OR Bus signal required Bus turn-around Green bike Bus queue lanes through Transit signal jump lanes intersection priority (TSP) Access Control CSU CAMPUS Green bike lanes through Two stage intersection turn box Myrtle St Leading pedestrian interval (LPI) Access Control Laurel St Leading pedestrian interval (LPI) Green bike lanes through intersection Access Control Shields St City Park Ave Bryan Ave Constitution Ave Skyline Dr Castlerock Dr Cragmore Dr Glenmoor Dr Meadowbrook Dr Taft Hill Rd Hillcrest Dr Ponderosa Dr Cypress Dr Timber Ln Rocky Rd Overland Trl Avery Park Transit signal priority (TSP) Leading pedestrian interval (LPI) University Ave Crossing Improvement Transit stop/ station CSU Main Campus Elizabeth St Overland Park CSU Transit Center Plum St Mason Corridor Roundabout Two-Way stop control Transit signal Bus queue priority (TSP) jump lanes Howes St New crossing (consistent w/ City plans) CAMPUS WEST Green bike Transit signal lanes through Two stage turn box priority (TSP) intersection Green bike Transit signal lanes through Bus queue priority (TSP) intersection jump lanes Meldrum St Transit stop/ station NEIGHBORHOODS/COMMERCIAL CONNECTOR WESTERN NEIGHBORHOODS CSU Foothills Campus Mulberry St City Park South Dr Crossing Improvement Pitkin St Lake St N Prospect Rd Legend Point Improvements Existing Transit Stops Fill in Sidewalk Gaps Bike Route Connecting Skyline Drive to Plum Street Lower Frequency Transit Operations High Frequency Transit Operations w/ Short route/surge frequency from Constitution Ave. to CSU Transit Center. Study Area Boundary Currently Funded Intersection Improvements RED FOX MEADOWS Low-Stress Bike Network NATURAL AREA SUMMARY: Minimal Capital Investment/Emphasis on Transit, Bikes and Ped. Improvements • Retain existing bike lanes, complete where necessary, add a striped buffer if possible • Fill in gaps in sidewalks and widen existing sidewalks when there is not sufficient width for ADA standards. Access Control Potential Underpass Pending Feasibility Analysis Transportation System Management (TSM) Design Approach West Elizabeth Enhanced Travel Corridor Draft 12.2.15
© Copyright 2024 Paperzz