Future Plan for the Water Transfer from the Underground Reservoirs Priority measures (1) (- Golden Week in May) Present status Leakage was found Leakage was found A small amount of leakage was suspected No.1 (13,000m3) No.2 (14,000m3) No.3 (11,000m3) Priority measures (2) (Late May -) 1,600m3 Approx.Transferred from April 23 to April 26*1 6,200m3 Tra Transfer had been in progress H2 tank nsf er from April 16 to April 22 is i Approx. Approx. np r ogr 1,070m3 *2 900m3 ess sin ce Ap ril 2 Approx. 4,6 5 Filtrate water tank 8,400m3 00 m3 No.4 (4,000m3) No.5 (2,000m3) Approx. 3,000m3 No.6 (10,000m3) Approx. 7,500m3 No.7 (4,000m3) <Reference> April 26, 2013 Tokyo Electric Power Company 0m3 15,900m3 G6 tank (19,000m3) 0m3 *1 Transfer will be started after transfer to the filtrate tank is completed. *2 The transferred amount was confirmed by the water gauge installed at the H2 area tank. *3 The water transfer is planned to be performed during daytime. Progress of transfer 本日の移送実績 移送ルート Transfer route Ended 停止日時 Started 開始日時 → H2 H2エリアタンク area tank *3 ※3 No.1No.2 → 4/26 9:34 ~ 4/26 12:04 No.1 No.1 → Filtrate water tank → ろ過水タンク 4/25 10:58 (Transfer is in progress) (移送実施中) ~
© Copyright 2024 Paperzz