close

Enter

Log in using OpenID

Data Center Construction Market Size, Demand, Price and Analysis To 2020

embed
According to the report, rise of government data centers will be a key driver for market growth. Over the past decade, many government agencies worldwide have established data centers for their operations.
Data Center Construction Market Share and Size, Emerging Trends,
Analysis, Overview and Outlook, Growth And Segment Forecasts To
2020
Technavio Announces the Publication of its Research Report Global Data Center Construction Market
2016-2020
Technavio recognizes the following companies as the key players in the global data center construction
market: AECOM, Arup, Corgan Associates, DPR Construction, Gensler, HDR Architecture, Holder
Construction, ISG, Jones Engineering, Nakano, John Sisk & Son, Sweett, Structure Tone, Syska Hennessy,
and Turner Construction.
Other Prominent Vendors in the market are: AKF, Alphamatic Systems, AWP Architects, Balfour Beatty,
Carlson Design Construct, Clune Construction, Commodore Contracting, Constructora Sudamericana,
Constructora Sudamericana, Drake & Scull International, Edarat, Fluor, Fortis Construction, Gilbane,
Hensel Phelps, HITT Contracting, Integrated Design, Jacobs Engineering, JE Dunn Construction, Kirby,
KKR, M+W, McGough, McLaren Construction, Mercury Engineering, Mercury MENA, Merrick, Mortenson
Construction, Nova Mission Critical, Page Southerland Page, Pepper Construction, PM, PTS, PWS, Red
Engineering, Skanska, and Whiting-Turner.
Browse full report with [email protected] https://marketreportscenter.com/reports/388351/global-data-centerconstruction-market-2016-2020
Commenting on the report, an analyst from Technavio’ s team said: “Emergence of modular data center
designs will be a key trend for market growth. A containerized data center is a portable data center preinstalled inside a shipping container. These data centers are a part of a modular data center, in which
each module is a container that can host IT, power, and cooling equipment. These data centers are
available in lengths of 40 feet and 20 feet and delivered to end-users on demand.”
According to the report, rise of government data centers will be a key driver for market growth. Over
the past decade, many government agencies worldwide have established data centers for their
operations. In the US, almost all state and local government agencies operate data centers across the
country. Many CSPs and colocation vendors are involved in building data centers for government
agencies. This trend is spreading worldwide along with the increase in the adoption of cloud-based
services, big data analytics, and the IoT.
Further, the report states that one of the challenges for the market will be lack of awareness of business
requirements. The cost estimation procedures associated with the requirement analysis of a data center
are not good enough at the moment. This analysis determines the present and future needs of
businesses. Enterprises build data center facilities to keep pace with their competitors and leave enough
room for future expansion. Some of the data centers are performing below average because of their
inability to analyze the increased needs of their business. The cost of establishing a data center is
decreasing along with its energy consumption. This presents a good opportunity for enterprises to adopt
data center facilities.
The study was conducted using an objective combination of primary and secondary information
including inputs from key participants in the industry. The report contains a comprehensive market and
vendor landscape in addition to a SWOT analysis of the key vendors.
Request A Sample copy of This Report @ https://marketreportscenter.com/request-sample/388351
About Data Center
A data center is a centralized storehouse, physical or virtual, for remote storage, management, and
processing of data and information. Data centers are required to house enterprise IT infrastructures.
They constitute the backbone of essential business operations. The demand for cloud-based services is
increasing among enterprises worldwide, including Fortune 500 companies. Several industry verticals
worldwide are using advanced technologies to gain a competitive advantage. The complexities
associated with business applications have increased because of the enormous growth in data volumes.
This has triggered an increase in the need for construction and renovation of data centers worldwide.
Technavio’ s analysts forecast the global data center construction market to grow at a CAGR of 12.51%
during the period 2016-2020.
Covered in this report
The report covers the present scenario and the growth prospects of the global data center construction
market for 2016-2020. To calculate the market size, the report considers the revenue generated from
new data center construction including the CAPEX used for the floor space of data centers
commissioned during the forecast period.
The market is divided into the following segments based on geography:
Americas
APAC
EMEA
Technavio's report, Global Data Center Construction Market 2016-2020, has been prepared based on an
in-depth market analysis with inputs from industry experts. The report covers the market landscape and
its growth prospects over the coming years. The report also includes a discussion of the key vendors
operating in this market.
To Get Discount On The Report @ https://marketreportscenter.com/request-discount/388351
Connect for more details:
Sam Collins
Market Reports Center
1-646-883-3044 (US)
[email protected]
Author
matthewjlarue
matthewjlarue341   document Email
Document
Category
Uncategorized
Views
30
File Size
351 KB
Tags
size
1/--pages
Report inappropriate content