PIANTA SEZIONE 03-03 SEZIONE 04-04 1:100 1:50 1:50 0.50 TRATTAMENTO DELLE SPALLE E DELLA VOLTA: -ASPORTAZIONE VECCHIA MALTA DI RINZAFFO MEDIANTE IDRODEMOLIZIONE CPN 241.R991.102 -ARMATURA DI RINFORZO 1x RETE K335 SOVRAPPOSIZIONE MIN. 40 cm CPN 241.521.211 -CALCESTRUZZO SPRUZZATO SC 12-8 CPN 241.R991.301 - ANCORAGGI CON MALTA HILTI HIT HY 200 CPN 241.112.204 CANALIZZAZIONE SMALTIMENTO ACQUE METEORICHE ESISTENTE SOLETTA DI TRANSIZIONE CPN B CPN 241.615.301 NUOVO PONTE 0.50 0.40 0.20 0.20 0.30 2.40 2.60 0.50 SOLETTA DI TRANSIZIONE CPN B CPN 241.615.301 PAVIMENTAZIONE: -STRATO D'USURA, AC 8 S, Sp. 30mm CPN 223.452.112 -STRATO PORTANTE, AC T 22 N, Sp. 100mm CPN 223.441.315 0.50 GOCCIOLATOIO 3 x 1 cm CPN 241.423.001 5.30 1.90 MURI DI CONTENIMENTO E MURI D'ALA: -ASPORTAZIONE VECCHIA MALTA DI RINZAFFO MEDIANTE IDROPULITRICE CPN 241.R991.101 -RIEMPIMENTO DELLE FUGHE CON MALTA CPN 241.R991.201 1.60 PAVIMENTAZIONE + IMPERMEABILIZZAZIONE: -STRATO D'USURA, AC 8 S, Sp. 30mm CPN 223.452.112 -STRATO DI PROTEZIONE MAT 16 H, SP. 40mm CPN 223.632.602 -IMPERMEABILIZZAZIONE PBD 5 mm CPN 172.341.111 ~0.15 CONNETTORI 15.40 PAVIMENTAZIONE: -STRATO D'USURA, AC 8 S, Sp. 30mm CPN 223.452.112 -STRATO DI PROTEZIONE, MAT 16 H, Sp. 60mm CPN 223.622.803 -IMPERMEABILIZZAZIONE PBD 5 mm CPN 172.341.111 3.00 0.10 1.40 TAPPA DI GETTO DETTAGLIO 4 0.50 04 03 1.60 BARRIERA DI SICUREZZA TIPO TI001 CON CORRIMANO DI 2 POLLICI ROR 60.3/2.9 0.40 RIPRESE TAPPA DI GETTO: ELEMENTI DI RIPRESA EBEA CPN 241.532.324 0.70 3 0.0 0.0 3 1.90 2.00 0.40 2.40 0.50 5.40 0.50 0.40 3.00 5.30 7.70 PONTE ESISTENTE NUOVO PONTE 6.80 1.50 1.50 Via Cantonale Zona nucleo da PR 60+440 a PR 70+000 Operatore: 7.70 Modifiche: ALLARGAMENTO PONTE 7.30 2.40 21 marzo 2014 5.30 Data: 1.50 0.50 1.50 GOCCIOLATOIO 3 x 1 cm CPN 241.423.001 0.40 1:100 - 50 - 20 - 10 LIMITE MARCIAPIEDE 01 0.30 2.00 Scala: 6.90 01 0.40 1.00 2^TAPPA 7.70 3 3 2.00 406.042 A / 008 0.0 0.0 TAPPA DI GETTO 1.50 Tel. 091 814 27 91 Fax 091 814 27 19 Formazione marciapiede, sistemazione stradale e nuovo impianto semaforico 02 1.90 Ufficio della progettazione del Sopraceneri PAVIMENTAZIONE + IMPERMEABILIZZAZIONE: -STRATO D'USURA, AC 8 S, Sp. 30mm CPN 223.452.112 -STRATO DI PROTEZIONE MAT 16 H, Sp. 40mm CPN 223.632.602 -IMPERMEABILIZZAZIONE PBD 5 mm CPN 172.341.111 3.00 Area operativa del Sopraceneri 1.50 1.50 02 1^ TAPPA BARRIERA DI SICUREZZA TIPO TI002 CON CORRIMANO DI 2 POLLICI ROR 60.3/2.9 0.40 Via Franco Zorzi 13 Casella postale 2170 6501 BELLINZONA 0.40 1.50 1.00 VERSCIO 2.30 1.00 SOLETTA DI TRANSIZIONE CPN B CPN 241.615.301 SOLETTA DI TRANSIZIONE CPN B CPN 241.615.301 0.50 7.60 0.30 0.40 SOLETTA DI RIVESTIMENTO CPN E CPN 241.761.001 1.60 04 INTRAGNA Divisione delle costruzioni Piano no.: SOLETTA DI TRANSIZIONE CPN B CPN 241.615.301 03 Comune di TERRE DI PEDEMONTE Frazione di Cavigliano 6.90 PAVIMENTAZIONE + IMPERMEABILIZZAZIONE: -STRATO D'USURA, AC 8 S, Sp. 30mm CPN 223.452.112 -STRATO DI PROTEZIONE MAT 16 H, Sp. 60mm CPN 223.622.803 -IMPERMEABILIZZAZIONE PBD 5 mm CPN 172.341.111 0.20 17.70 1.60 Dipartimento del territorio PRESENZA INFRASTRUTTURE IN CONFLITTO CON NUOVA SOLETTA 1.00 STRADA CANTONALE PA407.2 Ascona - P.te Brolla - Intragna 18.60 0.50 DETTAGLIO 3 SEZIONE 01-01 DETTAGLIO 4 1:20 1:100 1:10 1324.11 - 108 0.50 1.60 IMPERMEABILIZZAZIONE PBD 5 mm CPN 172.341.111 0.50 INTRAGNA 7.30 0.30 6.80 0.50 SALDATURE a = 11 mm CPN 241.R991.401 VERSCIO CPN 241.R991.401 BULLONE SBS M12 CPN 241.R991.401 CPN 241.121.212 SOLETTA DI TRANSIZIONE CPN B C25/30 CPN 241.615.301 0.40 2 STRATI DI CARTA CATRAMATA TIPO V60 CPN 241.444.003 SPINOTTO CRET-10 CPN 241.534.001 ~ 1.60 0 MURI DI CONTENIMENTO E MURI D'ALA: -ASPORTAZIONE VECCHIA MALTA DI RINZAFFO MEDIANTE IDROPULITRICE CPN 241.R991.101 -RIEMPIMENTO DELLE FUGHE CON MALTA CPN 241.R991.201 1.30 3.90 MICROPALI L=12 m +296.50 B C 2 FAZOLETTI 100/100/15 CPN 241.R991.401 CON GRADO DI PROTEZIONE 3 COMPRESI I BULLONI CPN 241.R991.402 5 VISTA 5 1:10 1:50 1:20 1:10 STRATO DI PROTEZIONE MAT 16 H, Sp. 60 mm CPN 223.622.803 STRATO D'USURA AC 8 S, Sp. 30 mm CPN 223.452.112 1.50 STRATO PORTANTE ACT 22 N, Sp. 100 mm CPN 223.441.315 FONDAZIONE MISTO GRANULARE 0-45 sp MIN 200 mm CPN 221.111.281 0.50 IMPERMEABILIZZAZIONE PBD 5 mm CPN 172.341.111 +306.30 VERSCIO PIASTRA 500/300/15 LASTRA DI SEPARAZIONE IN SCHIUMA DI POLISTIROLO ESTRUSO A CELLULE CHIUSE CPN 241.444.001 75 75 CPN 241.R991.401 ca.17 % 0.40 GUAINA CRET-O CPN 241.534.001 2 STRATI DI CARTA CATRAMATA TIPO V60 CPN 241.444.003 PIASTRA 500/300/20 CPN 241.R991.401 SPINOTTO CRET-10 CPN 241.534.001 0.40 DETTAGLIO 1 150 500 DETTAGLIO 2 PAVIMENTAZIONE: -STRATO D'USURA, AC 8 S, Sp. 30mm CPN 223.452.112 -STRATO PORTANTE, AC T 22 N, Sp. 100mm CPN 223.441.315 300 50 50 TRATTAMENTO DELLA VOLTA: -ASPORTAZIONE VECCHIA MALTA DI RINZAFFO MEDIANTE IDRODEMOLIZIONE CPN 241.R991.102 -ARMATURA DI RINFORZO 1X RETE K335 SOVRAPPOSIZIONE MIN. 40 CM CPN 241.521.211 -CALCESTRUZZO SPRUZZATO SC 12-8 CPN 241.R991.301 STRATO D'USURA, AC 8 S, Sp. 30 mm CPN 223.452.112 PIASTRA SAGOMATA AD ARCO SP. 15 mm RAGGIO IN MEZZERIA 2300 mm FORI ASOLATI CPN 241.R991.401 min.20 +306.48 1.60 SOLETTA DI TRANSIZIONE CPN B 0.30 PAVIMENTAZIONE + IMPERMEABILIZZAZIONE: -STRATO D'USURA, AC 8 S, Sp. 30mm CPN 223.452.112 -STRATO DI PROTEZIONE MAT 16 H, Sp. 60mm CPN 223.622.803 -IMPERMEABILIZZAZIONE PBD 5 mm CPN 172.341.111 PONTE 0.30 INTRAGNA SOLETTA DI RIVESTIMENTO CPN E - ANCORAGGIO CON MALTA SINTETICA TIPO HILTI HIT-HY 200 CPN 241.112.204 A CPN 241.R991.401 DETTAGLIO 2 6.90 100 500 SEZIONE 02-02 CONNETTORI DIS. DETTAGLIO 5 DETTAGLIO 1 1.60 SOLETTA DI TRANSIZIONE CPN B MODIFICA SALDATURA A COMPLETA PENETRAZIONE a = 14 mm CPN 241.R991.401 CPN 241.121.112 10.10 DATA CPN 241.R991.401 PIASTRA 500/300/20 CPN 241.R991.401 PROTEZIONE CONTRO LA CORROSIONE GRADO 3 CON GUAINA PREINIETTATA CPN 171.451.001 SPERONE CPN D CPN 241.631.132 PLINTO CPN B CPN 241.611.121 1.80 MOD. PIASTRA SAGOMATA AD ARCO SP. 15 mm RAGGIO IN MEZZERIA 2300 mm FORI ASOLATI CPN 241.R991.401 PIASTRA 500/300/15 PIASTRA 100/100/15 TRATTAMENTO DELLE SPALLE E DELLA VOLTA: -ASPORTAZIONE VECCHIA MALTA DI RINZAFFO MEDIANTE IDRODEMOLIZIONE CPN 241.R991.102 -ARMATURA DI RINFORZO 1x RETE K335 SOVRAPPOSIZIONE MIN. 40 cm CPN 241.521.211 -CALCESTRUZZO SPRUZZATO SC 12-8 CPN 241.R991.301 GUAINA CRET-O CPN 241.534.001 0.40 8.20 PROTEZIONE CONTRO LA CORROSIONE GRADO 3 CON GUAINA PREINIETTATA CPN CPN 171.451.001 LASTRA DI SEPARAZIONE IN SCHIUMA DI POLISTIROLO ESTRUSO A CELLULE CHIUSE CPN 241.444.001 DETTAGLIO 4 1.00 0.40 MICROPALI L=12 m 1.50 0.3 0.50 ca.17% 0.40 ca. 2.00 0.10 +306.33 1.30 15 1.60 DETTAGLIO 3 +306.50 15 20 STRATO DI PROTEZIONE MAT 16 H, Sp. 60 mm CPN 223.622.803 5 HILTI HIT-HY 200 260 Lotto 2915 59.4 x 126.0 cm STRATO PORTANTE ACT 22 N, sp. 100 mm CPN 223.441.315 FONDAZIONE MISTO GRANULARE 0-45 sp MIN 200 mm CPN 221.111.281 15.40 100 SU 1.50 0.30 Dimensione: Controllato 10 GA Disegnato STRATO D'USURA, AC 8 S, Sp. 30 mm CPN 223.452.112 3.5 6.5 Progettato 18.60 STRATO D'USURA AC 8 S, sp. 30 mm CPN 223.452.112 0.30 Piano no.: Allargamento e risanamento ponte esistente 20 Svizzera 500 550 Tel. Fax e-mail: [email protected] CPN 241.121.301 SOLETTA DI TRANSIZIONE CPN B C25/30 CPN 241.615.301 PIASTRA 100/100/15 30 15 CPN 241.R991.401 75 15 30 75 150 2 FAZOLETTI 100/100/15 CPN 241.R991.401
© Copyright 2024 Paperzz