165 Erdington Shard End Structures Planned Works ROAD NAME Arosa Drive updated DISTRICT Edgbaston For further information contact Amey –Dave Forsyth or Tony Beresford – 0121 212 7228 27 Street Lighting Planned Works updated ROAD NAME Rupert Street Ardath Road Beech Hurst Blossomfield Close Burley Way Butter Walk Gibbs Hill Road Grange Hill Grovewood Drive Highmeadow Road Hill Bank Road Ivy House Road Longlands Close Near Hill Road Old Meadow Road Pritchett Road Rednall Road Rothely Walk Fryer Road WARD Nechells Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Kings Norton Digby Walk Sheldon Granby Avenue Sheldon Meon Grove Sheldon Pebworth Grove Sheldon Sheldon Walk Sheldon Leabrook Stechford And Yardley North Dane Grove Bournville Derwent Grove Bournville Dingle Close Bournville Frampton Close Bournville Goldfinch Close Bournville Hoyland Way Bournville Kestrel Grove Bournville Kingfisher Way Bournville Linnet Close Bournville Lockton Road Bournville Selly Wood road Bournville Browns Green Handsworth Wood Hawthorn Park Drive Handsworth Wood High Trees Handsworth Wood Manway Close Handsworth Wood Park Hill Drive Handsworth Wood 28 Esher Road Oscott Fir Tree Close Oscott Keston Road Oscott Lilac Avenue Oscott Marshall Grove Oscott Wiremill Close Oscott Rosedene Drive Handsworth Wood Shireland Close Handsworth Wood St Annes Close Handsworth Wood St Christophers Handsworth Wood St Davids Grove Handsworth Wood Berwood Road Sutton New Hall Stag Walk Sutton New Hall The Boulevard Sutton New Hall The Chase Sutton New Hall Ashfurlong Crescent Sutton Trinity Birch Drive Sutton Trinity Carnoustie Close Sutton Trinity Corncrake Close Sutton Trinity Cotysmore Road Sutton Trinity East Rise Sutton Trinity Farthing Lane Sutton Trinity Garnett Drive Sutton Trinity Gleneagles Drive Sutton Trinity Honeyborne Road Sutton Trinity Keyse Road Sutton Trinity Ludford Close Sutton Trinity Manor Hill Sutton Trinity Maple Road Sutton Trinity Moor Meadow Road Sutton Trinity North Drive Sutton Trinity Pages Close Sutton Trinity Prestwick Close Sutton Trinity Sadler Road Sutton Trinity Shirley Drive Sutton Trinity Shooters Hill Sutton Trinity Chavasse Road Sutton Trinity East View Road Sutton Trinity Admington Road Sheldon Bannerley Road Sheldon Valepits Road Sheldon Gotham Road South Yardley 29 Steyning Road South Yardley Lyndworth Road Bournville Copthorne Road Oscott Birch Croft Road Sutton Trinity Duke Street Sutton Trinity Elms Road Sutton Trinity Kathleen Road Sutton Trinity Shipton Road Sutton Trinity Firswood Road Sheldon Markfield Road Sheldon Claines Road Bournville Derwent Road Bournville Dornton Road Bournville Traffic Signals Planned Works ROAD NAME Merritts Brook Lane Aldridge Road Balmoral Road Witton Lodge Road Church Road Whitmore Street Trinity Road Aldridge Road Whitmore Street Baldwins Lane Pershore Road Hill Village Road Shard End Crescent Witton Lodge Road Church Lane City Road Perry Common Road Heybarnes Road updated WARD Northfield Oscott Woodgate Short Heath Yardley Mere Green Aston Queslett Hockley Hall Green Cotteridge Sutton Shard End Short Heath Handsworth Edgbaston Perry Common Small Heath For further information contact Mike Nixon 0121 212 7281 Weed Control ROAD NAME Stratford Road updated WARD Springfield 30 Tree Control ROAD NAME BOSWELL ROAD COLLEGE ROAD CROSSWAY LANE EPWELL ROAD HAWTHORN ROAD KINGS ROAD LAMBETH ROAD MEADTHORPE ROAD NORBURY ROAD SUNDRIDGE ROAD THE RIDGEWAY TYSOE ROAD WARREN HILL ROAD WARREN ROAD WREKIN ROAD SHELDONFIELD ROAD SHEPHEARD ROAD THE RADLEYS WILLASTON ROAD BROOKS ROAD KEMPSON AVENUE PENNS LANE SIGNAL HAYES ROAD SPRINGFIELD ROAD THIMBLE END ROAD WALMLEY ROAD BROOKBANK AVENUE BROWNFIELD ROAD CROXTON GROVE FREASLEY ROAD GERARDSFIELD ROAD GILWELL ROAD HALL HAYS ROAD HARTSHILL ROAD HERNEFIELD ROAD KITSLAND ROAD LONGMEADOW CRESCENT OLD CROFT LANE PACKINGTON AVENUE PANTHER CROFT POLESWORTH GROVE PRIESTLAND ROAD SCHOOL LANE SCHOOLACRE ROAD SHARD END CRESCENT SHOPTON ROAD THE SHARDWAY updated WARD Oscott Oscott Oscott Oscott Oscott Oscott Oscott Oscott Oscott Oscott Oscott Oscott Oscott Oscott Oscott Sheldon Sheldon Sheldon Sheldon Sutton New Hall Sutton New Hall Sutton New Hall Sutton New Hall Sutton New Hall Sutton New Hall Sutton New Hall Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End Shard End 31 TIMBERLEY LANE KINGSHURST ROAD LONGBRIDGE LANE MAVIS ROAD MIDDLEMORE ROAD MILL LANE PENSFORD ROAD PITCLOSE ROAD REABROOK ROAD ROWAN WAY SOUTH WALK THE OAK WALK THELBRIDGE ROAD TURVES GREEN WARSTOCK ROAD ACACIA ROAD ASHBROOK ROAD ASHMORE ROAD AVEBURY GROVE BADSEY CLOSE BARN CLOSE BEILBY ROAD BLACKTHORN ROAD BOURNVILLE LANE BRENT ROAD BRISTOL ROAD BRISTOL ROAD SOUTH BUNBURY ROAD Shard End Northfield Northfield Northfield Northfield Northfield Northfield Northfield Northfield Northfield Northfield Northfield Northfield Northfield Billesley Bournville Bournville Bournville Bournville Bournville Bournville Bournville Bournville Bournville Bournville Bournville Bournville Bournville Prepared by Jo Nutter Street Services Division – 0121 675 0144 Working In Partnership 32
© Copyright 2024 Paperzz