60% REVIEW CHECKLISTS Title Sheet General Layout Standard Plates Earthwork Tabulation & Summary Tabulations Inplace Utility Tabulation Inplace Utility Plans Typical Sections Standard Plan Sheets Staging Plans Alignment Plan Alignment Tabulation Topography Plans Removal Plans Construction Plans Intersection Detail Profiles Concrete Paving Plan & Details Bituminous Paving Plan & Details Superelevation Plans Retaining Wall Plans Retaining Wall Profiles Retaining Wall Tabulations Noise Wall Profiles Noise Wall Tabulations Noise Wall Details Drainage Plans Drainage Profiles Drainage Tabulations Water Resources Notes Erosion Control Plans Attenuator Plan Traffic Barrier Details Traffic Control Plan Striping Plans Lighting Plans Signing Plans Traffic Management System Plans Signal Plans Contour Sheets Matchline Layout Cross Sections File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Title Sheet Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: General Layout Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Standard Plates Page 1 of 1 Standard Plates listed in numerical order Numbers, Letters and Descriptions of Standard Plates match the Standard Plates Manual Standard Plates applicable to other groups (Traffic, Signals, Lighting, etc.) are included Blank lines provided every 8-10 lines and between 1000 series Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left All text is legible and there is no text on top of text or lines going through text Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.)_________________________________________________________ File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN Page 1 of 2 60% Plan Review Checklist: Earthwork Tabulation & Summary Earthwork quantities tabulated by alignment Earthwork computed by stages, if applicable Swell and shrinkage factors shown in the balance Swell and shrinkage factors comply with the recommendations in the soils letter Earthwork balance includes any excess material that is to be hauled away Breakdown of granular materials included Footnote in the common excavation column indicates how much topsoil excavation, bituminous excavation (less than 6”), rubble, or other material is included in the common excavation quantity. Or, these various items and quantities are included in the earthwork balance. Quantities are accurate from the tabulation to the summary and from the summary to the balance If the plan is a metric plan, the metric symbol is in the upper right corner or along the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Earthwork Tabulation & Summary Page 2 of 2 File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Tabulations If tabulations are included in the 60% plan submittal, see the 95% Checklist for the tabulations checklist File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Inplace Utility Tabulation Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Inplace Utility Plans Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Typical Sections Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Standard Plan Sheets Page 1 of 1 Standard Plans in numerical order Standard Plans applicable to other groups (Traffic, Signals, Lighting, etc.) are included Current sheet only File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Staging Plans Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Alignment Plan Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Alignment Tabulation Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Topography Plans Page 1 of 1 30% review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) Note: Removal items may be included on the Topography Plans File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Removal Plans Page 1 of 2 The following items are shown and properly labeled: All roadway alignments (including equations) At least two stations for each alignment on each sheet R/W and Easements Beginning and End of Construction Scale North Arrow Legend which clearly indicates removal items Removal items included on the Removals tabulation Coordinate grid ticks and labels (minimum of three per sheet) Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Removal Plans Page 2 of 2 S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) Note: Removal items may be included on the Topography Plans File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Construction Plans Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Intersection Details Page 1 of 1 Use the 30% Plan Review Checklist if Intersection Details were not part of the 30% plan, but are included in the 60% plan Check to see that the 30% review comments that were sent to the consultant have been addressed in the 60% plan Check items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Profiles Page 1 of 1 30% review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Vertical Control note (may or may not have been included in 30% plan) Subgrade excavation depth and tapers (may or may not have been included in 30% plan) Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.)_________________________________________________________ File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN Page 1 of 2 60% Plan Review Checklist: Concrete Paving Plan and Details The following items are shown and properly labeled: Roadway alignments (including equations) ______________________________ At least two stations for each alignment on each sheet ______________________________ Curb and C&G ______________________________ Raised medians ______________________________ Joints ______________________________ Headers ______________________________ Bridges ______________________________ The following items are shown: Construction notes on first sheet ______________________________ Uniform panel lengths ______________________________ Pavement thickness ______________________________ Taper rates and pluses ______________________________ Taper rates should be shown as 1:x, not x:1. Beginning and End of Construction Roadway and shoulder dimensions Pavement design complies with the Project Memo, soils letter, and the typical sections Panel dimensions Reinforced panels over culverts (patterned) Taper lengths computed correctly Scale File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Concrete Paving Plan and Details Page 2 of 2 North Arrow Legend Coordinate grid ticks and labels (minimum of three per sheet) Plan Sheet Location box (on projects with complicated plan sheet layouts) Note(s) referring to details Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) _________________________________________________________ File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN Page 1 of 2 60% Plan Review Checklist: Bituminous Paving Plan & Details The following items are shown and properly labeled: Roadway alignments (including equations) ______________________________ At least two stations for each alignment on each sheet ______________________________ Curb and C&G ______________________________ Raised medians ______________________________ Bridges ______________________________ Beginning and End of Construction Roadway and shoulder dimensions Pavement design complies with the Project Memo, soils letter, and the typical sections Taper rates and pluses shown. Taper rates should be shown as 1:x, not x:1. Taper lengths computed correctly Scale North Arrow Legend Coordinate grid ticks and labels (minimum of three per sheet) Plan Sheet Location box (on projects with complicated plan sheet layouts) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Bituminous Paving Plan & Details Page 2 of 2 Note(s) referring to details Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Superelevation Plans Page 1 of 1 30% review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) Note: Superelevation Plan may be included with the Drainage Plan File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Retaining Wall Plans Page 1 of 1 The following items in the area of the retaining wall are shown and properly labeled: Roadways (including centerline and stationing) Walks Paths Other walls Beginning and End of Construction Scale North Arrow ______________________________ ______________________________ ______________________________ ______________________________ File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Retaining Wall Profiles The following items are shown and properly labeled: Page 1 of 2 Top of railing (or Parapet) Top of Retaining Wall Finished Groundline at front face Inplace groundline Top of footing Bottom of footing Any inplace utilities, sewer pipes or culverts which are to remain Any utilities, sewer pipes or culverts that will be installed ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ If not shown in tabulation form, the elevations of the following items should be shown at each wall joint: Top of railing (or Parapet) Top of Wall Finished Groundline at Front Face Top of Footing Bottom of Footing ________________________ ________________________ ________________________ ________________________ ________________________ If not shown in tabulation form, the station of the each joint is shown Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Sheet title at lower right S.P. number with T.H. designation at lower right File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Retaining Wall Profiles Page 2 of 2 Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Retaining Wall Tabs Page 1 of 2 If not shown on the profile, the elevations of the following items should be shown at each joint: Top of Railing (or Parapet) Top of Wall Finished groundline at Front Face Top of Footing Bottom of Footing ________________________ ________________________ ________________________ ________________________ ________________________ Joint Station Joint XY coordinates Panel Height Panel Length Concrete quantity for each panel Reinforcement quantity for each panel All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Retaining Wall Tabulations Page 2 of 2 Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Noise Wall Profiles Page 1 of 2 The following items are shown and properly labeled: Top and Bottom of Noise Wall Ground Elevation at face of wall Inplace Groundlines Depth of Post Embedment Any inplace utilities, sewer pipes or culverts which are to remain Any utilities, sewer pipes or culverts that will be installed ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ Station of each post/joint Elevations along the top of wall Every 10th post numbered Stationing along bottom of profile Even increment elevations on both sides of sheet Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Noise Wall Profiles Page 2 of 2 Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Noise Wall Tabulations Page 1 of 2 Post number and station Ground Elevation Slope Top of Wall Elevation Area Post Length Post Embedment Bottom of Embedment Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Noise Wall Tabulations Page 2 of 2 S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Noise Wall Details Page 1 of 2 Location of wall alignment in relation to the wall is indicated Station range that detail applies to, if not the entire wall Slopes Width of slopes Inplace groundline Limits of excavation Backfill material Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Noise Wall Details Page 2 of 2 Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Drainage Plans Page 1 of 3 The following items are shown and properly labeled: All roadway alignments (including equations) At least two stations for each alignment on each sheet Walls Bridges Paths/Walks Lakes Rivers Environmentally sensitive areas R/W and Easements ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ Beginning and End of Construction Inplace drainage structures, with numbers, and pipes, labeled (only those that won’t be removed) Proposed drainage structures, with numbers, and pipes, labeled Inplace culverts and aprons, numbered and labeled (only those that won’t be removed) ____________________________________________________________ Proposed culverts and aprons, numbered and labeled Ponds with Bottom, Normal Water Line and High Water Line data shown ____________________________________________________________ High and Low Point station and elevation shown ____________________________________________________________ Roadway and shoulder dimensions File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Drainage Plans Page 2 of 3 Direction of surface flow arrows Riprap locations Proposed ditch blocks Note(s) referring to drainage profiles, tabulations and details Scale North Arrow Legend Coordinate grid ticks and labels (minimum of three per sheet) Plan Sheet Location box (on projects with complicated plan sheet layouts) Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Drainage Plan s Page 3 of 3 S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) Note: Superelevation and Erosion Control information may be shown on Drainage Plan sheets File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Drainage Profiles The following items are shown and properly labeled: Elbows Bends Reducers Inplace and Proposed Groundlines Utilities adjacent to structures or pipes ________________________ ________________________ ________________________ ________________________ ________________________ Pipes are labeled with the following information: Page 1 of 1 Type Diameter Length Class (if other than class II) ________________________ ________________________ ________________________ ________________________ The following items are accurate when spot-checked: Structure station and offset Elevation Pipe lengths Grades ________________________ ________________________ ________________________ ________________________ Any inplace structures or pipes are shown dashed Structure numbers Pipe diameters, length and class are consistent between profiles and tabulation File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Drainage Tabulations Page 1 of 2 All information spot-checked All totals checked for accuracy Pipe diameters, length and class are consistent between profiles and tabulation Guide Posts are included at proper locations Sheet totals and notes correctly transferred to any summary tabulations Notes which indicate the location of station and offset for aprons, pipes and structures Note referring to casting assembly key and summary At the lower right, list of points found on this sheet Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Drainage Tabulations Page 2 of 2 Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Water Resources Notes Page 1 of 1 Information agrees with the information provided by the Water Resources section Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Erosion Control Plans Page 1 of 3 The following items are shown and properly labeled: All roadway alignments (including equations) At least two stations for each alignment on each sheet Paths/Walks Walls Bridges Lakes Rivers Environmentally sensitive areas Construction limits R/W and Easements ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ Beginning and End of Construction Inplace drainage structures, with numbers, and pipes, labeled (only those that won’t be removed) Proposed drainage structures, with numbers, and pipes, labeled Inplace culverts and aprons, numbered and labeled (only those that won’t be removed) Proposed culverts and aprons, numbered and labeled Ponds with Bottom, Normal Water Line and High Water Line data shown High and Low Point station and elevation shown ____________________________________________________________ Roadway and shoulder dimensions File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Erosion Control Plans Page 2 of 3 Direction of surface flow arrows Land feature changes Riprap locations Bale checks Silt fence Silt fence note (see Sample Plan) Proposed ditch blocks Note(s) referring to drainage profiles, tabulations and details Scale North Arrow Legend Coordinate grid ticks and labels (minimum of three per sheet) Plan Sheet Location box (on projects with complicated plan sheet layouts) Note(s) referring to details File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Erosion Control Plans Page 3 of 3 Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) Note: Erosion Control information may be shown on Drainage Plan sheets File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Impact Attenuator Plan Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Traffic Barrier Details Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Traffic Control Plans Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Striping Plans Page 1 of 2 Roadways labeled Stationing shown Bypass striping and staged construction striping shown if not included in the Traffic Control Plan Scale North Arrow Legend Patterns in legend match the patterns in the plan ____________________________________________________________ If the plan is a metric plan, the metric symbol is in the upper right corner or along the bottom of the sheet Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Striping Plans Page 2 of 2 Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) Note: Striping plans may not be included with the 60% plan File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Lighting Plans Page 1 of 2 Roadways labeled Stationing shown Bypasses and staged construction shown and labeled, if applicable Check for conflicts between light bases/wiring and drainage structures or utilities Scale North Arrow Legend Patterns in legend match the patterns in the plan ____________________________________________________________ If the plan is a metric plan, the metric symbol is in the upper right corner or along the bottom of the sheet Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Lighting Plans Page 2 of 2 File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) Note: Lighting plans may not be included with the 60% plan File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Signing Plans Page 1 of 2 Roadways labeled Stationing shown Bypasses and staged construction shown and labeled, if applicable Scale North Arrow Legend Patterns in legend match the patterns in the plan ____________________________________________________________ If the plan is a metric plan, the metric symbol is in the upper right corner or along the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Signing Plans Page 2 of 2 S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) Note: Signing plans may not be included with the 60% plan File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN Page 1 of 2 60% Plan Review Checklist: Traffic Management System Plans Roadways labeled Stationing shown Bypasses and staged construction shown and labeled, if applicable Check for conflicts between TMS and drainage structures or utilities Scale North Arrow Legend Patterns in legend match the patterns in the plan ____________________________________________________________ If the plan is a metric plan, the metric symbol is in the upper right corner or along the bottom of the sheet Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Traffic Mgmt. Sys. Plans Page 2 of 2 File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) Note: Traffic Management System plans may not be included with the 60% plan File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Signal Plans Page 1 of 2 Roadways labeled Stationing shown Bypasses and staged construction shown and labeled, if applicable Check for conflicts between signals/wiring and drainage structures or utilities Scale North Arrow Legend Patterns in legend match the patterns in the plan ____________________________________________________________ If the plan is a metric plan, the metric symbol is in the upper right corner or along the bottom of the sheet Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ 60% Plan Review Checklist: Signal Plans Page 2 of 2 File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) Note: Signal plans may not be included with the 60% plan File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Contour Sheets Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN Page 1 of 1 60% Plan Review Checklist: Cross Section Matchline Layout 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc S.P. Number: ________________________________ Consultant Designer:______________________ Checked By:__________________________________ Date:________________________________________ Mn/DOT DESIGN 60% Plan Review Checklist: Cross Sections Page 1 of 1 30% Review comments that were sent to the consultant have been addressed in the 60% plan Other items that may have been changed or added since the 30% review Text reads from the right side of the sheet or from the bottom of the sheet All text is legible and there is no text on top of text or lines going through text Drawn by: and Checked by: Initials included File name, plot name and date of plot at lower left Sheet title at lower right S.P. number with T.H. designation at lower right Comparison with Sample Plan completed Sample Plan Narrative and Checklist reviewed Complies with CADD Data Standards (i.e. level, line style, line weight, text size, cells, etc.) File Path: Mwentwfd056 / mn / PRJ / SQUAD / Documents / PlanCheckList / 60%CheckList.doc
© Copyright 2024 Paperzz