406.042 A 008

PIANTA
SEZIONE 03-03
SEZIONE 04-04
1:100
1:50
1:50
0.50
TRATTAMENTO DELLE SPALLE E DELLA VOLTA:
-ASPORTAZIONE VECCHIA MALTA DI RINZAFFO
MEDIANTE IDRODEMOLIZIONE
CPN 241.R991.102
-ARMATURA DI RINFORZO 1x RETE K335
SOVRAPPOSIZIONE MIN. 40 cm
CPN 241.521.211
-CALCESTRUZZO SPRUZZATO SC 12-8
CPN 241.R991.301
- ANCORAGGI CON MALTA HILTI HIT HY 200
CPN 241.112.204
CANALIZZAZIONE SMALTIMENTO
ACQUE METEORICHE ESISTENTE
SOLETTA DI TRANSIZIONE
CPN B
CPN 241.615.301
NUOVO PONTE
0.50 0.40
0.20
0.20
0.30
2.40
2.60
0.50
SOLETTA DI TRANSIZIONE
CPN B
CPN 241.615.301
PAVIMENTAZIONE:
-STRATO D'USURA, AC 8 S, Sp. 30mm
CPN 223.452.112
-STRATO PORTANTE, AC T 22 N, Sp. 100mm
CPN 223.441.315
0.50
GOCCIOLATOIO 3 x 1 cm
CPN 241.423.001
5.30
1.90
MURI DI CONTENIMENTO E MURI D'ALA:
-ASPORTAZIONE VECCHIA MALTA DI RINZAFFO
MEDIANTE IDROPULITRICE
CPN 241.R991.101
-RIEMPIMENTO DELLE FUGHE CON MALTA
CPN 241.R991.201
1.60
PAVIMENTAZIONE + IMPERMEABILIZZAZIONE:
-STRATO D'USURA, AC 8 S, Sp. 30mm
CPN 223.452.112
-STRATO DI PROTEZIONE MAT 16 H, SP. 40mm
CPN 223.632.602
-IMPERMEABILIZZAZIONE PBD 5 mm
CPN 172.341.111
~0.15
CONNETTORI
15.40
PAVIMENTAZIONE:
-STRATO D'USURA, AC 8 S, Sp. 30mm
CPN 223.452.112
-STRATO DI PROTEZIONE, MAT 16 H, Sp. 60mm
CPN 223.622.803
-IMPERMEABILIZZAZIONE PBD 5 mm
CPN 172.341.111
3.00
0.10
1.40
TAPPA DI GETTO
DETTAGLIO 4
0.50
04
03
1.60
BARRIERA DI SICUREZZA TIPO TI001
CON CORRIMANO DI 2 POLLICI ROR 60.3/2.9
0.40
RIPRESE TAPPA DI GETTO:
ELEMENTI DI RIPRESA EBEA
CPN 241.532.324
0.70
3
0.0
0.0
3
1.90
2.00
0.40
2.40
0.50
5.40
0.50
0.40
3.00
5.30
7.70
PONTE ESISTENTE
NUOVO PONTE
6.80
1.50
1.50
Via Cantonale
Zona nucleo
da PR 60+440 a PR 70+000
Operatore:
7.70
Modifiche:
ALLARGAMENTO PONTE
7.30
2.40
21 marzo 2014
5.30
Data:
1.50
0.50
1.50
GOCCIOLATOIO 3 x 1 cm
CPN 241.423.001
0.40
1:100 - 50 - 20 - 10
LIMITE MARCIAPIEDE
01
0.30
2.00
Scala:
6.90
01
0.40
1.00
2^TAPPA
7.70
3
3
2.00
406.042 A / 008
0.0
0.0
TAPPA DI GETTO
1.50
Tel. 091 814 27 91
Fax 091 814 27 19
Formazione marciapiede,
sistemazione stradale e nuovo
impianto semaforico
02
1.90
Ufficio della progettazione del
Sopraceneri
PAVIMENTAZIONE + IMPERMEABILIZZAZIONE:
-STRATO D'USURA, AC 8 S, Sp. 30mm
CPN 223.452.112
-STRATO DI PROTEZIONE MAT 16 H, Sp. 40mm
CPN 223.632.602
-IMPERMEABILIZZAZIONE PBD 5 mm
CPN 172.341.111
3.00
Area operativa del
Sopraceneri
1.50
1.50
02
1^ TAPPA
BARRIERA DI SICUREZZA TIPO TI002
CON CORRIMANO DI 2 POLLICI ROR 60.3/2.9
0.40
Via Franco Zorzi 13
Casella postale 2170
6501 BELLINZONA
0.40
1.50
1.00
VERSCIO
2.30
1.00
SOLETTA DI
TRANSIZIONE
CPN B
CPN 241.615.301
SOLETTA DI
TRANSIZIONE
CPN B
CPN 241.615.301
0.50
7.60
0.30 0.40
SOLETTA DI RIVESTIMENTO
CPN E
CPN 241.761.001
1.60
04
INTRAGNA
Divisione delle
costruzioni
Piano no.:
SOLETTA DI
TRANSIZIONE
CPN B
CPN 241.615.301
03
Comune di TERRE DI PEDEMONTE
Frazione di Cavigliano
6.90
PAVIMENTAZIONE + IMPERMEABILIZZAZIONE:
-STRATO D'USURA, AC 8 S, Sp. 30mm
CPN 223.452.112
-STRATO DI PROTEZIONE MAT 16 H, Sp. 60mm
CPN 223.622.803
-IMPERMEABILIZZAZIONE PBD 5 mm
CPN 172.341.111
0.20
17.70
1.60
Dipartimento
del
territorio
PRESENZA INFRASTRUTTURE IN CONFLITTO
CON NUOVA SOLETTA
1.00
STRADA CANTONALE PA407.2
Ascona - P.te Brolla - Intragna
18.60
0.50
DETTAGLIO 3
SEZIONE 01-01
DETTAGLIO 4
1:20
1:100
1:10
1324.11 - 108
0.50
1.60
IMPERMEABILIZZAZIONE PBD 5 mm
CPN 172.341.111
0.50
INTRAGNA
7.30
0.30
6.80
0.50
SALDATURE
a = 11 mm
CPN 241.R991.401
VERSCIO
CPN 241.R991.401
BULLONE SBS M12
CPN 241.R991.401
CPN 241.121.212
SOLETTA DI TRANSIZIONE CPN B C25/30
CPN 241.615.301
0.40
2 STRATI DI CARTA CATRAMATA TIPO V60
CPN 241.444.003
SPINOTTO CRET-10
CPN 241.534.001
~ 1.60
0
MURI DI CONTENIMENTO E MURI D'ALA:
-ASPORTAZIONE VECCHIA MALTA DI RINZAFFO
MEDIANTE IDROPULITRICE
CPN 241.R991.101
-RIEMPIMENTO DELLE FUGHE CON MALTA
CPN 241.R991.201
1.30
3.90
MICROPALI L=12 m
+296.50
B
C
2 FAZOLETTI 100/100/15
CPN 241.R991.401
CON GRADO DI PROTEZIONE 3
COMPRESI I BULLONI
CPN 241.R991.402
5
VISTA 5
1:10
1:50
1:20
1:10
STRATO DI PROTEZIONE MAT 16 H, Sp. 60 mm
CPN 223.622.803
STRATO D'USURA AC 8 S, Sp. 30 mm
CPN 223.452.112
1.50
STRATO PORTANTE ACT 22 N, Sp. 100 mm
CPN 223.441.315
FONDAZIONE MISTO GRANULARE 0-45
sp MIN 200 mm
CPN 221.111.281
0.50
IMPERMEABILIZZAZIONE PBD 5 mm
CPN 172.341.111
+306.30
VERSCIO
PIASTRA 500/300/15
LASTRA DI SEPARAZIONE
IN SCHIUMA DI POLISTIROLO ESTRUSO
A CELLULE CHIUSE
CPN 241.444.001
75
75
CPN 241.R991.401
ca.17
%
0.40
GUAINA CRET-O
CPN 241.534.001
2 STRATI DI CARTA CATRAMATA TIPO V60
CPN 241.444.003
PIASTRA 500/300/20
CPN 241.R991.401
SPINOTTO CRET-10
CPN 241.534.001
0.40
DETTAGLIO 1
150
500
DETTAGLIO 2
PAVIMENTAZIONE:
-STRATO D'USURA, AC 8 S, Sp. 30mm
CPN 223.452.112
-STRATO PORTANTE, AC T 22 N, Sp. 100mm
CPN 223.441.315
300
50 50
TRATTAMENTO DELLA VOLTA:
-ASPORTAZIONE VECCHIA MALTA DI RINZAFFO
MEDIANTE IDRODEMOLIZIONE
CPN 241.R991.102
-ARMATURA DI RINFORZO 1X RETE K335
SOVRAPPOSIZIONE MIN. 40 CM
CPN 241.521.211
-CALCESTRUZZO SPRUZZATO SC 12-8
CPN 241.R991.301
STRATO D'USURA, AC 8 S, Sp. 30 mm
CPN 223.452.112
PIASTRA SAGOMATA
AD ARCO SP. 15 mm
RAGGIO IN MEZZERIA 2300 mm
FORI ASOLATI
CPN 241.R991.401
min.20
+306.48
1.60
SOLETTA DI
TRANSIZIONE
CPN B
0.30
PAVIMENTAZIONE + IMPERMEABILIZZAZIONE:
-STRATO D'USURA, AC 8 S, Sp. 30mm
CPN 223.452.112
-STRATO DI PROTEZIONE MAT 16 H, Sp. 60mm
CPN 223.622.803
-IMPERMEABILIZZAZIONE PBD 5 mm
CPN 172.341.111
PONTE
0.30
INTRAGNA
SOLETTA DI RIVESTIMENTO
CPN E
- ANCORAGGIO CON MALTA SINTETICA
TIPO HILTI HIT-HY 200
CPN 241.112.204
A
CPN 241.R991.401
DETTAGLIO 2
6.90
100
500
SEZIONE 02-02
CONNETTORI
DIS.
DETTAGLIO 5
DETTAGLIO 1
1.60
SOLETTA DI
TRANSIZIONE
CPN B
MODIFICA
SALDATURA A COMPLETA
PENETRAZIONE
a = 14 mm
CPN 241.R991.401
CPN 241.121.112
10.10
DATA
CPN 241.R991.401
PIASTRA 500/300/20
CPN 241.R991.401
PROTEZIONE CONTRO LA CORROSIONE GRADO 3
CON GUAINA PREINIETTATA
CPN 171.451.001
SPERONE CPN D
CPN 241.631.132
PLINTO CPN B
CPN 241.611.121
1.80
MOD.
PIASTRA SAGOMATA AD ARCO SP. 15 mm
RAGGIO IN MEZZERIA 2300 mm
FORI ASOLATI
CPN 241.R991.401
PIASTRA 500/300/15
PIASTRA 100/100/15
TRATTAMENTO DELLE SPALLE E DELLA VOLTA:
-ASPORTAZIONE VECCHIA MALTA DI RINZAFFO
MEDIANTE IDRODEMOLIZIONE
CPN 241.R991.102
-ARMATURA DI RINFORZO 1x RETE K335
SOVRAPPOSIZIONE MIN. 40 cm
CPN 241.521.211
-CALCESTRUZZO SPRUZZATO SC 12-8
CPN 241.R991.301
GUAINA CRET-O
CPN 241.534.001
0.40
8.20
PROTEZIONE CONTRO LA CORROSIONE GRADO 3
CON GUAINA PREINIETTATA
CPN CPN 171.451.001
LASTRA DI SEPARAZIONE
IN SCHIUMA DI POLISTIROLO ESTRUSO
A CELLULE CHIUSE
CPN 241.444.001
DETTAGLIO 4
1.00
0.40
MICROPALI L=12 m
1.50
0.3
0.50
ca.17%
0.40
ca. 2.00
0.10
+306.33
1.30
15
1.60
DETTAGLIO 3
+306.50
15
20
STRATO DI PROTEZIONE MAT 16 H, Sp. 60 mm
CPN 223.622.803
5
HILTI HIT-HY 200
260
Lotto 2915
59.4 x 126.0 cm
STRATO PORTANTE ACT 22 N, sp. 100 mm
CPN 223.441.315
FONDAZIONE MISTO GRANULARE 0-45
sp MIN 200 mm
CPN 221.111.281
15.40
100
SU
1.50
0.30
Dimensione:
Controllato
10
GA
Disegnato
STRATO D'USURA, AC 8 S, Sp. 30 mm
CPN 223.452.112
3.5 6.5
Progettato
18.60
STRATO D'USURA AC 8 S, sp. 30 mm
CPN 223.452.112
0.30
Piano no.:
Allargamento e risanamento
ponte esistente
20
Svizzera
500
550
Tel.
Fax
e-mail: [email protected]
CPN 241.121.301
SOLETTA DI TRANSIZIONE CPN B C25/30
CPN 241.615.301
PIASTRA 100/100/15
30 15
CPN 241.R991.401
75
15 30
75
150
2 FAZOLETTI 100/100/15
CPN 241.R991.401